ROADWORKS SUMMARY
Stanborough Avenue, BOREHAMWOOD, WD6 5LX

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Stanborough Avenue, WD6 5LX and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Stanborough Avenue, BOREHAMWOOD, WD6 5LX

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Stanborough Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Water logo
LONG TERM
Until
25 Oct 2025
Details
View Map
Share
Follow
Barnet Road

Thames Water are carrying out Utility repair and maintenance works on Barnet Road, Barnet.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 October 2024 at 09:30 and could run through until 25 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 09:25.

London Borough Of Barnet logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Albert Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Albert Road, New Barnet, Barnet.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 27 Mar 2025 at 13:34.

London Borough Of Barnet logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Albert Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Albert Road, New Barnet, Barnet.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 27 Mar 2025 at 13:41.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Burnt Oak Broadway

Cadent Gas are carrying out Utility asset works on Burnt Oak Broadway, Edgware.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 06:26 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Aug 2025 at 09:28.

Cadent Gas logo
LONG TERM
Until
12 Oct 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are carrying out Utility asset works on High Street, Edgware.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 06:23 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Sep 2025 at 10:38.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Garratt Road

Cadent Gas are carrying out Utility asset works on Garratt Road, Edgware.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 July 2025 at 06:07 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Aug 2025 at 09:42.

Hertfordshire County Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Tylers Way

Hertfordshire County Council are carrying out Highway repair and maintenance works on Tylers Way, Watford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 July 2025 at 09:30 and could run through until 19 September 2025. The works will impact the verge only.

This roadwork event was last updated by Hertfordshire County Council on 20 Aug 2025 at 14:53.

Cadent Gas logo
LONG TERM
Between
28 Jul and 3 Oct 2025
Details
View Map
Share
Follow
Bushey Hall Road

Cadent Gas are proposing to carry out Utility asset works on Bushey Hall Road, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 18 Jun 2025 at 11:50.

Cadent Gas logo
LONG TERM
Between
4 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Clamp Hill

Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:13.

Cadent Gas logo
LONG TERM
Between
4 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Clamp Hill

Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 10 Jun 2025 at 16:10.

Cadent Gas logo
LONG TERM
Between
4 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Common Road

Cadent Gas are proposing to carry out Utility asset works on Common Road, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:14.

Cadent Gas logo
LONG TERM
Between
4 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Common Road

Cadent Gas are proposing to carry out Utility asset works on Common Road, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 11 Jun 2025 at 09:57.

Cadent Gas logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Rectory Lane

Cadent Gas are proposing to carry out Utility asset works on Rectory Lane, Shenley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 09:54.

Cadent Gas logo
LONG TERM
Until
13 Oct 2025
Details
View Map
Share
Follow
Common Road

Cadent Gas are carrying out Utility asset works on Common Road, Stanmore.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 August 2025 at 08:00 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 09:16.

Cadent Gas logo
LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Gateshead Road

Cadent Gas are carrying out Utility asset works on Gateshead Road, Borehamwood.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 05:56 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Aug 2025 at 08:12.

Cadent Gas logo
LONG TERM
Between
26 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Bullens Green Lane

Cadent Gas are proposing to carry out Utility asset works on Bullens Green Lane, Hatfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Aug 2025 at 11:53.

Cadent Gas logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Bullens Green Lane

Cadent Gas are carrying out Utility asset works on Bullens Green Lane, Hatfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 08:30 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Aug 2025 at 08:43.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Page Street

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Page Street, Mill Hill, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 August 2025 at 12:18 and could run through until 19 September 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Sep 2025 at 09:32.

Affinity Water logo
LONG TERM
Between
1 Sep and 14 Nov 2025
Details
View Map
Share
Queens Road

Affinity Water were proposing to carry out Utility asset works on Queens Road, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 14 November 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 17 Jun 2025 at 14:53.

Affinity Water logo
LONG TERM
Between
1 Sep and 14 Nov 2025
Details
View Map
Share
Queens Road

Affinity Water were proposing to carry out Utility asset works on Queens Road, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 14 November 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 6 Aug 2025 at 08:23.

Affinity Water logo
LONG TERM
Between
1 Sep and 10 Oct 2025
Details
View Map
Share
Granville Road

Affinity Water were proposing to carry out Utility asset works on Granville Road, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 10 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 13 Aug 2025 at 10:15.

