ROADWORKS SUMMARY
LEIGH, WN7 9BG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for WN7 9BG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to LEIGH, WN7 9BG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Wigan Metropolitan Borough Council logo
LONG TERM
Between
30 Sep 2024 and 27 May 2025
Details
View Map
Share
Follow
St Helens Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on St Helens Road, Leigh.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 27 May 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 13 Jan 2025 at 10:03.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Oct 2024 and 1 Apr 2025
Details
View Map
Share
East Lancashire Road

Wigan Metropolitan Borough Council were proposing to carry out Highway improvement works on East Lancashire Road, Worsley.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 October 2024 and run through until 1 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 9 Dec 2024 at 09:39.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Oct 2024 and 1 Apr 2025
Details
View Map
Share
Mosley Common Road

Wigan Metropolitan Borough Council were proposing to carry out Highway improvement works on Mosley Common Road, Worsley.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 October 2024 and run through until 1 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 9 Dec 2024 at 09:38.

Electricity North West (NorWeb) logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Daten Avenue

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Daten Avenue, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 13 Nov 2024 at 09:28.

Electricity North West (NorWeb) logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Daten Avenue

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Daten Avenue, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 13 Nov 2024 at 09:28.

Electricity North West (NorWeb) logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Warrington Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Warrington Road, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 13 Nov 2024 at 09:29.

Electricity North West (NorWeb) logo
LONG TERM
Until
23 Mar 2025
Details
View Map
Share
Follow
Leigh Road

Electricity North West (NorWeb) are carrying out Diversionary works on Leigh Road, Hindley Green.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 January 2025 at 14:00 and could run through until 23 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 23 Jan 2025 at 11:07.

Cadent Gas logo
LONG TERM
Between
20 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Leigh Road

Cadent Gas are proposing to carry out Utility asset works on Leigh Road, Worsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 10:17.

Cadent Gas logo
LONG TERM
Between
20 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Leigh Road

Cadent Gas are proposing to carry out Utility asset works on Leigh Road, Worsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 14:18.

Cadent Gas logo
LONG TERM
Until
7 Mar 2025
Details
View Map
Share
Follow
Leigh Road

Cadent Gas are carrying out Utility asset works on Leigh Road, Worsley.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 09:00 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 12:59.

Electricity North West (NorWeb) logo
Finishing
Sunday
Details
View Map
Share
Birchwood Park Avenue

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Birchwood Park Avenue, Birchwood, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 16 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 15 Nov 2024 at 08:46.

Electricity North West (NorWeb) logo
Finishing
Sunday
Details
View Map
Share
Daten Avenue

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Daten Avenue, Birchwood, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 16 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 15 Nov 2024 at 08:38.

Electricity North West (NorWeb) logo
Finishing
Sunday
Details
View Map
Share
Daten Avenue

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Daten Avenue, Birchwood, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 16 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 15 Nov 2024 at 08:42.

Electricity North West (NorWeb) logo
Finishing
Sunday
Details
View Map
Share
Warrington Road

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Warrington Road, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 16 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Nov 2024 at 08:30.

Electricity North West (NorWeb) logo
LONG TERM
Until
30 Mar 2025
Details
View Map
Share
Follow
Leigh Road

Electricity North West (NorWeb) are carrying out Diversionary works on Leigh Road, Hindley Green.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 16:45 and could run through until 30 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 28 Jan 2025 at 08:52.

Electricity North West (NorWeb) logo
Between
30 Jan and 27 Feb 2025
Details
View Map
Share
Follow
Newton Lane

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Newton Lane, Newton-le-willows.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 7 Nov 2024 at 14:52.

Warrington Borough Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Holcroft Lane

Warrington Borough Council are carrying out Highway repair and maintenance works on Holcroft Lane, Culcheth And Glazebury, Warrington.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 11:00 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 10 Feb 2025 at 10:34.

Electricity North West (NorWeb) logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Beaumaris Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Beaumaris Road, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 29 Oct 2024 at 11:05.

Electricity North West (NorWeb) logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Beaumaris Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Beaumaris Road, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 29 Oct 2024 at 13:07.

Electricity North West (NorWeb) logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Pendennis Crescent

Electricity North West (NorWeb) are proposing to carry out New service connection on Pendennis Crescent, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 29 Oct 2024 at 11:05.

