ROADWORKS SUMMARY
Britten Close, BOREHAMWOOD, WD6 3HT

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Britten Close, WD6 3HT and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Britten Close, BOREHAMWOOD, WD6 3HT

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Britten Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

London Borough Of Barnet logo
LONG TERM
Between
4 Jun 2024 and 31 Mar 2026
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The works will start on or after 4 June 2024 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 8 Feb 2024 at 08:15.

Thames Water logo
LONG TERM
Until
25 Oct 2025
Details
View Map
Share
Follow
Barnet Road

Thames Water are carrying out Utility repair and maintenance works on Barnet Road, Barnet.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 October 2024 at 09:30 and could run through until 25 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 09:25.

Cadent Gas logo
LONG TERM
Between
7 Apr 2025 and 1 Sep 2026
Details
View Map
Share
Cecil Park

Cadent Gas were proposing to carry out Utility asset works on Cecil Park, Pinner.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 1 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Apr 2025 at 10:31.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Burnt Oak Broadway

Cadent Gas are proposing to carry out Utility asset works on Burnt Oak Broadway, Edgware.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 6 May 2025 at 07:33.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Burnt Oak Broadway

Cadent Gas are proposing to carry out Utility asset works on Burnt Oak Broadway, Edgware.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 1 Jul 2025 at 09:56.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Burnt Oak Broadway

Cadent Gas are proposing to carry out Utility asset works on Burnt Oak Broadway, Edgware.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 7 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 3 Jul 2025 at 11:46.

Cadent Gas logo
LONG TERM
Until
21 Sep 2025
Details
View Map
Share
Follow
Burnt Oak Broadway

Cadent Gas are carrying out Utility asset works on Burnt Oak Broadway, Edgware.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 06:26 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Aug 2025 at 09:28.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Edgware.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 6 May 2025 at 07:33.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Edgware.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 27 Jun 2025 at 09:05.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Edgware.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 1 Jul 2025 at 10:02.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Edgware.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 7 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 3 Jul 2025 at 11:39.

Cadent Gas logo
LONG TERM
Until
21 Sep 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are carrying out Utility asset works on High Street, Edgware.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 06:23 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Aug 2025 at 09:35.

Cadent Gas logo
LONG TERM
Until
21 Sep 2025
Details
View Map
Share
Follow
Garratt Road

Cadent Gas are carrying out Utility asset works on Garratt Road, Edgware.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 July 2025 at 06:07 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Aug 2025 at 09:42.

London Borough Of Barnet logo
LONG TERM
Between
16 Jul and 12 Sep 2025
Details
View Map
Share
Follow
Aerodrome Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Aerodrome Road, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 12 September 2025. The works will impact the footway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 2 Jul 2025 at 10:20.

London Borough Of Barnet logo
LONG TERM
Until
12 Sep 2025
Details
View Map
Share
Follow
Aerodrome Road

London Borough Of Barnet are carrying out Highway improvement works on Aerodrome Road, Colindale, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 July 2025 at 00:00 and could run through until 12 September 2025. The works will impact the footway and footpath.

This roadwork event was last updated by London Borough Of Barnet on 17 Jul 2025 at 07:55.

Thames Water logo
LONG TERM
Between
20 Jul and 12 Sep 2025
Details
View Map
Share
Follow
Sunningfields Road

Thames Water are proposing to carry out Utility asset works on Sunningfields Road, Hendon, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 July 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 May 2025 at 07:39.

Thames Water logo
LONG TERM
Between
21 Jul and 12 Sep 2025
Details
View Map
Share
Follow
Sunningfields Road

Thames Water are proposing to carry out Utility asset works on Sunningfields Road, Hendon, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 2 May 2025 at 14:28.

Thames Water logo
LONG TERM
Between
21 Jul and 12 Sep 2025
Details
View Map
Share
Follow
Sunningfields Road

Thames Water are proposing to carry out Utility asset works on Sunningfields Road, Hendon, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 15 May 2025 at 11:44.

