ROADWORKS SUMMARY
Jennet Tree Lane, MALVERN, WR13 5BE

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Jennet Tree Lane, WR13 5BE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Jennet Tree Lane, MALVERN, WR13 5BE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Jennet Tree Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Worcestershire County Council logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Old Road

Worcestershire County Council are carrying out Highway repair and maintenance works on Old Road, Worcester.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 February 2024 at 07:00 and could run through until 31 October 2025. The works will impact the cycleway and footpath.

This roadwork event was last updated by Worcestershire County Council on 4 Jul 2025 at 12:09.

Worcestershire County Council logo
LONG TERM
Until
1 Jun 2026
Details
View Map
Share
Follow
Reservoir Lane

Worcestershire County Council are carrying out Highway repair and maintenance works on Reservoir Lane, Worcester.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 February 2024 at 00:00 and could run through until 1 June 2026. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 2 Jun 2025 at 14:52.

LONG TERM
Between
29 Oct 2024 and 30 Oct 2025
Details
View Map
Share
Follow
Buryfields

Herefordshire Council are proposing to carry out Highway repair and maintenance works on Buryfields, Cradley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 30 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Herefordshire Council on 3 Oct 2024 at 15:21.

Worcestershire County Council logo
LONG TERM
Between
12 Feb and 30 Sep 2025
Details
View Map
Share
Follow
Worcester Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Worcester Road, Hanley Castle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Worcestershire County Council on 5 Dec 2024 at 10:46.

Worcestershire County Council logo
LONG TERM
Between
12 Feb and 30 Sep 2025
Details
View Map
Share
Follow
Maples Cross Farm

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Maples Cross Farm, Broadheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Worcestershire County Council on 4 Dec 2024 at 13:09.

Worcestershire County Council logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Taylors Lane

Worcestershire County Council are proposing to carry out Highway improvement works on Taylors Lane, Broomhall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 23 September 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Worcestershire County Council on 7 Mar 2025 at 13:52.

Worcestershire County Council logo
LONG TERM
Between
10 Aug and 16 Nov 2025
Details
View Map
Share
Follow
Shaw Street

Worcestershire County Council are proposing to carry out roadworks on Shaw Street, Worcester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 August 2025 and could run through until 16 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Worcestershire County Council on 18 Jul 2025 at 14:01.

Cadent Gas logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Church Road

Cadent Gas were proposing to carry out Utility asset works on Church Road, Malvern.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 23 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jun 2025 at 15:09.

Cadent Gas logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Church Road

Cadent Gas were proposing to carry out Utility asset works on Church Road, Malvern.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 23 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 10:11.

Worcestershire County Council logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Lowesmoor Place

Worcestershire County Council are carrying out Highway improvement works on Lowesmoor Place, Worcester.

These works are categorised as Major.

The works started on 11 August 2025 at 07:00 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 4 Sep 2025 at 08:34.

Severn Trent Water logo
LONG TERM
Until
19 Dec 2025
Details
View Map
Share
Follow
Bell Lane

Severn Trent Water are carrying out Utility repair and maintenance works on Bell Lane, Lower Broadheath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 13:30 and could run through until 19 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 5 Sep 2025 at 09:45.

Severn Trent Water logo
Finishing
Tomorrow
Details
View Map
Share
Henwick Road

Severn Trent Water were proposing to carry out Utility asset works on Henwick Road, Worcester.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 19 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 28 Apr 2025 at 15:29.

Severn Trent Water logo
Finishing
Tomorrow
Details
View Map
Share
Himbleton Road

Severn Trent Water were proposing to carry out Utility asset works on Himbleton Road, Worcester.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 19 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 28 Apr 2025 at 15:29.

Cadent Gas logo
LONG TERM
Between
1 Sep and 10 Oct 2025
Details
View Map
Share
Pickersleigh Road

Cadent Gas were proposing to carry out Utility asset works on Pickersleigh Road, Malvern.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 10 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Jun 2025 at 13:24.

