ROADWORKS SUMMARY
Alton Grove, CANNOCK, WS11 1NW

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Alton Grove, WS11 1NW and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Alton Grove, CANNOCK, WS11 1NW

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Alton Grove are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Walsall Metropolitan Borough Council logo
LONG TERM
Between
18 Nov 2024 and 19 Sep 2025
Details
View Map
Share
Follow
Norton Road

Walsall Metropolitan Borough Council are proposing to carry out Highway improvement works on Norton Road, Pelsall.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 28 Nov 2024 at 15:52.

Walsall Metropolitan Borough Council logo
LONG TERM
Until
19 Sep 2025
Details
View Map
Share
Follow
Norton Road

Walsall Metropolitan Borough Council are carrying out Highway improvement works on Norton Road, Pelsall.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 07:00 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 30 Jan 2025 at 13:11.

Staffordshire County Council logo
LONG TERM
Between
2 Dec 2024 and 6 Jun 2025
Details
View Map
Share
Follow
Gravelly Way

Staffordshire County Council are proposing to carry out Highway improvement works on Gravelly Way, Four Ashes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 14:28.

Staffordshire County Council logo
LONG TERM
Between
2 Dec 2024 and 6 Jun 2025
Details
View Map
Share
Follow
Gravelly Way

Staffordshire County Council are proposing to carry out Highway improvement works on Gravelly Way, Four Ashes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Staffordshire County Council on 22 Oct 2024 at 14:22.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
6 Jan and 15 Mar 2025
Details
View Map
Share
Follow
Broadhurst Green

Western Power Distribution (West Midlands) are proposing to carry out Utility repair and maintenance works on Broadhurst Green, Pye Green, Cannock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 29 Aug 2024 at 16:19.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
6 Jan and 15 Mar 2025
Details
View Map
Share
Follow
Broadhurst Green

Western Power Distribution (West Midlands) are proposing to carry out Utility repair and maintenance works on Broadhurst Green, Pye Green, Cannock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 21 Oct 2024 at 14:56.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
6 Jan and 15 Mar 2025
Details
View Map
Share
Follow
Broadhurst Green Service Road

Western Power Distribution (West Midlands) are proposing to carry out Utility repair and maintenance works on Broadhurst Green Service Road, Cannock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 29 Aug 2024 at 16:19.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
6 Jan and 15 Mar 2025
Details
View Map
Share
Follow
Broadhurst Green Service Road

Western Power Distribution (West Midlands) are proposing to carry out Utility repair and maintenance works on Broadhurst Green Service Road, Cannock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 21 Oct 2024 at 15:23.

Cadent Gas logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
High Hill

Cadent Gas are proposing to carry out Utility asset works on High Hill, Essington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 15:15.

Cadent Gas logo
LONG TERM
Between
15 Jan and 31 Dec 2025
Details
View Map
Share
Upper Sneyd Road

Cadent Gas were proposing to carry out Utility asset works on Upper Sneyd Road, Essington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 January 2025 and run through until 31 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 15:10.

Cadent Gas logo
LONG TERM
Between
31 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Chorley Road

Cadent Gas are proposing to carry out Utility asset works on Chorley Road, Burntwood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 14:18.

Staffordshire County Council logo
LONG TERM
Between
3 Feb and 30 Mar 2025
Details
View Map
Share
Follow
Clarion Way

Staffordshire County Council are proposing to carry out Highway improvement works on Clarion Way, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Jan 2025 at 13:11.

Staffordshire County Council logo
LONG TERM
Until
14 May 2025
Details
View Map
Share
Follow
Gains Lane

Staffordshire County Council are carrying out Highway improvement works on Gains Lane, Cannock.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 10:42 and could run through until 14 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Feb 2025 at 10:58.

Staffordshire County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Lyne Hill Lane

Staffordshire County Council are carrying out Highway improvement works on Lyne Hill Lane, Penkridge.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 February 2025 at 14:43 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Feb 2025 at 15:58.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Fountains Way

Cadent Gas are carrying out New service connection on Fountains Way, Bloxwich.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 February 2025 at 13:01 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Feb 2025 at 13:01.

