ROADWORKS SUMMARY
New Market Street, WIGAN, WN1 1SE

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for New Market Street, WN1 1SE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to New Market Street, WIGAN, WN1 1SE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for New Market Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Network Rail logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Ince Green Lane

Network Rail are carrying out Works for Rail Purposes on Ince Green Lane, Ince.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 07:00 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 Jul 2024 at 08:02.

Electricity North West (NorWeb) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Bickershaw Lane

Electricity North West (NorWeb) are carrying out New service connection on Bickershaw Lane, Bickershaw.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 September 2024 at 08:30 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 15 Nov 2024 at 14:22.

Wigan Metropolitan Borough Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Market Street

Wigan Metropolitan Borough Council are proposing to carry out Section 50 on Market Street, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 6 Sep 2024 at 11:41.

Wigan Metropolitan Borough Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Market Street

Wigan Metropolitan Borough Council are proposing to carry out Section 50 on Market Street, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 6 Sep 2024 at 11:40.

National Highways logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Crow Orchard Road

National Highways are proposing to carry out Highway repair and maintenance works on Crow Orchard Road, Wrightington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 4 Oct 2024 at 10:26.

Cadent Gas logo
LONG TERM
Between
14 Oct 2024 and 15 Jan 2025
Details
View Map
Share
Follow
Manchester Road

Cadent Gas are proposing to carry out Utility asset works on Manchester Road, Blackrod, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 16 Jul 2024 at 07:50.

National Highways logo
LONG TERM
Between
18 Oct and 9 Dec 2024
Details
View Map
Share
Follow
Crow Orchard Road

National Highways are proposing to carry out Highway repair and maintenance works on Crow Orchard Road, Wrightington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 October 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 9 Oct 2024 at 13:33.

National Highways logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Crow Orchard Road

National Highways are carrying out Highway repair and maintenance works on Crow Orchard Road, Wrightington.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 October 2024 at 20:30 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 28 Oct 2024 at 13:44.

Cadent Gas logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Station Road

Cadent Gas are carrying out Utility asset works on Station Road, Blackrod, Bolton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 07:50 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 07:52.

LONG TERM
Between
30 Oct 2024 and 4 Nov 2025
Details
View Map
Share
Follow
Leyland Green Road

St. Helens Council are proposing to carry out Highway repair and maintenance works on Leyland Green Road, Ashton In Makerfield, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 4 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 18 Oct 2024 at 14:53.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Cale Lane Icw Ashbourne Avenue

Cadent Gas are carrying out Utility asset works on Cale Lane Icw Ashbourne Avenue, Aspull.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:16 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 12:05.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
St Georges Avenue

Cadent Gas are proposing to carry out Utility asset works on St Georges Avenue, Westhoughton, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Aug 2024 at 09:15.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
The Pewfist

Cadent Gas are proposing to carry out Utility asset works on The Pewfist, Westhoughton, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Aug 2024 at 09:14.

Cadent Gas logo
LONG TERM
Between
4 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Millers Lane

Cadent Gas are proposing to carry out Utility asset works on Millers Lane, Platt Bridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 14:23.

Cadent Gas logo
LONG TERM
Between
4 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Pepper Lane

Cadent Gas are proposing to carry out Utility asset works on Pepper Lane, Standish.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 10:53.

Cadent Gas logo
LONG TERM
Until
9 Dec 2024
Details
View Map
Share
Follow
Pepper Lane

Cadent Gas are carrying out Utility asset works on Pepper Lane, Standish.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:00 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 09:16.

United Utilities Water (formerly North West Water) logo
Finishing
Friday
Details
View Map
Share
Follow
Green Lane

United Utilities Water (formerly North West Water) are carrying out Utility asset works on Green Lane, Standish.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 10:30 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Nov 2024 at 10:35.

