ROADWORKS SUMMARY
Streetway Road, LICHFIELD, WS14 0DN

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Streetway Road, WS14 0DN and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Streetway Road, LICHFIELD, WS14 0DN

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Streetway Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Staffordshire County Council logo
LONG TERM
Until
1 Oct 2025
Details
View Map
Share
Follow
Meg Lane

Staffordshire County Council are carrying out Highway improvement works on Meg Lane, Burntwood.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 May 2024 at 00:00 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Jun 2024 at 15:04.

Staffordshire County Council logo
LONG TERM
Between
30 Oct 2024 and 28 Jan 2025
Details
View Map
Share
Follow
Netherstowe Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Netherstowe Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 28 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 10:20.

Staffordshire County Council logo
LONG TERM
Between
30 Oct 2024 and 28 Jan 2025
Details
View Map
Share
Follow
Netherstowe Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Netherstowe Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 28 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Staffordshire County Council on 8 Aug 2024 at 14:04.

Staffordshire County Council logo
LONG TERM
Between
30 Oct 2024 and 28 Jan 2025
Details
View Map
Share
Netherstowe Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Netherstowe Lane, Lichfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 October 2024 and run through until 28 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Aug 2024 at 08:50.

Staffordshire County Council logo
LONG TERM
Between
30 Nov 2024 and 28 Jan 2025
Details
View Map
Share
Netherstowe Lane

Staffordshire County Council were proposing to carry out Utility asset works on Netherstowe Lane, Lichfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 November 2024 and run through until 28 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Aug 2024 at 08:50.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Walsall Road

Staffordshire County Council are carrying out Highway improvement works on Walsall Road, Little Aston.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 08:47 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Dec 2024 at 14:13.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Wallheath Lane

Cadent Gas are carrying out Utility repair and maintenance works on Wallheath Lane, Stonnall, Walsall.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 December 2024 at 16:04 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Jan 2025 at 09:53.

Cadent Gas logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Worcester Lane

Cadent Gas are proposing to carry out Utility asset works on Worcester Lane, Sutton Coldfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 13:32.

Cadent Gas logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Hillwood Road

Cadent Gas are proposing to carry out Utility asset works on Hillwood Road, Sutton Four Oaks, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 13:27.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Walsall Road

Cadent Gas are carrying out Utility repair and maintenance works on Walsall Road, Pipehill, Lichfield.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 January 2025 at 14:11 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Jan 2025 at 14:29.

Cadent Gas logo
LONG TERM
Between
3 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Lindon Road

Cadent Gas are proposing to carry out Utility asset works on Lindon Road, Brownhills.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 12:41.

Severn Trent Water logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Slade Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Slade Road, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 16 Oct 2024 at 16:28.

Severn Trent Water logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Slade Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Slade Road, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 31 Oct 2024 at 12:50.

Cadent Gas logo
Between
6 and 22 Jan 2025
Details
View Map
Share
Follow
Worcester Lane

Cadent Gas are proposing to carry out Utility asset works on Worcester Lane, Sutton Coldfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 13:13.

Cadent Gas logo
Between
6 and 22 Jan 2025
Details
View Map
Share
Follow
Hillwood Road

Cadent Gas are proposing to carry out Utility asset works on Hillwood Road, Sutton Four Oaks, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 12:39.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Little Aston Road

Cadent Gas are proposing to carry out Utility asset works on Little Aston Road, Aldridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Aug 2024 at 15:53.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Little Aston Road

Cadent Gas are proposing to carry out Utility asset works on Little Aston Road, Aldridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 14:31.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Little Aston Road

Cadent Gas are proposing to carry out Utility asset works on Little Aston Road, Aldridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 16:31.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Little Aston Road

Cadent Gas are proposing to carry out Utility asset works on Little Aston Road, Aldridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 13:47.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Little Hay Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Little Hay Lane, Little Hay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Oct 2024 at 15:17.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Little Hay Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Little Hay Lane, Weeford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Oct 2024 at 15:17.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Mill Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Mill Lane, Stonnall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 19 Dec 2024 at 13:53.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Fighting Cock Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Fighting Cock Lane, Stonnall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 24 Oct 2024 at 10:09.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Thornyhurst Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Thornyhurst Lane, Hilton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 19 Dec 2024 at 14:08.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Hillside Close

Cadent Gas are proposing to carry out Utility asset works on Hillside Close, Brownhills.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 12:47.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Hillside Close

Cadent Gas are proposing to carry out Utility asset works on Hillside Close, Brownhills.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 14:30.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Commonside

Cadent Gas are proposing to carry out Utility asset works on Commonside, Brownhills.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 12:55.