South Staffordshire Water logo
Finishing
Friday
Details
View Map
Share
Fountains Road

South Staffordshire Water were proposing to carry out New service connection on Fountains Road, Bloxwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 28 Feb 2025 at 09:13.

South Staffordshire Water logo
Finishing
Friday
Details
View Map
Share
Selby Way

South Staffordshire Water were proposing to carry out New service connection on Selby Way, Bloxwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 28 Feb 2025 at 09:13.

Cadent Gas logo
Until
12 Mar 2025
Details
View Map
Share
Follow
Selby Way

Cadent Gas are carrying out New service connection on Selby Way, Bloxwich.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 February 2025 at 08:19 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 08:20.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Church Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Church Road, Cannock.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 28 Jan 2025 at 21:14.

Cadent Gas logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Union Street

Cadent Gas are proposing to carry out Utility asset works on Union Street, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 14:49.

Cadent Gas logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Union Street

Cadent Gas are carrying out Utility asset works on Union Street, Cannock.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 08:00 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Feb 2025 at 09:29.

Western Power Distribution (West Midlands) logo
Between
27 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Cromwell Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Cromwell Road, Wolverhampton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 5 Dec 2024 at 11:53.

Western Power Distribution (West Midlands) logo
Between
27 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Cromwell Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Cromwell Road, Wolverhampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 14 Feb 2025 at 14:19.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Wolverhampton Road

Cadent Gas are carrying out Utility repair and maintenance works on Wolverhampton Road, Dunston.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 February 2025 at 09:54 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 12:26.

Staffordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Water Eaton Lane

Staffordshire County Council are carrying out Highway improvement works on Water Eaton Lane, Water Eaton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 February 2025 at 15:31 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Feb 2025 at 16:43.

Cadent Gas logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Park Street

Cadent Gas were proposing to carry out Utility asset works on Park Street, Cannock.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Dec 2024 at 14:16.

Western Power Distribution (West Midlands) logo
Between
3 and 31 Mar 2025
Details
View Map
Share
Follow
Norton East Road

Western Power Distribution (West Midlands) are proposing to carry out Remedial works on Norton East Road, Cannock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 20 Dec 2024 at 14:13.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Hawks Green Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Hawks Green Lane, Hawks Green, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Jan 2025 at 10:08.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Walnut Drive

Staffordshire County Council are proposing to carry out Highway improvement works on Walnut Drive, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Jan 2025 at 14:52.

Severn Trent Water logo
Between
3 and 11 Mar 2025
Details
View Map
Share
Follow
Burgoyne Street

Severn Trent Water are proposing to carry out Remedial works on Burgoyne Street, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Dec 2024 at 11:07.

Severn Trent Water logo
Between
3 and 11 Mar 2025
Details
View Map
Share
Follow
Burgoyne Street

Severn Trent Water are proposing to carry out Remedial works on Burgoyne Street, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 2 Jan 2025 at 11:11.

Severn Trent Water logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Hill Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hill Street, Essington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 2 Jan 2025 at 12:13.

Severn Trent Water logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Hill Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hill Street, Essington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 20 Jan 2025 at 17:05.

Staffordshire County Council logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Cannock Wood Road

Staffordshire County Council are proposing to carry out Highway improvement works on Cannock Wood Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Jan 2025 at 08:50.

Staffordshire County Council logo
LONG TERM
Between
10 Mar and 11 May 2025
Details
View Map
Share
Follow
Clarion Way

Staffordshire County Council are proposing to carry out Highway improvement works on Clarion Way, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 11 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 6 Jan 2025 at 15:23.

Cadent Gas logo
LONG TERM
Between
10 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Thornhill Road

Cadent Gas are proposing to carry out Utility asset works on Thornhill Road, Cannock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 16:30.

Cadent Gas logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Pye Green Road

Cadent Gas are proposing to carry out Utility asset works on Pye Green Road, Cannock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 13:52.

Cadent Gas logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Pye Green Road

Cadent Gas are proposing to carry out Utility asset works on Pye Green Road, Cannock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 16:30.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Brewood Road

Staffordshire County Council are proposing to carry out Highway improvement works on Brewood Road, Coven.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Dec 2024 at 15:56.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Washbrook Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Washbrook Lane, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Dec 2024 at 09:54.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Burntwood Road

Staffordshire County Council are proposing to carry out Highway improvement works on Burntwood Road, Norton Canes, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 15:22.