Cadent Gas logo
LONG TERM
Until
7 Feb 2025
Details
View Map
Share
Follow
Manchester Road

Cadent Gas are carrying out Utility asset works on Manchester Road, Blackrod, Bolton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 08:51.

Electricity North West (NorWeb) logo
Until
11 Dec 2024
Details
View Map
Share
Follow
Smiths Lane

Electricity North West (NorWeb) are carrying out New service connection on Smiths Lane, Hindley Green.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 November 2024 at 16:45 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 15 Nov 2024 at 09:41.

Electricity North West (NorWeb) logo
LONG TERM
Between
15 Nov 2024 and 14 Jan 2025
Details
View Map
Share
Follow
Bickershaw Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Bickershaw Lane, Bickershaw.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 14 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 6 Sep 2024 at 09:48.

Electricity North West (NorWeb) logo
LONG TERM
Between
15 Nov 2024 and 28 Jan 2025
Details
View Map
Share
Bickershaw Lane

Electricity North West (NorWeb) were proposing to carry out New service connection on Bickershaw Lane, Bickershaw.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 November 2024 and run through until 28 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 23 Aug 2024 at 09:14.

Electricity North West (NorWeb) logo
Between
15 Nov and 12 Dec 2024
Details
View Map
Share
Follow
Smiths Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Smiths Lane, Hindley Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 6 Sep 2024 at 09:48.

Wigan Metropolitan Borough Council logo
Between
17 Nov and 7 Dec 2024
Details
View Map
Share
Follow
Dryden Close

Wigan Metropolitan Borough Council are proposing to carry out Section 50 on Dryden Close, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2024 and could run through until 7 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 25 Nov 2024 at 12:58.

Wigan Metropolitan Borough Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Dryden Close

Wigan Metropolitan Borough Council are proposing to carry out Section 50 on Dryden Close, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 5 Nov 2024 at 09:19.

Electricity North West (NorWeb) logo
Between
19 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Nicol Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Nicol Road, Ashton-in-makerfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 27 Aug 2024 at 14:53.

Cadent Gas logo
Between
2 and 22 Dec 2024
Details
View Map
Share
Blackrod Footpath 24

Cadent Gas were proposing to carry out Utility asset works on Blackrod Footpath 24, Blackrod.

These works were categorised as Major.

The works were originally planned to start 2 December 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 14:01.

Wigan Metropolitan Borough Council logo
Between
2 and 5 Dec 2024
Details
View Map
Share
Follow
The Avenue

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on The Avenue, Standish Lower Ground.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 25 Nov 2024 at 10:14.

Wigan Metropolitan Borough Council logo
Between
2 and 29 Dec 2024
Details
View Map
Share
Follow
Huxley Place

Wigan Metropolitan Borough Council are proposing to carry out Section 50 on Huxley Place, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 29 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 24 Oct 2024 at 12:35.

Wigan Metropolitan Borough Council logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
The Avenue

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on The Avenue, Standish Lower Ground.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 13 Nov 2024 at 12:50.

Electricity North West (NorWeb) logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Pendennis Crescent

Electricity North West (NorWeb) are proposing to carry out New service connection on Pendennis Crescent, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 25 Nov 2024 at 09:21.

Electricity North West (NorWeb) logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Beaumaris Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Beaumaris Road, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 25 Nov 2024 at 09:22.

Electricity North West (NorWeb) logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Richmond Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Richmond Road, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 25 Nov 2024 at 09:28.

Cadent Gas logo
Between
2 Dec 2024 and 1 Jan 2025
Details
View Map
Share
Garswood Road

Cadent Gas were proposing to carry out Utility asset works on Garswood Road, Ashton In Makerfield, St Helens.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 1 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 15:28.

Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Garswood Road

St. Helens Council are proposing to carry out Highway repair and maintenance works on Garswood Road, Ashton In Makerfield, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 20 Nov 2024 at 10:45.

United Utilities Water (formerly North West Water) logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Moss Road

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Moss Road, Billinge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 17 Sep 2024 at 11:55.

