ROADWORKS SUMMARY
Plank Lane, LEIGH, WN7 4QE

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Plank Lane, WN7 4QE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Plank Lane, LEIGH, WN7 4QE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Plank Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Wigan Metropolitan Borough Council logo
LONG TERM
Between
2 Mar 2025 and 31 Mar 2026
Details
View Map
Share
King Street

Wigan Metropolitan Borough Council were proposing to carry out Highway improvement works on King Street, Leigh.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 March 2025 and run through until 31 March 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 12 Mar 2025 at 08:45.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
2 Mar 2025 and 31 Mar 2026
Details
View Map
Share
Market Street

Wigan Metropolitan Borough Council were proposing to carry out Highway improvement works on Market Street, Leigh.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 March 2025 and run through until 31 March 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 2 Jun 2025 at 10:57.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
2 Mar 2025 and 31 Mar 2026
Details
View Map
Share
Market Place

Wigan Metropolitan Borough Council were proposing to carry out Highway improvement works on Market Place, Leigh.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 March 2025 and run through until 31 March 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 2 Jun 2025 at 10:57.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
2 Mar 2025 and 31 Mar 2026
Details
View Map
Share
Leigh Road

Wigan Metropolitan Borough Council were proposing to carry out Highway improvement works on Leigh Road, Leigh.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 March 2025 and run through until 31 March 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 2 Jun 2025 at 11:29.

LONG TERM
Between
3 Mar 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Earle Street

St. Helens Council are proposing to carry out Highway improvement works on Earle Street, Newton Le Willows, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by St. Helens Council on 2 Dec 2024 at 10:00.

LONG TERM
Between
3 Mar 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Queen Street

St. Helens Council are proposing to carry out Highway improvement works on Queen Street, Newton Le Willows, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by St. Helens Council on 2 Dec 2024 at 09:59.

LONG TERM
Between
3 Mar 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Bridge Street

St. Helens Council are proposing to carry out Highway improvement works on Bridge Street, Newton Le Willows, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by St. Helens Council on 2 Dec 2024 at 09:58.

LONG TERM
Between
3 Mar 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Stanley Street

St. Helens Council are proposing to carry out Highway improvement works on Stanley Street, Newton Le Willows, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by St. Helens Council on 2 Dec 2024 at 10:00.

LONG TERM
Between
3 Mar 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Oxford Street

St. Helens Council are proposing to carry out Highway improvement works on Oxford Street, Newton Le Willows, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by St. Helens Council on 2 Dec 2024 at 09:59.

LONG TERM
Between
3 Mar 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Market Street

St. Helens Council are proposing to carry out Highway improvement works on Market Street, Newton Le Willows, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by St. Helens Council on 2 Dec 2024 at 09:59.

LONG TERM
Between
3 Mar 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Haydock Street

St. Helens Council are proposing to carry out Highway improvement works on Haydock Street, Newton Le Willows, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by St. Helens Council on 2 Dec 2024 at 09:59.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
25 May and 31 Dec 2025
Details
View Map
Share
Follow
Liverpool Road

Wigan Metropolitan Borough Council are proposing to carry out Section 50 on Liverpool Road, Ashton-in-makerfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 May 2025 and could run through until 31 December 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 24 Mar 2025 at 13:38.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
25 May and 31 Dec 2025
Details
View Map
Share
Follow
Warrington Road

Wigan Metropolitan Borough Council are proposing to carry out Section 50 on Warrington Road, Wigan.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 May 2025 and could run through until 31 December 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 24 Mar 2025 at 13:34.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
27 May and 27 Sep 2025
Details
View Map
Share
Follow
Walmesley Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Walmesley Road, Leigh.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 27 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 27 Jan 2025 at 08:58.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
27 May and 27 Sep 2025
Details
View Map
Share
Follow
Walmesley Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Walmesley Road, Leigh.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 27 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 27 Jan 2025 at 08:58.

National Highways logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Warrington Road

National Highways are proposing to carry out Highway repair and maintenance works on Warrington Road, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 16 Jun 2025 at 14:56.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Jul and 1 Dec 2025
Details
View Map
Share
Follow
East Lancashire Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on East Lancashire Road, Lowton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 24 Sep 2024 at 09:27.

Wigan Metropolitan Borough Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Stone Cross Lane North

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Stone Cross Lane North, Lowton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 22 September 2025. The works will impact the carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 6 Feb 2025 at 13:31.

