ROADWORKS SUMMARY
Beech Tree Avenue, WIGAN, WN6 9DG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Beech Tree Avenue, WN6 9DG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Beech Tree Avenue, WIGAN, WN6 9DG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Beech Tree Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Oct and 30 Nov 2024
Details
View Map
Share
Follow
Market Street

Wigan Metropolitan Borough Council are proposing to carry out Section 50 on Market Street, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 6 Sep 2024 at 11:41.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Oct and 30 Nov 2024
Details
View Map
Share
Follow
Market Street

Wigan Metropolitan Borough Council are proposing to carry out Section 50 on Market Street, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 6 Sep 2024 at 11:40.

National Highways logo
LONG TERM
Between
11 Oct and 2 Dec 2024
Details
View Map
Share
Follow
Crow Orchard Road

National Highways are proposing to carry out Highway repair and maintenance works on Crow Orchard Road, Wrightington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 4 Oct 2024 at 10:26.

National Highways logo
LONG TERM
Between
18 Oct and 9 Dec 2024
Details
View Map
Share
Follow
Crow Orchard Road

National Highways are proposing to carry out Highway repair and maintenance works on Crow Orchard Road, Wrightington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 October 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 9 Oct 2024 at 13:33.

National Highways logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Crow Orchard Road

National Highways are carrying out Highway repair and maintenance works on Crow Orchard Road, Wrightington.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 October 2024 at 20:30 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 28 Oct 2024 at 13:44.

Wigan Metropolitan Borough Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Spring Road

Wigan Metropolitan Borough Council are proposing to carry out Section 50 on Spring Road, Orrell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2024 and could run through until 17 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 3 Oct 2024 at 15:11.

Cadent Gas logo
LONG TERM
Until
9 Dec 2024
Details
View Map
Share
Follow
Pepper Lane

Cadent Gas are carrying out Utility asset works on Pepper Lane, Standish.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:00 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 09:16.

Cadent Gas logo
LONG TERM
Between
4 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Pepper Lane

Cadent Gas are proposing to carry out Utility asset works on Pepper Lane, Standish.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 10:53.

Cadent Gas logo
Until
27 Nov 2024
Details
View Map
Share
Follow
Cale Lane Icw Ashbourne Avenue

Cadent Gas are carrying out Utility asset works on Cale Lane Icw Ashbourne Avenue, Aspull.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:16 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 12:05.

Lancashire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Brierfield

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Brierfield, Skelmersdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 14 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 8 Aug 2024 at 14:08.

Finishing
Today
Details
View Map
Share
Follow
Arcade Street

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Arcade Street, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 13 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 15 Aug 2024 at 12:02.

Cadent Gas logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Towngate

Cadent Gas are carrying out Utility asset works on Towngate, Eccleston.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 11:50 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 11:57.

Wigan Metropolitan Borough Council logo
Between
11 and 25 Nov 2024
Details
View Map
Share
Follow
Miles Lane

Wigan Metropolitan Borough Council are proposing to carry out Section 50 on Miles Lane, Shevington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 5 Nov 2024 at 09:13.

Wigan Metropolitan Borough Council logo
Between
17 and 30 Nov 2024
Details
View Map
Share
Follow
Dryden Close

Wigan Metropolitan Borough Council are proposing to carry out Section 50 on Dryden Close, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 5 Nov 2024 at 09:19.

Wigan Metropolitan Borough Council logo
Between
17 and 24 Nov 2024
Details
View Map
Share
Follow
Almond Brook Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Almond Brook Road, Standish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2024 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 28 Aug 2024 at 14:33.

Wigan Metropolitan Borough Council logo
Between
17 and 30 Nov 2024
Details
View Map
Share
Follow
Dryden Close

Wigan Metropolitan Borough Council are proposing to carry out Section 50 on Dryden Close, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 5 Nov 2024 at 09:19.

United Utilities Water (formerly North West Water) logo
Between
26 and 28 Nov 2024
Details
View Map
Share
Follow
Maltkiln Lane

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Maltkiln Lane, Bispham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 2 Sep 2024 at 14:33.

Wigan Metropolitan Borough Council logo
Between
2 and 29 Dec 2024
Details
View Map
Share
Follow
Huxley Place

Wigan Metropolitan Borough Council are proposing to carry out Section 50 on Huxley Place, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 29 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 24 Oct 2024 at 12:35.

United Utilities Water (formerly North West Water) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Chorley Lane

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Chorley Lane, Charnock Richard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 19 Oct 2024 at 16:25.

