ROADWORKS SUMMARY
Cinnamon Avenue, WIGAN, WN2 4RF

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Cinnamon Avenue, WN2 4RF and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Cinnamon Avenue, WIGAN, WN2 4RF

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Cinnamon Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Wigan Metropolitan Borough Council logo
LONG TERM
Between
22 Apr and 24 Nov 2024
Details
View Map
Share
Follow
Ince Green Lane

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Ince Green Lane, Ince.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 24 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 30 Jan 2024 at 10:35.

Network Rail logo
LONG TERM
Until
27 Nov 2024
Details
View Map
Share
Follow
Ince Green Lane

Network Rail are carrying out Works for Rail Purposes on Ince Green Lane, Ince.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 07:00 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 Jul 2024 at 08:02.

Wigan Metropolitan Borough Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Swan Lane

Wigan Metropolitan Borough Council are carrying out Highway repair and maintenance works on Swan Lane, Hindley Green.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 30 Oct 2024 at 12:38.

Cadent Gas logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Millers Lane

Cadent Gas are carrying out Utility asset works on Millers Lane, Platt Bridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 09:32 and could run through until 30 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 10:32.

Electricity North West (NorWeb) logo
LONG TERM
Until
17 Nov 2024
Details
View Map
Share
Follow
Bickershaw Lane

Electricity North West (NorWeb) are carrying out New service connection on Bickershaw Lane, Bickershaw.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 September 2024 at 08:30 and could run through until 17 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 23 Oct 2024 at 13:00.

Wigan Metropolitan Borough Council logo
LONG TERM
Until
21 Mar 2025
Details
View Map
Share
Follow
St Helens Road

Wigan Metropolitan Borough Council are carrying out Highway improvement works on St Helens Road, Leigh.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 09:00 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 4 Oct 2024 at 09:03.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Oct and 30 Nov 2024
Details
View Map
Share
Follow
Market Street

Wigan Metropolitan Borough Council are proposing to carry out Section 50 on Market Street, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 6 Sep 2024 at 11:41.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Oct and 30 Nov 2024
Details
View Map
Share
Follow
Market Street

Wigan Metropolitan Borough Council are proposing to carry out Section 50 on Market Street, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 6 Sep 2024 at 11:40.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Douglas Street

Cadent Gas are carrying out Utility asset works on Douglas Street, Atherton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 October 2024 at 11:00 and could run through until 31 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 11:11.

Cadent Gas logo
LONG TERM
Between
14 Oct 2024 and 15 Jan 2025
Details
View Map
Share
Follow
Manchester Road

Cadent Gas are proposing to carry out Utility asset works on Manchester Road, Blackrod, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jul 2024 at 07:50.

Cadent Gas logo
Between
14 Oct and 6 Nov 2024
Details
View Map
Share
Follow
Blackrod Footpath 24

Cadent Gas are proposing to carry out Utility asset works on Blackrod Footpath 24, Blackrod.

These works are categorised as Major.

The works will start on or after 14 October 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 16:30.

Cadent Gas logo
Between
14 Oct and 6 Nov 2024
Details
View Map
Share
Follow
Tempest Road

Cadent Gas are proposing to carry out Utility asset works on Tempest Road, Lostock, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jul 2024 at 11:26.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Lock Lane

Cadent Gas are proposing to carry out Utility asset works on Lock Lane, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 30 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jul 2024 at 11:30.

Electricity North West (NorWeb) logo
Between
17 Oct and 13 Nov 2024
Details
View Map
Share
Liscard Street

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Liscard Street, Atherton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 October 2024 and run through until 13 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Oct 2024 at 09:19.

Cadent Gas logo
Until
6 Nov 2024
Details
View Map
Share
Follow
Woodcock Drive

Cadent Gas are carrying out Utility asset works on Woodcock Drive, Platt Bridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 October 2024 at 09:20 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Oct 2024 at 09:24.

Cadent Gas logo
Between
19 Oct and 6 Nov 2024
Details
View Map
Share
Follow
Woodcock Drive

Cadent Gas are proposing to carry out Utility asset works on Woodcock Drive, Platt Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 15:48.