Cadent Gas logo
Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
Commonside

Cadent Gas are proposing to carry out Utility asset works on Commonside, Brownhills.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 15:02.

Cadent Gas logo
LONG TERM
Between
6 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Lindon Road

Cadent Gas are proposing to carry out Utility asset works on Lindon Road, Brownhills.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 14:40.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Wall Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Wall Lane, Wall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 10:56.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Fisherwick Road

Staffordshire County Council are proposing to carry out Highway improvement works on Fisherwick Road, Whittington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 7 Oct 2024 at 10:22.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Brantwood Avenue

Staffordshire County Council are proposing to carry out Highway improvement works on Brantwood Avenue, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 10:58.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Meadway Street

Staffordshire County Council are proposing to carry out Highway improvement works on Meadway Street, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 10:58.

Staffordshire County Council logo
Between
6 and 14 Jan 2025
Details
View Map
Share
Follow
Sandford Street

Staffordshire County Council are proposing to carry out Highway improvement works on Sandford Street, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Dec 2024 at 11:52.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Broad Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Broad Lane, Huddlesford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Oct 2024 at 09:16.

Staffordshire County Council logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Fecknam Way

Staffordshire County Council are proposing to carry out Highway improvement works on Fecknam Way, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Oct 2024 at 10:07.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Broad Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Broad Lane, Whittington Hurst, Lichfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Oct 2024 at 11:01.

Staffordshire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Ponesfield Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ponesfield Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Oct 2024 at 09:54.

Electricity Network Company logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
A38 From J A513 To J B5016 Ne

Electricity Network Company were proposing to carry out New service connection on A38 From J A513 To J B5016 Ne, Lichfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 14 February 2025. The works were due to impact the verge only.

This roadwork event was last updated by Electricity Network Company on 29 Oct 2024 at 13:17.

Staffordshire County Council logo
LONG TERM
Between
6 Jan and 2 Apr 2025
Details
View Map
Share
Follow
Watery Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Watery Lane, Curborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Nov 2024 at 16:30.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Brookhay Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Brookhay Lane, Hilliards Cross.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Oct 2024 at 10:48.

Staffordshire County Council logo
LONG TERM
Between
6 Jan and 8 Oct 2025
Details
View Map
Share
Watery Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Watery Lane, Curborough.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Oct 2024 at 13:33.

Staffordshire County Council logo
LONG TERM
Between
6 Jan and 1 Oct 2025
Details
View Map
Share
Follow
Watery Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Watery Lane, Lichfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 16:30.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
Roman Road

BT are proposing to carry out Utility asset works on Roman Road, Little Aston.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 29 Nov 2024 at 09:43.

South Staffordshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Coppice Lane

South Staffordshire Water are proposing to carry out New service connection on Coppice Lane, Middleton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South Staffordshire Water on 4 Oct 2024 at 09:22.

South Staffordshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Coppice Lane

South Staffordshire Water are proposing to carry out New service connection on Coppice Lane, Middleton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South Staffordshire Water on 22 Oct 2024 at 12:01.

South Staffordshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Coppice Lane

South Staffordshire Water are proposing to carry out New service connection on Coppice Lane, Middleton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South Staffordshire Water on 20 Dec 2024 at 12:22.

Cadent Gas logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Green Lane

Cadent Gas are proposing to carry out Utility asset works on Green Lane, Aldridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Aug 2024 at 16:12.

Cadent Gas logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Green Lane

Cadent Gas are proposing to carry out Utility asset works on Green Lane, Aldridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 15:06.

Cadent Gas logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Green Lane

Cadent Gas are proposing to carry out Utility asset works on Green Lane, Aldridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 15:58.

Cadent Gas logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Gould Firm Lane

Cadent Gas are proposing to carry out Utility asset works on Gould Firm Lane, Aldridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jan 2025 at 15:23.

Staffordshire County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Plantation Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Plantation Lane, Hopwas.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 21 Oct 2024 at 09:48.

Cadent Gas logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Brownhills Road

Cadent Gas were proposing to carry out Utility asset works on Brownhills Road, Walsall Wood.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 16:21.