Electricity North West (NorWeb) logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Pendennis Crescent

Electricity North West (NorWeb) are proposing to carry out New service connection on Pendennis Crescent, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 29 Oct 2024 at 13:07.

Cadent Gas logo
LONG TERM
Between
6 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Wigan Road

Cadent Gas are proposing to carry out Utility asset works on Wigan Road, Golborne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:48.

Cadent Gas logo
LONG TERM
Until
13 Mar 2025
Details
View Map
Share
Follow
Wigan Road

Cadent Gas are carrying out Utility asset works on Wigan Road, Golborne.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 February 2025 at 09:00 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Feb 2025 at 09:09.

Electricity North West (NorWeb) logo
Finishing
Today
Details
View Map
Share
Follow
Birchwood Park Avenue

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Birchwood Park Avenue, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 13 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 20 Nov 2024 at 14:36.

Electricity North West (NorWeb) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Daten Avenue

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Daten Avenue, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 20 Nov 2024 at 14:33.

Electricity North West (NorWeb) logo
Finishing
Today
Details
View Map
Share
Follow
Daten Avenue

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Daten Avenue, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 20 Nov 2024 at 14:35.

Cadent Gas logo
Between
10 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Taylors Lane

Cadent Gas are proposing to carry out Utility asset works on Taylors Lane, Ince.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:51.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Slack Fold Lane

Cadent Gas are carrying out Utility repair and maintenance works on Slack Fold Lane, Bolton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 09:05 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Feb 2025 at 07:56.

Electricity North West (NorWeb) logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Thomas Street

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Thomas Street, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 14 Jan 2025 at 09:32.

Electricity North West (NorWeb) logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
East Street

Electricity North West (NorWeb) are proposing to carry out Diversionary works on East Street, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 14 Jan 2025 at 09:32.

Wigan Metropolitan Borough Council logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Etherstone Street

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Etherstone Street, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 24 Jan 2025 at 13:27.

Wigan Metropolitan Borough Council logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Etherstone Street

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Etherstone Street, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 13 Jan 2025 at 10:03.

Electricity North West (NorWeb) logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Edale Road

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Edale Road, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 12 Dec 2024 at 11:12.

Salford City Council logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Anchor Lane

Salford City Council are proposing to carry out Highway improvement works on Anchor Lane, Worsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Salford City Council on 7 Feb 2025 at 13:57.

Salford City Council logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Anchor Lane

Salford City Council are proposing to carry out Highway improvement works on Anchor Lane, Worsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Salford City Council on 11 Feb 2025 at 07:59.

Electricity North West (NorWeb) logo
Between
20 and 26 Feb 2025
Details
View Map
Share
Follow
Edale Road

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Edale Road, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 12 Dec 2024 at 08:00.

Electricity North West (NorWeb) logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Atherton Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Atherton Road, Hindley Green.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 9 Dec 2024 at 17:01.

Cadent Gas logo
Between
24 Feb and 19 Mar 2025
Details
View Map
Share
Follow
Taylors Lane

Cadent Gas are proposing to carry out Utility asset works on Taylors Lane, Ince.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Jan 2025 at 13:23.

Electricity North West (NorWeb) logo
Between
27 Feb and 19 Mar 2025
Details
View Map
Share
Newton Lane

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Newton Lane, Newton-le-willows.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 February 2025 and run through until 19 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 4 Dec 2024 at 08:54.

Electricity North West (NorWeb) logo
Between
27 Feb and 19 Mar 2025
Details
View Map
Share
Follow
Newton Lane

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Newton Lane, Newton-le-willows.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 12 Dec 2024 at 07:59.

Electricity North West (NorWeb) logo
Between
27 Feb and 19 Mar 2025
Details
View Map
Share
Follow
Newton Lane

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Newton Lane, Newton-le-willows.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 16 Dec 2024 at 13:17.

Electricity North West (NorWeb) logo
Between
27 Feb and 19 Mar 2025
Details
View Map
Share
Follow
Newton Lane

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Newton Lane, Newton-le-willows.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 12 Dec 2024 at 07:58.

Electricity North West (NorWeb) logo
Between
27 Feb and 19 Mar 2025
Details
View Map
Share
Follow
Newton Lane

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Newton Lane, Newton-le-willows.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 19 Dec 2024 at 09:08.

Electricity North West (NorWeb) logo
Between
27 Feb and 19 Mar 2025
Details
View Map
Share
Follow
Smiths Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Smiths Lane, Hindley Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 5 Dec 2024 at 10:55.

