ROADWORKS SUMMARY
Woodhouse Lane, WIGAN, WN6 7NR

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Woodhouse Lane, WN6 7NR and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Woodhouse Lane, WIGAN, WN6 7NR

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Woodhouse Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Wigan Metropolitan Borough Council logo
LONG TERM
Until
22 Nov 2026
Details
View Map
Share
Follow
Garswood Street

Wigan Metropolitan Borough Council are carrying out Highway improvement works on Garswood Street, Ashton-in-makerfield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 February 2026 at 09:30 and could run through until 22 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 23 Feb 2026 at 16:17.

Wigan Metropolitan Borough Council logo
LONG TERM
Until
22 Nov 2026
Details
View Map
Share
Follow
Gerard Street

Wigan Metropolitan Borough Council are carrying out Highway improvement works on Gerard Street, Ashton-in-makerfield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 February 2026 at 09:30 and could run through until 22 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 23 Feb 2026 at 16:15.

Wigan Metropolitan Borough Council logo
LONG TERM
Until
22 Nov 2026
Details
View Map
Share
Follow
Butchers Lane

Wigan Metropolitan Borough Council are carrying out Highway improvement works on Butchers Lane, Ashton-in-makerfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 February 2026 at 09:30 and could run through until 22 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 23 Feb 2026 at 16:17.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 May and 30 Sep 2026
Details
View Map
Share
Follow
Warrington Lane

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Warrington Lane, Wigan.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2026 and could run through until 30 September 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 5 Nov 2025 at 10:59.

Transport For Greater Manchester logo
LONG TERM
Until
30 Jan 2027
Details
View Map
Share
Follow
Railway Street

Transport For Greater Manchester are carrying out Works for Rail Purposes on Railway Street, Hindley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 May 2026 at 08:00 and could run through until 30 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by Transport For Greater Manchester on 29 Jun 2026 at 15:28.

Transport For Greater Manchester logo
LONG TERM
Until
28 Feb 2027
Details
View Map
Share
Follow
Wigan Road

Transport For Greater Manchester are carrying out Works for Rail Purposes on Wigan Road, Ashton-in-makerfield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2026 at 08:00 and could run through until 28 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport For Greater Manchester on 8 Jul 2026 at 16:31.

Transport For Greater Manchester logo
LONG TERM
Until
18 Dec 2026
Details
View Map
Share
Follow
Hall Lane

Transport For Greater Manchester are carrying out Works for Rail Purposes on Hall Lane, Hindley.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 June 2026 at 22:00 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport For Greater Manchester on 6 Jul 2026 at 15:07.

Wigan Metropolitan Borough Council logo
LONG TERM
Until
4 Oct 2026
Details
View Map
Share
Follow
Roundmoor Road

Wigan Metropolitan Borough Council are carrying out Highway improvement works on Roundmoor Road, Standish.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 09:00 and could run through until 4 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 27 Jul 2026 at 14:10.

Wigan Metropolitan Borough Council logo
LONG TERM
Until
4 Oct 2026
Details
View Map
Share
Follow
Pilgrims Way

Wigan Metropolitan Borough Council are carrying out Highway improvement works on Pilgrims Way, Standish.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 09:00 and could run through until 4 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 27 Jul 2026 at 14:10.

Wigan Metropolitan Borough Council logo
LONG TERM
Until
26 Nov 2026
Details
View Map
Share
Follow
Liverpool Road

Wigan Metropolitan Borough Council are carrying out Highway improvement works on Liverpool Road, Ashton-in-makerfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 July 2026 at 09:30 and could run through until 26 November 2026. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 24 Jul 2026 at 13:55.

Wigan Metropolitan Borough Council logo
LONG TERM
Until
14 Oct 2026
Details
View Map
Share
Follow
Wigan Road

Wigan Metropolitan Borough Council are carrying out Highway improvement works on Wigan Road, Standish.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 09:00 and could run through until 14 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 27 Jul 2026 at 14:11.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
3 Aug and 31 Dec 2026
Details
View Map
Share
Follow
Pepper Lane

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Pepper Lane, Standish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 31 December 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 15 Jun 2026 at 16:08.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
3 Aug and 31 Dec 2026
Details
View Map
Share
Follow
Lily Lane

