ROADWORKS SUMMARY
Maple View, White Moss Business Park, SKELMERSDALE, WN8 9TD
Introduction
View current and future planned roadworks and road closures for Maple View, White Moss Business Park, WN8 9TD and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Maple View, White Moss Business Park, SKELMERSDALE, WN8 9TD
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Maple View, White Moss Business Park are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
3 Aug and 31 Dec 2026
Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Gathurst Lane, Shevington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 August 2026 and could run through until 31 December 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 15 Jun 2026 at 16:11.
Sunday
Cadent Gas are carrying out Utility asset works on Ashley Road, Skelmersdale.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 August 2026 at 07:48 and could run through until 27 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Sep 2026 at 13:45.
14 Oct 2026
Cadent Gas are carrying out Utility asset works on Abbeystead, Skelmersdale.
These works are categorised as Major.
The works started on 24 August 2026 at 14:45 and could run through until 14 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 13:30.
Sunday
Cadent Gas are carrying out Utility asset works on Lulworth, Skelmersdale.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 08:50 and could run through until 27 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Sep 2026 at 09:54.
8 Sep and 1 Oct 2026
United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Ashurst Road, Skelmersdale.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 September 2026 and run through until 1 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 8 Sep 2026 at 15:00.
16 Nov 2026
Lancashire County Council are carrying out Highway improvement works on Derby Street West, Ormskirk.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 07:45 and could run through until 16 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Lancashire County Council on 14 Sep 2026 at 21:51.
14 and 28 Sep 2026
Cadent Gas are proposing to carry out Utility asset works on Church Road, Rainford, St Helens.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 13:49.
14 Sep and 2 Oct 2026
Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Orrell Road, Orrell.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 2 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 14 Aug 2026 at 10:34.
Tomorrow
United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Latham Lane, Orrell.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2026 at 05:13 and could run through until 22 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 16 Sep 2026 at 15:11.
14 Oct 2026
Cadent Gas are carrying out Utility asset works on Church Road, Rainford, St Helens.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 September 2026 at 08:00 and could run through until 14 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Sep 2026 at 09:04.
Friday
Electricity North West (NorWeb) are proposing to carry out New service connection on Grovewood Drive, Appley Bridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 17 Aug 2026 at 11:30.
21 Sep and 22 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Manfield, Skelmersdale.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 22 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 08:39.
21 Sep and 22 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Manfield, Skelmersdale.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 22 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Aug 2026 at 16:02.
24 Sep and 12 Oct 2026
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Birch Green Road, Skelmersdale.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 12 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Mar 2026 at 09:56.
28 Sep and 23 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Rookery Lane, Rainford, St Helens.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 08:16.
28 Sep and 9 Oct 2026
ManWeb were proposing to carry out New service connection on Pimbo Road, Kings Moss, St Helens.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 September 2026 and run through until 9 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by ManWeb on 17 Sep 2026 at 11:28.
5 and 8 Oct 2026
St. Helens Council are proposing to carry out Highway repair and maintenance works on East Lancashire Road, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 8 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by St. Helens Council on 3 Sep 2026 at 11:51.
5 and 9 Oct 2026
Lancashire County Council are proposing to carry out Highway improvement works on Liverpool Road South, Burscough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 24 Aug 2026 at 16:05.
5 and 8 Oct 2026
St. Helens Council are proposing to carry out Highway repair and maintenance works on Abbey Road, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 8 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by St. Helens Council on 27 Aug 2026 at 07:47.
5 Oct and 23 Dec 2026
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Crank Road, Crank, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 23 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 24 Aug 2026 at 11:31.
5 Oct and 23 Dec 2026
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Crank Road, Crank, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 23 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Sep 2026 at 08:02.
5 and 15 Oct 2026
ManWeb are proposing to carry out New service connection on Pimbo Road, Kings Moss, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 15 October 2026. The works will impact the verge only.
This roadwork event was last updated by ManWeb on 6 Aug 2026 at 11:07.
12 and 26 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Church Road, Rainford, St Helens.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Jul 2026 at 07:44.
14 Oct and 4 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Rookery Lane, Rainford, St Helens.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2026 and could run through until 4 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Jul 2026 at 07:45.
19 Oct and 4 Dec 2026
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Pimbo Road, Kings Moss, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 4 December 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 17 Aug 2026 at 10:37.