Electricity North West (NorWeb) logo
LONG TERM
Between
27 Feb and 12 May 2025
Details
View Map
Share
Follow
Leigh Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Leigh Road, Hindley Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 5 Dec 2024 at 10:53.

Electricity North West (NorWeb) logo
LONG TERM
Between
27 Feb and 12 May 2025
Details
View Map
Share
Follow
Leigh Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Leigh Road, Hindley Green.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 5 Dec 2024 at 10:54.

Electricity North West (NorWeb) logo
Between
27 Feb and 19 Mar 2025
Details
View Map
Share
Follow
Atherton Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Atherton Road, Hindley Green.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 5 Dec 2024 at 10:55.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
2 Mar 2025 and 31 Mar 2026
Details
View Map
Share
Follow
King Street

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on King Street, Leigh.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 March 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 16 Sep 2024 at 11:22.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
2 Mar 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Market Street

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Market Street, Leigh.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 March 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 16 Sep 2024 at 11:21.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
2 Mar 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Market Place

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Market Place, Leigh.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 March 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 16 Sep 2024 at 11:20.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
2 Mar 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Leigh Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Leigh Road, Leigh.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 March 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 16 Sep 2024 at 11:23.

Electricity North West (NorWeb) logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
East Lancashire Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on East Lancashire Road, Golborne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 4 Dec 2024 at 12:09.

Electricity North West (NorWeb) logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Richmond Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Richmond Road, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 29 Oct 2024 at 11:05.

Electricity North West (NorWeb) logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Richmond Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Richmond Road, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 29 Oct 2024 at 13:07.

Electricity North West (NorWeb) logo
LONG TERM
Between
4 Mar and 7 Apr 2025
Details
View Map
Share
Thomas Street

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Thomas Street, Hindley Green.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 March 2025 and run through until 7 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 10 Dec 2024 at 11:00.

Electricity North West (NorWeb) logo
Between
4 and 10 Mar 2025
Details
View Map
Share
Follow
Thomas Street

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Thomas Street, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 12 Dec 2024 at 08:22.

Electricity North West (NorWeb) logo
LONG TERM
Between
4 Mar and 7 Apr 2025
Details
View Map
Share
East Street

Electricity North West (NorWeb) were proposing to carry out Diversionary works on East Street, Hindley Green.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 March 2025 and run through until 7 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 10 Dec 2024 at 11:08.

Electricity North West (NorWeb) logo
Between
4 and 10 Mar 2025
Details
View Map
Share
Follow
East Street

Electricity North West (NorWeb) are proposing to carry out Diversionary works on East Street, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 12 Dec 2024 at 08:21.

Electricity North West (NorWeb) logo
Between
6 and 26 Mar 2025
Details
View Map
Share
Newton Lane

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Newton Lane, Newton-le-willows.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 March 2025 and run through until 26 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 12 Dec 2024 at 14:40.

Electricity North West (NorWeb) logo
Between
6 and 26 Mar 2025
Details
View Map
Share
Follow
Newton Lane

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Newton Lane, Newton-le-willows.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 12 Dec 2024 at 15:10.

Electricity North West (NorWeb) logo
Between
6 and 26 Mar 2025
Details
View Map
Share
Follow
Newton Lane

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Newton Lane, Newton-le-willows.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 16 Dec 2024 at 13:17.

Salford City Council logo
Between
8 and 24 Mar 2025
Details
View Map
Share
Follow
Manchester Road East

Salford City Council are proposing to carry out Highway repair and maintenance works on Manchester Road East, Worsley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Salford City Council on 23 Dec 2024 at 09:58.

Salford City Council logo
Between
8 and 24 Mar 2025
Details
View Map
Share
Follow
Manchester Road West

Salford City Council are proposing to carry out Utility repair and maintenance works on Manchester Road West, Worsley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Salford City Council on 23 Dec 2024 at 09:59.

Cadent Gas logo
Between
10 and 26 Mar 2025
Details
View Map
Share
Follow
Shaw Street

Cadent Gas are proposing to carry out Utility asset works on Shaw Street, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Feb 2025 at 16:24.

Cadent Gas logo
Between
17 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Shaw Street

Cadent Gas are proposing to carry out Utility asset works on Shaw Street, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 15:52.

United Utilities Water (formerly North West Water) logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Bridgewater Street

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Bridgewater Street, Hindley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 17 Dec 2024 at 10:37.