Affinity Water logo
LONG TERM
Between
1 Sep and 14 Nov 2025
Details
View Map
Share
Queens Road

Affinity Water were proposing to carry out Utility asset works on Queens Road, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 14 November 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 17 Jun 2025 at 14:48.

Cadent Gas logo
LONG TERM
Between
8 Sep and 9 Nov 2025
Details
View Map
Share
Follow
Clamp Hill

Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jun 2025 at 09:40.

Cadent Gas logo
Between
8 and 26 Sep 2025
Details
View Map
Share
Follow
North Orbital Road

Cadent Gas are proposing to carry out Utility repair and maintenance works on North Orbital Road, St Albans.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 21 Aug 2025 at 10:18.

Cadent Gas logo
Until
26 Sep 2025
Details
View Map
Share
Follow
North Orbital Road

Cadent Gas are carrying out Utility repair and maintenance works on North Orbital Road, St Albans.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 08:15 and could run through until 26 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 9 Sep 2025 at 11:32.

Thames Water logo
Until
1 Oct 2025
Details
View Map
Share
Follow
Riverdene

Thames Water are carrying out Utility repair and maintenance works on Riverdene, Edgware.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2025 at 09:30 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 09:07.

Cadent Gas logo
LONG TERM
Until
11 Nov 2025
Details
View Map
Share
Follow
Stanmore Hill

Cadent Gas are carrying out Utility asset works on Stanmore Hill, Stanmore.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 13:56 and could run through until 11 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 14:19.

London Borough Of Barnet logo
Finishing
Monday
Details
View Map
Share
Lawrence Street

London Borough Of Barnet were proposing to carry out Highway improvement works on Lawrence Street, Mill Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 22 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2025 at 15:25.

London Borough Of Barnet logo
Finishing
Monday
Details
View Map
Share
Follow
Lawrence Street

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Lawrence Street, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 19 Jun 2025 at 14:36.

London Borough Of Barnet logo
Finishing
Monday
Details
View Map
Share
Follow
Lawrence Street

London Borough Of Barnet are proposing to carry out Remedial works on Lawrence Street, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Jul 2025 at 13:14.

Affinity Water logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Leicester Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Leicester Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 22 Jul 2025 at 10:48.

Affinity Water logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Leicester Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Leicester Road, East Finchley, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 5 Sep 2025 at 14:20.

Affinity Water logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Leicester Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Leicester Road, New Barnet, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 10 Sep 2025 at 14:25.

Cadent Gas logo
LONG TERM
Between
15 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Shenleybury

Cadent Gas are proposing to carry out Utility asset works on Shenleybury, Shenley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 7 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 5 Aug 2025 at 11:30.

Cadent Gas logo
LONG TERM
Between
15 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Shenleybury

Cadent Gas are proposing to carry out Utility asset works on Shenleybury, Shenley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 7 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 6 Aug 2025 at 14:24.

Cadent Gas logo
LONG TERM
Until
7 Nov 2025
Details
View Map
Share
Follow
Shenleybury

Cadent Gas are carrying out Utility asset works on Shenleybury, Shenley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 12:32 and could run through until 7 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 12:35.

London Borough Of Barnet logo
Finishing
Monday
Details
View Map
Share
Follow
Grove Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Grove Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2025 at 13:55.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Dury Road

Cadent Gas are carrying out Utility repair and maintenance works on Dury Road, Barnet.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 12:16 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 11:48.

Affinity Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Orchard Drive

Affinity Water are carrying out Utility repair and maintenance works on Orchard Drive, Edgware.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 19:00 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 18 Sep 2025 at 14:33.

London Borough Of Barnet logo
Finishing
Tuesday
Details
View Map
Share
Follow
Grove Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Grove Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2025 at 15:06.

London Borough Of Barnet logo
Finishing
Tuesday
Details
View Map
Share
Follow
Grove Road

London Borough Of Barnet are carrying out Highway improvement works on Grove Road, New Barnet, Barnet.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 08:00 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 17 Sep 2025 at 08:07.

Hertfordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Sixth Avenue

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sixth Avenue, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 2 May 2025 at 10:28.

Cadent Gas logo
Until
25 Sep 2025
Details
View Map
Share
Follow
Shenleybury

Cadent Gas are carrying out Utility repair and maintenance works on Shenleybury, Shenley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 14:49 and could run through until 25 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 18 Sep 2025 at 08:50.

