ROADWORKS SUMMARY
The Green, PERSHORE, WR10 3LJ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for The Green, WR10 3LJ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to The Green, PERSHORE, WR10 3LJ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for The Green are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Wales And West Utilities logo
LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Chestnut Close

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Chestnut Close, Evesham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 9 Dec 2024 at 10:16.

Wales And West Utilities logo
LONG TERM
Until
3 Apr 2025
Details
View Map
Share
Follow
Chestnut Close

Wales And West Utilities are carrying out Utility repair and maintenance works on Chestnut Close, Evesham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 January 2025 at 09:00 and could run through until 3 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 10 Jan 2025 at 10:11.

Severn Trent Water logo
LONG TERM
Until
14 Apr 2025
Details
View Map
Share
Follow
The Squires

Severn Trent Water are carrying out Utility asset works on The Squires, Evesham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 10:56 and could run through until 14 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 6 Jan 2025 at 10:58.

Severn Trent Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Hipton Hill

Severn Trent Water are carrying out Utility repair and maintenance works on Hipton Hill, Lenchwick.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 January 2025 at 09:17 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 27 Jan 2025 at 11:27.

Severn Trent Water logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Wyre Road

Severn Trent Water are proposing to carry out Utility asset works on Wyre Road, Pershore.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 08:01.

Severn Trent Water logo
Until
24 Feb 2025
Details
View Map
Share
Follow
Evesham Road

Severn Trent Water are carrying out Utility asset works on Evesham Road, Fladbury.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 12:22 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 27 Jan 2025 at 12:27.

Severn Trent Water logo
Until
24 Feb 2025
Details
View Map
Share
Follow
Evesham Road

Severn Trent Water are carrying out roadworks on Evesham Road, Fladbury.

These works are categorised as Major.

The works started on 27 January 2025 at 12:22 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 27 Jan 2025 at 12:27.

Severn Trent Water logo
Until
24 Feb 2025
Details
View Map
Share
Follow
Evesham Road

Severn Trent Water are carrying out Utility asset works on Evesham Road, Lower Moor.

These works are categorised as Major.

The works started on 27 January 2025 at 12:22 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 27 Jan 2025 at 12:27.

Wales And West Utilities logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Lenchwick Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Lenchwick Lane, Twyford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 18 Oct 2024 at 08:18.

Wales And West Utilities logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Lenchwick Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Lenchwick Lane, Twyford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 18 Oct 2024 at 14:43.

Severn Trent Water logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Mill Bank

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Mill Bank, Fladbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Nov 2024 at 10:13.

Severn Trent Water logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Mill Bank

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Mill Bank, Fladbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 29 Oct 2024 at 14:44.

Worcestershire County Council logo
Between
6 and 8 Feb 2025
Details
View Map
Share
Follow
Radford Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Radford Road, Rous Lench.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 8 February 2025. The works will impact the verge only.

This roadwork event was last updated by Worcestershire County Council on 13 Dec 2024 at 12:59.

Worcestershire County Council logo
Between
6 and 8 Feb 2025
Details
View Map
Share
Follow
Radford Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Radford Road, Rous Lench.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 8 February 2025. The works will impact the verge only.

This roadwork event was last updated by Worcestershire County Council on 12 Dec 2024 at 11:35.

Worcestershire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Long Hyde Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Long Hyde Road, South Littleton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 6 Nov 2024 at 14:30.

Worcestershire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Bennetts Hill

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Bennetts Hill, Offenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 6 Nov 2024 at 14:24.

Worcestershire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Bennetts Hill

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Bennetts Hill, Offenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 7 Nov 2024 at 14:03.

Western Power Distribution (West Midlands) logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Holloway

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Holloway, Pershore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 17 Dec 2024 at 13:56.

Western Power Distribution (West Midlands) logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Holloway

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Holloway, Pershore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 17 Dec 2024 at 11:44.

Severn Trent Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Pershore Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Pershore Road, Great Comberton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the verge only.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 16:53.

Worcestershire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Long Hyde Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Long Hyde Road, South Littleton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 7 Nov 2024 at 14:04.

Worcestershire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Albert Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Albert Road, Evesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 17 Oct 2024 at 07:20.

Western Power Distribution (West Midlands) logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Upton Snodsbury Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Upton Snodsbury Road, Pinvin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 12 Sep 2024 at 08:26.

Western Power Distribution (West Midlands) logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Upton Snodsbury Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Upton Snodsbury Road, Pinvin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Sep 2024 at 08:55.

Western Power Distribution (West Midlands) logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Upton Snodsbury Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Upton Snodsbury Road, Pinvin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 22 Jan 2025 at 15:21.

Worcestershire County Council logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Shinehill Lane

Worcestershire County Council are proposing to carry out Remedial works on Shinehill Lane, South Littleton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Worcestershire County Council on 7 Jan 2025 at 08:33.