Cadent Gas logo
Between
17 and 20 Mar 2025
Details
View Map
Share
Follow
North Street

Cadent Gas are proposing to carry out New service connection on North Street, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jan 2025 at 13:33.

Cadent Gas logo
Between
17 and 20 Mar 2025
Details
View Map
Share
Follow
North Street

Cadent Gas are proposing to carry out New service connection on North Street, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jan 2025 at 10:39.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Poplar Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Poplar Lane, Hatherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Dec 2024 at 11:40.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Poplar Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Poplar Lane, Hatherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Jan 2025 at 11:54.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Ironstone Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ironstone Road, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Jan 2025 at 11:52.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Congreve Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Congreve Lane, Stretton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Dec 2024 at 14:19.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Cannock Road

Staffordshire County Council were proposing to carry out Highway improvement works on Cannock Road, Chadsmoor, Cannock.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Dec 2024 at 13:34.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Cecil Street

Staffordshire County Council are proposing to carry out Highway improvement works on Cecil Street, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 12 Feb 2025 at 12:15.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Cannock Wood Road

Staffordshire County Council are proposing to carry out Highway improvement works on Cannock Wood Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Nov 2024 at 11:18.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Whittamoor Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Whittamoor Lane, Longridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Dec 2024 at 08:08.

Western Power Distribution (West Midlands) logo
Between
19 Mar and 10 Apr 2025
Details
View Map
Share
Follow
Cromwell Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Cromwell Road, Wolverhampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 10 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 26 Feb 2025 at 08:50.

South Staffordshire Water logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Follow
Washbrook Lane

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Washbrook Lane, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the verge only.

This roadwork event was last updated by South Staffordshire Water on 9 Jan 2025 at 13:44.

Cadent Gas logo
Between
24 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Church Street

Cadent Gas are proposing to carry out Utility asset works on Church Street, Bridgtown, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 09:40.

Cadent Gas logo
Between
24 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Church Street

Cadent Gas are proposing to carry out Utility asset works on Church Street, Bridgtown, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 10:48.

Cadent Gas logo
Between
24 Mar and 11 Apr 2025
Details
View Map
Share
Follow
New Street

Cadent Gas are proposing to carry out Utility asset works on New Street, Bridgtown, Cannock.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Dec 2024 at 11:19.

Cadent Gas logo
Between
24 Mar and 11 Apr 2025
Details
View Map
Share
Follow
New Street

Cadent Gas are proposing to carry out Utility asset works on New Street, Bridgtown, Cannock.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jan 2025 at 11:11.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Holly Grove Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Holly Grove Lane, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 09:40.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Langholm Drive

Staffordshire County Council are proposing to carry out Highway improvement works on Langholm Drive, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Nov 2024 at 11:46.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Sevens Road

Staffordshire County Council are proposing to carry out Highway improvement works on Sevens Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 09:25.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Cannock Road

Staffordshire County Council are proposing to carry out Highway improvement works on Cannock Road, Chadsmoor, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Dec 2024 at 12:43.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Johnson Road

Staffordshire County Council are proposing to carry out Highway improvement works on Johnson Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Jan 2025 at 09:07.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Milton Road

Staffordshire County Council are proposing to carry out Highway improvement works on Milton Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Jan 2025 at 09:07.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
St Aidans Road

Staffordshire County Council are proposing to carry out Highway improvement works on St Aidans Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Jan 2025 at 09:07.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Grasmere Place

Staffordshire County Council are proposing to carry out Highway improvement works on Grasmere Place, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Jan 2025 at 09:07.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Burgoyne Street

Staffordshire County Council are proposing to carry out Highway improvement works on Burgoyne Street, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Jan 2025 at 12:38.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Moorland Road

Staffordshire County Council are proposing to carry out Highway improvement works on Moorland Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Jan 2025 at 12:38.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Teddesley Road

Staffordshire County Council are proposing to carry out Highway improvement works on Teddesley Road, Acton Trussell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Jan 2025 at 10:55.

Cadent Gas logo
Between
26 Mar and 23 Apr 2025
Details
View Map
Share
Follow
Badgers Way

Cadent Gas are proposing to carry out Utility asset works on Badgers Way, Cannock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 23 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Feb 2025 at 16:30.