National Highways logo
LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Warrington Road

National Highways are carrying out Highway repair and maintenance works on Warrington Road, Warrington.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 23:00 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 18 Jul 2025 at 14:16.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
14 Jul 2025 and 23 Feb 2026
Details
View Map
Share
Follow
Well Street

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Well Street, Tyldesley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 23 February 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 2 Apr 2025 at 13:19.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
14 Jul 2025 and 23 Feb 2026
Details
View Map
Share
Elliott Street

Wigan Metropolitan Borough Council were proposing to carry out Highway improvement works on Elliott Street, Tyldesley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 23 February 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 25 Mar 2025 at 13:11.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
14 Jul 2025 and 23 Feb 2026
Details
View Map
Share
Follow
Elliott Street

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Elliott Street, Tyldesley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 23 February 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 25 Mar 2025 at 16:26.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
14 Jul 2025 and 23 Feb 2026
Details
View Map
Share
Follow
Shuttle Street

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Shuttle Street, Tyldesley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 23 February 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 2 Apr 2025 at 13:19.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
14 Jul 2025 and 23 Feb 2026
Details
View Map
Share
Follow
Bolton Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Bolton Road, Atherton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 23 February 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 2 Apr 2025 at 14:07.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
20 Jul and 1 Dec 2025
Details
View Map
Share
Follow
Stone Cross Lane North

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Stone Cross Lane North, Lowton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 July 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 24 Sep 2024 at 09:25.

Wigan Metropolitan Borough Council logo
LONG TERM
Until
9 Nov 2025
Details
View Map
Share
Follow
Bryn Road

Wigan Metropolitan Borough Council are carrying out Section 50 on Bryn Road, Ashton-in-makerfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 July 2025 at 08:00 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 19 Aug 2025 at 09:29.

LONG TERM
Between
31 Jul 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Stanley Street

St. Helens Council are proposing to carry out Highway improvement works on Stanley Street, Newton Le Willows, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by St. Helens Council on 7 May 2025 at 12:03.

Wigan Metropolitan Borough Council logo
LONG TERM
Until
1 Dec 2025
Details
View Map
Share
Follow
Bolton Road

Wigan Metropolitan Borough Council are carrying out Section 50 on Bolton Road, Ashton-in-makerfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 08:00 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 19 Aug 2025 at 09:29.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
4 Aug and 26 Oct 2025
Details
View Map
Share
Atherton Road

Wigan Metropolitan Borough Council were proposing to carry out Highway improvement works on Atherton Road, Hindley.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 26 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 3 Jul 2025 at 09:41.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
4 Aug and 26 Oct 2025
Details
View Map
Share
Liverpool Road

Wigan Metropolitan Borough Council were proposing to carry out Highway improvement works on Liverpool Road, Hindley.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 26 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 3 Jul 2025 at 09:44.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
4 Aug and 26 Oct 2025
Details
View Map
Share
Market Street

Wigan Metropolitan Borough Council were proposing to carry out Highway improvement works on Market Street, Hindley.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 26 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 3 Jul 2025 at 09:39.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
4 Aug and 26 Oct 2025
Details
View Map
Share
Wigan Road

Wigan Metropolitan Borough Council were proposing to carry out Highway improvement works on Wigan Road, Hindley.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 26 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 3 Jul 2025 at 09:34.

Electricity North West (NorWeb) logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Chorley Road

Electricity North West (NorWeb) are carrying out New service connection on Chorley Road, Westhoughton, Bolton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 August 2025 at 09:40 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 11 Aug 2025 at 09:41.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
15 Aug 2025 and 12 Feb 2026
Details
View Map
Share
Follow
Liverpool Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Liverpool Road, Ashton-in-makerfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 12 February 2026. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 20 Feb 2025 at 10:58.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
15 Aug 2025 and 12 Feb 2026
Details
View Map
Share
Follow
Bolton Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Bolton Road, Ashton-in-makerfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 12 February 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 20 Feb 2025 at 10:59.

Cadent Gas logo
LONG TERM
Between
25 Aug and 26 Sep 2025
Details
View Map
Share
Follow
Warrington Road

Cadent Gas are proposing to carry out Utility asset works on Warrington Road, Wigan.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2025 at 11:09.