Cadent Gas logo
Until
12 Nov 2024
Details
View Map
Share
Follow
The Pewfist

Cadent Gas are carrying out Utility asset works on The Pewfist, Westhoughton, Bolton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 October 2024 at 09:00 and could run through until 12 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 09:02.

Wigan Metropolitan Borough Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Bridge Street

Wigan Metropolitan Borough Council are carrying out Highway repair and maintenance works on Bridge Street, Hindley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 October 2024 at 08:00 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 28 Oct 2024 at 09:03.

Wigan Metropolitan Borough Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Tunstall Lane

Wigan Metropolitan Borough Council are carrying out Highway repair and maintenance works on Tunstall Lane, Wigan.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 October 2024 at 07:00 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 28 Oct 2024 at 09:03.

Cadent Gas logo
Between
28 Oct and 13 Nov 2024
Details
View Map
Share
Follow
Woodcock Drive

Cadent Gas are proposing to carry out Utility asset works on Woodcock Drive, Platt Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 13 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 10:30.

Electricity North West (NorWeb) logo
Until
15 Nov 2024
Details
View Map
Share
Follow
Liscard Street

Electricity North West (NorWeb) are carrying out Diversionary works on Liscard Street, Atherton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 16:45 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 29 Oct 2024 at 09:35.

Cadent Gas logo
LONG TERM
Until
28 Nov 2024
Details
View Map
Share
Follow
Station Road

Cadent Gas are carrying out Utility asset works on Station Road, Blackrod, Bolton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 07:50 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 07:52.

Cadent Gas logo
Until
21 Nov 2024
Details
View Map
Share
Follow
Tempest Road

Cadent Gas are carrying out Utility asset works on Tempest Road, Lostock, Bolton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 10:00 and could run through until 21 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 10:14.

Bolton Metropolitan Borough Council logo
Between
30 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Church Street

Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Church Street, Horwich, Bolton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 22 Oct 2024 at 12:59.

Cadent Gas logo
Between
30 Oct and 14 Nov 2024
Details
View Map
Share
Follow
St Georges Avenue

Cadent Gas are proposing to carry out Utility asset works on St Georges Avenue, Westhoughton, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 13:34.

Bolton Metropolitan Borough Council logo
Until
29 Nov 2024
Details
View Map
Share
Follow
Church Street

Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Church Street, Horwich, Bolton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 08:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 30 Oct 2024 at 08:31.

Cadent Gas logo
Between
4 Nov and 4 Dec 2024
Details
View Map
Share
Follow
Chanters Avenue

Cadent Gas are proposing to carry out Utility asset works on Chanters Avenue, Atherton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 12:35.

Cadent Gas logo
LONG TERM
Between
4 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Manchester Road

Cadent Gas are proposing to carry out Utility asset works on Manchester Road, Blackrod, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 11:08.

Cadent Gas logo
Between
4 and 27 Nov 2024
Details
View Map
Share
Follow
Douglas Street

Cadent Gas are proposing to carry out Utility asset works on Douglas Street, Atherton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 12:38.

Cadent Gas logo
Between
4 and 27 Nov 2024
Details
View Map
Share
Follow
St Georges Avenue

Cadent Gas are proposing to carry out Utility asset works on St Georges Avenue, Westhoughton, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Aug 2024 at 09:15.

Electricity North West (NorWeb) logo
Between
4 and 22 Nov 2024
Details
View Map
Share
Follow
Nicol Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Nicol Road, Ashton-in-makerfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 10 Sep 2024 at 15:37.

Electricity North West (NorWeb) logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Follow
Smiths Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Smiths Lane, Hindley Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 12 Sep 2024 at 11:34.

Cadent Gas logo
Between
4 Nov and 4 Dec 2024
Details
View Map
Share
Follow
Chanters Avenue

Cadent Gas are proposing to carry out Utility asset works on Chanters Avenue, Atherton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Aug 2024 at 11:25.

Cadent Gas logo
Between
4 Nov and 4 Dec 2024
Details
View Map
Share
Follow
Tyldesley Old Road

Cadent Gas are proposing to carry out Utility asset works on Tyldesley Old Road, Atherton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Aug 2024 at 11:26.