Cadent Gas logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Occupation Road

Cadent Gas were proposing to carry out Utility asset works on Occupation Road, Brownhills.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 16:14.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Borman

Staffordshire County Council are proposing to carry out Highway improvement works on Borman, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Oct 2024 at 09:49.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Marsh Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Marsh Lane, Darnford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 7 Oct 2024 at 16:15.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Marsh Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Marsh Lane, Darnford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 12 Nov 2024 at 09:13.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Chase Road

Staffordshire County Council are proposing to carry out Highway improvement works on Chase Road, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 10:27.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Ivanhoe Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ivanhoe Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Oct 2024 at 16:12.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Sycamore Road

Staffordshire County Council are proposing to carry out Highway improvement works on Sycamore Road, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Oct 2024 at 16:44.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
St John Street

Staffordshire County Council are proposing to carry out Highway improvement works on St John Street, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 12:54.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Stowe Street

Staffordshire County Council are proposing to carry out Highway improvement works on Stowe Street, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 11:35.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Abnalls Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Abnalls Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 13:45.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Brownsfield Road

Staffordshire County Council are proposing to carry out Highway improvement works on Brownsfield Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 11:49.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Spring Road

Staffordshire County Council are proposing to carry out Highway improvement works on Spring Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 13:32.

Staffordshire County Council logo
Between
13 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Wood End Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Wood End Lane, Hilliards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 09:09.

Staffordshire County Council logo
Between
13 Jan and 10 Feb 2025
Details
View Map
Share
Wood End Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Wood End Lane, Wood End.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 10 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 15:23.

South Staffordshire Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Ashcroft Lane

South Staffordshire Water are proposing to carry out Remedial works on Ashcroft Lane, Shenstone, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 8 Oct 2024 at 11:40.

Staffordshire County Council logo
Between
15 and 24 Jan 2025
Details
View Map
Share
Follow
Bird Street

Staffordshire County Council are proposing to carry out Highway improvement works on Bird Street, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Dec 2024 at 11:52.

Walsall Metropolitan Borough Council logo
Between
17 and 21 Jan 2025
Details
View Map
Share
Follow
Ollison Drive

Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Ollison Drive, Streetly.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 23 Dec 2024 at 13:15.

Cadent Gas logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Marklew Close

Cadent Gas are proposing to carry out Utility asset works on Marklew Close, Brownhills.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 17:03.

Cadent Gas logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Pauls Coppice

Cadent Gas are proposing to carry out Utility asset works on Pauls Coppice, Brownhills.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 17:02.

Cadent Gas logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Pauls Coppice

Cadent Gas are proposing to carry out Utility asset works on Pauls Coppice, Brownhills.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 11:19.

Cadent Gas logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Pauls Coppice

Cadent Gas are proposing to carry out Utility asset works on Pauls Coppice, Brownhills.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jan 2025 at 08:11.

Cadent Gas logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Wrekin View

Cadent Gas are proposing to carry out Utility asset works on Wrekin View, Brownhills.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 16:03.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Cappers Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Cappers Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 6 Dec 2024 at 11:39.

South Staffordshire Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Market Street

South Staffordshire Water were proposing to carry out New service connection on Market Street, Lichfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 28 Oct 2024 at 11:54.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Hobstone Hill Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Hobstone Hill Lane, Chorley, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 6 Dec 2024 at 15:30.

Staffordshire County Council logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Blake Street

Staffordshire County Council are proposing to carry out Highway improvement works on Blake Street, Little Aston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Oct 2024 at 14:27.

Staffordshire County Council logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Blake Street

Staffordshire County Council are proposing to carry out Highway improvement works on Blake Street, Little Aston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 14:42.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
St Marks Road

Cadent Gas are proposing to carry out Utility asset works on St Marks Road, Brownhills.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 13:39.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Marklew Close

Cadent Gas are proposing to carry out Utility asset works on Marklew Close, Brownhills.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 13:41.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Wrekin View

Cadent Gas were proposing to carry out Utility asset works on Wrekin View, Brownhills.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 09:57.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Mariner

Staffordshire County Council are proposing to carry out Highway improvement works on Mariner, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Nov 2024 at 13:27.

South Staffordshire Water logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Quarry Hills Lane

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Quarry Hills Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South Staffordshire Water on 10 Oct 2024 at 10:07.

Severn Trent Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Sturgeons Hill

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Sturgeons Hill, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Nov 2024 at 16:30.

Severn Trent Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Sturgeons Hill

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Sturgeons Hill, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 16 Dec 2024 at 09:03.