Cadent Gas logo
LONG TERM
Between
25 Aug and 15 Oct 2025
Details
View Map
Share
Follow
Wigan Road

Cadent Gas are proposing to carry out Utility asset works on Wigan Road, Atherton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 May 2025 at 14:31.

Cadent Gas logo
LONG TERM
Between
25 Aug and 15 Oct 2025
Details
View Map
Share
Follow
Wigan Road

Cadent Gas are proposing to carry out Utility asset works on Wigan Road, Atherton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 May 2025 at 13:08.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
26 Aug and 28 Oct 2025
Details
View Map
Share
Follow
Atherleigh Way

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Atherleigh Way, Leigh.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 28 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 11 Aug 2025 at 13:52.

Finishing
Tomorrow
Details
View Map
Share
Follow
Golborne Road

Last Mile Gas are proposing to carry out Utility asset works on Golborne Road, Winwick, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Gas on 16 Jul 2025 at 10:09.

Finishing
Tomorrow
Details
View Map
Share
Follow
Golborne Road

Last Mile Gas are proposing to carry out Utility asset works on Golborne Road, Winwick, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Gas on 16 Jul 2025 at 13:12.

Finishing
Tomorrow
Details
View Map
Share
Follow
Golborne Road

Last Mile Gas are proposing to carry out Utility asset works on Golborne Road, Winwick, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Gas on 7 Aug 2025 at 10:56.

Finishing
Tomorrow
Details
View Map
Share
Follow
Golborne Road

Last Mile Gas are proposing to carry out Utility asset works on Golborne Road, Winwick, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Gas on 26 Aug 2025 at 14:39.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Hob Hey Lane

Cadent Gas are carrying out Utility asset works on Hob Hey Lane, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 11:00 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 11:09.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Sep and 23 Nov 2025
Details
View Map
Share
Follow
Atherton Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Atherton Road, Hindley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 4 Jul 2025 at 11:43.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Sep and 23 Nov 2025
Details
View Map
Share
Follow
Liverpool Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Liverpool Road, Hindley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 4 Jul 2025 at 11:43.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Sep and 23 Nov 2025
Details
View Map
Share
Follow
Market Street

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Market Street, Hindley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 4 Jul 2025 at 11:44.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Sep and 23 Nov 2025
Details
View Map
Share
Follow
Wigan Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Wigan Road, Hindley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 23 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 4 Jul 2025 at 11:43.

Until
25 Sep 2025
Details
View Map
Share
Follow
Golborne Road

Last Mile Gas are carrying out Utility asset works on Golborne Road, Winwick, Warrington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 September 2025 at 10:10 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Gas on 3 Sep 2025 at 10:24.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Warrington Road

Cadent Gas are proposing to carry out Utility asset works on Warrington Road, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Jun 2025 at 10:25.

Electricity North West (NorWeb) logo
Between
8 and 26 Sep 2025
Details
View Map
Share
Follow
Wigshaw Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Wigshaw Lane, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Jun 2025 at 15:40.

Cadent Gas logo
Between
8 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Lansdowne

Cadent Gas are proposing to carry out Utility asset works on Lansdowne, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 May 2025 at 15:06.

Cadent Gas logo
Until
1 Oct 2025
Details
View Map
Share
Follow
Lansdowne

Cadent Gas are carrying out Utility asset works on Lansdowne, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 13:51 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 13:51.

Electricity North West (NorWeb) logo
Between
8 and 26 Sep 2025
Details
View Map
Share
Follow
Wigshaw Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Wigshaw Lane, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Jun 2025 at 15:41.

Electricity North West (NorWeb) logo
Between
8 and 26 Sep 2025
Details
View Map
Share
Follow
Common Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Common Lane, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Jun 2025 at 15:41.

Cadent Gas logo
LONG TERM
Between
8 Sep and 29 Oct 2025
Details
View Map
Share
Follow
Wigan Road

Cadent Gas are proposing to carry out Utility asset works on Wigan Road, Atherton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jun 2025 at 14:21.

Wigan Metropolitan Borough Council logo
LONG TERM
Until
12 Dec 2025
Details
View Map
Share
Follow
Atherton Road

Wigan Metropolitan Borough Council are carrying out Highway improvement works on Atherton Road, Hindley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 09:30 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 9 Sep 2025 at 16:30.

Wigan Metropolitan Borough Council logo
LONG TERM
Until
12 Dec 2025
Details
View Map
Share
Follow
Liverpool Road

Wigan Metropolitan Borough Council are carrying out Highway improvement works on Liverpool Road, Hindley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 09:30 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 9 Sep 2025 at 16:30.