Cadent Gas logo
LONG TERM
Between
1 Sep and 27 Oct 2025
Details
View Map
Share
Hornyold Road

Cadent Gas were proposing to carry out Utility asset works on Hornyold Road, Malvern.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 15:50.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
St Peters Road

Cadent Gas were proposing to carry out Utility asset works on St Peters Road, Malvern.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 22 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 15:51.

Severn Trent Water logo
LONG TERM
Between
1 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Tudor Way

Severn Trent Water are proposing to carry out Utility asset works on Tudor Way, Worcester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 27 Feb 2025 at 08:49.

Severn Trent Water logo
LONG TERM
Until
17 Oct 2025
Details
View Map
Share
Follow
Tudor Way

Severn Trent Water are carrying out Utility asset works on Tudor Way, Worcester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 10:30 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 1 Sep 2025 at 11:12.

Cadent Gas logo
Between
8 and 26 Sep 2025
Details
View Map
Share
Ashdown Close

Cadent Gas were proposing to carry out Utility asset works on Ashdown Close, Malvern.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 15:38.

Cadent Gas logo
Between
8 and 26 Sep 2025
Details
View Map
Share
Ashdown Close

Cadent Gas were proposing to carry out Utility asset works on Ashdown Close, Malvern.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Jun 2025 at 13:30.

Cadent Gas logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Pickersleigh Road

Cadent Gas were proposing to carry out Utility asset works on Pickersleigh Road, Malvern.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 15:37.

Severn Trent Water logo
LONG TERM
Between
8 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Himbleton Road

Severn Trent Water are proposing to carry out Utility asset works on Himbleton Road, Worcester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 4 Jul 2025 at 14:35.

Severn Trent Water logo
LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Himbleton Road

Severn Trent Water are carrying out Utility asset works on Himbleton Road, Worcester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 09:30 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 8 Sep 2025 at 09:55.

Severn Trent Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Wells Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Wells Road, Malvern.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 September 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 20 Jun 2025 at 14:16.

Worcestershire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Edith Walk

Worcestershire County Council are proposing to carry out Section 50 on Edith Walk, Malvern.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 7 Jul 2025 at 11:19.

Worcestershire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Edith Walk

Worcestershire County Council are carrying out Section 50 on Edith Walk, Malvern.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 09:55 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 15 Sep 2025 at 09:58.

Cadent Gas logo
Until
10 Oct 2025
Details
View Map
Share
Follow
Orford Way

Cadent Gas are carrying out Utility asset works on Orford Way, Malvern.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 11:48 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 11:50.

Severn Trent Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Stocks Lane

Severn Trent Water are carrying out Remedial works on Stocks Lane, Newland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:30 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 16 Sep 2025 at 12:51.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Bath Road

Cadent Gas are carrying out Utility repair and maintenance works on Bath Road, Worcester.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 11:38 and could run through until 22 September 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 12:46.

Worcestershire County Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Tolladine Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Tolladine Road, Worcester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 20 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 6 Aug 2025 at 13:28.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
West Malvern Road

Cadent Gas were proposing to carry out Remedial works on West Malvern Road, Malvern.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2025 and run through until 18 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 1 Aug 2025 at 15:25.

Severn Trent Water logo
Finishing
Monday
Details
View Map
Share
Follow
Upper Woodsfield

Severn Trent Water are carrying out Utility repair and maintenance works on Upper Woodsfield, Madresfield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 09:55 and could run through until 22 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 17 Sep 2025 at 10:08.

Severn Trent Water logo
Finishing
Wednesday
Details
View Map
Share
Clarence Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Clarence Road, Malvern.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 September 2025 and run through until 24 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 20 Jun 2025 at 15:36.

Cadent Gas logo
Between
22 Sep and 13 Oct 2025
Details
View Map
Share
Harbinger Avenue

Cadent Gas were proposing to carry out Utility asset works on Harbinger Avenue, Malvern.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 13 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 15:37.