Staffordshire County Council logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Moseley Road

Staffordshire County Council are proposing to carry out Highway improvement works on Moseley Road, Featherstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Feb 2025 at 12:26.

Staffordshire County Council logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Tennscore Avenue

Staffordshire County Council are proposing to carry out Highway improvement works on Tennscore Avenue, Cheslyn Hay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Feb 2025 at 10:44.

Staffordshire County Council logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Sutherland Road

Staffordshire County Council are proposing to carry out Highway improvement works on Sutherland Road, Cheslyn Hay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 21 Feb 2025 at 11:07.

Staffordshire County Council logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Glenthorne Drive

Staffordshire County Council are proposing to carry out Highway improvement works on Glenthorne Drive, Cheslyn Hay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 21 Feb 2025 at 11:07.

Cadent Gas logo
Between
31 Mar and 22 Apr 2025
Details
View Map
Share
Follow
Park Street

Cadent Gas are proposing to carry out Utility asset works on Park Street, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 11:17.

Cadent Gas logo
Between
31 Mar and 22 Apr 2025
Details
View Map
Share
Follow
Park Street

Cadent Gas are proposing to carry out Utility asset works on Park Street, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 14:11.

Staffordshire County Council logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Cannock Road

Staffordshire County Council were proposing to carry out Highway improvement works on Cannock Road, Chadsmoor, Cannock.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 4 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Feb 2025 at 10:39.

Staffordshire County Council logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
East Road

Staffordshire County Council are proposing to carry out Highway improvement works on East Road, Featherstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Jan 2025 at 10:29.

Staffordshire County Council logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Ivy House Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Ivy House Lane, Brewood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Feb 2025 at 11:21.

Staffordshire County Council logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Ivy House Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Ivy House Lane, Brewood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Feb 2025 at 14:11.

Staffordshire County Council logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Hawks Green Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Hawks Green Lane, Hawks Green, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Jan 2025 at 13:39.

Staffordshire County Council logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Lansbury Drive

Staffordshire County Council are proposing to carry out Highway improvement works on Lansbury Drive, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Jan 2025 at 12:53.

Staffordshire County Council logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Florence Street

Staffordshire County Council are proposing to carry out Highway improvement works on Florence Street, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Jan 2025 at 13:10.

Staffordshire County Council logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Abbey Street

Staffordshire County Council are proposing to carry out Highway improvement works on Abbey Street, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Jan 2025 at 13:10.

Staffordshire County Council logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Bungham Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Bungham Lane, Penkridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Jan 2025 at 10:44.

Staffordshire County Council logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Levedale Road

Staffordshire County Council are proposing to carry out Highway improvement works on Levedale Road, Longridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Feb 2025 at 08:25.

Staffordshire County Council logo
Between
10 Apr and 1 May 2025
Details
View Map
Share
Follow
Pinfold Lane

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Pinfold Lane, Congreve.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Feb 2025 at 13:43.

Staffordshire County Council logo
Between
10 and 27 Apr 2025
Details
View Map
Share
Follow
Wiscombe Avenue

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Wiscombe Avenue, Penkridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Feb 2025 at 13:57.

Staffordshire County Council logo
Between
10 and 27 Apr 2025
Details
View Map
Share
Follow
Cherrybrook Drive

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Cherrybrook Drive, Penkridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Feb 2025 at 14:12.

Staffordshire County Council logo
Between
10 and 27 Apr 2025
Details
View Map
Share
Follow
Marsh Lane

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Marsh Lane, Penkridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Feb 2025 at 11:56.

Staffordshire County Council logo
Between
10 and 27 Apr 2025
Details
View Map
Share
Follow
Haling Road

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Haling Road, Penkridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Feb 2025 at 11:40.

Staffordshire County Council logo
Between
10 and 27 Apr 2025
Details
View Map
Share
Follow
Leacroft Road

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Leacroft Road, Penkridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Feb 2025 at 11:20.

Staffordshire County Council logo
Between
10 and 27 Apr 2025
Details
View Map
Share
Follow
Frederick Road

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Frederick Road, Penkridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Feb 2025 at 15:41.