Wigan Metropolitan Borough Council logo
LONG TERM
Until
12 Dec 2025
Details
View Map
Share
Follow
Market Street

Wigan Metropolitan Borough Council are carrying out Highway improvement works on Market Street, Hindley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 09:30 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 9 Sep 2025 at 16:30.

Wigan Metropolitan Borough Council logo
LONG TERM
Until
12 Dec 2025
Details
View Map
Share
Follow
Wigan Road

Wigan Metropolitan Borough Council are carrying out Highway improvement works on Wigan Road, Hindley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 09:30 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 9 Sep 2025 at 10:18.

United Utilities Water (formerly North West Water) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Tanners Lane

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Tanners Lane, Golborne.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2025 at 20:30 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Sep 2025 at 13:50.

United Utilities Water (formerly North West Water) logo
Until
28 Sep 2025
Details
View Map
Share
Follow
Robertshaw Street

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Robertshaw Street, Leigh.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2025 at 08:17 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Sep 2025 at 09:12.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
14 Sep and 15 Nov 2025
Details
View Map
Share
Newton Road

Wigan Metropolitan Borough Council were proposing to carry out Highway improvement works on Newton Road, Lowton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2025 and run through until 15 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 7 Aug 2025 at 12:35.

Wigan Metropolitan Borough Council logo
Between
14 and 28 Sep 2025
Details
View Map
Share
Follow
Leigh Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Leigh Road, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 21 Aug 2025 at 14:22.

Wigan Metropolitan Borough Council logo
Until
28 Sep 2025
Details
View Map
Share
Follow
Leigh Road

Wigan Metropolitan Borough Council are carrying out Highway repair and maintenance works on Leigh Road, Leigh.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2025 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 15 Sep 2025 at 09:01.

Cadent Gas logo
Between
15 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Lansdowne

Cadent Gas are proposing to carry out Utility asset works on Lansdowne, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 13:34.

Electricity North West (NorWeb) logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Barn Lane

Electricity North West (NorWeb) are carrying out Diversionary works on Barn Lane, Golborne.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 14:38 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 15 Sep 2025 at 16:37.

Cadent Gas logo
Between
15 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Prestwich Street

Cadent Gas are proposing to carry out Utility asset works on Prestwich Street, Atherton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jun 2025 at 14:19.

Cadent Gas logo
Between
15 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Gloucester Street

Cadent Gas are proposing to carry out Utility asset works on Gloucester Street, Atherton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jun 2025 at 14:22.

Cadent Gas logo
LONG TERM
Between
15 Sep and 12 Dec 2025
Details
View Map
Share
Follow
Bag Lane

Cadent Gas are proposing to carry out Utility asset works on Bag Lane, Atherton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 13:57.

National Highways logo
LONG TERM
Between
16 Sep and 1 Dec 2025
Details
View Map
Share
Follow
Warrington Road

National Highways are proposing to carry out Highway repair and maintenance works on Warrington Road, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 17 Jun 2025 at 08:55.

Electricity North West (NorWeb) logo
LONG TERM
Between
16 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Manchester Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Manchester Road, Westhoughton, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 8 Jul 2025 at 12:30.

Electricity North West (NorWeb) logo
LONG TERM
Between
16 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Chorley Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Chorley Road, Westhoughton, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 8 Jul 2025 at 12:31.

Wigan Metropolitan Borough Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Algernon Street

Wigan Metropolitan Borough Council are carrying out Highway repair and maintenance works on Algernon Street, Hindley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 11:30 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 18 Sep 2025 at 09:52.

Between
22 and 25 Sep 2025
Details
View Map
Share
Follow
Winwick Link Road

St. Helens Council are proposing to carry out Remedial works on Winwick Link Road, Winwick, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 9 Jul 2025 at 15:23.

Between
22 and 25 Sep 2025
Details
View Map
Share
Follow
M6 J22 Leave N

St. Helens Council are proposing to carry out Remedial works on M6 J22 Leave N, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 14 Jul 2025 at 09:12.

Between
22 and 25 Sep 2025
Details
View Map
Share
Follow
M6 J22 Join S

St. Helens Council are proposing to carry out Remedial works on M6 J22 Join S, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 14 Jul 2025 at 09:12.