Thames Water logo
LONG TERM
Until
12 Sep 2025
Details
View Map
Share
Follow
Sunningfields Road

Thames Water are carrying out Utility asset works on Sunningfields Road, Hendon, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 July 2025 at 13:47 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Aug 2025 at 09:58.

Hertfordshire County Council logo
LONG TERM
Until
19 Sep 2025
Details
View Map
Share
Follow
Tylers Way

Hertfordshire County Council are carrying out Highway repair and maintenance works on Tylers Way, Watford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 July 2025 at 09:30 and could run through until 19 September 2025. The works will impact the verge only.

This roadwork event was last updated by Hertfordshire County Council on 20 Aug 2025 at 14:53.

London Borough Of Barnet logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Hadley Green

London Borough Of Barnet are proposing to carry out Highway improvement works on Hadley Green, Barnet.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 29 Jan 2025 at 13:51.

London Borough Of Barnet logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Hadley Green

London Borough Of Barnet are proposing to carry out Highway improvement works on Hadley Green, Barnet.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 18 Feb 2025 at 08:21.

London Borough Of Barnet logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Hadley Green

London Borough Of Barnet are proposing to carry out Highway improvement works on Hadley Green, Barnet.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 7 Jul 2025 at 13:41.

London Borough Of Barnet logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Hadley Green

London Borough Of Barnet are proposing to carry out Highway improvement works on Hadley Green, Barnet.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 14 Jul 2025 at 14:51.

London Borough Of Barnet logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Hadley Green

London Borough Of Barnet are proposing to carry out Highway improvement works on Hadley Green, Barnet.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 17 Jul 2025 at 09:48.

London Borough Of Barnet logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Hadley Green

London Borough Of Barnet are carrying out Highway improvement works on Hadley Green, Barnet.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 July 2025 at 09:30 and could run through until 6 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Jul 2025 at 10:28.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Marsh Road

Cadent Gas are carrying out Utility asset works on Marsh Road, Pinner.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 09:00 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 15:27.

London Borough Of Barnet logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Aerodrome Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Aerodrome Road, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 22 Oct 2024 at 12:07.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Bacon Lane

Cadent Gas are proposing to carry out Utility asset works on Bacon Lane, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 7 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 4 Jun 2025 at 10:45.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
The Avenue

Cadent Gas were proposing to carry out Utility asset works on The Avenue, Bushey.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Aug 2025 at 08:55.

Cadent Gas logo
LONG TERM
Between
28 Jul and 3 Oct 2025
Details
View Map
Share
Follow
Bushey Hall Road

Cadent Gas are proposing to carry out Utility asset works on Bushey Hall Road, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 18 Jun 2025 at 11:50.

Cadent Gas logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Station Road

Cadent Gas are proposing to carry out Utility repair and maintenance works on Station Road, Bricket Wood.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 9 September 2025. The works will impact the verge only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 12 Jun 2025 at 15:11.

LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Kingsfield Avenue

London Borough Of Harrow are proposing to carry out Highway improvement works on Kingsfield Avenue, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 6 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Harrow on 1 Aug 2025 at 09:33.

LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Southfield Park

London Borough Of Harrow are proposing to carry out Highway improvement works on Southfield Park, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 6 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Harrow on 1 Aug 2025 at 09:31.

Cadent Gas logo
LONG TERM
Between
4 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Clamp Hill

Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:13.

Cadent Gas logo
LONG TERM
Between
4 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Clamp Hill

Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jun 2025 at 16:10.

Cadent Gas logo
LONG TERM
Between
4 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Old Redding

Cadent Gas are proposing to carry out Utility asset works on Old Redding, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:12.

Cadent Gas logo
LONG TERM
Between
4 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Old Redding

Cadent Gas are proposing to carry out Utility asset works on Old Redding, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jun 2025 at 16:05.

Cadent Gas logo
LONG TERM
Between
4 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Common Road

Cadent Gas are proposing to carry out Utility asset works on Common Road, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:14.

Cadent Gas logo
LONG TERM
Between
4 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Common Road

Cadent Gas are proposing to carry out Utility asset works on Common Road, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Jun 2025 at 09:57.