South Staffordshire Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Wade Street

South Staffordshire Water were proposing to carry out New service connection on Wade Street, Lichfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 24 Oct 2024 at 10:12.

Staffordshire County Council logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Tamworth Street

Staffordshire County Council are proposing to carry out Highway improvement works on Tamworth Street, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Dec 2024 at 11:52.

Cadent Gas logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Chester Road

Cadent Gas are proposing to carry out Utility asset works on Chester Road, Aldridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Aug 2024 at 15:55.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Little Hay Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Little Hay Lane, Little Hay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Oct 2024 at 14:23.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Little Hay Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Little Hay Lane, Weeford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Oct 2024 at 14:23.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Pauls Coppice

Cadent Gas are proposing to carry out Utility asset works on Pauls Coppice, Brownhills.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 15:11.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Robson Close

Cadent Gas were proposing to carry out Utility asset works on Robson Close, Brownhills.

These works were categorised as Major.

The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway, verge and footpath.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 09:06.

Staffordshire County Council logo
LONG TERM
Between
3 Feb and 16 May 2025
Details
View Map
Share
Follow
Friary Road

Staffordshire County Council are proposing to carry out Highway improvement works on Friary Road, Lichfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 18 Dec 2024 at 11:52.

Staffordshire County Council logo
LONG TERM
Between
3 Feb and 21 Mar 2025
Details
View Map
Share
Friary Road

Staffordshire County Council were proposing to carry out Highway improvement works on Friary Road, Lichfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 12 Nov 2024 at 15:11.

Staffordshire County Council logo
LONG TERM
Between
3 Feb and 16 May 2025
Details
View Map
Share
Follow
Friary Island

Staffordshire County Council are proposing to carry out Highway improvement works on Friary Island, Lichfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 18 Dec 2024 at 11:52.

Cadent Gas logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Cedar Road

Cadent Gas are proposing to carry out New service connection on Cedar Road, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 11:31.

Staffordshire County Council logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Cappers Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Cappers Lane, Lichfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 12 Nov 2024 at 15:11.

Walsall Metropolitan Borough Council logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Ollison Drive

Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Ollison Drive, Streetly.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 9 Dec 2024 at 17:54.

Walsall Metropolitan Borough Council logo
Between
6 and 26 Feb 2025
Details
View Map
Share
Follow
Lichfield Road

Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Lichfield Road, Sandhills.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 9 Dec 2024 at 17:58.

South Staffordshire Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Lichfield Road

South Staffordshire Water are proposing to carry out New service connection on Lichfield Road, Sutton Four Oaks, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 9 Dec 2024 at 12:55.

Western Power Distribution (West Midlands) logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Streetly Crescent

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Streetly Crescent, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 4 Dec 2024 at 13:29.

Western Power Distribution (West Midlands) logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Streetly Crescent

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Streetly Crescent, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 10 Dec 2024 at 12:36.

Cadent Gas logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Chester Road

Cadent Gas are proposing to carry out Utility asset works on Chester Road, Aldridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 16:30.

Cadent Gas logo
Between
10 and 23 Feb 2025
Details
View Map
Share
Follow
Chester Road

Cadent Gas are proposing to carry out Utility asset works on Chester Road, Aldridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 11:10.

Cadent Gas logo
Between
10 and 17 Feb 2025
Details
View Map
Share
Gould Firm Lane

Cadent Gas were proposing to carry out Utility asset works on Gould Firm Lane, Aldridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 17 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 10:36.

Cadent Gas logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Pinfold Hill

Cadent Gas are proposing to carry out New service connection on Pinfold Hill, Shenstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 09:59.

South Staffordshire Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Back Lane

South Staffordshire Water are proposing to carry out New service connection on Back Lane, Whittington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 11 Dec 2024 at 11:24.

Staffordshire County Council logo
LONG TERM
Between
10 Feb and 23 May 2025
Details
View Map
Share
Follow
Friary Road

Staffordshire County Council are proposing to carry out Highway improvement works on Friary Road, Lichfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 5 Dec 2024 at 15:58.

Staffordshire County Council logo
LONG TERM
Between
10 Feb and 23 May 2025
Details
View Map
Share
Follow
Friary Island

Staffordshire County Council are proposing to carry out Highway improvement works on Friary Island, Lichfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 5 Dec 2024 at 15:45.

South Staffordshire Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Four Oaks Road

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Four Oaks Road, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 6 Dec 2024 at 14:36.