T-Mobile (UK) logo
Finishing
Monday
Details
View Map
Share
Follow
The Fairway

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on The Fairway, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by T-Mobile (UK) on 26 Jun 2025 at 15:38.

Cadent Gas logo
LONG TERM
Between
22 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Clamp Hill

Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 15:21.

Affinity Water logo
Between
22 Sep and 3 Oct 2025
Details
View Map
Share
Granville Road

Affinity Water were proposing to carry out Utility asset works on Granville Road, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 3 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 6 Aug 2025 at 08:24.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
Camlet Way

BT are proposing to carry out Utility repair and maintenance works on Camlet Way, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 12 Aug 2025 at 09:36.

Hertfordshire County Council logo
Between
22 Sep and 11 Oct 2025
Details
View Map
Share
Follow
York Way

Hertfordshire County Council are proposing to carry out roadworks on York Way, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 1 Sep 2025 at 13:17.

London Borough Of Barnet logo
Between
23 and 25 Sep 2025
Details
View Map
Share
Follow
Lawrence Street

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Lawrence Street, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 19 Jun 2025 at 14:36.

London Borough Of Barnet logo
Between
24 and 26 Sep 2025
Details
View Map
Share
Follow
Hartley Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Hartley Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 1 Sep 2025 at 09:30.

London Borough Of Barnet logo
Between
24 Sep and 7 Oct 2025
Details
View Map
Share
York Road

London Borough Of Barnet were proposing to carry out Highway improvement works on York Road, New Barnet, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 September 2025 and run through until 7 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2025 at 12:48.

London Borough Of Barnet logo
Between
24 Sep and 9 Oct 2025
Details
View Map
Share
Follow
York Road

London Borough Of Barnet are proposing to carry out Highway improvement works on York Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2025 at 12:50.

Hertfordshire County Council logo
Between
24 and 26 Sep 2025
Details
View Map
Share
Follow
Sixth Avenue

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sixth Avenue, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 Aug 2025 at 14:58.

Hertfordshire County Council logo
Between
24 and 27 Sep 2025
Details
View Map
Share
Follow
Coursers Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Coursers Road, Colney Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 14 Aug 2025 at 16:05.

Hertfordshire County Council logo
Between
24 and 27 Sep 2025
Details
View Map
Share
Follow
Coursers Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Coursers Road, Colney Heath, St Albans.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 13 Aug 2025 at 11:51.

London Borough Of Barnet logo
Between
25 and 29 Sep 2025
Details
View Map
Share
Follow
Ellesmere Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Ellesmere Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 6 Aug 2025 at 15:13.

Hertfordshire County Council logo
Between
25 and 27 Sep 2025
Details
View Map
Share
Sixth Avenue

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Sixth Avenue, Watford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 September 2025 and run through until 27 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 22 Apr 2025 at 15:44.

Cadent Gas logo
LONG TERM
Between
29 Sep 2025 and 23 Jan 2026
Details
View Map
Share
Follow
Whitchurch Lane

Cadent Gas are proposing to carry out Utility asset works on Whitchurch Lane, Edgware.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 23 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Jul 2025 at 12:39.

Cadent Gas logo
LONG TERM
Between
29 Sep 2025 and 23 Jan 2026
Details
View Map
Share
Follow
Whitchurch Lane

Cadent Gas are proposing to carry out Utility asset works on Whitchurch Lane, Edgware.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 23 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2025 at 00:10.

London Borough Of Barnet logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Pike Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Pike Road, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2025 at 13:59.

London Borough Of Barnet logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Pike Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Pike Road, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2025 at 07:33.

London Borough Of Barnet logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Fernside Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Fernside Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2025 at 13:26.

London Borough Of Barnet logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Fernside Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Fernside Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2025 at 13:52.

London Borough Of Barnet logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Fernside Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Fernside Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2025 at 07:33.

London Borough Of Barnet logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Ellesmere Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Ellesmere Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2025 at 14:07.

London Borough Of Barnet logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Ellesmere Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Ellesmere Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 5 Sep 2025 at 11:54.

London Borough Of Barnet logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Ellesmere Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Ellesmere Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2025 at 07:33.