United Utilities Water (formerly North West Water) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Chorley Lane

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Chorley Lane, Charnock Richard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 18 Oct 2024 at 10:51.

BT logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Elmers Green

BT are proposing to carry out Utility asset works on Elmers Green, Skelmersdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 6 Nov 2024 at 10:41.

United Utilities Water (formerly North West Water) logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Moss Road

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Moss Road, Billinge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 17 Sep 2024 at 11:55.

United Utilities Water (formerly North West Water) logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Chorley Lane

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Chorley Lane, Charnock Richard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 24 Sep 2024 at 11:10.

Transport For Greater Manchester logo
LONG TERM
Between
1 Jan and 1 Mar 2025
Details
View Map
Share
Follow
Gidlow Lane

Transport For Greater Manchester are proposing to carry out Highway improvement works on Gidlow Lane, Wigan.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 1 March 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Transport For Greater Manchester on 31 Oct 2024 at 11:23.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Jan and 1 Mar 2025
Details
View Map
Share
Follow
Gidlow Lane

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Gidlow Lane, Wigan.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 1 March 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 6 Sep 2024 at 11:08.

Transport For Greater Manchester logo
LONG TERM
Between
1 Jan and 1 Mar 2025
Details
View Map
Share
Follow
Beech Hill Avenue

Transport For Greater Manchester are proposing to carry out Highway improvement works on Beech Hill Avenue, Wigan.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 1 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport For Greater Manchester on 31 Oct 2024 at 16:04.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Jan and 1 Mar 2025
Details
View Map
Share
Follow
Spencer Road West

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Spencer Road West, Wigan.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 1 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 3 Oct 2024 at 13:28.

Transport For Greater Manchester logo
LONG TERM
Between
1 Jan and 1 Mar 2025
Details
View Map
Share
Follow
Spencer Road West

Transport For Greater Manchester are proposing to carry out Highway improvement works on Spencer Road West, Wigan.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 1 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport For Greater Manchester on 31 Oct 2024 at 11:23.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Jan and 1 Mar 2025
Details
View Map
Share
Follow
Beech Hill Avenue

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Beech Hill Avenue, Wigan.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 1 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 3 Oct 2024 at 12:20.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Towngate

Cadent Gas are proposing to carry out Utility asset works on Towngate, Eccleston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Oct 2024 at 15:07.

Wigan Metropolitan Borough Council logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Spring Road

Wigan Metropolitan Borough Council are proposing to carry out Section 50 on Spring Road, Orrell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 11 Nov 2024 at 09:58.

Electricity North West (NorWeb) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Rose Avenue

Electricity North West (NorWeb) are proposing to carry out New service connection on Rose Avenue, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 7 Nov 2024 at 12:59.

BT logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Elmers Green

BT are proposing to carry out Utility asset works on Elmers Green, Skelmersdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 Oct 2024 at 10:27.

United Utilities Water (formerly North West Water) logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Poolstock

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Poolstock, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Oct 2024 at 14:04.

BT logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Elmers Green

BT are proposing to carry out Utility asset works on Elmers Green, Skelmersdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 17 Oct 2024 at 13:28.

Electricity North West (NorWeb) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Rose Avenue

Electricity North West (NorWeb) are proposing to carry out New service connection on Rose Avenue, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 8 Oct 2024 at 09:11.

Network Rail logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Wallgate

Network Rail are proposing to carry out Works for Rail Purposes on Wallgate, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 6 Nov 2024 at 10:55.

Network Rail logo
Between
15 and 18 Jan 2025
Details
View Map
Share
Follow
Wallgate

Network Rail are proposing to carry out Works for Rail Purposes on Wallgate, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 4 Nov 2024 at 15:46.

Network Rail logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Wallgate

Network Rail are proposing to carry out Works for Rail Purposes on Wallgate, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Sep 2024 at 13:21.

Network Rail logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Wallgate

Network Rail are proposing to carry out Works for Rail Purposes on Wallgate, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 4 Oct 2024 at 09:43.

Electricity North West (NorWeb) logo
Between
22 and 30 Jan 2025
Details
View Map
Share
Follow
Greenland Avenue

Electricity North West (NorWeb) are proposing to carry out New service connection on Greenland Avenue, Standish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 25 Oct 2024 at 11:46.

Cadent Gas logo
LONG TERM
Between
22 Jan and 25 Feb 2025
Details
View Map
Share
Follow
Towngate

Cadent Gas are proposing to carry out Utility asset works on Towngate, Eccleston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 14:34.

Network Rail logo
Between
27 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Wallgate

Network Rail are proposing to carry out Works for Rail Purposes on Wallgate, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 4 Nov 2024 at 15:46.