Western Power Distribution (West Midlands) logo
Between
14 and 28 Feb 2025
Details
View Map
Share
Follow
Park View Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Park View Road, Sutton Four Oaks, Sutton Coldfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 4 Dec 2024 at 13:25.

Western Power Distribution (West Midlands) logo
Between
14 and 28 Feb 2025
Details
View Map
Share
Follow
Park View Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Park View Road, Sutton Four Oaks, Sutton Coldfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 3 Jan 2025 at 13:10.

National Highways logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
A38 Weeford To Bassetts Pole

National Highways are proposing to carry out Highway repair and maintenance works on A38 Weeford To Bassetts Pole, Weeford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 4 Dec 2024 at 11:28.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Mariner

Staffordshire County Council are proposing to carry out Highway improvement works on Mariner, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 09:48.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Willow Avenue

Staffordshire County Council are proposing to carry out Highway improvement works on Willow Avenue, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 11:51.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Borrowcop Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Borrowcop Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 11:36.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Chase Road

Staffordshire County Council are proposing to carry out Highway improvement works on Chase Road, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 13:33.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Quarry Hills Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Quarry Hills Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 10:37.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Gorse Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Gorse Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 11:07.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Chapel Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Chapel Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 10:37.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Ivanhoe Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ivanhoe Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Nov 2024 at 10:24.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Tudor Road

Staffordshire County Council are proposing to carry out Highway improvement works on Tudor Road, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 11:36.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Sycamore Road

Staffordshire County Council are proposing to carry out Highway improvement works on Sycamore Road, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 13:33.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Broad Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Broad Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 10:37.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Cherry Orchard

Staffordshire County Council are proposing to carry out Highway improvement works on Cherry Orchard, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 11:36.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Cappers Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Cappers Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 10:28.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Fisherwick Road

Staffordshire County Council are proposing to carry out Highway improvement works on Fisherwick Road, Fisherwick, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 13:11.

South Staffordshire Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Wissage Lane

South Staffordshire Water are proposing to carry out New service connection on Wissage Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 14 Oct 2024 at 09:44.

South Staffordshire Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Scotch Orchard

South Staffordshire Water are proposing to carry out New service connection on Scotch Orchard, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 14 Oct 2024 at 09:44.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Gilbert Road

Staffordshire County Council are proposing to carry out Highway improvement works on Gilbert Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Nov 2024 at 11:58.

Walsall Metropolitan Borough Council logo
Between
19 and 24 Feb 2025
Details
View Map
Share
Follow
Brickyard Road

Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Brickyard Road, Aldridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 9 Dec 2024 at 18:05.

Walsall Metropolitan Borough Council logo
Between
19 and 24 Feb 2025
Details
View Map
Share
Follow
Brickyard Road

Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Brickyard Road, Aldridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 23 Dec 2024 at 13:06.

Walsall Metropolitan Borough Council logo
Between
19 and 25 Feb 2025
Details
View Map
Share
Follow
Northgate Way

Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Northgate Way, Aldridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 9 Dec 2024 at 18:02.

Walsall Metropolitan Borough Council logo
Between
19 and 25 Feb 2025
Details
View Map
Share
Follow
Northgate Way

Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Northgate Way, Aldridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 23 Dec 2024 at 13:05.

Vodafone logo
Between
20 and 27 Feb 2025
Details
View Map
Share
Follow
A38 From J A5127 To J A513 Ne

Vodafone are proposing to carry out Statutory Infrastructure Works on A38 From J A5127 To J A513 Ne, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Vodafone on 26 Dec 2024 at 16:30.

Network Rail logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Ivanhoe Road

Network Rail are proposing to carry out Works for Rail Purposes on Ivanhoe Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 28 Nov 2024 at 08:50.

Cadent Gas logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Cedar Road

Cadent Gas are proposing to carry out New service connection on Cedar Road, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 08:23.

Staffordshire County Council logo
LONG TERM
Between
25 Feb 2025 and 25 Feb 2026
Details
View Map
Share
Follow
Church Road

Staffordshire County Council are proposing to carry out Highway improvement works on Church Road, Stonnall, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 25 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 12 Nov 2024 at 08:47.

Cadent Gas logo
Between
26 Feb and 18 Mar 2025
Details
View Map
Share
Follow
Gould Firm Lane

Cadent Gas are proposing to carry out Utility asset works on Gould Firm Lane, Aldridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Dec 2024 at 16:45.