London Borough Of Barnet logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
High Street

London Borough Of Barnet are proposing to carry out Highway improvement works on High Street, Barnet.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 24 Jul 2025 at 14:23.

Cadent Gas logo
LONG TERM
Between
4 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Rectory Lane

Cadent Gas are proposing to carry out Utility asset works on Rectory Lane, Shenley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 09:54.

Cadent Gas logo
LONG TERM
Between
5 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Station Road

Cadent Gas are proposing to carry out roadworks on Station Road, Bricket Wood.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 23 May 2025 at 14:54.

Thames Water logo
LONG TERM
Until
19 Sep 2025
Details
View Map
Share
Follow
Hindes Road

Thames Water are carrying out Utility repair and maintenance works on Hindes Road, Harrow.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 August 2025 at 11:00 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 09:54.

Cadent Gas logo
LONG TERM
Until
13 Oct 2025
Details
View Map
Share
Follow
Common Road

Cadent Gas are carrying out Utility asset works on Common Road, Stanmore.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 August 2025 at 08:00 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 09:16.

London Borough Of Barnet logo
LONG TERM
Until
11 Sep 2025
Details
View Map
Share
Follow
High Street

London Borough Of Barnet are carrying out Highway improvement works on High Street, Barnet.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 August 2025 at 09:00 and could run through until 11 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 20 Aug 2025 at 12:28.

Affinity Water logo
Finishing
Monday
Details
View Map
Share
Follow
Kenton Road

Affinity Water are proposing to carry out Utility asset works on Kenton Road, Harrow.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 7 Aug 2025 at 10:57.

Affinity Water logo
Until
12 Sep 2025
Details
View Map
Share
Follow
Kenton Road

Affinity Water are carrying out Utility asset works on Kenton Road, Harrow.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 09:15 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 1 Sep 2025 at 16:30.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Station Road

Cadent Gas are proposing to carry out Utility asset works on Station Road, North Harrow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 11:30.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Station Road

Cadent Gas are proposing to carry out Utility asset works on Station Road, North Harrow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2025 at 16:21.

Cadent Gas logo
LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Gateshead Road

Cadent Gas are carrying out Utility asset works on Gateshead Road, Borehamwood.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 05:56 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Aug 2025 at 08:12.

Cadent Gas logo
Until
10 Sep 2025
Details
View Map
Share
Follow
Wood Street

Cadent Gas are carrying out Utility repair and maintenance works on Wood Street, Barnet.

The works started on 26 August 2025 at 14:31 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2025 at 10:14.

Cadent Gas logo
Until
12 Sep 2025
Details
View Map
Share
Follow
Booth Road

Cadent Gas are carrying out Utility repair and maintenance works on Booth Road, Colindale, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2025 at 08:00 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 10:48.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Alexandra Road

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Alexandra Road, Borehamwood.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 August 2025 at 13:49 and could run through until 4 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2025 at 09:02.

London Borough Of Barnet logo
Finishing
Saturday
Details
View Map
Share
The Hyde

London Borough Of Barnet were proposing to carry out Highway improvement works on The Hyde, Colindale, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 6 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 5 Jun 2025 at 14:34.

Finishing
Monday
Details
View Map
Share
Priory Way

London Borough Of Harrow were proposing to carry out Highway improvement works on Priory Way, North Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 8 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 Aug 2025 at 08:44.

Finishing
Monday
Details
View Map
Share
Follow
Priory Way

London Borough Of Harrow are carrying out Highway improvement works on Priory Way, North Harrow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:00 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 2 Sep 2025 at 09:06.

London Borough Of Barnet logo
Finishing
Saturday
Details
View Map
Share
Follow
The Hyde

London Borough Of Barnet are proposing to carry out Highway improvement works on The Hyde, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 9 Jun 2025 at 08:31.

Affinity Water logo
LONG TERM
Between
1 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Meredith Close

Affinity Water are proposing to carry out Utility asset works on Meredith Close, Hatch End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 8 Jul 2025 at 13:37.

Affinity Water logo
LONG TERM
Between
1 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Meredith Close

Affinity Water are proposing to carry out Utility asset works on Meredith Close, Hatch End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 7 Aug 2025 at 14:17.