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Lily Lane, Bamfurlong.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 31 December 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 15 Jun 2026 at 15:31.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
3 Aug and 31 Dec 2026
Details
View Map
Share
Follow
Chorley Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Chorley Road, Standish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 31 December 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 15 Jun 2026 at 15:31.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
3 Aug and 31 Dec 2026
Details
View Map
Share
Follow
Robin Park Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Robin Park Road, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 31 December 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 15 Jun 2026 at 16:12.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
3 Aug and 31 Dec 2026
Details
View Map
Share
Follow
Haigh Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Haigh Road, Aspull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 31 December 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 15 Jun 2026 at 16:09.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
3 Aug and 31 Dec 2026
Details
View Map
Share
Follow
Gathurst Lane

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Gathurst Lane, Shevington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 31 December 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 15 Jun 2026 at 16:11.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
3 Aug and 31 Dec 2026
Details
View Map
Share
Follow
Preston Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Preston Road, Standish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 31 December 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 15 Jun 2026 at 15:31.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
3 Aug and 31 Dec 2026
Details
View Map
Share
Follow
Preston Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Preston Road, Standish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 31 December 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 15 Jun 2026 at 15:36.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
3 Aug and 31 Dec 2026
Details
View Map
Share
Follow
Crompton Street

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Crompton Street, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 31 December 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 15 Jun 2026 at 16:11.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
3 Aug and 31 Dec 2026
Details
View Map
Share
Follow
Pepper Lane

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Pepper Lane, Standish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 31 December 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 15 Jun 2026 at 16:08.

Wigan Metropolitan Borough Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Branthwaite

Wigan Metropolitan Borough Council are carrying out New service connection on Branthwaite, Ince.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 August 2026 at 08:00 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 14 Sep 2026 at 09:12.

Cadent Gas logo
LONG TERM
Until
27 Sep 2026
Details
View Map
Share
Follow
Ashley Road

Cadent Gas are carrying out Utility asset works on Ashley Road, Skelmersdale.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 August 2026 at 07:48 and could run through until 27 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Sep 2026 at 13:45.

Cadent Gas logo
LONG TERM
Until
29 Sep 2026
Details
View Map
Share
Follow
Lincoln Drive

Cadent Gas are carrying out Utility asset works on Lincoln Drive, Ashton-in-makerfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 August 2026 at 09:05 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Aug 2026 at 09:21.

Cadent Gas logo
LONG TERM
Until
14 Oct 2026
Details
View Map
Share
Follow
Abbeystead

Cadent Gas are carrying out Utility asset works on Abbeystead, Skelmersdale.

These works are categorised as Major.

The works started on 24 August 2026 at 14:45 and could run through until 14 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 13:30.

Cadent Gas logo
LONG TERM
Until
27 Sep 2026
Details
View Map
Share
Follow
Lulworth

Cadent Gas are carrying out Utility asset works on Lulworth, Skelmersdale.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:50 and could run through until 27 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Sep 2026 at 09:54.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Sep and 30 Nov 2026
Details
View Map
Share
Follow
Manchester Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Manchester Road, Ince.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 30 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 12 Nov 2025 at 16:29.

Cadent Gas logo
Between
1 and 28 Sep 2026
Details
View Map
Share
Follow
Bolton Road

Cadent Gas are proposing to carry out Utility asset works on Bolton Road, Ashton-in-makerfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Aug 2026 at 12:19.

Wigan Metropolitan Borough Council logo
LONG TERM
Until
26 Nov 2026
Details
View Map
Share
Follow
Bolton Road

Wigan Metropolitan Borough Council are carrying out Highway improvement works on Bolton Road, Ashton-in-makerfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 09:30 and could run through until 26 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 24 Aug 2026 at 13:06.

Lancashire County Council logo
Until
2 Oct 2026
Details
View Map
Share
Follow
Chorley Road

Lancashire County Council are carrying out Highway repair and maintenance works on Chorley Road, Adlington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 09:30 and could run through until 2 October 2026. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Lancashire County Council on 7 Sep 2026 at 09:32.

Cadent Gas logo
Between
7 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Warrington Road

Cadent Gas are proposing to carry out Utility asset works on Warrington Road, Wigan.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2026 at 10:38.

United Utilities Water (formerly North West Water) logo
Between
8 Sep and 1 Oct 2026
Details
View Map
Share
Ashurst Road

United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Ashurst Road, Skelmersdale.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2026 and run through until 1 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 8 Sep 2026 at 15:00.