Cadent Gas logo
Between
22 Sep and 10 Oct 2025
Details
View Map
Share
Harbinger Avenue

Cadent Gas were proposing to carry out Utility asset works on Harbinger Avenue, Malvern.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 10 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 13 Jun 2025 at 13:14.

Worcestershire County Council logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
North End Lane

Worcestershire County Council are proposing to carry out Remedial works on North End Lane, Madresfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 27 Aug 2025 at 16:09.

Western Power Distribution (West Midlands) logo
Between
22 and 29 Sep 2025
Details
View Map
Share
Follow
Arden Road

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Arden Road, Worcester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 1 Jul 2025 at 09:41.

Western Power Distribution (West Midlands) logo
Between
22 and 29 Sep 2025
Details
View Map
Share
Follow
Arden Road

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Arden Road, Worcester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 2 Sep 2025 at 13:53.

Worcestershire County Council logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Bath Road

Worcestershire County Council are proposing to carry out Highway improvement works on Bath Road, Worcester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 9 Jul 2025 at 15:52.

Worcestershire County Council logo
Between
22 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Bath Road

Worcestershire County Council are proposing to carry out Highway improvement works on Bath Road, Worcester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 7 Aug 2025 at 10:03.

Network Rail logo
Between
23 and 26 Sep 2025
Details
View Map
Share
Follow
Rainbow Hill

Network Rail are proposing to carry out Works for Rail Purposes on Rainbow Hill, Worcester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 10 Jul 2025 at 08:44.

Network Rail logo
Between
23 and 26 Sep 2025
Details
View Map
Share
Follow
Rainbow Hill

Network Rail are proposing to carry out Works for Rail Purposes on Rainbow Hill, Worcester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Sep 2025 at 08:36.

Worcestershire County Council logo
LONG TERM
Between
29 Sep and 1 Nov 2025
Details
View Map
Share
Follow
Belle Vue Terrace

Worcestershire County Council are proposing to carry out roadworks on Belle Vue Terrace, Malvern.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 21 Aug 2025 at 10:37.

Worcestershire County Council logo
Between
29 Sep and 7 Oct 2025
Details
View Map
Share
Follow
Main Road

Worcestershire County Council are proposing to carry out Highway improvement works on Main Road, Kempsey.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 7 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Worcestershire County Council on 6 Aug 2025 at 15:36.

Worcestershire County Council logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Tolladine Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Tolladine Road, Worcester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 7 Aug 2025 at 15:26.

Severn Trent Water logo
LONG TERM
Between
29 Sep 2025 and 20 Feb 2026
Details
View Map
Share
Follow
Bell Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Bell Lane, Lower Broadheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 20 February 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 4 Jul 2025 at 10:32.

Worcestershire County Council logo
Between
1 and 10 Oct 2025
Details
View Map
Share
Follow
Lowesmoor

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Lowesmoor, Worcester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 23 Jul 2025 at 12:14.

Worcestershire County Council logo
Between
2 and 10 Oct 2025
Details
View Map
Share
Follow
Lowesmoor

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Lowesmoor, Worcester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 2 Jul 2025 at 11:41.

Worcestershire County Council logo
Between
2 and 10 Oct 2025
Details
View Map
Share
Lowesmoor

Worcestershire County Council were proposing to carry out Highway repair and maintenance works on Lowesmoor, Worcester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2025 and run through until 10 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 23 Jul 2025 at 10:56.

Worcestershire County Council logo
Between
3 and 10 Oct 2025
Details
View Map
Share
Tolladine Road

Worcestershire County Council were proposing to carry out Highway repair and maintenance works on Tolladine Road, Worcester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 October 2025 and run through until 10 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 6 Aug 2025 at 08:57.

Cadent Gas logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Orford Way

Cadent Gas are proposing to carry out Utility asset works on Orford Way, Malvern.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 11:16.

Cadent Gas logo
Between
6 and 27 Oct 2025
Details
View Map
Share
Trinity Road

Cadent Gas were proposing to carry out Utility asset works on Trinity Road, Malvern.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 15:55.

Cadent Gas logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
North End Lane

Cadent Gas are proposing to carry out Utility asset works on North End Lane, Malvern.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2025 at 12:31.