Hertfordshire County Council logo
Between
29 Sep and 4 Oct 2025
Details
View Map
Share
Follow
Meriden Way

Hertfordshire County Council are proposing to carry out roadworks on Meriden Way, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Aug 2025 at 12:19.

Hertfordshire County Council logo
Between
29 Sep and 4 Oct 2025
Details
View Map
Share
Follow
The Gossamers

Hertfordshire County Council are proposing to carry out roadworks on The Gossamers, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Aug 2025 at 12:19.

Hertfordshire County Council logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
St Lawrence Way

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on St Lawrence Way, Bricket Wood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 16 Apr 2025 at 10:24.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Oct 2025 and 6 Nov 2026
Details
View Map
Share
Follow
Brockenhurst Gardens

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Brockenhurst Gardens, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Jul 2025 at 11:32.

Affinity Water logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Argyle Road

Affinity Water were proposing to carry out Utility asset works on Argyle Road, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 24 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 13 Aug 2025 at 10:17.

London Borough Of Enfield logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Waggon Road

London Borough Of Enfield were proposing to carry out Highway improvement works on Waggon Road, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 8 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 9 Jul 2025 at 09:19.

National Highways logo
Between
7 and 11 Oct 2025
Details
View Map
Share
Follow
Watford Way

National Highways are proposing to carry out Works for road purposes on Watford Way, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 11 Sep 2025 at 15:11.

Affinity Water logo
Between
7 and 9 Oct 2025
Details
View Map
Share
Follow
Hartsbourne Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Hartsbourne Road, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 3 Jul 2025 at 10:08.

Hertfordshire County Council logo
Between
8 and 10 Oct 2025
Details
View Map
Share
Follow
Mimms Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Mimms Lane, Ridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 4 Sep 2025 at 09:54.

Hertfordshire County Council logo
Between
8 and 10 Oct 2025
Details
View Map
Share
Follow
Earls Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Earls Lane, South Mimms.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 4 Sep 2025 at 09:54.

Cadent Gas logo
Between
13 and 24 Oct 2025
Details
View Map
Share
Follow
Jellicoe Gardens

Cadent Gas are proposing to carry out Utility asset works on Jellicoe Gardens, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2025 at 09:53.

London Borough Of Barnet logo
Between
13 and 16 Oct 2025
Details
View Map
Share
Follow
Millway

London Borough Of Barnet are proposing to carry out Highway improvement works on Millway, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 15 Sep 2025 at 13:47.

London Borough Of Barnet logo
Between
13 and 16 Oct 2025
Details
View Map
Share
Follow
Millway

London Borough Of Barnet are proposing to carry out Highway improvement works on Millway, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 17 Sep 2025 at 12:56.

Affinity Water logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Lower Paddock Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Lower Paddock Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 15 Jul 2025 at 14:24.

Affinity Water logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Lower Paddock Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Lower Paddock Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 2 Sep 2025 at 10:36.

Hertfordshire County Council logo
Between
13 and 16 Oct 2025
Details
View Map
Share
Follow
Watling Street

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Watling Street, Elstree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 5 Sep 2025 at 13:58.

London Borough Of Barnet logo
Between
13 and 19 Oct 2025
Details
View Map
Share
Follow
Galley Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Galley Lane, Arkley Barnet Section, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 19 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by London Borough Of Barnet on 30 Jun 2025 at 15:06.

Affinity Water logo
LONG TERM
Between
13 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Granville Road

Affinity Water are proposing to carry out Utility asset works on Granville Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 21 Aug 2025 at 09:17.

Hertfordshire County Council logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Dancers Hill Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Dancers Hill Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Sep 2025 at 12:01.

Virgin Media logo
Between
14 and 16 Oct 2025
Details
View Map
Share
Follow
Park Way

Virgin Media are proposing to carry out Utility asset works on Park Way, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 29 Jul 2025 at 09:01.

BT logo
Between
14 and 17 Oct 2025
Details
View Map
Share
Follow
Darlands Drive

BT are proposing to carry out Utility repair and maintenance works on Darlands Drive, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 12 Sep 2025 at 15:29.

Affinity Water logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Granville Road

Affinity Water are proposing to carry out Utility asset works on Granville Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 9 Sep 2025 at 08:49.

Affinity Water logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Kings Road

Affinity Water were proposing to carry out Utility asset works on Kings Road, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 13 Aug 2025 at 10:31.