United Utilities Water (formerly North West Water) logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Bridgewater Street

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Bridgewater Street, Hindley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Feb 2025 at 09:14.

Electricity North West (NorWeb) logo
Between
21 Mar and 6 Apr 2025
Details
View Map
Share
Follow
East Lancashire Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on East Lancashire Road, Golborne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 6 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 17 Oct 2024 at 10:18.

Electricity North West (NorWeb) logo
LONG TERM
Between
24 Mar and 18 May 2025
Details
View Map
Share
Follow
Newton Lane

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Newton Lane, Newton-le-willows.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 18 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 17 Oct 2024 at 10:20.

Electricity North West (NorWeb) logo
LONG TERM
Between
24 Mar and 18 May 2025
Details
View Map
Share
Newton Lane

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Newton Lane, Newton-le-willows.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 18 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 5 Dec 2024 at 10:21.

Transport For Greater Manchester logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Follow
Bolton Road

Transport For Greater Manchester are proposing to carry out Highway repair and maintenance works on Bolton Road, Atherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport For Greater Manchester on 10 Feb 2025 at 12:10.

Wigan Metropolitan Borough Council logo
Between
31 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Walmesley Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Walmesley Road, Leigh.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 16 Dec 2024 at 12:12.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Apr and 31 Jul 2025
Details
View Map
Share
Follow
Atherleigh Way

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Atherleigh Way, Leigh.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 13 Nov 2024 at 09:14.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Apr and 1 Jul 2025
Details
View Map
Share
Follow
East Lancashire Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on East Lancashire Road, Worsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 23 Dec 2024 at 15:51.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Apr and 1 Jul 2025
Details
View Map
Share
Follow
Mosley Common Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Mosley Common Road, Worsley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 July 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 6 Feb 2025 at 11:16.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Apr and 1 Jul 2025
Details
View Map
Share
Follow
Mosley Common Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Mosley Common Road, Worsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 10 Dec 2024 at 14:45.

Salford City Council logo
Between
1 and 15 Apr 2025
Details
View Map
Share
Follow
Worsley Avenue

Salford City Council are proposing to carry out Highway repair and maintenance works on Worsley Avenue, Worsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Salford City Council on 6 Feb 2025 at 18:39.

Salford City Council logo
Between
1 and 15 Apr 2025
Details
View Map
Share
Follow
Eastwood Avenue

Salford City Council are proposing to carry out Highway repair and maintenance works on Eastwood Avenue, Worsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Salford City Council on 11 Feb 2025 at 10:30.

Salford City Council logo
Between
1 and 15 Apr 2025
Details
View Map
Share
Follow
Fleetwood Road

Salford City Council are proposing to carry out Highway repair and maintenance works on Fleetwood Road, Worsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Salford City Council on 11 Feb 2025 at 10:31.

Salford City Council logo
Between
1 and 15 Apr 2025
Details
View Map
Share
Follow
Wardley Avenue

Salford City Council are proposing to carry out Highway repair and maintenance works on Wardley Avenue, Worsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Salford City Council on 11 Feb 2025 at 10:48.

Salford City Council logo
Between
1 and 15 Apr 2025
Details
View Map
Share
Follow
Westwood Avenue

Salford City Council are proposing to carry out Highway repair and maintenance works on Westwood Avenue, Worsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Salford City Council on 11 Feb 2025 at 10:49.

Salford City Council logo
Between
1 and 15 Apr 2025
Details
View Map
Share
Barry Crescent

Salford City Council were proposing to carry out Highway repair and maintenance works on Barry Crescent, Worsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 15 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Salford City Council on 7 Feb 2025 at 07:32.

Salford City Council logo
Between
1 and 15 Apr 2025
Details
View Map
Share
Follow
Barry Crescent

Salford City Council are proposing to carry out Highway repair and maintenance works on Barry Crescent, Worsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Salford City Council on 11 Feb 2025 at 10:19.

Salford City Council logo
Between
1 and 15 Apr 2025
Details
View Map
Share
Follow
Hulton Avenue

Salford City Council are proposing to carry out Highway repair and maintenance works on Hulton Avenue, Worsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Salford City Council on 11 Feb 2025 at 10:42.