Worcestershire County Council logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Mayfield Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Mayfield Road, Malvern.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the verge only.

This roadwork event was last updated by Worcestershire County Council on 18 Jul 2025 at 08:43.

Cadent Gas logo
Between
6 and 27 Oct 2025
Details
View Map
Share
Newtown Road

Cadent Gas were proposing to carry out Utility asset works on Newtown Road, Malvern.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 15:52.

Worcestershire County Council logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Main Road

Worcestershire County Council are proposing to carry out Section 50 on Main Road, Kempsey.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Worcestershire County Council on 17 Jul 2025 at 14:57.

Severn Trent Water logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Brookend Lane

Severn Trent Water are proposing to carry out New service connection on Brookend Lane, Kempsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 15 Jul 2025 at 12:14.

Severn Trent Water logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Brookend Lane

Severn Trent Water are proposing to carry out New service connection on Brookend Lane, Kempsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 16 Jul 2025 at 13:40.

Worcestershire County Council logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
A4103 Leigh Sinton

Worcestershire County Council are proposing to carry out Section 50 on A4103 Leigh Sinton, Leigh Sinton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Worcestershire County Council on 5 Aug 2025 at 09:38.

Worcestershire County Council logo
Between
8 and 28 Oct 2025
Details
View Map
Share
Follow
Main Road

Worcestershire County Council are proposing to carry out Section 50 on Main Road, Kempsey.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 28 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Worcestershire County Council on 14 Aug 2025 at 15:38.

Between
9 and 14 Oct 2025
Details
View Map
Share
Follow
West Malvern Road

Herefordshire Council are proposing to carry out Highway repair and maintenance works on West Malvern Road, Malvern.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Herefordshire Council on 5 Aug 2025 at 10:01.

Between
9 and 14 Oct 2025
Details
View Map
Share
Follow
West Malvern Road

Herefordshire Council are proposing to carry out Highway repair and maintenance works on West Malvern Road, Malvern.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Herefordshire Council on 11 Aug 2025 at 15:32.

Worcestershire County Council logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Pixham Ferry Lane

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Pixham Ferry Lane, Kempsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the verge only.

This roadwork event was last updated by Worcestershire County Council on 15 Jul 2025 at 11:42.

Worcestershire County Council logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Pixham Ferry Lane

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Pixham Ferry Lane, Kempsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the verge only.

This roadwork event was last updated by Worcestershire County Council on 16 Jul 2025 at 12:57.

Worcestershire County Council logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Brockamin

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Brockamin, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 15 Jul 2025 at 11:52.

Worcestershire County Council logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Brockamin

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Brockamin, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 16 Jul 2025 at 13:14.

Cadent Gas logo
LONG TERM
Between
13 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Tolladine Road

Cadent Gas are proposing to carry out Utility asset works on Tolladine Road, Worcester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 12:30.

Cadent Gas logo
LONG TERM
Between
13 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Tolladine Road

Cadent Gas are proposing to carry out Utility asset works on Tolladine Road, Worcester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 10:10.

Severn Trent Water logo
LONG TERM
Between
13 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Oldbury Road

Severn Trent Water are proposing to carry out Utility asset works on Oldbury Road, Worcester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 4 Jul 2025 at 16:16.

Severn Trent Water logo
LONG TERM
Between
13 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Oldbury Road

Severn Trent Water are proposing to carry out Utility asset works on Oldbury Road, Worcester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 18 Sep 2025 at 14:33.

Severn Trent Water logo
Between
14 and 16 Oct 2025
Details
View Map
Share
Follow
Diglis Road

Severn Trent Water are proposing to carry out New service connection on Diglis Road, Worcester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 10 Jul 2025 at 09:18.

Worcestershire County Council logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Rectory Lane

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Rectory Lane, Guarlford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 7 Jul 2025 at 15:54.

Worcestershire County Council logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Rectory Lane

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Rectory Lane, Guarlford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 9 Jul 2025 at 13:49.