Cadent Gas logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Radlett Road

Cadent Gas are proposing to carry out Utility asset works on Radlett Road, Watford.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the cycleway only.

This roadwork event was last updated by Cadent Gas on 25 Jul 2025 at 10:50.

Cadent Gas logo
LONG TERM
Between
20 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Black Lion Hill

Cadent Gas are proposing to carry out Utility asset works on Black Lion Hill, Shenley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 10:32.

Affinity Water logo
LONG TERM
Between
21 Oct 2025 and 20 Mar 2026
Details
View Map
Share
Follow
Kitts End Road

Affinity Water are proposing to carry out Utility asset works on Kitts End Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 20 March 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 27 May 2025 at 09:57.

Affinity Water logo
LONG TERM
Between
21 Oct 2025 and 20 Mar 2026
Details
View Map
Share
Kitts End Road

Affinity Water were proposing to carry out Utility asset works on Kitts End Road, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2025 and run through until 20 March 2026. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 17 Jul 2025 at 10:31.

Affinity Water logo
LONG TERM
Between
21 Oct 2025 and 20 Mar 2026
Details
View Map
Share
Follow
Kitts End Road

Affinity Water are proposing to carry out Utility asset works on Kitts End Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 20 March 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 1 Aug 2025 at 10:57.

Affinity Water logo
LONG TERM
Between
21 Oct 2025 and 20 Mar 2026
Details
View Map
Share
Follow
Kitts End Road

Affinity Water are proposing to carry out Utility asset works on Kitts End Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 20 March 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 16 Sep 2025 at 13:47.

Cadent Gas logo
Between
23 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Shenleybury

Cadent Gas are proposing to carry out Utility asset works on Shenleybury, Shenley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 2 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 13:35.

London Borough Of Barnet logo
Between
25 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Mays Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Mays Lane, Underhill, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 31 Jul 2025 at 10:49.

London Borough Of Barnet logo
Between
25 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Barnet Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Barnet Lane, Underhill, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 31 Jul 2025 at 10:49.

London Borough Of Barnet logo
Between
25 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Underhill

London Borough Of Barnet are proposing to carry out Highway improvement works on Underhill, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 31 Jul 2025 at 10:49.

Affinity Water logo
Between
26 and 29 Oct 2025
Details
View Map
Share
St Albans Road

Affinity Water were proposing to carry out Utility repair and maintenance works on St Albans Road, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 13 Jun 2025 at 09:34.

Cadent Gas logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Chartley Avenue

Cadent Gas are proposing to carry out Utility asset works on Chartley Avenue, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2025 at 09:56.

Cadent Gas logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2025 at 10:00.

Cadent Gas logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Masefield Avenue

Cadent Gas were proposing to carry out Utility asset works on Masefield Avenue, Stanmore.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 10:23.

London Borough Of Barnet logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Wood Street

London Borough Of Barnet are proposing to carry out Highway improvement works on Wood Street, Barnet.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 23 Jul 2025 at 15:20.

Affinity Water logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Regina Close

Affinity Water were proposing to carry out Utility asset works on Regina Close, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 14 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 6 Aug 2025 at 08:22.

BT logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Camlet Way

BT are proposing to carry out Utility repair and maintenance works on Camlet Way, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 13 Aug 2025 at 14:04.

Hertfordshire County Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Drop Lane

Hertfordshire County Council are proposing to carry out Highway improvement works on Drop Lane, Bricket Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hertfordshire County Council on 27 Aug 2025 at 08:31.

Affinity Water logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Hartsbourne Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Hartsbourne Road, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 3 Jul 2025 at 14:24.

Affinity Water logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Hartsbourne Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Hartsbourne Road, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 18 Sep 2025 at 14:53.

Hertfordshire County Council logo
Between
31 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Dancers Hill Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Dancers Hill Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 27 Aug 2025 at 09:06.

Cadent Gas logo
Between
3 and 17 Nov 2025
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2025 at 09:59.