Cadent Gas logo
Between
9 and 29 Sep 2026
Details
View Map
Share
Ashton Heath

Cadent Gas were proposing to carry out Utility asset works on Ashton Heath, Ashton-in-makerfield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2026 and run through until 29 September 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 5 Sep 2026 at 16:04.

Cadent Gas logo
LONG TERM
Between
9 Sep and 19 Oct 2026
Details
View Map
Share
Heath Road

Cadent Gas were proposing to carry out Utility asset works on Heath Road, Ashton-in-makerfield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2026 and run through until 19 October 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 5 Sep 2026 at 15:59.

United Utilities Water (formerly North West Water) logo
Finishing
Friday
Details
View Map
Share
Follow
Beacon Lane

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Beacon Lane, Dalton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2026 at 08:45 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 13 Sep 2026 at 08:53.

Wigan Metropolitan Borough Council logo
Until
27 Sep 2026
Details
View Map
Share
Follow
Spencer Road

Wigan Metropolitan Borough Council are carrying out Highway repair and maintenance works on Spencer Road, Wigan.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2026 at 08:00 and could run through until 27 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 14 Sep 2026 at 06:46.

Wigan Metropolitan Borough Council logo
Until
27 Sep 2026
Details
View Map
Share
Follow
Spencer Road West

Wigan Metropolitan Borough Council are carrying out Highway repair and maintenance works on Spencer Road West, Wigan.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2026 at 08:00 and could run through until 27 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 14 Sep 2026 at 06:45.

Electricity North West (NorWeb) logo
Finishing
Monday
Details
View Map
Share
Follow
Woodview

Electricity North West (NorWeb) are carrying out New service connection on Woodview, Shevington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 11:44 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 15 Sep 2026 at 13:42.

Wigan Metropolitan Borough Council logo
Between
14 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Orrell Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Orrell Road, Orrell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 2 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 14 Aug 2026 at 10:34.

Cadent Gas logo
Between
14 Sep and 4 Oct 2026
Details
View Map
Share
Follow
Garswood Road

Cadent Gas are proposing to carry out Utility asset works on Garswood Road, Ashton In Makerfield, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 4 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2026 at 11:35.

Cadent Gas logo
Until
11 Oct 2026
Details
View Map
Share
Follow
Warrington Road

Cadent Gas are carrying out Utility asset works on Warrington Road, Wigan.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 09:40 and could run through until 11 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 09:44.

United Utilities Water (formerly North West Water) logo
Until
25 Sep 2026
Details
View Map
Share
Follow
Drummers Lane

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Drummers Lane, Ashton-in-makerfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 12:40 and could run through until 25 September 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 14 Sep 2026 at 12:43.

Bolton Metropolitan Borough Council logo
Between
16 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Vicarage Road West

Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Vicarage Road West, Blackrod, Bolton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 1 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 15 Sep 2026 at 09:35.

Transport For Greater Manchester logo
Finishing
Friday
Details
View Map
Share
Follow
Wigan Road

Transport For Greater Manchester are proposing to carry out Works for Rail Purposes on Wigan Road, Ashton-in-makerfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport For Greater Manchester on 2 Sep 2026 at 13:05.

Cadent Gas logo
Between
17 Sep and 14 Oct 2026
Details
View Map
Share
Mill Street

Cadent Gas were proposing to carry out Utility asset works on Mill Street, Ashton-in-makerfield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 September 2026 and run through until 14 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2026 at 16:10.

Electricity North West (NorWeb) logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Grovewood Drive

Electricity North West (NorWeb) are proposing to carry out New service connection on Grovewood Drive, Appley Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 17 Aug 2026 at 11:30.

Electricity North West (NorWeb) logo
Between
21 and 28 Sep 2026
Details
View Map
Share
Railway Street

Electricity North West (NorWeb) were proposing to carry out New service connection on Railway Street, Hindley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 September 2026 and run through until 28 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 2 Sep 2026 at 13:31.

United Utilities Water (formerly North West Water) logo
Between
21 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Dickens Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Dickens Road, Coppull.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 8 Sep 2026 at 09:14.