Salford City Council logo
Between
1 and 15 Apr 2025
Details
View Map
Share
Follow
Pemberton Street

Salford City Council are proposing to carry out Highway repair and maintenance works on Pemberton Street, Worsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Salford City Council on 11 Feb 2025 at 10:45.

Salford City Council logo
Between
1 and 15 Apr 2025
Details
View Map
Share
Coniston Avenue

Salford City Council were proposing to carry out Highway repair and maintenance works on Coniston Avenue, Worsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 15 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Salford City Council on 7 Feb 2025 at 07:42.

Salford City Council logo
Between
1 and 15 Apr 2025
Details
View Map
Share
Follow
Coniston Avenue

Salford City Council are proposing to carry out Highway repair and maintenance works on Coniston Avenue, Worsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Salford City Council on 11 Feb 2025 at 10:23.

Salford City Council logo
Between
1 and 15 Apr 2025
Details
View Map
Share
Follow
Eastham Way

Salford City Council are proposing to carry out Highway repair and maintenance works on Eastham Way, Worsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Salford City Council on 11 Feb 2025 at 10:27.

Electricity North West (NorWeb) logo
Between
5 and 22 Apr 2025
Details
View Map
Share
Thomas Street

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Thomas Street, Hindley Green.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 April 2025 and run through until 22 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 15 Dec 2024 at 12:56.

Electricity North West (NorWeb) logo
Between
5 and 19 Apr 2025
Details
View Map
Share
Follow
Thomas Street

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Thomas Street, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 19 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 16 Dec 2024 at 12:20.

Electricity North West (NorWeb) logo
Between
5 and 19 Apr 2025
Details
View Map
Share
Follow
Thomas Street

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Thomas Street, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 19 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 19 Dec 2024 at 08:58.

Electricity North West (NorWeb) logo
Between
5 and 22 Apr 2025
Details
View Map
Share
East Street

Electricity North West (NorWeb) were proposing to carry out Diversionary works on East Street, Hindley Green.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 April 2025 and run through until 22 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 15 Dec 2024 at 12:54.

Electricity North West (NorWeb) logo
Between
5 and 19 Apr 2025
Details
View Map
Share
Follow
East Street

Electricity North West (NorWeb) are proposing to carry out Diversionary works on East Street, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 19 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 16 Dec 2024 at 12:20.

Electricity North West (NorWeb) logo
Between
5 and 19 Apr 2025
Details
View Map
Share
Follow
East Street

Electricity North West (NorWeb) are proposing to carry out Diversionary works on East Street, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 19 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 19 Dec 2024 at 08:58.

Murphy Power Distribution logo
LONG TERM
Between
28 Apr and 22 Jun 2025
Details
View Map
Share
Follow
Wigan Road

Murphy Power Distribution are proposing to carry out Utility asset works on Wigan Road, Golborne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 5 Feb 2025 at 14:14.

Murphy Power Distribution logo
LONG TERM
Between
28 Apr and 22 Jun 2025
Details
View Map
Share
Follow
Wigan Road

Murphy Power Distribution are proposing to carry out Utility asset works on Wigan Road, Golborne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 5 Feb 2025 at 16:00.

Murphy Gas Networks logo
LONG TERM
Between
28 Apr and 22 Jun 2025
Details
View Map
Share
Wigan Road

Murphy Gas Networks were proposing to carry out Utility asset works on Wigan Road, Golborne.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 22 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Murphy Gas Networks on 5 Feb 2025 at 13:25.

Wigan Metropolitan Borough Council logo
Between
28 Apr and 23 May 2025
Details
View Map
Share
Follow
Kirkhall Lane

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Kirkhall Lane, Leigh.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 16 Dec 2024 at 12:12.

Cadent Gas logo
Between
5 and 22 May 2025
Details
View Map
Share
Follow
Shaw Street

Cadent Gas are proposing to carry out Utility asset works on Shaw Street, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 22 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Feb 2025 at 13:13.

Cadent Gas logo
LONG TERM
Between
5 May and 10 Jun 2025
Details
View Map
Share
Follow
Kennedy Road

Cadent Gas are proposing to carry out Utility asset works on Kennedy Road, Tyldesley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Feb 2025 at 14:51.

United Utilities Water (formerly North West Water) logo
Between
6 and 8 May 2025
Details
View Map
Share
Follow
Wellfield Road

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Wellfield Road, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Feb 2025 at 10:02.