Cadent Gas logo
Between
20 Oct and 10 Nov 2025
Details
View Map
Share
North Malvern Road

Cadent Gas were proposing to carry out Utility asset works on North Malvern Road, Malvern.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 10 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 15:56.

Cadent Gas logo
Between
20 Oct and 14 Nov 2025
Details
View Map
Share
Follow
North End Lane

Cadent Gas are proposing to carry out Utility asset works on North End Lane, Malvern.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 10:20.

Worcestershire County Council logo
Between
20 and 23 Oct 2025
Details
View Map
Share
Follow
Cowleigh Park

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Cowleigh Park, Cradley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Worcestershire County Council on 24 Jul 2025 at 14:32.

Severn Trent Water logo
Between
21 and 23 Oct 2025
Details
View Map
Share
Follow
Albert Road North

Severn Trent Water are proposing to carry out New service connection on Albert Road North, Malvern.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 18 Jul 2025 at 09:08.

Severn Trent Water logo
Between
21 and 23 Oct 2025
Details
View Map
Share
Follow
Albert Road North

Severn Trent Water are proposing to carry out New service connection on Albert Road North, Malvern.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 23 Jul 2025 at 15:05.

Severn Trent Water logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Follow
Clarence Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Clarence Road, Malvern.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 7 Jul 2025 at 15:13.

Severn Trent Water logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Follow
Clarence Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Clarence Road, Malvern.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 16 Jul 2025 at 11:00.

Cadent Gas logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Service Road Between 181 And 219 Pickersleigh Road

Cadent Gas are proposing to carry out Utility asset works on Service Road Between 181 And 219 Pickersleigh Road, Malvern.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 10:25.

Cadent Gas logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Service Road Between 181 And 219 Pickersleigh Road

Cadent Gas are proposing to carry out Utility asset works on Service Road Between 181 And 219 Pickersleigh Road, Malvern.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 09:32.

Severn Trent Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Brookend Lane

Severn Trent Water were proposing to carry out New service connection on Brookend Lane, Kempsey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 24 Jun 2025 at 10:59.

Severn Trent Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Brookend Lane

Severn Trent Water are proposing to carry out New service connection on Brookend Lane, Kempsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 3 Jul 2025 at 15:56.

BT logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Taylors Lane

BT were proposing to carry out Utility asset works on Taylors Lane, Broomhall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 25 Jul 2025 at 08:58.

Worcestershire County Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Bridges Stone

Worcestershire County Council are proposing to carry out roadworks on Bridges Stone, Alfrick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 25 Apr 2025 at 11:09.

Worcestershire County Council logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Brockamin

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Brockamin, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 15 Jul 2025 at 11:14.

Worcestershire County Council logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Camp Hill Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Camp Hill Road, Worcester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 4 Jul 2025 at 14:55.

Worcestershire County Council logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Camp Hill Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Camp Hill Road, Worcester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 7 Jul 2025 at 12:36.

Worcestershire County Council logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Battenhall Avenue

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Battenhall Avenue, Worcester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 4 Jul 2025 at 14:56.

Worcestershire County Council logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Battenhall Avenue

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Battenhall Avenue, Worcester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 7 Jul 2025 at 12:33.

Severn Trent Water logo
LONG TERM
Between
3 Nov and 5 Dec 2025
Details
View Map
Share
C2056 Kerswell Green

Severn Trent Water were proposing to carry out Utility asset works on C2056 Kerswell Green, Kerswell Green.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 5 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 8 Aug 2025 at 08:46.

Cadent Gas logo
LONG TERM
Between
3 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Pickersleigh Road

Cadent Gas are proposing to carry out Utility asset works on Pickersleigh Road, Malvern.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Aug 2025 at 14:16.

Cadent Gas logo
LONG TERM
Between
3 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Pickersleigh Road

Cadent Gas are proposing to carry out Utility asset works on Pickersleigh Road, Malvern.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 15:15.

