ROADWORKS SUMMARY
Aspen Way, SKELMERSDALE, WN8 8QJ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Aspen Way, WN8 8QJ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Aspen Way, SKELMERSDALE, WN8 8QJ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Aspen Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Lancashire County Council logo
LONG TERM
Between
9 Jun 2024 and 30 Mar 2025
Details
View Map
Share
Follow
Derby Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Derby Street, West Of Stanley Street, Ormskirk.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 30 March 2025. The works will impact the carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Lancashire County Council on 9 Jan 2024 at 08:56.

Lancashire County Council logo
LONG TERM
Between
9 Jun 2024 and 30 Mar 2025
Details
View Map
Share
Follow
Railway Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Railway Road, Ormskirk.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 30 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Lancashire County Council on 15 Jan 2024 at 10:06.

Lancashire County Council logo
LONG TERM
Until
29 Aug 2025
Details
View Map
Share
Follow
Derby Street

Lancashire County Council are carrying out Highway repair and maintenance works on Derby Street, West Of Stanley Street, Ormskirk.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:00 and could run through until 29 August 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Lancashire County Council on 5 Nov 2024 at 08:28.

Lancashire County Council logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Railway Road

Lancashire County Council are carrying out Highway repair and maintenance works on Railway Road, Ormskirk.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 20:00 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 25 Feb 2025 at 09:58.

BT logo
Finishing
Today
Details
View Map
Share
Hobcross Lane

BT were proposing to carry out Utility asset works on Hobcross Lane, Lathom.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 21 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 24 Feb 2025 at 08:40.

BT logo
Finishing
Today
Details
View Map
Share
Follow
Hobcross Lane

BT are proposing to carry out Utility asset works on Hobcross Lane, Lathom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 6 Jan 2025 at 09:43.

BT logo
Finishing
Today
Details
View Map
Share
Blythe Lane

BT were proposing to carry out Utility asset works on Blythe Lane, Lathom.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 21 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 24 Feb 2025 at 08:40.

BT logo
Finishing
Today
Details
View Map
Share
Follow
Blythe Lane

BT are proposing to carry out Utility asset works on Blythe Lane, Lathom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 6 Jan 2025 at 10:00.

BT logo
Finishing
Today
Details
View Map
Share
Follow
Flax Lane

BT are proposing to carry out Utility asset works on Flax Lane, Burscough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 6 Jan 2025 at 09:40.

BT logo
Finishing
Today
Details
View Map
Share
Flax Lane

BT were proposing to carry out Utility asset works on Flax Lane, Burscough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 21 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 24 Feb 2025 at 08:40.

Wigan Metropolitan Borough Council logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Upholland Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Upholland Road, Billinge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 19 Mar 2025 at 12:36.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
1 Apr and 31 Oct 2025
Details
View Map
Share
Follow
Calder Close

Knowsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Calder Close, Tower Hill, Kirkby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 18 Mar 2025 at 10:34.

Lancashire County Council logo
LONG TERM
Between
7 Apr and 9 May 2025
Details
View Map
Share
Follow
Higgins Lane

Lancashire County Council are proposing to carry out Section 50 on Higgins Lane, Burscough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 28 Jan 2025 at 12:46.

Lancashire County Council logo
LONG TERM
Between
7 Apr and 9 May 2025
Details
View Map
Share
Follow
Langley Road

Lancashire County Council are proposing to carry out Section 50 on Langley Road, Burscough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 28 Jan 2025 at 12:50.

Lancashire County Council logo
LONG TERM
Between
7 Apr and 9 May 2025
Details
View Map
Share
Follow
Langley Road

Lancashire County Council are proposing to carry out Section 50 on Langley Road, Burscough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 28 Jan 2025 at 12:51.

Lancashire County Council logo
LONG TERM
Between
7 Apr and 9 May 2025
Details
View Map
Share
Follow
Higgins Lane

Lancashire County Council are proposing to carry out Section 50 on Higgins Lane, Burscough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 28 Jan 2025 at 12:45.