Cadent Gas logo
Between
3 and 17 Nov 2025
Details
View Map
Share
Follow
Chenduit Way

Cadent Gas are proposing to carry out Utility asset works on Chenduit Way, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 12:22.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Selvage Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2025 at 09:04.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Selvage Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2025 at 09:35.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Selvage Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2025 at 13:41.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Selvage Lane

Transport for London (TfL) were proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 25 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2025 at 10:15.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Watford Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Watford Way, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 13:19.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Watford Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Watford Way, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:18.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Edgware Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgware Way, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 13:21.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Edgware Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgware Way, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:18.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Barnet Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Barnet Way, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 13:21.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Barnet Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Barnet Way, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:18.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Northway Circus

Transport for London (TfL) are proposing to carry out Highway improvement works on Northway Circus, Apex Corner, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 13:20.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Northway Circus

Transport for London (TfL) are proposing to carry out Highway improvement works on Northway Circus, Apex Corner, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:17.

Affinity Water logo
LONG TERM
Between
3 Nov and 5 Dec 2025
Details
View Map
Share
Cavendish Road

Affinity Water were proposing to carry out Utility asset works on Cavendish Road, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 5 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 13 Aug 2025 at 10:32.

Cadent Gas logo
LONG TERM
Between
3 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Dancers Hill Road

Cadent Gas are proposing to carry out Utility asset works on Dancers Hill Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 29 Aug 2025 at 08:51.

Cadent Gas logo
LONG TERM
Between
3 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Rectory Lane

Cadent Gas are proposing to carry out Utility asset works on Rectory Lane, Shenley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 10:33.

Cadent Gas logo
LONG TERM
Between
3 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Black Lion Hill

Cadent Gas are proposing to carry out Utility asset works on Black Lion Hill, Shenley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 14 Aug 2025 at 10:17.

Hertfordshire County Council logo
Between
3 and 8 Nov 2025
Details
View Map
Share
Follow
London Colney Bypass

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on London Colney Bypass, St Albans.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 8 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 12:24.

Hertfordshire County Council logo
Between
3 and 8 Nov 2025
Details
View Map
Share
London Colney Bypass

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on London Colney Bypass, St Albans.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 8 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 May 2025 at 09:14.

London Borough Of Barnet logo
Between
8 and 9 Nov 2025
Details
View Map
Share
Follow
Mays Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Mays Lane, Underhill, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 9 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 9 Sep 2025 at 08:14.

London Borough Of Barnet logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Hartley Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Hartley Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2025 at 13:20.

Cadent Gas logo
LONG TERM
Between
10 Nov and 26 Dec 2025
Details
View Map
Share
Follow
Old Redding

Cadent Gas are proposing to carry out Utility asset works on Old Redding, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 26 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jun 2025 at 09:40.

BT logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Barnet Lane

BT were proposing to carry out Utility asset works on Barnet Lane, Totteridge, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 12 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Aug 2025 at 16:01.

BT logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Barnet Lane

BT are proposing to carry out Utility asset works on Barnet Lane, Totteridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 22 Aug 2025 at 12:39.

Affinity Water logo
LONG TERM
Between
10 Nov 2025 and 16 Jan 2026
Details
View Map
Share
Follow
Granville Road

Affinity Water are proposing to carry out Utility asset works on Granville Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 16 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 20 Jun 2025 at 10:44.

Cadent Gas logo
LONG TERM
Between
10 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Black Lion Hill

Cadent Gas are proposing to carry out Utility asset works on Black Lion Hill, Shenley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 13:00.

Hertfordshire County Council logo
Between
10 and 15 Nov 2025
Details
View Map
Share
Follow
London Colney Bypass

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on London Colney Bypass, St Albans.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 2 May 2025 at 11:45.

UK Power Networks Eastern & London logo
Between
14 and 21 Nov 2025
Details
View Map
Share
Follow
Berkeley Crescent

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Berkeley Crescent, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Aug 2025 at 08:26.

Affinity Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Silverston Way

Affinity Water are proposing to carry out roadworks on Silverston Way, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 18 Aug 2025 at 13:26.

Affinity Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Silverston Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Silverston Way, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 15 Sep 2025 at 14:46.

Cadent Gas logo
Between
17 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Greyfell Close

Cadent Gas are proposing to carry out Utility asset works on Greyfell Close, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2025 at 13:15.

Cadent Gas logo
Between
17 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Stangate Gardens

Cadent Gas are proposing to carry out Utility asset works on Stangate Gardens, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2025 at 13:03.

Cadent Gas logo
Between
17 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Hewett Close

Cadent Gas are proposing to carry out Utility asset works on Hewett Close, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2025 at 13:01.