Affinity Water logo
LONG TERM
Until
21 Nov 2025
Details
View Map
Share
Follow
Meredith Close

Affinity Water are carrying out Utility asset works on Meredith Close, Hatch End.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 11:32 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 1 Sep 2025 at 11:39.

Thames Water logo
Until
12 Sep 2025
Details
View Map
Share
Follow
The Avenue

Thames Water are carrying out Utility repair and maintenance works on The Avenue, Hatch End.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 13:00 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 12:18.

Hertfordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Sandy Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sandy Lane, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 24 Jun 2025 at 13:45.

Hertfordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Sandy Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sandy Lane, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 8 Jul 2025 at 11:01.

Affinity Water logo
LONG TERM
Between
1 Sep and 14 Nov 2025
Details
View Map
Share
Queens Road

Affinity Water were proposing to carry out Utility asset works on Queens Road, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 14 November 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 17 Jun 2025 at 14:53.

Affinity Water logo
LONG TERM
Between
1 Sep and 14 Nov 2025
Details
View Map
Share
Queens Road

Affinity Water were proposing to carry out Utility asset works on Queens Road, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 14 November 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 6 Aug 2025 at 08:23.

Affinity Water logo
LONG TERM
Between
1 Sep and 10 Oct 2025
Details
View Map
Share
Granville Road

Affinity Water were proposing to carry out Utility asset works on Granville Road, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 10 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 13 Aug 2025 at 10:15.

Affinity Water logo
LONG TERM
Between
1 Sep and 14 Nov 2025
Details
View Map
Share
Queens Road

Affinity Water were proposing to carry out Utility asset works on Queens Road, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 14 November 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 17 Jun 2025 at 14:48.

Hertfordshire County Council logo
Between
1 and 12 Sep 2025
Details
View Map
Share
Follow
Drop Lane

Hertfordshire County Council are proposing to carry out Highway improvement works on Drop Lane, Bricket Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hertfordshire County Council on 31 Jul 2025 at 13:40.

Hertfordshire County Council logo
Between
3 and 17 Sep 2025
Details
View Map
Share
Follow
Little Oxhey Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Little Oxhey Lane, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Jul 2025 at 10:17.

Hertfordshire County Council logo
Until
18 Sep 2025
Details
View Map
Share
Follow
Little Oxhey Lane

Hertfordshire County Council are carrying out Highway repair and maintenance works on Little Oxhey Lane, South Oxhey.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 September 2025 at 09:30 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 3 Sep 2025 at 10:54.

Hertfordshire County Council logo
Between
3 and 17 Sep 2025
Details
View Map
Share
Follow
Prestwick Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Prestwick Road, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Jul 2025 at 10:12.

Hertfordshire County Council logo
Until
18 Sep 2025
Details
View Map
Share
Follow
Prestwick Road

Hertfordshire County Council are carrying out Highway repair and maintenance works on Prestwick Road, South Oxhey.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 September 2025 at 09:30 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 3 Sep 2025 at 10:53.

BT logo
Finishing
Friday
Details
View Map
Share
Barnet Lane

BT were proposing to carry out Utility asset works on Barnet Lane, Totteridge, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 September 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Aug 2025 at 15:45.

Cadent Gas logo
Until
11 Sep 2025
Details
View Map
Share
Follow
Elstree Hill North

Cadent Gas are carrying out Utility repair and maintenance works on Elstree Hill North, Elstree.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 September 2025 at 13:12 and could run through until 11 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 13:15.

Hertfordshire County Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Watling Street

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Watling Street, Elstree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 27 May 2025 at 10:30.

Finishing
Saturday
Details
View Map
Share
Follow
Station Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Station Road, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 28 Jul 2025 at 12:39.

Finishing
Saturday
Details
View Map
Share
Follow
Kingsfield Avenue

London Borough Of Harrow are proposing to carry out Highway improvement works on Kingsfield Avenue, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 28 Jul 2025 at 15:58.