20 and 23 Oct 2026
Lancashire County Council are proposing to carry out Highway improvement works on Chorley Road, Hilldale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 23 Jul 2026 at 14:21.
20 and 23 Oct 2026
Lancashire County Council are proposing to carry out Highway improvement works on Chorley Road, Parbold.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 23 Jul 2026 at 14:26.
23 and 28 Oct 2026
Lancashire County Council are proposing to carry out Highway improvement works on Parbold Hill, Parbold.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 23 Jul 2026 at 14:28.
23 and 28 Oct 2026
Lancashire County Council are proposing to carry out Highway improvement works on Alder Lane, Parbold.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 23 Jul 2026 at 14:28.
26 Oct and 15 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Abbeystead, Skelmersdale.
These works are categorised as Major.
The works will start on or after 26 October 2026 and could run through until 15 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Jul 2026 at 09:32.
26 Oct 2026 and 13 Jul 2027
Cadent Gas are proposing to carry out Utility asset works on Alderley, Skelmersdale.
These works are categorised as Major.
The works will start on or after 26 October 2026 and could run through until 13 July 2027. The works will impact the carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 5 Aug 2026 at 16:06.
26 and 30 Oct 2026
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Grimshaw Lane, Ormskirk.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 18 Sep 2026 at 14:59.
27 and 30 Oct 2026
Lancashire County Council are proposing to carry out Highway improvement works on Appley Lane North, Appley Bridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 23 Jul 2026 at 14:32.
27 and 30 Oct 2026
Lancashire County Council are proposing to carry out Highway improvement works on Appley Lane South, Appley Bridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 23 Jul 2026 at 14:34.
30 Oct and 5 Nov 2026
Lancashire County Council are proposing to carry out Highway improvement works on Stoney Brow, Up Holland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2026 and could run through until 5 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 31 Jul 2026 at 14:07.
30 Oct and 5 Nov 2026
Lancashire County Council are proposing to carry out Highway improvement works on Bank Brow, Up Holland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2026 and could run through until 5 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 31 Jul 2026 at 14:04.
30 Oct and 5 Nov 2026
Lancashire County Council are proposing to carry out Highway improvement works on Roby Mill, Up Holland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2026 and could run through until 5 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 31 Jul 2026 at 14:06.
4 and 6 Nov 2026
Lancashire County Council are proposing to carry out Highway improvement works on Sandbrook Road, Up Holland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 25 Aug 2026 at 08:59.
9 and 13 Nov 2026
Lancashire County Council are proposing to carry out Highway improvement works on Derby Street West, Ormskirk.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 10 Jun 2026 at 13:25.
9 and 13 Nov 2026
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Ruff Lane, Ormskirk.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Aug 2026 at 08:49.
9 Nov and 22 Dec 2026
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Catchdale Moss Lane, Eccleston, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 22 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 6 May 2026 at 08:23.
23 and 27 Nov 2026
Electricity North West (NorWeb) are proposing to carry out New service connection on Merton Road, Wigan.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2026 at 11:13.
23 Nov 2026 and 10 Jan 2027
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Vicarage Lane, Shevington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 10 January 2027. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Aug 2026 at 12:05.
23 Nov and 4 Dec 2026
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Grimshaw Lane, Ormskirk.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 4 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Sep 2026 at 10:17.
23 Nov and 4 Dec 2026
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Grimshaw Lane, Ormskirk.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 4 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 17 Sep 2026 at 10:19.
23 and 27 Nov 2026
Electricity North West (NorWeb) are proposing to carry out New service connection on Merton Road, Wigan.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 4 Sep 2026 at 13:24.
23 and 27 Nov 2026
Electricity North West (NorWeb) are proposing to carry out New service connection on Merton Road, Wigan.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 2 Sep 2026 at 13:45.
Roadworks Map near to Maple View, White Moss Business Park, SKELMERSDALE, WN8 9TD
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Maple View, White Moss Business Park, SKELMERSDALE, WN8 9TD (18 Events)
(Scheduled Dates)
(miles)
(Scheduled: 20 Sep 2026 - 24 Sep 2026)
(Scheduled: 17 Sep 2026 - 21 Sep 2026)
(Scheduled: 15 Sep 2026 - 21 Sep 2026)
(Scheduled: 24 Aug 2026 - 14 Oct 2026)
Contains public sector information licensed under the Open Government Licence v3.0.