Cadent Gas logo
Between
4 Nov and 3 Dec 2024
Details
View Map
Share
Follow
The Pewfist

Cadent Gas are proposing to carry out Utility asset works on The Pewfist, Westhoughton, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Aug 2024 at 09:14.

Cadent Gas logo
LONG TERM
Between
4 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Millers Lane

Cadent Gas are proposing to carry out Utility asset works on Millers Lane, Platt Bridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 14:23.

United Utilities Water (formerly North West Water) logo
Between
6 and 8 Nov 2024
Details
View Map
Share
Follow
Back Wigan Road South

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Wigan Road South, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 12 Aug 2024 at 08:50.

United Utilities Water (formerly North West Water) logo
Between
6 and 8 Nov 2024
Details
View Map
Share
Follow
Back Wigan Road South

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Wigan Road South, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 21 Oct 2024 at 12:06.

Between
7 and 13 Nov 2024
Details
View Map
Share
Follow
Arcade Street

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Arcade Street, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 13 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 15 Aug 2024 at 12:02.

Cadent Gas logo
LONG TERM
Between
11 Nov 2024 and 7 Feb 2025
Details
View Map
Share
Follow
Manchester Road

Cadent Gas are proposing to carry out Utility asset works on Manchester Road, Blackrod, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 15:39.

Cadent Gas logo
Between
11 Nov and 11 Dec 2024
Details
View Map
Share
Manor Avenue

Cadent Gas were proposing to carry out Utility asset works on Manor Avenue, Golborne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 13:05.

Cadent Gas logo
Between
11 and 27 Nov 2024
Details
View Map
Share
Lancaster Avenue

Cadent Gas were proposing to carry out Utility asset works on Lancaster Avenue, Golborne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 27 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 13:05.

Electricity North West (NorWeb) logo
LONG TERM
Between
15 Nov 2024 and 14 Jan 2025
Details
View Map
Share
Follow
Bickershaw Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Bickershaw Lane, Bickershaw.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 14 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 6 Sep 2024 at 09:48.

Electricity North West (NorWeb) logo
Between
15 Nov and 12 Dec 2024
Details
View Map
Share
Follow
Smiths Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Smiths Lane, Hindley Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 6 Sep 2024 at 09:48.

Electricity North West (NorWeb) logo
LONG TERM
Between
15 Nov 2024 and 28 Jan 2025
Details
View Map
Share
Bickershaw Lane

Electricity North West (NorWeb) were proposing to carry out New service connection on Bickershaw Lane, Bickershaw.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 November 2024 and run through until 28 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 23 Aug 2024 at 09:14.

Wigan Metropolitan Borough Council logo
Between
18 and 24 Nov 2024
Details
View Map
Share
Follow
Alder Street

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Alder Street, Atherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 9 Oct 2024 at 12:58.

Electricity North West (NorWeb) logo
Between
19 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Nicol Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Nicol Road, Ashton-in-makerfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 27 Aug 2024 at 14:53.

United Utilities Water (formerly North West Water) logo
Between
20 and 22 Nov 2024
Details
View Map
Share
Follow
Platt Street

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Platt Street, Platt Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Sep 2024 at 08:53.

Cadent Gas logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Regent Road

Cadent Gas are proposing to carry out Utility asset works on Regent Road, Lostock, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 15:19.

Cadent Gas logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Overdene Close

Cadent Gas are proposing to carry out Utility asset works on Overdene Close, Lostock, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 15:19.

Cadent Gas logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Morris Fold Drive

Cadent Gas are proposing to carry out Utility asset works on Morris Fold Drive, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 15:20.

Wigan Metropolitan Borough Council logo
Between
2 and 29 Dec 2024
Details
View Map
Share
Follow
Huxley Place

Wigan Metropolitan Borough Council are proposing to carry out Section 50 on Huxley Place, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 29 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 24 Oct 2024 at 12:35.