Staffordshire County Council logo
Between
10 and 27 Apr 2025
Details
View Map
Share
Follow
Littleton Crescent

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Littleton Crescent, Penkridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Feb 2025 at 15:41.

Staffordshire County Council logo
Between
11 and 28 Apr 2025
Details
View Map
Share
Follow
New Road

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on New Road, Penkridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Feb 2025 at 14:42.

Staffordshire County Council logo
Between
11 and 28 Apr 2025
Details
View Map
Share
Follow
Cannock Road

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Cannock Road, Penkridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Feb 2025 at 13:57.

Staffordshire County Council logo
Between
11 and 28 Apr 2025
Details
View Map
Share
Follow
Bellbrook

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Bellbrook, Penkridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Feb 2025 at 13:57.

Cadent Gas logo
Between
14 and 17 Apr 2025
Details
View Map
Share
Follow
Mitre Road

Cadent Gas are proposing to carry out New service connection on Mitre Road, Cheslyn Hay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Feb 2025 at 16:53.

Cadent Gas logo
Between
14 and 17 Apr 2025
Details
View Map
Share
Follow
Mitre Road

Cadent Gas are proposing to carry out New service connection on Mitre Road, Cheslyn Hay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Feb 2025 at 16:22.

Staffordshire County Council logo
LONG TERM
Between
14 Apr and 15 May 2025
Details
View Map
Share
Follow
Gains Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Gains Lane, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 15 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Jan 2025 at 15:23.

Staffordshire County Council logo
Between
14 and 19 Apr 2025
Details
View Map
Share
Follow
Ironstone Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ironstone Road, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 19 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Jan 2025 at 09:37.

Staffordshire County Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Hannaford Way

Staffordshire County Council are proposing to carry out Highway improvement works on Hannaford Way, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Jan 2025 at 15:45.

Staffordshire County Council logo
Between
14 and 19 Apr 2025
Details
View Map
Share
Follow
Walnut Drive

Staffordshire County Council are proposing to carry out Highway improvement works on Walnut Drive, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 19 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Jan 2025 at 09:37.

Staffordshire County Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Petersfield

Staffordshire County Council are proposing to carry out Highway improvement works on Petersfield, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Jan 2025 at 15:59.

Staffordshire County Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Arthur Street

Staffordshire County Council are proposing to carry out Highway improvement works on Arthur Street, Chadsmoor, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Jan 2025 at 12:35.

Staffordshire County Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Johnson Road

Staffordshire County Council are proposing to carry out Highway improvement works on Johnson Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Jan 2025 at 13:53.

Cadent Gas logo
Between
14 Apr and 2 May 2025
Details
View Map
Share
Pye Green Road

Cadent Gas were proposing to carry out Utility asset works on Pye Green Road, Cannock.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 2 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Feb 2025 at 14:26.

Staffordshire County Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Milton Road

Staffordshire County Council are proposing to carry out Highway improvement works on Milton Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Jan 2025 at 15:45.

Staffordshire County Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
St Aidans Road

Staffordshire County Council are proposing to carry out Highway improvement works on St Aidans Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Jan 2025 at 16:14.

Staffordshire County Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Grasmere Place

Staffordshire County Council are proposing to carry out Highway improvement works on Grasmere Place, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Jan 2025 at 13:53.

Staffordshire County Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Burgoyne Street

Staffordshire County Council are proposing to carry out Highway improvement works on Burgoyne Street, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Jan 2025 at 13:39.

Staffordshire County Council logo
Between
14 and 19 Apr 2025
Details
View Map
Share
Follow
Pye Green Road Service Road

Staffordshire County Council are proposing to carry out Highway improvement works on Pye Green Road Service Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 19 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Jan 2025 at 10:28.

Staffordshire County Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Moorland Road

Staffordshire County Council are proposing to carry out Highway improvement works on Moorland Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Jan 2025 at 13:39.

Staffordshire County Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Clarion Way

Staffordshire County Council are proposing to carry out Highway improvement works on Clarion Way, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Feb 2025 at 15:13.

Staffordshire County Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Water Eaton Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Water Eaton Lane, Congreve.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 21 Feb 2025 at 15:26.

Staffordshire County Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Heath Street

Staffordshire County Council are proposing to carry out Highway improvement works on Heath Street, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Feb 2025 at 15:13.