Western Power Distribution (West Midlands) logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Upton Snodsbury Road

Western Power Distribution (West Midlands) are proposing to carry out Diversionary works on Upton Snodsbury Road, Pinvin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 9 Sep 2024 at 14:39.

Western Power Distribution (West Midlands) logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Pershore Road

Western Power Distribution (West Midlands) are proposing to carry out Remedial works on Pershore Road, Worcestershire County Council, Little Comberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 21 Nov 2024 at 09:20.

Worcestershire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Elmley Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Elmley Road, Ashton Under Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 16 Aug 2024 at 13:26.

Western Power Distribution (West Midlands) logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Pershore Road

Western Power Distribution (West Midlands) are proposing to carry out Remedial works on Pershore Road, Worcestershire County Council, Little Comberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 19 Nov 2024 at 12:42.

Worcestershire County Council logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Station Road

Worcestershire County Council are proposing to carry out Remedial works on Station Road, Harvington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 6 Nov 2024 at 07:51.

Wales And West Utilities logo
Between
18 and 24 Feb 2025
Details
View Map
Share
Follow
Atch Lench Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Atch Lench Road, Church Lench.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 19 Nov 2024 at 14:23.

Wales And West Utilities logo
Between
18 and 24 Feb 2025
Details
View Map
Share
Follow
Atch Lench Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Atch Lench Road, Church Lench.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 21 Nov 2024 at 09:11.

Severn Trent Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Main Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Main Street, Cropthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 9 Oct 2024 at 13:11.

Severn Trent Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Main Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Main Street, Cropthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 8 Oct 2024 at 12:39.

Severn Trent Water logo
LONG TERM
Between
24 Feb and 7 Apr 2025
Details
View Map
Share
Follow
Evesham Road

Severn Trent Water are proposing to carry out Utility asset works on Evesham Road, Lower Moor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 18 Dec 2024 at 12:21.

Western Power Distribution (West Midlands) logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Main Street

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Main Street, Bishampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 25 Nov 2024 at 11:11.

Severn Trent Water logo
LONG TERM
Between
3 Mar and 14 Apr 2025
Details
View Map
Share
Follow
Evesham Road

Severn Trent Water are proposing to carry out Utility asset works on Evesham Road, Fladbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 17 Jan 2025 at 12:11.

BT logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Winchcombe Road

BT are proposing to carry out Utility repair and maintenance works on Winchcombe Road, Sedgeberrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 2 Jan 2025 at 12:28.

Severn Trent Water logo
LONG TERM
Between
3 Mar and 14 Apr 2025
Details
View Map
Share
Follow
Evesham Road

Severn Trent Water are proposing to carry out roadworks on Evesham Road, Fladbury.

These works are categorised as Major.

The works will start on or after 3 March 2025 and could run through until 14 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Jan 2025 at 16:10.

BT logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Winchcombe Road

BT are proposing to carry out Utility repair and maintenance works on Winchcombe Road, Sedgeberrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 20 Dec 2024 at 08:31.

Worcestershire County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Middle Lane

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Middle Lane, Cropthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 4 Dec 2024 at 06:54.

Worcestershire County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Middle Lane

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Middle Lane, Cropthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 5 Dec 2024 at 12:14.

Worcestershire County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Middle Lane

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Middle Lane, Cropthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 5 Dec 2024 at 15:51.

Worcestershire County Council logo
Between
3 and 6 Mar 2025
Details
View Map
Share
Farm Street

Worcestershire County Council were proposing to carry out Highway repair and maintenance works on Farm Street, Fladbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 6 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 29 Nov 2024 at 10:23.

Severn Trent Water logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Broadway Lane

Severn Trent Water were proposing to carry out New service connection on Broadway Lane, Fladbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 9 Dec 2024 at 11:08.

Severn Trent Water logo
Between
10 Mar and 7 Apr 2025
Details
View Map
Share
Follow
Evesham Road

Severn Trent Water are proposing to carry out Utility asset works on Evesham Road, Lower Moor.

These works are categorised as Major.

The works will start on or after 10 March 2025 and could run through until 7 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 12 Dec 2024 at 12:02.

Worcestershire County Council logo
Between
23 and 31 Mar 2025
Details
View Map
Share
Follow
Waterside

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Waterside, Evesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 13 Nov 2024 at 09:19.

Severn Trent Water logo
Between
26 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Evesham Road

Severn Trent Water are proposing to carry out Remedial works on Evesham Road, Wood Norton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 17 Jan 2025 at 12:23.

Worcestershire County Council logo
LONG TERM
Between
7 Apr and 16 May 2025
Details
View Map
Share
Follow
Main Street

Worcestershire County Council are proposing to carry out roadworks on Main Street, South Littleton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 16 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Worcestershire County Council on 10 Jan 2025 at 10:30.