Between
22 and 25 Sep 2025
Details
View Map
Share
Follow
M6 J22 Join N

St. Helens Council are proposing to carry out Remedial works on M6 J22 Join N, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 14 Jul 2025 at 09:12.

Between
22 and 25 Sep 2025
Details
View Map
Share
Follow
M6 J22 Leave S

St. Helens Council are proposing to carry out Remedial works on M6 J22 Leave S, St. Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 14 Jul 2025 at 09:12.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
22 Sep 2025 and 9 Aug 2026
Details
View Map
Share
Butchers Lane

Wigan Metropolitan Borough Council were proposing to carry out Highway improvement works on Butchers Lane, Ashton-in-makerfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 9 August 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 3 Jul 2025 at 09:22.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
22 Sep 2025 and 9 Aug 2026
Details
View Map
Share
Gerard Street

Wigan Metropolitan Borough Council were proposing to carry out Highway improvement works on Gerard Street, Ashton-in-makerfield.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 9 August 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 3 Jul 2025 at 09:06.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
22 Sep 2025 and 9 Aug 2026
Details
View Map
Share
Garswood Street

Wigan Metropolitan Borough Council were proposing to carry out Highway improvement works on Garswood Street, Ashton-in-makerfield.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 9 August 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 3 Jul 2025 at 09:17.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
22 Sep 2025 and 7 Aug 2026
Details
View Map
Share
Follow
Gerard Street

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Gerard Street, Ashton-in-makerfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 7 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 20 Feb 2025 at 10:59.

Wigan Metropolitan Borough Council logo
Between
22 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Warrington Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Warrington Road, Abram.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 28 Aug 2025 at 10:59.

Wigan Metropolitan Borough Council logo
Between
22 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Warrington Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Warrington Road, Abram.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 28 Aug 2025 at 11:05.

Cadent Gas logo
Between
22 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Grafton Street

Cadent Gas are proposing to carry out Utility asset works on Grafton Street, Atherton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jun 2025 at 15:13.

Cadent Gas logo
Between
22 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Grafton Street

Cadent Gas are proposing to carry out Utility asset works on Grafton Street, Atherton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 09:49.

Cadent Gas logo
Between
22 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Grafton Street

Cadent Gas are proposing to carry out Utility asset works on Grafton Street, Atherton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2025 at 10:56.

Cadent Gas logo
Between
22 Sep and 15 Oct 2025
Details
View Map
Share
Follow
Lovers Lane

Cadent Gas are proposing to carry out Utility asset works on Lovers Lane, Atherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jun 2025 at 15:14.

Cadent Gas logo
Between
22 Sep and 15 Oct 2025
Details
View Map
Share
Follow
Lovers Lane

Cadent Gas are proposing to carry out Utility asset works on Lovers Lane, Atherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jun 2025 at 14:21.

Cadent Gas logo
Between
22 Sep and 15 Oct 2025
Details
View Map
Share
Follow
Lovers Lane

Cadent Gas are proposing to carry out Utility asset works on Lovers Lane, Atherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Jul 2025 at 10:38.

Cadent Gas logo
LONG TERM
Between
22 Sep and 5 Nov 2025
Details
View Map
Share
Follow
Leigh Road

Cadent Gas are proposing to carry out Utility asset works on Leigh Road, Atherton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jun 2025 at 13:36.

Cadent Gas logo
LONG TERM
Between
22 Sep and 5 Nov 2025
Details
View Map
Share
Follow
Leigh Road

Cadent Gas are proposing to carry out Utility asset works on Leigh Road, Atherton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 09:50.

Cadent Gas logo
LONG TERM
Between
22 Sep and 5 Nov 2025
Details
View Map
Share
Follow
Leigh Road

Cadent Gas are proposing to carry out Utility asset works on Leigh Road, Atherton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2025 at 10:58.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
22 Sep and 14 Nov 2025
Details
View Map
Share
Follow
Crab Tree Lane

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Crab Tree Lane, Atherton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 20 Aug 2025 at 15:55.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
22 Sep and 14 Nov 2025
Details
View Map
Share
Follow
Crab Tree Lane

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Crab Tree Lane, Atherton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 20 Aug 2025 at 15:55.

Cadent Gas logo
LONG TERM
Between
22 Sep and 19 Dec 2025
Details
View Map
Share
Follow
Bag Lane

Cadent Gas are proposing to carry out Utility asset works on Bag Lane, Atherton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 16:30.