Staffordshire County Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Green Heath Road

Staffordshire County Council are proposing to carry out Highway improvement works on Green Heath Road, Green Heath, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Feb 2025 at 12:26.

Staffordshire County Council logo
Between
14 and 19 Apr 2025
Details
View Map
Share
Pye Green Road

Staffordshire County Council were proposing to carry out Highway improvement works on Pye Green Road, Cannock.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 19 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Jan 2025 at 12:23.

Staffordshire County Council logo
Between
14 and 19 Apr 2025
Details
View Map
Share
Pye Green Road

Staffordshire County Council were proposing to carry out Highway improvement works on Pye Green Road, Cannock.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 19 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Jan 2025 at 11:19.

Staffordshire County Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Brindley Heath Road

Staffordshire County Council are proposing to carry out Highway improvement works on Brindley Heath Road, Brindley Valley, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Feb 2025 at 12:26.

Staffordshire County Council logo
Between
17 Apr and 5 May 2025
Details
View Map
Share
Follow
Hayes Way

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Hayes Way, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 5 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Feb 2025 at 16:30.

Staffordshire County Council logo
Between
17 Apr and 5 May 2025
Details
View Map
Share
New Road

Staffordshire County Council were proposing to carry out Highway repair and maintenance works on New Road, Penkridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 April 2025 and run through until 5 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 21 Feb 2025 at 12:49.

Staffordshire County Council logo
Between
17 Apr and 5 May 2025
Details
View Map
Share
Cannock Road

Staffordshire County Council were proposing to carry out Highway repair and maintenance works on Cannock Road, Penkridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 April 2025 and run through until 5 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 21 Feb 2025 at 12:36.

Staffordshire County Council logo
Between
17 Apr and 5 May 2025
Details
View Map
Share
Broadhurst Green Road

Staffordshire County Council were proposing to carry out Highway repair and maintenance works on Broadhurst Green Road, Cannock.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 April 2025 and run through until 5 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 21 Feb 2025 at 12:23.

Staffordshire County Council logo
Between
17 Apr and 5 May 2025
Details
View Map
Share
Penkridge Bank Road

Staffordshire County Council were proposing to carry out Highway repair and maintenance works on Penkridge Bank Road, Rugeley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 April 2025 and run through until 5 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 21 Feb 2025 at 12:54.

Staffordshire County Council logo
Between
21 and 25 Apr 2025
Details
View Map
Share
Follow
Cumberland Road

Staffordshire County Council are proposing to carry out Highway improvement works on Cumberland Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Feb 2025 at 14:41.

Staffordshire County Council logo
Between
21 and 25 Apr 2025
Details
View Map
Share
Follow
Levedale Road

Staffordshire County Council are proposing to carry out Highway improvement works on Levedale Road, Penkridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 24 Feb 2025 at 16:02.

Network Rail logo
Between
26 Apr and 3 May 2025
Details
View Map
Share
Follow
Old Hednesford Road

Network Rail are proposing to carry out Works for Rail Purposes on Old Hednesford Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 April 2025 and could run through until 3 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 3 Feb 2025 at 12:22.

Cadent Gas logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Fountains Way

Cadent Gas are proposing to carry out New service connection on Fountains Way, Bloxwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Jan 2025 at 13:00.

Cadent Gas logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Selby Way

Cadent Gas are proposing to carry out New service connection on Selby Way, Bloxwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Jan 2025 at 13:30.

Cadent Gas logo
LONG TERM
Between
28 Apr and 3 Jun 2025
Details
View Map
Share
Follow
Oak Avenue

Cadent Gas are proposing to carry out Utility asset works on Oak Avenue, Great Wyrley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 15:16.

Cadent Gas logo
Between
28 Apr and 13 May 2025
Details
View Map
Share
Follow
Walsall Road

Cadent Gas are proposing to carry out Utility asset works on Walsall Road, Great Wyrley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 13 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 15:17.

Severn Trent Water logo
Between
28 Apr and 9 May 2025
Details
View Map
Share
Walsall Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Walsall Road, Churchbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 9 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Feb 2025 at 13:46.

Cadent Gas logo
Between
5 and 9 May 2025
Details
View Map
Share
Follow
Margam Crescent

Cadent Gas are proposing to carry out New service connection on Margam Crescent, Bloxwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jan 2025 at 14:30.