United Utilities Water (formerly North West Water) logo
Between
24 Sep and 12 Oct 2026
Details
View Map
Share
Follow
Birch Green Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Birch Green Road, Skelmersdale.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 12 October 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Mar 2026 at 09:56.

Cadent Gas logo
LONG TERM
Between
28 Sep and 30 Oct 2026
Details
View Map
Share
Follow
Ashton Heath

Cadent Gas are proposing to carry out Utility asset works on Ashton Heath, Ashton-in-makerfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 15:40.

Cadent Gas logo
Between
28 Sep and 24 Oct 2026
Details
View Map
Share
Follow
Mill Street

Cadent Gas are proposing to carry out Utility asset works on Mill Street, Ashton-in-makerfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 24 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 16:10.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Oct 2026 and 31 Mar 2027
Details
View Map
Share
Follow
Bickershaw Lane

Wigan Metropolitan Borough Council are proposing to carry out Remedial works on Bickershaw Lane, Bickershaw.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 31 March 2027. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 9 Sep 2026 at 13:06.

Wigan Metropolitan Borough Council logo
Between
4 and 11 Oct 2026
Details
View Map
Share
Follow
Wigan Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Wigan Road, Hindley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2026 and could run through until 11 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 23 Jun 2026 at 12:14.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
4 Oct and 6 Dec 2026
Details
View Map
Share
Follow
Warrington Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Warrington Road, Abram.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2026 and could run through until 6 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 6 May 2026 at 09:52.

Cadent Gas logo
LONG TERM
Between
5 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Ashton Heath

Cadent Gas are proposing to carry out Utility asset works on Ashton Heath, Ashton-in-makerfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 10:14.

Cadent Gas logo
LONG TERM
Between
5 Oct and 27 Nov 2026
Details
View Map
Share
Follow
Heath Road

Cadent Gas are proposing to carry out Utility asset works on Heath Road, Ashton-in-makerfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 10:17.

Cadent Gas logo
Between
5 and 30 Oct 2026
Details
View Map
Share
Follow
Mill Street

Cadent Gas are proposing to carry out Utility asset works on Mill Street, Ashton-in-makerfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 10:15.

ManWeb logo
Between
5 and 15 Oct 2026
Details
View Map
Share
Follow
Pimbo Road

ManWeb are proposing to carry out New service connection on Pimbo Road, Kings Moss, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 15 October 2026. The works will impact the verge only.

This roadwork event was last updated by ManWeb on 6 Aug 2026 at 11:07.

Wigan Metropolitan Borough Council logo
Between
18 and 25 Oct 2026
Details
View Map
Share
Follow
Warrington Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Warrington Road, Ince.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 October 2026 and could run through until 25 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 25 Jun 2026 at 09:51.

United Utilities Water (formerly North West Water) logo
Between
19 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Regent Street

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Regent Street, Coppull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 30 Jul 2026 at 13:14.

Cadent Gas logo
Between
19 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Poolstock

Cadent Gas are proposing to carry out Utility asset works on Poolstock, Wigan.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jul 2026 at 15:14.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
19 Oct and 4 Dec 2026
Details
View Map
Share
Follow
Pimbo Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Pimbo Road, Kings Moss, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 4 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 17 Aug 2026 at 10:37.

Lancashire County Council logo
Between
23 and 28 Oct 2026
Details
View Map
Share
Follow
Parbold Hill

Lancashire County Council are proposing to carry out Highway improvement works on Parbold Hill, Parbold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 23 Jul 2026 at 14:28.

Cadent Gas logo
Between
26 Oct and 15 Nov 2026
Details
View Map
Share
Follow
Abbeystead

Cadent Gas are proposing to carry out Utility asset works on Abbeystead, Skelmersdale.

These works are categorised as Major.

The works will start on or after 26 October 2026 and could run through until 15 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Jul 2026 at 09:32.

Cadent Gas logo
LONG TERM
Between
26 Oct 2026 and 13 Jul 2027
Details
View Map
Share
Follow
Alderley

Cadent Gas are proposing to carry out Utility asset works on Alderley, Skelmersdale.

These works are categorised as Major.

The works will start on or after 26 October 2026 and could run through until 13 July 2027. The works will impact the carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 5 Aug 2026 at 16:06.