United Utilities Water (formerly North West Water) logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Green Lane

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Green Lane, Billinge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 13 Jan 2025 at 09:42.

Wigan Metropolitan Borough Council logo
Between
7 and 10 Apr 2025
Details
View Map
Share
Follow
Upholland Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Upholland Road, Billinge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 17 Mar 2025 at 16:36.

Lancashire County Council logo
Between
15 and 17 Apr 2025
Details
View Map
Share
The Common

Lancashire County Council were proposing to carry out Highway repair and maintenance works on The Common, Parbold.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 April 2025 and run through until 17 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 24 Jan 2025 at 07:59.

Lancashire County Council logo
Between
15 and 17 Apr 2025
Details
View Map
Share
Station Road

Lancashire County Council were proposing to carry out Highway repair and maintenance works on Station Road, Parbold.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 April 2025 and run through until 17 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 23 Jan 2025 at 07:37.

Lancashire County Council logo
Between
15 and 17 Apr 2025
Details
View Map
Share
Mill Lane

Lancashire County Council were proposing to carry out Highway repair and maintenance works on Mill Lane, Windmill Bridge, Parbold.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 April 2025 and run through until 17 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 22 Jan 2025 at 07:49.

Lancashire County Council logo
Between
28 Apr and 6 May 2025
Details
View Map
Share
Lathom Lane

Lancashire County Council were proposing to carry out Highway repair and maintenance works on Lathom Lane, Ormskirk.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 6 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 6 Feb 2025 at 14:36.

United Utilities Water (formerly North West Water) logo
Between
28 Apr and 6 May 2025
Details
View Map
Share
Follow
Mill Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Mill Lane, Rainford, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 6 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 29 Jan 2025 at 12:25.

Lancashire County Council logo
LONG TERM
Between
29 Apr and 4 Jul 2025
Details
View Map
Share
Follow
Derby Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Derby Street, West Of Stanley Street, Ormskirk.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 13 Mar 2025 at 14:16.

Lancashire County Council logo
LONG TERM
Between
29 Apr and 4 Jul 2025
Details
View Map
Share
Follow
Derby Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Derby Street, West Of Stanley Street, Ormskirk.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 18 Dec 2024 at 16:34.

United Utilities Water (formerly North West Water) logo
Between
13 and 26 May 2025
Details
View Map
Share
Follow
Robin Hood Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Robin Hood Lane, Wrightington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 26 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 17 Mar 2025 at 09:27.

Lancashire County Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Delph Lane

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Delph Lane, Aughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 14 Mar 2025 at 09:48.

United Utilities Water (formerly North West Water) logo
Between
26 May and 3 Jun 2025
Details
View Map
Share
Follow
St Helens Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on St Helens Road, North Of Park Road, Ormskirk.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Feb 2025 at 15:56.

Cadent Gas logo
LONG TERM
Between
26 May and 23 Jul 2025
Details
View Map
Share
Follow
Church Road

Cadent Gas are proposing to carry out Utility asset works on Church Road, Rainford, St Helens.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Feb 2025 at 11:35.

Cadent Gas logo
Between
2 and 22 Jun 2025
Details
View Map
Share
Follow
Lord Street

Cadent Gas are proposing to carry out Utility asset works on Lord Street, Burscough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 15:52.

Cadent Gas logo
Between
2 and 22 Jun 2025
Details
View Map
Share
Follow
Lord Street

Cadent Gas are proposing to carry out Utility asset works on Lord Street, Burscough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Mar 2025 at 15:00.

Cadent Gas logo
Between
2 and 18 Jun 2025
Details
View Map
Share
Follow
Festival Road

Cadent Gas are proposing to carry out Utility asset works on Festival Road, Rainford, St Helens.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Feb 2025 at 11:33.

United Utilities Water (formerly North West Water) logo
Between
2 and 4 Jun 2025
Details
View Map
Share
Follow
Hillock Lane

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Hillock Lane, Dalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 18 Mar 2025 at 15:28.