Cadent Gas logo
Between
22 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Railway Street

Cadent Gas are proposing to carry out Utility asset works on Railway Street, Atherton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2025 at 15:02.

Cadent Gas logo
Between
29 Sep and 15 Oct 2025
Details
View Map
Share
Follow
Warrington Road

Cadent Gas are proposing to carry out Utility asset works on Warrington Road, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 10:34.

Wigan Metropolitan Borough Council logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Ashby Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Ashby Road, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 31 Jul 2025 at 09:50.

Wigan Metropolitan Borough Council logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Howden Drive

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Howden Drive, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 31 Jul 2025 at 09:57.

Transport For Greater Manchester logo
LONG TERM
Between
1 Oct and 30 Nov 2025
Details
View Map
Share
Follow
Newton Road

Transport For Greater Manchester are proposing to carry out Highway improvement works on Newton Road, Lowton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport For Greater Manchester on 18 Sep 2025 at 14:55.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Oct and 30 Nov 2025
Details
View Map
Share
Follow
Newton Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Newton Road, Lowton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 7 Aug 2025 at 12:41.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Oct and 30 Nov 2025
Details
View Map
Share
Follow
Newton Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Newton Road, Lowton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 8 Aug 2025 at 09:04.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Oct and 30 Nov 2025
Details
View Map
Share
Follow
Parsonage Way

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Parsonage Way, Leigh.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 3 Apr 2025 at 12:41.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Oct 2025 and 1 May 2026
Details
View Map
Share
Follow
Market Place

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Market Place, Leigh.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 1 May 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 3 Jun 2025 at 10:46.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Oct and 1 Dec 2025
Details
View Map
Share
Follow
Hough Lane

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Hough Lane, Tyldesley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 3 Apr 2025 at 12:43.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Oct and 1 Dec 2025
Details
View Map
Share
Follow
Manchester Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Manchester Road, Tyldesley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 3 Apr 2025 at 12:43.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Oct and 1 Dec 2025
Details
View Map
Share
Follow
Sale Lane

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Sale Lane, Tyldesley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 3 Apr 2025 at 12:43.

Electricity North West (NorWeb) logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Wigshaw Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Wigshaw Lane, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 21 Jul 2025 at 13:54.

Electricity North West (NorWeb) logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Wigshaw Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Wigshaw Lane, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2025 at 15:00.

Electricity North West (NorWeb) logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Wigshaw Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Wigshaw Lane, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 21 Jul 2025 at 13:56.

Electricity North West (NorWeb) logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Wigshaw Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Wigshaw Lane, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2025 at 15:01.

Electricity North West (NorWeb) logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Common Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Common Lane, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 21 Jul 2025 at 13:55.

Electricity North West (NorWeb) logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Common Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Common Lane, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2025 at 15:00.

Cadent Gas logo
Between
6 and 22 Oct 2025
Details
View Map
Share
Follow
Vicarage Road

Cadent Gas are proposing to carry out Utility asset works on Vicarage Road, Ashton-in-makerfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jul 2025 at 13:49.

Cadent Gas logo
Between
6 and 29 Oct 2025
Details
View Map
Share
Follow
Derby Street

Cadent Gas are proposing to carry out Utility asset works on Derby Street, Atherton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 09:49.

Electricity North West (NorWeb) logo
Between
9 and 26 Oct 2025
Details
View Map
Share
Follow
Warrington Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Warrington Road, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 26 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2025 at 14:59.

United Utilities Water (formerly North West Water) logo
Between
9 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Lancaster Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Lancaster Road, Hindley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Aug 2025 at 11:51.

United Utilities Water (formerly North West Water) logo
Between
9 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Lancaster Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Lancaster Road, Hindley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 22 Aug 2025 at 11:46.

Electricity North West (NorWeb) logo
LONG TERM
Between
13 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Barn Lane

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Barn Lane, Golborne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 22 Jul 2025 at 08:50.

Cadent Gas logo
Between
13 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Windsor Road

Cadent Gas are proposing to carry out Utility asset works on Windsor Road, Ashton-in-makerfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jul 2025 at 13:48.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
17 Oct 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Winwick Lane

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Winwick Lane, Lowton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 31 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 1 Aug 2025 at 10:01.