Finishing
Saturday
Details
View Map
Share
Follow
Southfield Park

London Borough Of Harrow are proposing to carry out Highway improvement works on Southfield Park, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 28 Jul 2025 at 15:40.

Finishing
Saturday
Details
View Map
Share
Follow
Dennis Lane

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Dennis Lane, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 26 Jun 2025 at 16:02.

Hertfordshire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Windmill Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Windmill Lane, Bushey Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 9 Jun 2025 at 09:16.

Hertfordshire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Grange Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Grange Lane, Letchmore Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 9 Jun 2025 at 09:15.

Between
8 and 15 Sep 2025
Details
View Map
Share
Follow
Manor Way

London Borough Of Harrow are proposing to carry out Highway improvement works on Manor Way, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 2 Sep 2025 at 14:05.

London Borough Of Barnet logo
Between
8 and 12 Sep 2025
Details
View Map
Share
Follow
Aerodrome Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Aerodrome Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 17 Mar 2025 at 11:14.

Cadent Gas logo
LONG TERM
Between
8 Sep and 9 Nov 2025
Details
View Map
Share
Follow
Clamp Hill

Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jun 2025 at 09:40.

Cadent Gas logo
LONG TERM
Between
8 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Clamp Hill

Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2025 at 14:14.

Hertfordshire County Council logo
Between
8 and 10 Sep 2025
Details
View Map
Share
Follow
Beethoven Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Beethoven Road, Elstree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 4 Aug 2025 at 13:29.

Hertfordshire County Council logo
Between
8 and 10 Sep 2025
Details
View Map
Share
Follow
Beethoven Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Beethoven Road, Elstree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 Aug 2025 at 11:58.

Hertfordshire County Council logo
Between
8 and 10 Sep 2025
Details
View Map
Share
Mimms Lane

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Mimms Lane, Ridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 10 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Jul 2025 at 11:21.

Hertfordshire County Council logo
Between
8 and 10 Sep 2025
Details
View Map
Share
Earls Lane

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Earls Lane, South Mimms.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 10 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Jul 2025 at 11:22.

Between
9 and 11 Sep 2025
Details
View Map
Share
Follow
Canning Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Canning Road, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 11 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 25 Jun 2025 at 15:58.

BT logo
Between
9 and 12 Sep 2025
Details
View Map
Share
Follow
Darlands Drive

BT are proposing to carry out Utility repair and maintenance works on Darlands Drive, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 27 Jun 2025 at 11:53.

London Borough Of Barnet logo
Between
10 and 15 Sep 2025
Details
View Map
Share
Follow
Whitings Road

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Whitings Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2025 at 10:22.

London Borough Of Barnet logo
Between
10 and 15 Sep 2025
Details
View Map
Share
Follow
Chesterfield Road

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Chesterfield Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 12 Jun 2025 at 13:38.

London Borough Of Barnet logo
Between
10 and 15 Sep 2025
Details
View Map
Share
Follow
Bells Hill

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Bells Hill, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 12 Jun 2025 at 13:46.

London Borough Of Barnet logo
Between
10 and 15 Sep 2025
Details
View Map
Share
Follow
Trinder Road

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Trinder Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2025 at 10:22.

Hertfordshire County Council logo
Between
11 and 16 Sep 2025
Details
View Map
Share
Follow
Barnet Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Barnet Lane, Borehamwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 16 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 Aug 2025 at 12:09.

Between
14 and 16 Sep 2025
Details
View Map
Share
Follow
The Gardens

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on The Gardens, West Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2025 and could run through until 16 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Jun 2025 at 13:23.

Thames Water logo
Between
15 and 17 Sep 2025
Details
View Map
Share
Pinner Road

Thames Water were proposing to carry out Utility repair and maintenance works on Pinner Road, North Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 17 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Jun 2025 at 19:11.

London Borough Of Barnet logo
LONG TERM
Between
15 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 20 Jun 2025 at 08:45.

London Borough Of Barnet logo
LONG TERM
Between
15 Sep and 27 Oct 2025
Details
View Map
Share
Follow
The Hyde

London Borough Of Barnet are proposing to carry out Highway improvement works on The Hyde, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 19 Jun 2025 at 14:49.