United Utilities Water (formerly North West Water) logo
Between
4 and 23 Jun 2025
Details
View Map
Share
Follow
Whiteledge Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Whiteledge Road, Skelmersdale.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 23 June 2025. The works will impact the verge only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 12 Mar 2025 at 10:07.

Electricity North West (NorWeb) logo
Between
6 and 19 Jun 2025
Details
View Map
Share
Follow
Spa Lane

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Spa Lane, Lathom, Ormskirk.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 19 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 15 Mar 2025 at 09:28.

Cadent Gas logo
Between
9 and 24 Jun 2025
Details
View Map
Share
Follow
Wigan Road

Cadent Gas are proposing to carry out Utility asset works on Wigan Road, Lathom.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Mar 2025 at 14:00.

Cadent Gas logo
Between
9 and 24 Jun 2025
Details
View Map
Share
Follow
Wigan Road

Cadent Gas are proposing to carry out Utility asset works on Wigan Road, Lathom.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 15:55.

Cadent Gas logo
LONG TERM
Between
9 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Dickets Lane

Cadent Gas are proposing to carry out Utility asset works on Dickets Lane, Lathom, Skelmersdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Mar 2025 at 14:00.

Cadent Gas logo
LONG TERM
Between
9 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Dickets Lane

Cadent Gas are proposing to carry out Utility asset works on Dickets Lane, Lathom, Skelmersdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 15:55.

Cadent Gas logo
Between
9 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Blaguegate Lane

Cadent Gas are proposing to carry out Utility asset works on Blaguegate Lane, Lathom, Skelmersdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Mar 2025 at 14:00.

Cadent Gas logo
Between
9 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Blaguegate Lane

Cadent Gas are proposing to carry out Utility asset works on Blaguegate Lane, Lathom, Skelmersdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 15:56.

Cadent Gas logo
LONG TERM
Between
11 Jun and 15 Aug 2025
Details
View Map
Share
Follow
Prescot Road

Cadent Gas are proposing to carry out Utility asset works on Prescot Road, Ormskirk.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 15:07.

BT logo
Between
16 and 27 Jun 2025
Details
View Map
Share
Jacksons Lane

BT were proposing to carry out Utility asset works on Jacksons Lane, Bispham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 18 Mar 2025 at 08:07.


Roadworks Map near to Aspen Way, SKELMERSDALE, WN8 8QJ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Mar 2025 18:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Aspen Way, SKELMERSDALE, WN8 8QJ (6 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Virgin Media logo
MILLBROOK CLOSE 
(0.2 miles)
Virgin Media
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 21 Mar 2025 12:35
(Scheduled: 21 Mar 2025 - 25 Mar 2025)
0.2
Details
Share
Follow
2
BT logo
MILLBROOK CLOSE 
(0.2 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 22 Mar 2025 - 23 Mar 2025
0.2
Details
Share
Follow
3
Virgin Media logo
THEALBY CLOSE 
(0.3 miles)
Virgin Media
Utility asset works - Footway - Some carriageway incursion
Complete
20 Mar 2025 12:25 - 14:21
0.3
Details
Share
4
Lancashire County Council logo
MAJOR
  
STATHAM ROAD 
(0.5 miles)
Lancashire County Council
Section 50 - Verge - Some carriageway incursion
Planned
Scheduled: 17 Mar 2025 - 7 Apr 2025
0.5
Details
Share
Follow
5
Lancashire County Council logo
MAJOR
  
STATHAM ROAD 
(0.5 miles)
Lancashire County Council
Section 50 - Verge - Some carriageway incursion
Planned
Scheduled: 17 Mar 2025 - 7 Apr 2025
0.5
Details
Share
Follow
6
Virgin Media logo
INSKIP 
(0.5 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Complete
20 Mar 2025 10:10 - 12:00
0.5
Details
Share