Transport For Greater Manchester logo
LONG TERM
Between
17 Oct 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Winwick Lane

Transport For Greater Manchester are proposing to carry out Highway improvement works on Winwick Lane, Lowton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 31 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport For Greater Manchester on 14 Aug 2025 at 10:27.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
17 Oct 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Newton Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Newton Road, Lowton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 31 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 1 Aug 2025 at 10:01.

Transport For Greater Manchester logo
LONG TERM
Between
17 Oct 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Newton Road

Transport For Greater Manchester are proposing to carry out Highway improvement works on Newton Road, Lowton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 31 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport For Greater Manchester on 14 Aug 2025 at 09:43.

Cadent Gas logo
Between
20 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Warrington Road

Cadent Gas are proposing to carry out Utility asset works on Warrington Road, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2025 at 15:18.

United Utilities Water (formerly North West Water) logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Old Wargrave Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Old Wargrave Road, Newton Le Willows, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 23 Jul 2025 at 08:26.

United Utilities Water (formerly North West Water) logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Old Wargrave Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Old Wargrave Road, Newton Le Willows, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 23 Jul 2025 at 11:59.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Winwick Lane

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Winwick Lane, Lowton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 10 Mar 2025 at 15:47.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Newton Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Newton Road, Lowton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 10 Mar 2025 at 15:47.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
20 Oct 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Market Place

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Market Place, Leigh.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 30 April 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 18 Sep 2025 at 09:39.

Cadent Gas logo
LONG TERM
Between
20 Oct 2025 and 28 Jan 2026
Details
View Map
Share
Follow
Bag Lane

Cadent Gas are proposing to carry out Utility asset works on Bag Lane, Atherton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jun 2025 at 10:25.

Cadent Gas logo
Between
20 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Railway Street

Cadent Gas are proposing to carry out Utility asset works on Railway Street, Atherton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Jun 2025 at 09:20.

Cadent Gas logo
Between
20 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Railway Street

Cadent Gas are proposing to carry out Utility asset works on Railway Street, Atherton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jul 2025 at 13:38.

Network Rail logo
Between
24 and 27 Oct 2025
Details
View Map
Share
Mill Lane

Network Rail were proposing to carry out Works for Rail Purposes on Mill Lane, Newton Le Willows, St Helens.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 October 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 May 2025 at 11:30.

Wigan Metropolitan Borough Council logo
Between
26 Oct and 16 Nov 2025
Details
View Map
Share
Follow
Bridge Street

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Bridge Street, Golborne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 31 Jul 2025 at 11:58.

Cadent Gas logo
Between
27 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Liverpool Road

Cadent Gas are proposing to carry out Utility asset works on Liverpool Road, Ashton-in-makerfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 13:48.

Cadent Gas logo
LONG TERM
Between
27 Oct and 17 Dec 2025
Details
View Map
Share
Follow
Woodedge

Cadent Gas are proposing to carry out Utility asset works on Woodedge, Ashton-in-makerfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jul 2025 at 09:23.

Cadent Gas logo
LONG TERM
Between
27 Oct and 3 Dec 2025
Details
View Map
Share
Follow
Poolstock Lane

Cadent Gas are proposing to carry out Utility asset works on Poolstock Lane, Wigan.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jul 2025 at 12:29.

Cadent Gas logo
LONG TERM
Between
27 Oct and 3 Dec 2025
Details
View Map
Share
Follow
Poolstock Lane

Cadent Gas are proposing to carry out Utility asset works on Poolstock Lane, Wigan.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Aug 2025 at 15:48.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
27 Oct 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Hereford Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Hereford Road, Hindley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 22 Aug 2025 at 11:40.

Wigan Metropolitan Borough Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Hereford Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Hereford Road, Hindley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 26 Aug 2025 at 10:32.

Wigan Metropolitan Borough Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Hereford Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Hereford Road, Hindley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 4 Sep 2025 at 09:00.

Electricity North West (NorWeb) logo
Between
31 Oct and 20 Nov 2025
Details
View Map
Share
Long Lane

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Long Lane, Hindley Green.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 October 2025 and run through until 20 November 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 8 Aug 2025 at 15:23.

Electricity North West (NorWeb) logo
Between
31 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Long Lane

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Long Lane, Hindley Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 21 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 8 Aug 2025 at 15:53.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
3 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Wigan Road

Wigan Metropolitan Borough Council are proposing to carry out roadworks on Wigan Road, Golborne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 16 Sep 2025 at 10:33.