Severn Trent Water logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Coulter Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Coulter Lane, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 9 Dec 2024 at 11:05.

Severn Trent Water logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Coulter Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Coulter Lane, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 9 Dec 2024 at 17:42.

Staffordshire County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Gilbert Road

Staffordshire County Council are proposing to carry out Highway improvement works on Gilbert Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Dec 2024 at 09:44.

BT logo
Between
6 and 7 Mar 2025
Details
View Map
Share
Roman Road

BT were proposing to carry out Utility asset works on Roman Road, Little Aston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 March 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 17 Dec 2024 at 07:54.

BT logo
Between
7 and 10 Mar 2025
Details
View Map
Share
Follow
Pouk Lane

BT are proposing to carry out Utility repair and maintenance works on Pouk Lane, Hilton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 10 March 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 11 Dec 2024 at 10:39.

Cadent Gas logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Pinfold Hill

Cadent Gas are proposing to carry out New service connection on Pinfold Hill, Shenstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jan 2025 at 08:51.

Cadent Gas logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Pinfold Hill

Cadent Gas are proposing to carry out New service connection on Pinfold Hill, Shenstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jan 2025 at 09:30.

Staffordshire County Council logo
Between
12 and 21 Mar 2025
Details
View Map
Share
Follow
Bird Street

Staffordshire County Council are proposing to carry out Highway improvement works on Bird Street, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 12 Dec 2024 at 09:13.

Staffordshire County Council logo
Between
17 and 25 Mar 2025
Details
View Map
Share
Follow
Sandford Street

Staffordshire County Council are proposing to carry out Highway improvement works on Sandford Street, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 25 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Dec 2024 at 13:59.

Cadent Gas logo
Between
17 Mar and 6 Apr 2025
Details
View Map
Share
Follow
Valley Lane

Cadent Gas are proposing to carry out Utility asset works on Valley Lane, Lichfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 11:33.

Staffordshire County Council logo
Between
21 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Cappers Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Cappers Lane, Lichfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 25 Nov 2024 at 11:55.

Staffordshire County Council logo
Between
21 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Cappers Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Cappers Lane, Lichfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 23 Dec 2024 at 11:46.

Staffordshire County Council logo
Between
21 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Europa Way

Staffordshire County Council are proposing to carry out Highway improvement works on Europa Way, Lichfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 25 Nov 2024 at 12:04.

Staffordshire County Council logo
Between
21 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Europa Way

Staffordshire County Council are proposing to carry out Highway improvement works on Europa Way, Lichfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 23 Dec 2024 at 11:46.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Mill Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Mill Lane, Stonnall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Dec 2024 at 14:15.

Western Power Distribution (West Midlands) logo
Between
24 Mar and 1 Apr 2025
Details
View Map
Share
Follow
Church Road

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Church Road, Shenstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 1 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 23 Dec 2024 at 15:34.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Thornyhurst Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Thornyhurst Lane, Hilton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Dec 2024 at 13:45.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Tamworth Road

Staffordshire County Council are proposing to carry out Highway improvement works on Tamworth Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 19 Dec 2024 at 14:37.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Willow Avenue

Staffordshire County Council are proposing to carry out Highway improvement works on Willow Avenue, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 08:12.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Borrowcop Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Borrowcop Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 09:40.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Quarry Hills Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Quarry Hills Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 09:11.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Gorse Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Gorse Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 08:41.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Chapel Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Chapel Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 08:25.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Tudor Road

Staffordshire County Council are proposing to carry out Highway improvement works on Tudor Road, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 08:12.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Broad Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Broad Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 08:25.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Cherry Orchard

Staffordshire County Council are proposing to carry out Highway improvement works on Cherry Orchard, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 09:40.

Staffordshire County Council logo
Between
24 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Tamworth Street

Staffordshire County Council are proposing to carry out Highway improvement works on Tamworth Street, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 12 Dec 2024 at 09:56.

South Staffordshire Water logo
Between
25 and 27 Mar 2025
Details
View Map
Share
Follow
Four Oaks Road

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Four Oaks Road, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 27 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 23 Dec 2024 at 11:38.

Staffordshire County Council logo
Between
31 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Mill Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Mill Lane, Mill Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Dec 2024 at 08:23.


Roadworks Map near to Streetway Road, LICHFIELD, WS14 0DN

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 6 Jan 2025 02:26
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Streetway Road, LICHFIELD, WS14 0DN (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.