Cadent Gas logo
Between
5 May and 3 Jun 2025
Details
View Map
Share
Badgers Way

Cadent Gas were proposing to carry out Utility asset works on Badgers Way, Cannock.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 3 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Feb 2025 at 14:48.

Staffordshire County Council logo
Between
6 and 19 May 2025
Details
View Map
Share
Gorsemoor Road

Staffordshire County Council were proposing to carry out Highway repair and maintenance works on Gorsemoor Road, Cannock.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 19 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 21 Feb 2025 at 12:57.

Staffordshire County Council logo
Between
6 and 19 May 2025
Details
View Map
Share
Follow
Pinfold Lane

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Pinfold Lane, Congreve.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Feb 2025 at 11:10.

Staffordshire County Council logo
Between
6 and 19 May 2025
Details
View Map
Share
Follow
Wiscombe Avenue

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Wiscombe Avenue, Penkridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Feb 2025 at 15:57.

Staffordshire County Council logo
Between
6 and 19 May 2025
Details
View Map
Share
Follow
Cherrybrook Drive

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Cherrybrook Drive, Penkridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Feb 2025 at 15:41.

Staffordshire County Council logo
Between
6 and 19 May 2025
Details
View Map
Share
Follow
Marsh Lane

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Marsh Lane, Penkridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Feb 2025 at 12:27.

Staffordshire County Council logo
Between
6 and 19 May 2025
Details
View Map
Share
Follow
Haling Road

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Haling Road, Penkridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Feb 2025 at 12:11.

Staffordshire County Council logo
Between
6 and 19 May 2025
Details
View Map
Share
Follow
Bellbrook

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Bellbrook, Penkridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Feb 2025 at 15:16.

Staffordshire County Council logo
Between
6 and 19 May 2025
Details
View Map
Share
Follow
Leacroft Road

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Leacroft Road, Penkridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Feb 2025 at 11:56.

Staffordshire County Council logo
Between
6 and 19 May 2025
Details
View Map
Share
Follow
Frederick Road

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Frederick Road, Penkridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Feb 2025 at 12:26.

Staffordshire County Council logo
Between
6 and 19 May 2025
Details
View Map
Share
Follow
Littleton Crescent

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Littleton Crescent, Penkridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Feb 2025 at 12:26.

Cadent Gas logo
Between
10 May and 6 Jun 2025
Details
View Map
Share
Follow
Badgers Way

Cadent Gas are proposing to carry out Utility asset works on Badgers Way, Cannock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Feb 2025 at 14:50.

South Staffordshire Water logo
Between
12 and 15 May 2025
Details
View Map
Share
Follow
Fountains Way

South Staffordshire Water are proposing to carry out New service connection on Fountains Way, Bloxwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 15 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 21 Feb 2025 at 14:25.

Staffordshire County Council logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Gorsey Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Gorsey Lane, Little Wyrley, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 12 Feb 2025 at 09:01.

Staffordshire County Council logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Cecil Street

Staffordshire County Council are proposing to carry out Highway improvement works on Cecil Street, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 12 Feb 2025 at 09:49.

Staffordshire County Council logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Bath Road

Staffordshire County Council are proposing to carry out Highway improvement works on Bath Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 12 Feb 2025 at 09:49.

Staffordshire County Council logo
Between
16 and 23 May 2025
Details
View Map
Share
Follow
Tennscore Avenue

Staffordshire County Council are proposing to carry out Highway improvement works on Tennscore Avenue, Cheslyn Hay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 12 Feb 2025 at 12:48.

Staffordshire County Council logo
Between
16 May and 1 Jun 2025
Details
View Map
Share
Follow
New Road

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on New Road, Penkridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Feb 2025 at 15:16.

Staffordshire County Council logo
Between
16 May and 1 Jun 2025
Details
View Map
Share
Follow
Cannock Road

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Cannock Road, Penkridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Feb 2025 at 16:11.

Staffordshire County Council logo
Between
16 May and 1 Jun 2025
Details
View Map
Share
Follow
Broadhurst Green Road

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Broadhurst Green Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 21 Feb 2025 at 12:30.