Cadent Gas logo
Between
2 and 22 Dec 2024
Details
View Map
Share
Blackrod Footpath 24

Cadent Gas were proposing to carry out Utility asset works on Blackrod Footpath 24, Blackrod.

These works were categorised as Major.

The works were originally planned to start 2 December 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 14:01.

Cadent Gas logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Briar Walk

Cadent Gas were proposing to carry out Utility asset works on Briar Walk, Golborne.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 23 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 13:06.

Cadent Gas logo
Between
9 and 17 Dec 2024
Details
View Map
Share
Follow
Hamilton Street

Cadent Gas are proposing to carry out Utility repair and maintenance works on Hamilton Street, Atherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 09:59.

Cadent Gas logo
Between
16 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Rectory Avenue

Cadent Gas are proposing to carry out Utility asset works on Rectory Avenue, Lowton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 10:56.

Cadent Gas logo
Between
16 and 27 Dec 2024
Details
View Map
Share
Follow
Battersby Street

Cadent Gas are proposing to carry out Utility asset works on Battersby Street, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 27 December 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 14:59.

Cadent Gas logo
Between
16 and 27 Dec 2024
Details
View Map
Share
Follow
Battersby Street

Cadent Gas are proposing to carry out Utility asset works on Battersby Street, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 27 December 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 20 Sep 2024 at 11:00.

Cadent Gas logo
LONG TERM
Between
19 Dec 2024 and 10 Feb 2025
Details
View Map
Share
Follow
St Helens Road

Cadent Gas are proposing to carry out Utility asset works on St Helens Road, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 12:57.

Electricity North West (NorWeb) logo
Between
27 Dec 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Liscard Street

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Liscard Street, Atherton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 7 Oct 2024 at 09:25.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Jan and 1 Mar 2025
Details
View Map
Share
Follow
Beech Hill Avenue

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Beech Hill Avenue, Wigan.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 1 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 3 Oct 2024 at 12:20.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Jan and 1 Mar 2025
Details
View Map
Share
Follow
Spencer Road West

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Spencer Road West, Wigan.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 1 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 3 Oct 2024 at 13:28.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Jan and 1 Mar 2025
Details
View Map
Share
Follow
Gidlow Lane

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Gidlow Lane, Wigan.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 1 March 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 6 Sep 2024 at 11:08.

Cadent Gas logo
Between
2 and 20 Jan 2025
Details
View Map
Share
Follow
The Cheethams

Cadent Gas are proposing to carry out Utility asset works on The Cheethams, Blackrod, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jul 2024 at 07:51.

United Utilities Water (formerly North West Water) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Glebe Street Back Service Road East 82 - 144

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Glebe Street Back Service Road East 82 - 144, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 1 Oct 2024 at 10:15.

Cadent Gas logo
Between
6 and 22 Jan 2025
Details
View Map
Share
Braithwaite Road

Cadent Gas were proposing to carry out Utility asset works on Braithwaite Road, Lowton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 22 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 11:00.

Cadent Gas logo
LONG TERM
Between
6 Jan and 12 Feb 2025
Details
View Map
Share
Slag Lane

Cadent Gas were proposing to carry out Utility asset works on Slag Lane, Lowton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 12 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 11:01.

Cadent Gas logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Manchester Road

Cadent Gas are proposing to carry out Utility asset works on Manchester Road, Blackrod, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 13:48.

United Utilities Water (formerly North West Water) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Back Morris Green Lane

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Morris Green Lane, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Oct 2024 at 11:45.

The Environment Agency logo
LONG TERM
Between
8 Jan and 25 Apr 2025
Details
View Map
Share
Follow
Alexandra Road

The Environment Agency are proposing to carry out Statutory Infrastructure Works on Alexandra Road, Ashton-in-makerfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by The Environment Agency on 20 Jun 2024 at 08:50.

Cadent Gas logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Hamilton Street

Cadent Gas are proposing to carry out Utility repair and maintenance works on Hamilton Street, Atherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 09:50.

Cadent Gas logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Hamilton Street

Cadent Gas are proposing to carry out Utility repair and maintenance works on Hamilton Street, Atherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 11:38.