Network Rail logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Wallgate

Network Rail are proposing to carry out Works for Rail Purposes on Wallgate, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 6 Nov 2024 at 10:55.

Cadent Gas logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Towngate

Cadent Gas are proposing to carry out Utility asset works on Towngate, Eccleston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 09:15.

Electricity North West (NorWeb) logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Bretherton Row

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Bretherton Row, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 6 Nov 2024 at 15:39.

Cadent Gas logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Towngate

Cadent Gas are proposing to carry out Utility asset works on Towngate, Eccleston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 10:23.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Feb and 1 Apr 2025
Details
View Map
Share
Follow
School Lane

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on School Lane, Wigan.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 1 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 3 Oct 2024 at 13:26.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Feb and 1 Apr 2025
Details
View Map
Share
Follow
Warrington Lane

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Warrington Lane, Wigan.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 1 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 6 Sep 2024 at 11:03.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Feb and 1 Apr 2025
Details
View Map
Share
Follow
Millgate

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Millgate, Wigan.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 1 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 3 Oct 2024 at 13:25.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Feb and 1 Apr 2025
Details
View Map
Share
Follow
Scholes

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Scholes, Wigan.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 1 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 3 Oct 2024 at 13:25.

Lancashire County Council logo
Between
4 and 9 Feb 2025
Details
View Map
Share
Follow
Gorsey Lane

Lancashire County Council are proposing to carry out Section 50 on Gorsey Lane, Mawdesley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 9 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Lancashire County Council on 12 Nov 2024 at 15:26.


Roadworks Map near to Beech Tree Avenue, WIGAN, WN6 9DG

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 13 Nov 2024 07:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Beech Tree Avenue, WIGAN, WN6 9DG (12 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
MILES LANE 
(0.1 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 12 Nov 2024 09:30
(Scheduled: 11 Nov 2024 - 14 Nov 2024)
0.1
Details
Share
Follow
2
BT logo
WOODNOOK ROAD 
(0.2 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
12 Nov 2024 12:15 - 14:30
0.2
Details
Share
3
Virgin Media logo
GLEN DRIVE 
(0.3 miles)
Virgin Media
Utility asset works - Footway - Some carriageway incursion
In Progress
Since: 12 Nov 2024 09:30
(Scheduled: 11 Nov 2024 - 14 Nov 2024)
0.3
Details
Share
Follow
4
Virgin Media logo
BACK LANE 
(0.3 miles)
Virgin Media
Utility asset works - Footway - Some carriageway incursion
In Progress
Since: 12 Nov 2024 09:30
(Scheduled: 11 Nov 2024 - 14 Nov 2024)
0.3
Details
Share
Follow
5
United Utilities Water (formerly North West Water) logo
URGENT
  
KNIGHTSCLIFFE CRESCENT 
(0.4 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Carriageway - Some carriageway incursion
In Progress
Since: 12 Nov 2024 13:30
(Scheduled: 12 Nov 2024 - 18 Nov 2024)
0.4
Details
Share
Follow
6
Wigan Metropolitan Borough Council logo
MAJOR
  
MILES LANE 
(0.8 miles)
Wigan Metropolitan Borough Council
Section 50 - Footway, Carriageway - Two-way signals
Planned
Scheduled: 11 Nov 2024 - 25 Nov 2024
0.8
Details
Share
Follow
7
Wigan Metropolitan Borough Council logo
NEW MILES LANE 
(1.0 miles)
Wigan Metropolitan Borough Council
Highway repair and maintenance works - Carriageway - Some carriageway incursion
Planned
Scheduled: 12 Nov 2024 - 14 Nov 2024
1.0
Details
Share
Follow
8
National Highways logo
MAJOR
  
CROW ORCHARD ROAD 
(1.0 miles)
National Highways
Highway repair and maintenance works - Carriageway - Lane closure
In Progress
Since: 25 Oct 2024 20:30
(Scheduled: 25 Oct 2024 - 16 Dec 2024)
1.0
Details
Share
Follow
9
National Highways logo
MAJOR
  
CROW ORCHARD ROAD 
(1.0 miles)
National Highways
Highway repair and maintenance works - Carriageway - Lane closure
Planned
Scheduled: 11 Oct 2024 - 2 Dec 2024
1.0
Details
Share
Follow
10
National Highways logo
MAJOR
  
CROW ORCHARD ROAD 
(1.0 miles)
National Highways
Highway repair and maintenance works - Carriageway - Lane closure
Planned
Scheduled: 18 Oct 2024 - 9 Dec 2024
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.