Worcestershire County Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Main Street

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Main Street, Pinvin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 21 Jan 2025 at 14:41.

Worcestershire County Council logo
Between
14 and 21 Apr 2025
Details
View Map
Share
Follow
Holloway

Worcestershire County Council are proposing to carry out Section 50 on Holloway, Pershore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Worcestershire County Council on 21 Jan 2025 at 14:34.

Severn Trent Water logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Elmley Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Elmley Road, Ashton Under Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 24 Jan 2025 at 11:10.

Worcestershire County Council logo
Between
14 and 21 Apr 2025
Details
View Map
Share
Follow
Holloway

Worcestershire County Council are proposing to carry out Section 50 on Holloway, Pershore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Worcestershire County Council on 15 Jan 2025 at 15:18.

Worcestershire County Council logo
Between
14 and 21 Apr 2025
Details
View Map
Share
Follow
Allesborough Drive

Worcestershire County Council are proposing to carry out Section 50 on Allesborough Drive, Pershore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 21 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 15 Jan 2025 at 15:23.

Worcestershire County Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Main Street

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Main Street, Pinvin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 17 Jan 2025 at 07:24.

Worcestershire County Council logo
Between
14 and 21 Apr 2025
Details
View Map
Share
Follow
Allesborough Drive

Worcestershire County Council are proposing to carry out Section 50 on Allesborough Drive, Pershore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 21 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 21 Jan 2025 at 14:36.

Worcestershire County Council logo
Between
17 Apr and 1 May 2025
Details
View Map
Share
Follow
Farleigh Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Farleigh Road, Pershore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 19 Dec 2024 at 14:00.

Worcestershire County Council logo
Between
17 Apr and 1 May 2025
Details
View Map
Share
Follow
St Andrews Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on St Andrews Road, Pershore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 19 Dec 2024 at 14:01.

Worcestershire County Council logo
Between
17 Apr and 1 May 2025
Details
View Map
Share
Follow
Abbey Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Abbey Road, Pershore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 19 Dec 2024 at 14:00.

Severn Trent Water logo
LONG TERM
Between
21 Apr and 12 Oct 2025
Details
View Map
Share
Follow
Worcester Road

Severn Trent Water are proposing to carry out Utility asset works on Worcester Road, Evesham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 12 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 25 Oct 2022 at 12:56.

Worcestershire County Council logo
Between
21 Apr and 5 May 2025
Details
View Map
Share
Follow
Hill Furze Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hill Furze Road, Bishampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 5 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 12 Dec 2024 at 16:06.

Worcestershire County Council logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Follow
Main Street

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Main Street, Cropthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 22 Jan 2025 at 09:56.

Worcestershire County Council logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Follow
Brook Lane

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Brook Lane, Cropthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 22 Jan 2025 at 10:04.

Worcestershire County Council logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Follow
Allesborough Drive

Worcestershire County Council are proposing to carry out Section 50 on Allesborough Drive, Pershore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 15 Jan 2025 at 15:36.

Worcestershire County Council logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Follow
Three Cocks Lane

Worcestershire County Council are proposing to carry out Section 50 on Three Cocks Lane, Offenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 21 Jan 2025 at 14:48.

Worcestershire County Council logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Follow
Three Cocks Lane

Worcestershire County Council are proposing to carry out Section 50 on Three Cocks Lane, Offenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 16 Jan 2025 at 14:56.

Worcestershire County Council logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Follow
Allesborough Drive

Worcestershire County Council are proposing to carry out Section 50 on Allesborough Drive, Pershore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 21 Jan 2025 at 14:39.

Worcestershire County Council logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Follow
Holloway

Worcestershire County Council are proposing to carry out Section 50 on Holloway, Pershore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 15 Jan 2025 at 15:26.

Worcestershire County Council logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Follow
Holloway

Worcestershire County Council are proposing to carry out Section 50 on Holloway, Pershore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 21 Jan 2025 at 14:37.

Western Power Distribution (West Midlands) logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Head Street

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Head Street, Pershore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Jan 2025 at 14:14.


Roadworks Map near to The Green, PERSHORE, WR10 3LJ (2 Events)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Marker
Last Updated: 30 Jan 2025 20:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to The Green, PERSHORE, WR10 3LJ (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Worcestershire County Council logo
MAJOR
  
CANADA BANK 
(0.2 miles)
Worcestershire County Council
Highway repair and maintenance works - Verge - Road closure
Complete
28 Jan 2025 08:00 - 29 Jan 2025 16:35
0.2
Details
Share
2
Severn Trent Water logo
BLACKSMITHS LANE 
(0.5 miles)
Severn Trent Water
New service connection - Verge - Some carriageway incursion
Cancelled
(Scheduled: 28 Jan 2025 - 30 Jan 2025)
0.5
Details
Share