Cadent Gas logo
LONG TERM
Between
17 Nov 2025 and 16 Jan 2026
Details
View Map
Share
Follow
Stanmore Hill

Cadent Gas are proposing to carry out Utility asset works on Stanmore Hill, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 16 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2025 at 13:29.

London Borough Of Barnet logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Lawrence Street

London Borough Of Barnet were proposing to carry out Highway improvement works on Lawrence Street, Mill Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 22 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2025 at 15:33.

London Borough Of Barnet logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Lawrence Street

London Borough Of Barnet are proposing to carry out Highway improvement works on Lawrence Street, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 9 Sep 2025 at 11:53.

Affinity Water logo
Between
17 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Argyle Road

Affinity Water are proposing to carry out Utility asset works on Argyle Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 21 Aug 2025 at 09:17.

London Borough Of Barnet logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Follow
Lawrence Street

London Borough Of Barnet are proposing to carry out Highway improvement works on Lawrence Street, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Aug 2025 at 10:55.

London Borough Of Barnet logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Follow
Highwood Hill

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Highwood Hill, Holcombe Hill To Marsh Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Aug 2025 at 10:55.

Affinity Water logo
Between
24 Nov and 17 Dec 2025
Details
View Map
Share
Follow
Argyle Road

Affinity Water are proposing to carry out Utility asset works on Argyle Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 9 Sep 2025 at 08:50.

Affinity Water logo
Between
24 and 27 Nov 2025
Details
View Map
Share
Loom Lane

Affinity Water were proposing to carry out Utility asset works on Loom Lane, Radlett.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 November 2025 and run through until 27 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 15 Sep 2025 at 07:56.

Affinity Water logo
Between
1 and 19 Dec 2025
Details
View Map
Share
Follow
Kings Road

Affinity Water are proposing to carry out Utility asset works on Kings Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 21 Aug 2025 at 09:17.

Affinity Water logo
LONG TERM
Between
1 Dec 2025 and 23 Jan 2026
Details
View Map
Share
Kings Road

Affinity Water were proposing to carry out Utility asset works on Kings Road, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 23 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 13 Aug 2025 at 10:33.

BT logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Christ Church Lane

BT were proposing to carry out Utility repair and maintenance works on Christ Church Lane, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 5 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Sep 2025 at 14:04.

BT logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Christ Church Lane

BT are proposing to carry out Utility repair and maintenance works on Christ Church Lane, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 17 Sep 2025 at 08:45.

Hertfordshire County Council logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
North Western Avenue

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on North Western Avenue, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 18 Sep 2025 at 14:45.

Hertfordshire County Council logo
Between
1 and 4 Dec 2025
Details
View Map
Share
Follow
How Wood

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on How Wood, Park Street, St Albans.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 4 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Sep 2025 at 14:05.

Affinity Water logo
LONG TERM
Between
8 Dec 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Kings Road

Affinity Water are proposing to carry out Utility asset works on Kings Road, Barnet.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 9 Sep 2025 at 08:55.

BT logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Follow
Buckettsland Lane

BT are proposing to carry out Utility asset works on Buckettsland Lane, Borehamwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 27 Aug 2025 at 09:03.

BT logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Follow
Summerswood Lane

BT are proposing to carry out Utility asset works on Summerswood Lane, Borehamwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 27 Aug 2025 at 09:05.

BT logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Follow
Summerswood Lane

BT are proposing to carry out Utility asset works on Summerswood Lane, Borehamwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 27 Aug 2025 at 09:05.

Cadent Gas logo
Between
8 and 19 Dec 2025
Details
View Map
Share
Follow
Pound Lane

Cadent Gas are proposing to carry out Utility asset works on Pound Lane, Shenley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 13:01.

Network Rail logo
Between
10 and 12 Dec 2025
Details
View Map
Share
Follow
Bunns Lane

Network Rail are proposing to carry out Works for Rail Purposes on Bunns Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 27 Aug 2025 at 15:50.

Transport for London (TfL) logo
Between
15 and 18 Dec 2025
Details
View Map
Share
Follow
The Broadway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on The Broadway, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 14:58.

Transport for London (TfL) logo
Between
15 and 18 Dec 2025
Details
View Map
Share
Follow
Weymouth Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Weymouth Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 14:57.

Transport for London (TfL) logo
Between
15 and 18 Dec 2025
Details
View Map
Share
Follow
Russell Grove

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Russell Grove, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 14:56.