Cadent Gas logo
Between
26 Oct and 15 Nov 2026
Details
View Map
Share
Follow
Pool Street

Cadent Gas are proposing to carry out Utility asset works on Pool Street, Wigan.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 15 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Aug 2026 at 12:21.

Lancashire County Council logo
Between
27 and 30 Oct 2026
Details
View Map
Share
Follow
Appley Lane South

Lancashire County Council are proposing to carry out Highway improvement works on Appley Lane South, Appley Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 23 Jul 2026 at 14:34.

Electricity North West (NorWeb) logo
Between
27 and 30 Oct 2026
Details
View Map
Share
Follow
Eskdale Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Eskdale Road, Ashton-in-makerfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 17 Aug 2026 at 12:35.

Electricity North West (NorWeb) logo
Between
27 and 30 Oct 2026
Details
View Map
Share
Follow
Shaw Street

Electricity North West (NorWeb) are proposing to carry out New service connection on Shaw Street, Ashton-in-makerfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 17 Aug 2026 at 12:35.

Lancashire County Council logo
Between
27 and 30 Oct 2026
Details
View Map
Share
Follow
Appley Lane North

Lancashire County Council are proposing to carry out Highway improvement works on Appley Lane North, Appley Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 23 Jul 2026 at 14:32.

Lancashire County Council logo
Between
30 Oct and 5 Nov 2026
Details
View Map
Share
Follow
Bank Brow

Lancashire County Council are proposing to carry out Highway improvement works on Bank Brow, Up Holland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2026 and could run through until 5 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 31 Jul 2026 at 14:04.

Lancashire County Council logo
Between
30 Oct and 5 Nov 2026
Details
View Map
Share
Follow
Stoney Brow

Lancashire County Council are proposing to carry out Highway improvement works on Stoney Brow, Up Holland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2026 and could run through until 5 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 31 Jul 2026 at 14:07.

Lancashire County Council logo
Between
30 Oct and 5 Nov 2026
Details
View Map
Share
Follow
Roby Mill

Lancashire County Council are proposing to carry out Highway improvement works on Roby Mill, Up Holland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2026 and could run through until 5 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 31 Jul 2026 at 14:06.

Electricity North West (NorWeb) logo
Between
2 and 9 Nov 2026
Details
View Map
Share
Follow
Strathmore Avenue

Electricity North West (NorWeb) are proposing to carry out New service connection on Strathmore Avenue, Ashton-in-makerfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 9 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 11 Aug 2026 at 14:29.

Lancashire County Council logo
Between
4 and 6 Nov 2026
Details
View Map
Share
Follow
Sandbrook Road

Lancashire County Council are proposing to carry out Highway improvement works on Sandbrook Road, Up Holland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 25 Aug 2026 at 08:59.

Cadent Gas logo
Between
9 and 23 Nov 2026
Details
View Map
Share
Follow
Swan Meadow Road

Cadent Gas are proposing to carry out Utility asset works on Swan Meadow Road, Wigan.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jul 2026 at 12:39.

Cadent Gas logo
LONG TERM
Between
13 Nov 2026 and 10 Feb 2027
Details
View Map
Share
Follow
Preston Road

Cadent Gas are proposing to carry out Utility asset works on Preston Road, Coppull.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2026 and could run through until 10 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2026 at 13:39.

Wigan Metropolitan Borough Council logo
Between
15 and 22 Nov 2026
Details
View Map
Share
Follow
Manchester Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Manchester Road, Ince.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 22 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 23 Jun 2026 at 12:18.

Cadent Gas logo
LONG TERM
Between
16 Nov 2026 and 11 Feb 2027
Details
View Map
Share
Follow
Preston Road

Cadent Gas are proposing to carry out Utility asset works on Preston Road, Coppull.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 11 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 09:33.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
23 Nov 2026 and 10 Jan 2027
Details
View Map
Share
Follow
Vicarage Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Vicarage Lane, Shevington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 10 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Aug 2026 at 12:05.

Electricity North West (NorWeb) logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Merton Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Merton Road, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 2 Sep 2026 at 13:45.

Electricity North West (NorWeb) logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Elmfield

Electricity North West (NorWeb) are proposing to carry out New service connection on Elmfield, Shevington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 24 Aug 2026 at 13:19.

Electricity North West (NorWeb) logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Merton Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Merton Road, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 4 Sep 2026 at 13:24.

Electricity North West (NorWeb) logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Merton Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Merton Road, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2026 at 11:13.

