ROADWORKS SUMMARY
Brierfield, SKELMERSDALE, WN8 9JD
Introduction

View current and future planned roadworks and road closures for Brierfield, WN8 9JD and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Brierfield, SKELMERSDALE, WN8 9JD
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Brierfield are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
30 Oct 2024 and 4 Nov 2025
St. Helens Council are proposing to carry out Highway repair and maintenance works on Leyland Green Road, Ashton In Makerfield, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2024 and could run through until 4 November 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by St. Helens Council on 18 Oct 2024 at 14:53.
Today
United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Hexham Avenue, Wigan.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 March 2025 at 12:52 and could run through until 19 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 13 Mar 2025 at 13:51.
Friday
Network Rail are proposing to carry out Works for Rail Purposes on M6 From J254 To J25 N, Wigan.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 24 Sep 2024 at 07:10.
Friday
Network Rail were proposing to carry out Works for Rail Purposes on M6 From J254 To J25 N, Wigan.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 March 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 18 Dec 2024 at 13:40.
Today
United Utilities Water (formerly North West Water) are carrying out Disconnection or alteration of supply on Firswood Road, Lathom.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 March 2025 at 09:22 and could run through until 19 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 17 Mar 2025 at 11:19.
Today
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Firswood Road, Lathom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 16 Jan 2025 at 10:44.
Friday
BT are proposing to carry out Utility asset works on Blythe Lane, Lathom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 6 Jan 2025 at 10:00.
Friday
BT were proposing to carry out Utility asset works on Blythe Lane, Lathom.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 21 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 24 Feb 2025 at 08:40.
Friday
BT are proposing to carry out Utility asset works on Hobcross Lane, Lathom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 6 Jan 2025 at 09:43.
Friday
BT were proposing to carry out Utility asset works on Hobcross Lane, Lathom.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 21 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 24 Feb 2025 at 08:40.
31 Mar and 17 Apr 2025
Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Fitzadam Street, Wigan.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 17 Mar 2025 at 12:48.
31 Mar and 17 Apr 2025
Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Ivy Street, Wigan.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 17 Mar 2025 at 12:45.
31 Mar and 17 Apr 2025
Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Crook Street, Wigan.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 17 Mar 2025 at 12:35.
31 Mar and 4 Apr 2025
Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Upholland Road, Billinge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 19 Mar 2025 at 07:43.
31 Mar and 2 Apr 2025
Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Bryn Road, Ashton-in-makerfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 17 Mar 2025 at 08:03.
6 and 13 Apr 2025
Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Enfield Street, Wigan.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 April 2025 and could run through until 13 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 17 Mar 2025 at 13:59.
7 and 9 Apr 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Green Lane, Billinge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 13 Jan 2025 at 09:42.
7 and 10 Apr 2025
Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Upholland Road, Billinge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 17 Mar 2025 at 16:36.
7 and 9 Apr 2025
Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Bryn Road, Ashton-in-makerfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 19 Mar 2025 at 10:16.
15 and 17 Apr 2025
Lancashire County Council were proposing to carry out Highway repair and maintenance works on Mill Lane, Windmill Bridge, Parbold.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 April 2025 and run through until 17 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 22 Jan 2025 at 07:49.
15 and 17 Apr 2025
Lancashire County Council were proposing to carry out Highway repair and maintenance works on Station Road, Parbold.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 April 2025 and run through until 17 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 23 Jan 2025 at 07:37.
15 and 17 Apr 2025
Lancashire County Council were proposing to carry out Highway repair and maintenance works on The Common, Parbold.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 April 2025 and run through until 17 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 24 Jan 2025 at 07:59.
22 Apr and 7 May 2025
Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Westminster Street, Newtown, Wigan.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 17 Mar 2025 at 12:38.
28 Apr and 23 May 2025
Cadent Gas are proposing to carry out Utility asset works on Frog Lane, Wigan.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 14:58.
28 Apr and 2 May 2025
Network Rail are proposing to carry out Works for Rail Purposes on Wallgate, Wigan.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 15 Jan 2025 at 13:28.
28 Apr and 6 May 2025
Lancashire County Council were proposing to carry out Highway repair and maintenance works on Lathom Lane, Ormskirk.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 April 2025 and run through until 6 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 6 Feb 2025 at 14:36.
28 Apr and 6 May 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Mill Lane, Rainford, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 6 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 29 Jan 2025 at 12:25.
30 Apr and 2 May 2025
Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Ivy Street, Wigan.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 17 Mar 2025 at 16:05.
30 Apr and 2 May 2025
Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Crook Street, Wigan.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 17 Mar 2025 at 16:19.
30 Apr and 2 May 2025
Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Fitzadam Street, Wigan.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 17 Mar 2025 at 16:01.
8 and 12 May 2025
Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Westminster Street, Newtown, Wigan.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 May 2025 and could run through until 12 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 17 Mar 2025 at 16:20.
12 and 14 May 2025
Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Southgate, Wigan.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 18 Mar 2025 at 11:01.
13 and 26 May 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Robin Hood Lane, Wrightington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2025 and could run through until 26 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 17 Mar 2025 at 09:27.
26 May and 12 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Washway Lane, St Helens.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 14:24.
26 May and 23 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Church Road, Rainford, St Helens.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Feb 2025 at 11:35.
2 and 4 Jun 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Hillock Lane, Dalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 18 Mar 2025 at 15:28.
2 and 18 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Festival Road, Rainford, St Helens.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Feb 2025 at 11:33.
2 Jun and 7 Sep 2025
Transport For Greater Manchester are proposing to carry out Highway improvement works on Poolstock Lane, Wigan.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport For Greater Manchester on 5 Mar 2025 at 09:14.
2 Jun and 7 Sep 2025
Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Poolstock Lane, Wigan.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 27 Feb 2025 at 14:16.
2 Jun and 7 Sep 2025
Transport For Greater Manchester are proposing to carry out Highway improvement works on Poolstock Lane, Wigan.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport For Greater Manchester on 13 Mar 2025 at 10:11.
4 and 23 Jun 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Whiteledge Road, Skelmersdale.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 23 June 2025. The works will impact the verge only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 12 Mar 2025 at 10:07.
6 and 19 Jun 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Spa Lane, Lathom, Ormskirk.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 19 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 15 Mar 2025 at 09:28.
9 and 24 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Wigan Road, Lathom.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 15:55.
9 Jun and 18 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Dickets Lane, Lathom, Skelmersdale.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 15:55.
9 Jun and 4 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Blaguegate Lane, Lathom, Skelmersdale.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 15:56.
Roadworks Map near to Brierfield, SKELMERSDALE, WN8 9JD
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Brierfield, SKELMERSDALE, WN8 9JD (6 Events)
(Scheduled Dates)
(miles)
(Scheduled: 18 Mar 2025 - 20 Mar 2025)
(Scheduled: 15 Mar 2025 - 21 Mar 2025)
(Scheduled: 19 Mar 2025 - 21 Mar 2025)
(Scheduled: 19 Mar 2025 - 25 Mar 2025)
Contains public sector information licensed under the Open Government Licence v3.0.