Cadent Gas logo
Between
13 and 29 Jan 2025
Details
View Map
Share
The Grove

Cadent Gas were proposing to carry out Utility asset works on The Grove, Lowton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 29 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 11:02.

Electricity North West (NorWeb) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Rose Avenue

Electricity North West (NorWeb) are proposing to carry out New service connection on Rose Avenue, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 8 Oct 2024 at 09:11.

United Utilities Water (formerly North West Water) logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Poolstock

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Poolstock, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Oct 2024 at 14:04.

United Utilities Water (formerly North West Water) logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Platt Street

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Platt Street, Platt Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Sep 2024 at 14:46.

Network Rail logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Wallgate

Network Rail are proposing to carry out Works for Rail Purposes on Wallgate, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Sep 2024 at 13:21.

Network Rail logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Wallgate

Network Rail are proposing to carry out Works for Rail Purposes on Wallgate, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 4 Oct 2024 at 09:43.

United Utilities Water (formerly North West Water) logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Back Hulton Lane West

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Hulton Lane West, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 29 Oct 2024 at 10:07.

Cadent Gas logo
Between
27 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Wash Lane

Cadent Gas are proposing to carry out Utility asset works on Wash Lane, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 13:57.

Cadent Gas logo
Between
27 Jan and 26 Feb 2025
Details
View Map
Share
Follow
Crown Lane

Cadent Gas are proposing to carry out Utility asset works on Crown Lane, Horwich, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Aug 2024 at 08:50.

Cadent Gas logo
Between
27 Jan and 12 Feb 2025
Details
View Map
Share
Follow
James Street

Cadent Gas are proposing to carry out Utility asset works on James Street, Horwich, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 10:02.

Cadent Gas logo
Between
27 Jan and 12 Feb 2025
Details
View Map
Share
Follow
James Street

Cadent Gas are proposing to carry out Utility asset works on James Street, Horwich, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 10:10.


Roadworks Map near to Cinnamon Avenue, WIGAN, WN2 4RF

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 30 Oct 2024 17:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Cinnamon Avenue, WIGAN, WN2 4RF (7 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Virgin Media logo
ATHERTON ROAD 
(0.4 miles)
Virgin Media
Utility asset works - Footway, Verge - Two-way signals
Planned
Scheduled: 30 Oct 2024 - 1 Nov 2024
0.4
Details
Share
Follow
2
BT logo
BORSDANE AVENUE 
(0.5 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 31 Oct 2024 - 4 Nov 2024
0.5
Details
Share
Follow
3
Wigan Metropolitan Borough Council logo
MAJOR
  
SWAN LANE 
(0.5 miles)
Wigan Metropolitan Borough Council
Highway repair and maintenance works - Carriageway - Road closure
In Progress
Since: 28 Oct 2024 08:00
(Scheduled: 28 Aug 2024 - 31 Oct 2024)
0.5
Details
Share
Follow
4
Wigan Metropolitan Borough Council logo
ATHERTON ROAD 
(0.5 miles)
Wigan Metropolitan Borough Council
Highway repair and maintenance works - Carriageway - Two-way signals
In Progress
Since: 28 Oct 2024 09:30
(Scheduled: 28 Oct 2024 - 30 Oct 2024)
0.5
Details
Share
Follow
5
United Utilities Water (formerly North West Water) logo
URGENT
  
BELMONT ROAD 
(0.5 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 30 Oct 2024 15:23
(Scheduled: 30 Oct 2024 - 5 Nov 2024)
0.5
Details
Share
Follow
6
BT logo
TRENT DRIVE 
(0.8 miles)
BT
Utility repair and maintenance works - Footway - Give and take
Planned
Scheduled: 31 Oct 2024 - 4 Nov 2024
0.8
Details
Share
Follow
7
Wigan Metropolitan Borough Council logo
MAJOR
  
BRIDGE STREET 
(0.9 miles)
Wigan Metropolitan Borough Council
Highway repair and maintenance works - Carriageway - Road closure
In Progress
Since: 27 Oct 2024 08:00
(Scheduled: 27 Oct 2024 - 3 Nov 2024)
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.