United Utilities Water (formerly North West Water) logo
Between
6 and 8 May 2025
Details
View Map
Share
Follow
Wellfield Road

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Wellfield Road, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Feb 2025 at 14:37.

Virgin Media logo
Between
12 and 27 May 2025
Details
View Map
Share
Heath Street

Virgin Media were proposing to carry out Utility asset works on Heath Street, Golborne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 27 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 9 Jan 2025 at 11:09.

Cadent Gas logo
Between
12 May and 2 Jun 2025
Details
View Map
Share
Follow
Golborne Road

Cadent Gas are proposing to carry out Utility asset works on Golborne Road, Ashton-in-makerfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Feb 2025 at 10:05.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
12 May and 3 Aug 2025
Details
View Map
Share
Follow
Atherton Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Atherton Road, Hindley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 6 Nov 2024 at 15:41.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
12 May and 3 Aug 2025
Details
View Map
Share
Follow
Liverpool Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Liverpool Road, Hindley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 6 Nov 2024 at 15:42.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
12 May and 3 Aug 2025
Details
View Map
Share
Follow
Market Street

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Market Street, Hindley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 6 Nov 2024 at 15:40.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
12 May and 3 Aug 2025
Details
View Map
Share
Follow
Wigan Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Wigan Road, Hindley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 3 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 6 Nov 2024 at 15:40.


Roadworks Map near to LEIGH, WN7 9BG (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 13 Feb 2025 03:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to LEIGH, WN7 9BG (28 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Electricity North West (NorWeb) logo
CHAPEL STREET 
(0.3 miles)
Electricity North West (NorWeb)
New service connection - Footway - Some carriageway incursion
Planned
Scheduled: 12 Feb 2025 - 18 Feb 2025
0.3
Details
Share
Follow
2
Virgin Media logo
BATTERSBY STREET 
(0.3 miles)
Virgin Media
Utility asset works - Footway - Some carriageway incursion
Complete
12 Feb 2025 13:00 - 13:29
0.3
Details
Share
3
United Utilities Water (formerly North West Water) logo
URGENT
  
SMITH STREET BACK SERVICE ROAD 5 - 15 
(0.4 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Carriageway - Some carriageway incursion
In Progress
Since: 7 Feb 2025 11:29
(Scheduled: 7 Feb 2025 - 13 Feb 2025)
0.4
Details
Share
Follow
4
Virgin Media logo
BRADSHAWGATE 
(0.4 miles)
Virgin Media
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 13 Feb 2025 - 17 Feb 2025
0.4
Details
Share
Follow
5
Wigan Metropolitan Borough Council logo
URGENT
  
CHARLES STREET 
(0.4 miles)
Wigan Metropolitan Borough Council
Highway improvement works - Footway - Some carriageway incursion
In Progress
Since: 12 Feb 2025 09:30
(Scheduled: 12 Feb 2025 - 19 Feb 2025)
0.4
Details
Share
Follow
6
Wigan Metropolitan Borough Council logo
URGENT
  
LORD STREET 
(0.4 miles)
Wigan Metropolitan Borough Council
Highway improvement works - Footway, Carriageway - Lane closure
In Progress
Since: 4 Feb 2025 09:30
(Scheduled: 4 Feb 2025 - 17 Feb 2025)
0.4
Details
Share
Follow
7
Electricity North West (NorWeb) logo
MAJOR
  
ETHERSTONE STREET 
(0.5 miles)
Electricity North West (NorWeb)
Diversionary works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 15 Jan 2025 16:45
(Scheduled: 13 Jan 2025 - 18 Feb 2025)
0.5
Details
Share
Follow
8
Electricity North West (NorWeb) logo
MAJOR
  
BUCK STREET 
(0.5 miles)
Electricity North West (NorWeb)
Diversionary works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 15 Jan 2025 16:45
(Scheduled: 13 Jan 2025 - 18 Feb 2025)
0.5
Details
Share
Follow
9
Virgin Media logo
ST HELENS ROAD 
(0.5 miles)
Virgin Media
Utility asset works - Carriageway - Multi-way signals
Cancelled
(Scheduled: 12 Feb 2025 - 14 Feb 2025)
0.5
Details
Share
10
Virgin Media logo
ST HELENS ROAD 
(0.5 miles)
Virgin Media
Utility asset works - Carriageway - Multi-way signals
Cancelled
(Scheduled: 12 Feb 2025 - 14 Feb 2025)
0.5
Details
Share
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.