United Utilities Water (formerly North West Water) logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Moss Road

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Moss Road, Billinge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 21 Nov 2024 at 09:28.

Transport For Greater Manchester logo
LONG TERM
Between
1 Jan and 1 Mar 2025
Details
View Map
Share
Follow
Gidlow Lane

Transport For Greater Manchester are proposing to carry out Highway improvement works on Gidlow Lane, Wigan.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 1 March 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Transport For Greater Manchester on 31 Oct 2024 at 11:23.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Jan and 1 Mar 2025
Details
View Map
Share
Follow
Gidlow Lane

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Gidlow Lane, Wigan.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 1 March 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 6 Sep 2024 at 11:08.

Transport For Greater Manchester logo
LONG TERM
Between
1 Jan and 1 Mar 2025
Details
View Map
Share
Follow
Beech Hill Avenue

Transport For Greater Manchester are proposing to carry out Highway improvement works on Beech Hill Avenue, Wigan.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 1 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport For Greater Manchester on 31 Oct 2024 at 16:04.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Jan and 1 Mar 2025
Details
View Map
Share
Follow
Spencer Road West

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Spencer Road West, Wigan.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 1 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 3 Oct 2024 at 13:28.

Transport For Greater Manchester logo
LONG TERM
Between
1 Jan and 1 Mar 2025
Details
View Map
Share
Follow
Spencer Road West

Transport For Greater Manchester are proposing to carry out Highway improvement works on Spencer Road West, Wigan.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 1 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport For Greater Manchester on 31 Oct 2024 at 11:23.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Jan and 1 Mar 2025
Details
View Map
Share
Follow
Beech Hill Avenue

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Beech Hill Avenue, Wigan.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 1 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 3 Oct 2024 at 12:20.

Cadent Gas logo
Between
2 and 20 Jan 2025
Details
View Map
Share
Follow
The Cheethams

Cadent Gas are proposing to carry out Utility asset works on The Cheethams, Blackrod, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jul 2024 at 07:51.

Cadent Gas logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Manchester Road

Cadent Gas are proposing to carry out Utility asset works on Manchester Road, Blackrod, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 13:48.

Wigan Metropolitan Borough Council logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Spring Road

Wigan Metropolitan Borough Council are proposing to carry out Section 50 on Spring Road, Orrell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 11 Nov 2024 at 09:58.

The Environment Agency logo
LONG TERM
Between
8 Jan and 25 Apr 2025
Details
View Map
Share
Follow
Alexandra Road

The Environment Agency are proposing to carry out Statutory Infrastructure Works on Alexandra Road, Ashton-in-makerfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by The Environment Agency on 20 Jun 2024 at 08:50.

Cadent Gas logo
LONG TERM
Between
13 Jan and 26 Feb 2025
Details
View Map
Share
Follow
Manchester Road

Cadent Gas are proposing to carry out Utility asset works on Manchester Road, Blackrod, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 13:59.

Electricity North West (NorWeb) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Rose Avenue

Electricity North West (NorWeb) are proposing to carry out New service connection on Rose Avenue, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 8 Oct 2024 at 09:11.

Electricity North West (NorWeb) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Rose Avenue

Electricity North West (NorWeb) are proposing to carry out New service connection on Rose Avenue, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 7 Nov 2024 at 12:59.

United Utilities Water (formerly North West Water) logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Poolstock

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Poolstock, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Oct 2024 at 14:04.

Network Rail logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Wallgate

Network Rail are proposing to carry out Works for Rail Purposes on Wallgate, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 6 Nov 2024 at 10:55.

Network Rail logo
Between
15 and 18 Jan 2025
Details
View Map
Share
Follow
Wallgate

Network Rail are proposing to carry out Works for Rail Purposes on Wallgate, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 4 Nov 2024 at 15:46.

Network Rail logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Wallgate

Network Rail are proposing to carry out Works for Rail Purposes on Wallgate, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 4 Oct 2024 at 09:43.