Transport for London (TfL) logo
Between
15 and 18 Dec 2025
Details
View Map
Share
Follow
Millway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Millway, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 14:55.

Transport for London (TfL) logo
Between
15 and 18 Dec 2025
Details
View Map
Share
Follow
Selvage Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Selvage Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 14:54.

Transport for London (TfL) logo
Between
15 and 18 Dec 2025
Details
View Map
Share
Follow
Marsh Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Marsh Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 14:51.

Transport for London (TfL) logo
Between
15 and 17 Dec 2025
Details
View Map
Share
Follow
Pike Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Pike Road, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 17 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 14:48.

Transport for London (TfL) logo
Between
15 and 18 Dec 2025
Details
View Map
Share
Follow
Westfield Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westfield Road, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 14:52.

Transport for London (TfL) logo
Between
15 and 18 Dec 2025
Details
View Map
Share
Follow
Courtland Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Courtland Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 14:53.


Roadworks Map near to Stanborough Avenue, BOREHAMWOOD, WD6 5LX (15 Events)

Colour Codes
Planned
In Progress
Completed
Cancelled
Marker
Marker
Marker
Marker
Marker
Last Updated: 18 Sep 2025 22:33
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Stanborough Avenue, BOREHAMWOOD, WD6 5LX (15 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cadent Gas logo
MAJOR
  
GATESHEAD ROAD 
(0.2 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
In Progress
Since: 22 Aug 2025 05:56
(Scheduled: 18 Aug 2025 - 10 Oct 2025)
0.2
Details
Share
Follow
2
Cadent Gas logo
MAJOR
  
COWLEY HILL 
(0.2 miles)
Cadent Gas
Utility asset works - Carriageway, Verge - Some carriageway incursion
Planned
Scheduled: 18 Aug 2025 - 24 Oct 2025
0.2
Details
Share
Follow
3
Cadent Gas logo
MAJOR
  
COWLEY HILL 
(0.2 miles)
Cadent Gas
Utility asset works - Verge - No carriageway incursion
In Progress
Since: 18 Aug 2025 08:59
(Scheduled: 18 Aug 2025 - 24 Oct 2025)
0.2
Details
Share
Follow
4
Cadent Gas logo
EMERGENCY
  
STAPLETON ROAD 
(0.3 miles)
Cadent Gas
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
4 Sep 2025 14:53 - 11 Sep 2025 15:02
0.3
Details
Share
5
Cadent Gas logo
MAJOR
  
GROVE ROAD 
(0.3 miles)
Cadent Gas
Utility asset works - Carriageway, Verge - Some carriageway incursion
Planned
Scheduled: 18 Aug 2025 - 24 Oct 2025
0.3
Details
Share
Follow
6
Cadent Gas logo
MAJOR
  
GROVE ROAD 
(0.3 miles)
Cadent Gas
Utility asset works - Verge - No carriageway incursion
In Progress
Since: 22 Aug 2025 05:56
(Scheduled: 18 Aug 2025 - 30 Oct 2025)
0.3
Details
Share
Follow
7
Cadent Gas logo
STANNINGTON PATH 
(0.4 miles)
Cadent Gas
Utility asset works - Footway, Verge - No carriageway incursion
In Progress
Since: 12 Sep 2025 06:52
(Scheduled: 8 Sep 2025 - 25 Sep 2025)
0.4
Details
Share
Follow
8
UK Power Networks Eastern & London logo
URGENT
  
GATESHEAD ROAD 
(0.5 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Footway, Verge - Some carriageway incursion
Complete
9 Sep 2025 12:26 - 15 Sep 2025 15:20
0.5
Details
Share
9
Cadent Gas logo
MAJOR
  
ORGAN HALL ROAD 
(0.9 miles)
Cadent Gas
Utility asset works - Carriageway, Verge - Some carriageway incursion
Planned
Scheduled: 8 Sep 2025 - 14 Nov 2025
0.9
Details
Share
Follow
10
Cadent Gas logo
MAJOR
  
ORGAN HALL ROAD 
(0.9 miles)
Cadent Gas
Utility asset works - Carriageway, Verge - Some carriageway incursion
In Progress
Since: 12 Sep 2025 08:39
(Scheduled: 8 Sep 2025 - 20 Nov 2025)
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.