Cadent Gas logo
Between
3 and 24 Nov 2025
Details
View Map
Share
Follow
Bath Road

Cadent Gas are proposing to carry out Utility asset works on Bath Road, Worcester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 16:30.

Worcestershire County Council logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
Brockamin

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Brockamin, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 17 Jul 2025 at 11:26.

Worcestershire County Council logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Follow
The Hill Avenue

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on The Hill Avenue, Worcester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 2 Jul 2025 at 15:45.

Worcestershire County Council logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Follow
The Hill Avenue

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on The Hill Avenue, Worcester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 3 Jul 2025 at 12:19.

BT logo
Between
5 and 7 Nov 2025
Details
View Map
Share
Britten Drive

BT were proposing to carry out Utility asset works on Britten Drive, Malvern.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 November 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 5 Sep 2025 at 07:40.

Worcestershire County Council logo
Between
7 and 14 Nov 2025
Details
View Map
Share
Follow
Kilbury Drive

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Kilbury Drive, Worcester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 22 Aug 2025 at 16:33.

Worcestershire County Council logo
Between
7 and 14 Nov 2025
Details
View Map
Share
Follow
Kilbury Drive

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Kilbury Drive, Worcester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 27 Aug 2025 at 11:22.

Cadent Gas logo
Between
10 and 28 Nov 2025
Details
View Map
Share
Follow
Ashdown Close

Cadent Gas are proposing to carry out Utility asset works on Ashdown Close, Malvern.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Aug 2025 at 14:17.

Cadent Gas logo
Between
10 and 28 Nov 2025
Details
View Map
Share
Follow
Ashdown Close

Cadent Gas are proposing to carry out Utility asset works on Ashdown Close, Malvern.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 14:35.

Severn Trent Water logo
LONG TERM
Between
10 Nov 2025 and 1 May 2026
Details
View Map
Share
Follow
C2056 Kerswell Green

Severn Trent Water are proposing to carry out Utility asset works on C2056 Kerswell Green, Kerswell Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 1 May 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Sep 2025 at 15:15.

Worcestershire County Council logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Hanbury Avenue

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hanbury Avenue, Worcester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 2 Sep 2025 at 12:06.

Worcestershire County Council logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Hanbury Avenue

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hanbury Avenue, Worcester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 3 Sep 2025 at 12:51.

Worcestershire County Council logo
Between
14 and 21 Nov 2025
Details
View Map
Share
Follow
Buck Street

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Buck Street, Worcester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 2 Jul 2025 at 15:40.

Worcestershire County Council logo
Between
14 and 21 Nov 2025
Details
View Map
Share
Follow
Buck Street

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Buck Street, Worcester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 3 Jul 2025 at 12:16.

Severn Trent Water logo
LONG TERM
Between
17 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Brookside Road

Severn Trent Water are proposing to carry out Utility asset works on Brookside Road, Worcester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 4 Jul 2025 at 16:25.

Severn Trent Water logo
LONG TERM
Between
17 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Oldbury Road

Severn Trent Water are proposing to carry out Utility asset works on Oldbury Road, Worcester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 4 Jul 2025 at 16:18.

Cadent Gas logo
LONG TERM
Between
18 Nov and 31 Dec 2025
Details
View Map
Share
Worcester Road

Cadent Gas were proposing to carry out Utility asset works on Worcester Road, Worcester.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2025 and run through until 31 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 17:25.

Cadent Gas logo
LONG TERM
Between
18 Nov and 31 Dec 2025
Details
View Map
Share
Bath Road

Cadent Gas were proposing to carry out Utility asset works on Bath Road, Worcester.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2025 and run through until 31 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 17:24.

Cadent Gas logo
Between
24 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Harbinger Avenue

Cadent Gas are proposing to carry out Utility asset works on Harbinger Avenue, Malvern.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 5 Aug 2025 at 14:12.

Cadent Gas logo
Between
24 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Harbinger Avenue

Cadent Gas are proposing to carry out Utility asset works on Harbinger Avenue, Malvern.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 14:14.

Worcestershire County Council logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Follow
Squires Walk

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Squires Walk, Kempsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 11 Sep 2025 at 16:28.