Network Rail logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Wallgate

Network Rail are proposing to carry out Works for Rail Purposes on Wallgate, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Sep 2024 at 13:21.

United Utilities Water (formerly North West Water) logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Platt Street

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Platt Street, Platt Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Sep 2024 at 14:46.

Electricity North West (NorWeb) logo
Between
22 and 30 Jan 2025
Details
View Map
Share
Follow
Greenland Avenue

Electricity North West (NorWeb) are proposing to carry out New service connection on Greenland Avenue, Standish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 25 Oct 2024 at 11:46.

Cadent Gas logo
Between
27 Jan and 26 Feb 2025
Details
View Map
Share
Follow
Crown Lane

Cadent Gas are proposing to carry out Utility asset works on Crown Lane, Horwich, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Aug 2024 at 08:50.

Cadent Gas logo
Between
27 Jan and 12 Feb 2025
Details
View Map
Share
Follow
James Street

Cadent Gas are proposing to carry out Utility asset works on James Street, Horwich, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 10:02.

Cadent Gas logo
Between
27 Jan and 12 Feb 2025
Details
View Map
Share
Follow
James Street

Cadent Gas are proposing to carry out Utility asset works on James Street, Horwich, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 12:49.

Electricity North West (NorWeb) logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Bretherton Row

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Bretherton Row, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 6 Nov 2024 at 15:39.

Network Rail logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Wallgate

Network Rail are proposing to carry out Works for Rail Purposes on Wallgate, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 6 Nov 2024 at 10:55.

Network Rail logo
Between
27 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Wallgate

Network Rail are proposing to carry out Works for Rail Purposes on Wallgate, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 4 Nov 2024 at 15:46.

The Environment Agency logo
LONG TERM
Between
29 Jan and 16 May 2025
Details
View Map
Share
Follow
Queens Road

The Environment Agency are proposing to carry out Statutory Infrastructure Works on Queens Road, Ashton-in-makerfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by The Environment Agency on 20 Jun 2024 at 08:45.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Feb and 1 Apr 2025
Details
View Map
Share
Follow
Warrington Lane

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Warrington Lane, Wigan.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 1 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 6 Sep 2024 at 11:03.

Network Rail logo
Between
1 and 7 Feb 2025
Details
View Map
Share
Follow
M6 From J25 To J24 S

Network Rail are proposing to carry out Works for Rail Purposes on M6 From J25 To J24 S, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 24 Sep 2024 at 07:09.

Network Rail logo
Between
1 and 7 Feb 2025
Details
View Map
Share
Follow
M6 From J25 To J24 S

Network Rail are proposing to carry out Works for Rail Purposes on M6 From J25 To J24 S, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 22 Oct 2024 at 16:30.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Feb and 1 Apr 2025
Details
View Map
Share
Follow
Millgate

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Millgate, Wigan.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 1 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 3 Oct 2024 at 13:25.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Feb and 1 Apr 2025
Details
View Map
Share
Follow
Scholes

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Scholes, Wigan.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 1 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 3 Oct 2024 at 13:25.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Feb and 1 Apr 2025
Details
View Map
Share
Follow
School Lane

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on School Lane, Wigan.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 1 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 3 Oct 2024 at 13:26.

Wigan Metropolitan Borough Council logo
Between
2 and 9 Feb 2025
Details
View Map
Share
Follow
Almond Brook Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Almond Brook Road, Standish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2025 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 14 Nov 2024 at 13:14.

Electricity North West (NorWeb) logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Pendennis Crescent

Electricity North West (NorWeb) are proposing to carry out New service connection on Pendennis Crescent, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 29 Oct 2024 at 13:07.

Electricity North West (NorWeb) logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Pendennis Crescent

Electricity North West (NorWeb) are proposing to carry out New service connection on Pendennis Crescent, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 29 Oct 2024 at 11:05.