United Utilities Water (formerly North West Water) logo
Between
30 Nov and 2 Dec 2026
Details
View Map
Share
Follow
Kintbury Street

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Kintbury Street, Bamfurlong.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 2 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 7 Sep 2026 at 09:59.

Cadent Gas logo
LONG TERM
Between
2 Dec 2026 and 22 Jan 2027
Details
View Map
Share
Follow
Spendmore Lane

Cadent Gas are proposing to carry out Utility asset works on Spendmore Lane, Coppull.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 22 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 08:46.

Cadent Gas logo
Between
2 and 22 Dec 2026
Details
View Map
Share
Follow
Chapel Street

Cadent Gas are proposing to carry out Utility asset works on Chapel Street, Coppull.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 22 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 08:47.

Cadent Gas logo
LONG TERM
Between
3 Dec 2026 and 25 Jan 2027
Details
View Map
Share
Follow
Spendmore Lane

Cadent Gas are proposing to carry out Utility asset works on Spendmore Lane, Coppull.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2026 and could run through until 25 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 11:00.

Cadent Gas logo
Between
3 and 23 Dec 2026
Details
View Map
Share
Follow
Chapel Street

Cadent Gas are proposing to carry out Utility asset works on Chapel Street, Coppull.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2026 and could run through until 23 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 11:00.

BT logo
Between
7 and 9 Dec 2026
Details
View Map
Share
Follow
Westbury Avenue

BT are proposing to carry out Utility asset works on Westbury Avenue, Winstanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 9 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Sep 2026 at 13:43.


Roadworks Map near to Woodhouse Lane, WIGAN, WN6 7NR

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 16 Sep 2026 01:08
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Woodhouse Lane, WIGAN, WN6 7NR (18 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
United Utilities Water (formerly North West Water) logo
WOODHOUSE LANE 
(0.2 miles)
United Utilities Water (formerly North West Water)
Disconnection or alteration of supply - Footway - Give and take
In Progress
Since: 15 Sep 2026 13:22
(Scheduled: 15 Sep 2026 - 17 Sep 2026)
0.2
Details
Share
Follow
2
BT logo
ABBEYFIELDS 
(0.2 miles)
BT
New service connection - Footway - Some carriageway incursion
Planned
Scheduled: 14 Sep 2026 - 16 Sep 2026
0.2
Details
Share
Follow
3
Virgin Media logo
COMMODORE PLACE 
(0.5 miles)
Virgin Media
New service connection - Footway - No carriageway incursion
Planned
Scheduled: 15 Sep 2026 - 17 Sep 2026
0.5
Details
Share
Follow
4
Virgin Media logo
RATCLIFFE STREET 
(0.5 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Complete
15 Sep 2026 11:49 - 12:10
0.5
Details
Share
5
Virgin Media logo
PARK ROAD 
(0.5 miles)
Virgin Media
New service connection - Footway - No carriageway incursion
Planned
Scheduled: 16 Sep 2026 - 18 Sep 2026
0.5
Details
Share
Follow
6
United Utilities Water (formerly North West Water) logo
DIGGLE STREET 
(0.5 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 16 Sep 2026 - 18 Sep 2026
0.5
Details
Share
Follow
7
Wigan Metropolitan Borough Council logo
MAJOR
  
SPENCER ROAD WEST 
(0.7 miles)
Wigan Metropolitan Borough Council
Highway repair and maintenance works - Carriageway - Road closure
In Progress
Since: 13 Sep 2026 08:00
(Scheduled: 13 Sep 2026 - 27 Sep 2026)
0.7
Details
Share
Follow
8
Wigan Metropolitan Borough Council logo
FRITH STREET 
(0.8 miles)
Wigan Metropolitan Borough Council
Highway improvement works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 7 Sep 2026 - 17 Sep 2026
0.8
Details
Share
Follow
9
United Utilities Water (formerly North West Water) logo
SCOT LANE 
(0.9 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Carriageway - Two-way signals
Planned
Scheduled: 16 Sep 2026
0.9
Details
Share
Follow
10
United Utilities Water (formerly North West Water) logo
SCOT LANE 
(0.9 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Carriageway - Two-way signals
Planned
Scheduled: 16 Sep 2026
0.9
Details
Share
Follow