Worcestershire County Council logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Follow
Squires Walk

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Squires Walk, Kempsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 12 Sep 2025 at 12:50.

Worcestershire County Council logo
Between
24 and 30 Nov 2025
Details
View Map
Share
Waverley Street

Worcestershire County Council were proposing to carry out Highway improvement works on Waverley Street, Worcester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 November 2025 and run through until 30 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 28 Aug 2025 at 11:36.

Cadent Gas logo
Between
1 and 22 Dec 2025
Details
View Map
Share
Imperial Road

Cadent Gas were proposing to carry out Utility asset works on Imperial Road, Malvern.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 22 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 13:45.

Cadent Gas logo
Between
1 and 22 Dec 2025
Details
View Map
Share
Follow
Imperial Road

Cadent Gas are proposing to carry out Utility asset works on Imperial Road, Malvern.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 14:00.

Cadent Gas logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Sparrowhall Lane

Cadent Gas are proposing to carry out New service connection on Sparrowhall Lane, Powick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 9 Sep 2025 at 11:30.

Worcestershire County Council logo
Between
1 and 6 Dec 2025
Details
View Map
Share
Follow
Orchard Street

Worcestershire County Council are proposing to carry out Highway improvement works on Orchard Street, Worcester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 6 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 26 Aug 2025 at 10:52.

Worcestershire County Council logo
Between
1 and 6 Dec 2025
Details
View Map
Share
Follow
Orchard Street

Worcestershire County Council are proposing to carry out Highway improvement works on Orchard Street, Worcester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 6 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 3 Sep 2025 at 16:15.

Cadent Gas logo
Between
2 and 23 Dec 2025
Details
View Map
Share
Follow
Bath Road

Cadent Gas are proposing to carry out Utility asset works on Bath Road, Worcester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2025 and could run through until 23 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 10:51.

Cadent Gas logo
Between
8 and 24 Dec 2025
Details
View Map
Share
Follow
Fruitlands

Cadent Gas are proposing to carry out Utility asset works on Fruitlands, Malvern.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 09:30.

Cadent Gas logo
Between
8 and 22 Dec 2025
Details
View Map
Share
Follow
Avenue Road

Cadent Gas are proposing to carry out Utility asset works on Avenue Road, Malvern.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 14:00.

Cadent Gas logo
Between
8 and 22 Dec 2025
Details
View Map
Share
Avenue Road

Cadent Gas were proposing to carry out Utility asset works on Avenue Road, Malvern.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 December 2025 and run through until 22 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 13:49.

Worcestershire County Council logo
Between
8 and 16 Dec 2025
Details
View Map
Share
Follow
Waverley Street

Worcestershire County Council are proposing to carry out Highway improvement works on Waverley Street, Worcester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 16 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 28 Aug 2025 at 12:42.

Worcestershire County Council logo
Between
8 and 16 Dec 2025
Details
View Map
Share
Follow
Waverley Street

Worcestershire County Council are proposing to carry out Highway improvement works on Waverley Street, Worcester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 16 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 3 Sep 2025 at 16:11.

Worcestershire County Council logo
Between
15 and 19 Dec 2025
Details
View Map
Share
Follow
Priory Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Priory Road, Malvern.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 3 Sep 2025 at 11:51.

Worcestershire County Council logo
Between
15 and 19 Dec 2025
Details
View Map
Share
Follow
Priory Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Priory Road, Malvern.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 10 Sep 2025 at 10:36.


Roadworks Map near to Jennet Tree Lane, MALVERN, WR13 5BE (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 18 Sep 2025 22:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Jennet Tree Lane, MALVERN, WR13 5BE (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Severn Trent Water logo
URGENT
  
UPPER WOODSFIELD 
(0.5 miles)
Severn Trent Water
Utility repair and maintenance works - Carriageway, Verge - Road closure
In Progress
Since: 17 Sep 2025 09:55
(Scheduled: 17 Sep 2025 - 22 Sep 2025)
0.5
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.