Staffordshire County Council logo
Between
16 May and 1 Jun 2025
Details
View Map
Share
Follow
Penkridge Bank Road

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Penkridge Bank Road, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 21 Feb 2025 at 12:58.

South Staffordshire Water logo
Between
19 and 23 May 2025
Details
View Map
Share
Follow
Fountains Road

South Staffordshire Water are proposing to carry out New service connection on Fountains Road, Bloxwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 21 Feb 2025 at 14:35.

South Staffordshire Water logo
Between
19 and 23 May 2025
Details
View Map
Share
Follow
Selby Way

South Staffordshire Water are proposing to carry out New service connection on Selby Way, Bloxwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 21 Feb 2025 at 14:29.

Staffordshire County Council logo
Between
19 and 23 May 2025
Details
View Map
Share
Follow
Moseley Road

Staffordshire County Council are proposing to carry out Highway improvement works on Moseley Road, Featherstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Feb 2025 at 15:13.

Staffordshire County Council logo
Between
19 and 23 May 2025
Details
View Map
Share
Follow
Sutherland Road

Staffordshire County Council are proposing to carry out Highway improvement works on Sutherland Road, Cheslyn Hay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Feb 2025 at 16:16.

Staffordshire County Council logo
Between
19 and 23 May 2025
Details
View Map
Share
Follow
Glenthorne Drive

Staffordshire County Council are proposing to carry out Highway improvement works on Glenthorne Drive, Cheslyn Hay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Feb 2025 at 15:31.

Staffordshire County Council logo
Between
19 and 23 May 2025
Details
View Map
Share
Follow
Ivy House Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Ivy House Lane, Brewood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Feb 2025 at 12:20.

Staffordshire County Council logo
Between
19 and 23 May 2025
Details
View Map
Share
Follow
Levedale Road

Staffordshire County Council are proposing to carry out Highway improvement works on Levedale Road, Penkridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 21 Feb 2025 at 10:53.

Staffordshire County Council logo
Between
19 and 23 May 2025
Details
View Map
Share
Follow
Levedale Road

Staffordshire County Council are proposing to carry out Highway improvement works on Levedale Road, Longridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Feb 2025 at 12:20.

Staffordshire County Council logo
Between
21 May and 4 Jun 2025
Details
View Map
Share
Follow
Gorsemoor Road

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Gorsemoor Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 21 Feb 2025 at 13:14.

Cadent Gas logo
Between
26 May and 9 Jun 2025
Details
View Map
Share
Follow
Walsall Road

Cadent Gas are proposing to carry out Utility asset works on Walsall Road, Great Wyrley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 15:30.

Cadent Gas logo
Between
26 May and 9 Jun 2025
Details
View Map
Share
Follow
Shaws Lane

Cadent Gas are proposing to carry out Utility asset works on Shaws Lane, Great Wyrley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 08:48.

Staffordshire County Council logo
Between
26 and 30 May 2025
Details
View Map
Share
Follow
School Lane

Staffordshire County Council are proposing to carry out Highway improvement works on School Lane, Coven.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 21 Feb 2025 at 09:12.

Staffordshire County Council logo
Between
26 and 30 May 2025
Details
View Map
Share
Follow
Water Eaton Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Water Eaton Lane, Congreve.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 21 Feb 2025 at 09:28.

South Staffordshire Water logo
Between
27 and 30 May 2025
Details
View Map
Share
Follow
Margam Crescent

South Staffordshire Water are proposing to carry out New service connection on Margam Crescent, Bloxwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 21 Feb 2025 at 14:38.


Roadworks Map near to Alton Grove, CANNOCK, WS11 1NW

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 2 Mar 2025 19:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Alton Grove, CANNOCK, WS11 1NW (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
A5 FROM M6 J12 ROUNDABOUT INCLUDING DUALLING TO J A460/A4601 ROUNDABOUT 
(0.6 miles)
BT
Utility repair and maintenance works - Footway - Lane closure
Planned
Scheduled: 3 Mar 2025 - 5 Mar 2025
0.6
Details
Share
Follow
2
South Staffordshire Water logo
HAMPTON STREET 
(1.0 miles)
South Staffordshire Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Cancelled
(Scheduled: 3 Mar 2025 - 5 Mar 2025)
1.0
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.