Electricity North West (NorWeb) logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Beaumaris Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Beaumaris Road, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 29 Oct 2024 at 13:07.

Electricity North West (NorWeb) logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Beaumaris Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Beaumaris Road, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 29 Oct 2024 at 11:05.

Cadent Gas logo
LONG TERM
Between
6 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Wigan Road

Cadent Gas are proposing to carry out Utility asset works on Wigan Road, Golborne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:48.

Cadent Gas logo
LONG TERM
Between
6 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Wigan Road

Cadent Gas are proposing to carry out Utility asset works on Wigan Road, Golborne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 15:34.

Cadent Gas logo
Between
10 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Taylors Lane

Cadent Gas are proposing to carry out Utility asset works on Taylors Lane, Ince.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:51.

Cadent Gas logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
Warrington Road

Cadent Gas are proposing to carry out Utility asset works on Warrington Road, Ince.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:50.


Roadworks Map near to New Market Street, WIGAN, WN1 1SE

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Nov 2024 06:25
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to New Market Street, WIGAN, WN1 1SE (28 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Wigan Metropolitan Borough Council logo
MAJOR
  
MARKET STREET 
(0.0 miles)
Wigan Metropolitan Borough Council
Section 50 - Footway, Carriageway - Road closure
Planned
Scheduled: 1 Oct 2024 - 30 Nov 2024
0.0
Details
Share
Follow
2
Wigan Metropolitan Borough Council logo
MAJOR
  
MARKET STREET 
(0.0 miles)
Wigan Metropolitan Borough Council
Section 50 - Footway, Carriageway - Road closure
Planned
Scheduled: 1 Oct 2024 - 30 Nov 2024
0.0
Details
Share
Follow
3
United Utilities Water (formerly North West Water) logo
URGENT
  
MARKET PLACE 
(0.2 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 24 Nov 2024 13:07
(Scheduled: 24 Nov 2024 - 29 Nov 2024)
0.2
Details
Share
Follow
4
Cadent Gas logo
WALLGATE 
(0.3 miles)
Cadent Gas
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 28 Nov 2024 - 2 Dec 2024
0.3
Details
Share
Follow
5
Cadent Gas logo
WALLGATE 
(0.3 miles)
Cadent Gas
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 28 Nov 2024 - 29 Nov 2024
0.3
Details
Share
Follow
6
Electricity North West (NorWeb) logo
URGENT
  
WALLGATE 
(0.3 miles)
Electricity North West (NorWeb)
Utility repair and maintenance works - Carriageway - Some carriageway incursion
Complete
22 Nov 2024 12:46 - 25 Nov 2024 12:00
0.3
Details
Share
7
Wigan Metropolitan Borough Council logo
MILLGATE 
(0.4 miles)
Wigan Metropolitan Borough Council
Disconnection or alteration of supply - Footway - No carriageway incursion
In Progress
Since: 25 Nov 2024 19:05
(Scheduled: 25 Nov 2024 - 28 Nov 2024)
0.4
Details
Share
Follow
8
United Utilities Water (formerly North West Water) logo
URGENT
  
GIDLOW LANE 
(0.4 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Give and take
In Progress
Since: 23 Nov 2024 14:01
(Scheduled: 23 Nov 2024 - 29 Nov 2024)
0.4
Details
Share
Follow
9
Electricity North West (NorWeb) logo
URGENT
  
WARRINGTON LANE 
(0.4 miles)
Electricity North West (NorWeb)
Utility repair and maintenance works - Verge - Some carriageway incursion
Complete
19 Nov 2024 16:05 - 25 Nov 2024 13:00
0.4
Details
Share
10
BT logo
WARRINGTON LANE 
(0.4 miles)
BT
Utility repair and maintenance works - Footway - Give and take
Cancelled
(Scheduled: 26 Nov 2024 - 28 Nov 2024)
0.4
Details
Share
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.