Cadent Gas logo
Between
3 Nov and 3 Dec 2025
Details
View Map
Share
Follow
Lockett Road

Cadent Gas are proposing to carry out Utility asset works on Lockett Road, South Lancashire Industrial Estate, Ashton-in-makerfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jul 2025 at 16:05.

Cadent Gas logo
Between
3 Nov and 3 Dec 2025
Details
View Map
Share
Follow
Gloucester Street

Cadent Gas are proposing to carry out Utility asset works on Gloucester Street, Atherton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 09:51.

Cadent Gas logo
Between
10 and 26 Nov 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Lowton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Jul 2025 at 14:41.

Cadent Gas logo
Between
10 Nov and 3 Dec 2025
Details
View Map
Share
Follow
Nelson Drive

Cadent Gas are proposing to carry out Utility asset works on Nelson Drive, Ince.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jul 2025 at 11:52.

Electricity North West (NorWeb) logo
Between
10 and 28 Nov 2025
Details
View Map
Share
Follow
White Horse Grove

Electricity North West (NorWeb) are proposing to carry out New service connection on White Horse Grove, Westhoughton, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 16 Sep 2025 at 12:05.

Electricity North West (NorWeb) logo
Between
10 and 28 Nov 2025
Details
View Map
Share
Follow
Bolton Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Bolton Road, Westhoughton, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 16 Sep 2025 at 12:05.

Wigan Metropolitan Borough Council logo
Between
23 and 30 Nov 2025
Details
View Map
Share
Follow
Wigan Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Wigan Road, Atherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2025 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 31 Jul 2025 at 11:50.

Network Rail logo
Between
24 and 27 Nov 2025
Details
View Map
Share
Follow
Mill Lane

Network Rail are proposing to carry out Works for Rail Purposes on Mill Lane, Newton Le Willows, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 27 May 2025 at 12:40.

Electricity North West (NorWeb) logo
Between
27 Nov and 24 Dec 2025
Details
View Map
Share
Follow
Wigshaw Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Wigshaw Lane, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2025 and could run through until 24 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 4 Sep 2025 at 09:05.

Electricity North West (NorWeb) logo
Between
27 Nov and 24 Dec 2025
Details
View Map
Share
Follow
Wigshaw Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Wigshaw Lane, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 4 Sep 2025 at 09:03.

Electricity North West (NorWeb) logo
Between
27 Nov and 24 Dec 2025
Details
View Map
Share
Follow
Common Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Common Lane, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 4 Sep 2025 at 09:04.

Electricity North West (NorWeb) logo
Between
1 and 19 Dec 2025
Details
View Map
Share
Follow
White Horse Grove

Electricity North West (NorWeb) are proposing to carry out New service connection on White Horse Grove, Westhoughton, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 15 Sep 2025 at 10:54.

Electricity North West (NorWeb) logo
Between
1 and 19 Dec 2025
Details
View Map
Share
Follow
Bolton Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Bolton Road, Westhoughton, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 15 Sep 2025 at 10:53.

Cadent Gas logo
LONG TERM
Between
8 Dec 2025 and 28 Jan 2026
Details
View Map
Share
Follow
Poolstock Lane

Cadent Gas are proposing to carry out Utility asset works on Poolstock Lane, Wigan.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 28 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2025 at 14:41.

Cadent Gas logo
LONG TERM
Between
11 Dec 2025 and 13 Jan 2026
Details
View Map
Share
Follow
Violet Street

Cadent Gas are proposing to carry out Utility asset works on Violet Street, Ashton-in-makerfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2025 and could run through until 13 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 15:26.


Roadworks Map near to Plank Lane, LEIGH, WN7 4QE (3 Events)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Marker
Last Updated: 18 Sep 2025 22:33
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Plank Lane, LEIGH, WN7 4QE (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Virgin Media logo
LINDOW STREET 
(0.8 miles)
Virgin Media
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
16 Sep 2025 15:00 - 15:12
0.8
Details
Share
2
Wigan Metropolitan Borough Council logo
MAJOR
  
ATHERLEIGH WAY 
(0.8 miles)
Wigan Metropolitan Borough Council
Highway repair and maintenance works - Footway, Carriageway - Two-way signals
Planned
Scheduled: 26 Aug 2025 - 28 Oct 2025
0.8
Details
Share
Follow
3
United Utilities Water (formerly North West Water) logo
ANGUS AVENUE 
(0.9 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
17 Sep 2025 09:41 - 10:43
0.9
Details
Share