London Borough Of Barnet logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 24 Jul 2025 at 15:12.

Cadent Gas logo
Between
15 Sep and 9 Oct 2025
Details
View Map
Share
Follow
Mollison Way

Cadent Gas are proposing to carry out Utility asset works on Mollison Way, Edgware.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 12:57.

Hertfordshire County Council logo
Between
15 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Foxgrove Path

Hertfordshire County Council are proposing to carry out Section 50 on Foxgrove Path, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 11 Aug 2025 at 12:16.

London Borough Of Barnet logo
Between
15 and 22 Sep 2025
Details
View Map
Share
Lawrence Street

London Borough Of Barnet were proposing to carry out Highway improvement works on Lawrence Street, Mill Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 22 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2025 at 15:25.

London Borough Of Barnet logo
Between
15 and 22 Sep 2025
Details
View Map
Share
Follow
Lawrence Street

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Lawrence Street, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 19 Jun 2025 at 14:36.

London Borough Of Barnet logo
Between
15 and 22 Sep 2025
Details
View Map
Share
Follow
Lawrence Street

London Borough Of Barnet are proposing to carry out Remedial works on Lawrence Street, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Jul 2025 at 13:14.

Hertfordshire County Council logo
Between
15 and 17 Sep 2025
Details
View Map
Share
Follow
Norfolk Avenue

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Norfolk Avenue, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 23 Apr 2025 at 10:59.

Cadent Gas logo
LONG TERM
Between
15 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Shenleybury

Cadent Gas are proposing to carry out Utility asset works on Shenleybury, Shenley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 7 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 5 Aug 2025 at 11:30.

Cadent Gas logo
LONG TERM
Between
15 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Shenleybury

Cadent Gas are proposing to carry out Utility asset works on Shenleybury, Shenley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 7 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 6 Aug 2025 at 14:24.

Cadent Gas logo
LONG TERM
Between
15 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Shenleybury

Cadent Gas are proposing to carry out Utility asset works on Shenleybury, Shenley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 7 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 08:59.

London Borough Of Brent logo
Between
16 and 26 Sep 2025
Details
View Map
Share
Follow
Princes Avenue

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Princes Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 11 Jun 2025 at 17:39.

National Highways logo
Between
16 Sep and 7 Oct 2025
Details
View Map
Share
Follow
Ashley Lane

National Highways are proposing to carry out Works for road purposes on Ashley Lane, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 21 Aug 2025 at 11:12.

National Highways logo
Between
16 Sep and 7 Oct 2025
Details
View Map
Share
Follow
Downage

National Highways are proposing to carry out Works for road purposes on Downage, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 21 Aug 2025 at 11:12.

National Highways logo
Between
16 Sep and 7 Oct 2025
Details
View Map
Share
Follow
Chatsworth Avenue

National Highways are proposing to carry out Works for road purposes on Chatsworth Avenue, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 21 Aug 2025 at 11:12.

National Highways logo
Between
16 Sep and 11 Oct 2025
Details
View Map
Share
Follow
Sunny Gardens Road

National Highways are proposing to carry out Works for road purposes on Sunny Gardens Road, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 21 Aug 2025 at 11:12.

Affinity Water logo
Between
17 and 23 Sep 2025
Details
View Map
Share
Follow
Palmerston Road

Affinity Water are proposing to carry out Utility asset works on Palmerston Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 23 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 9 Jul 2025 at 12:18.

Hertfordshire County Council logo
Between
17 and 19 Sep 2025
Details
View Map
Share
Follow
Sixth Avenue

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sixth Avenue, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 2 May 2025 at 10:28.

Hertfordshire County Council logo
Between
17 and 19 Sep 2025
Details
View Map
Share
Follow
Garston Drive

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Garston Drive, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 8 May 2025 at 11:54.

Hertfordshire County Council logo
Between
17 and 19 Sep 2025
Details
View Map
Share
Follow
Gwent Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Gwent Close, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 23 Apr 2025 at 11:02.

T-Mobile (UK) logo
Between
18 and 22 Sep 2025
Details
View Map
Share
Follow
The Fairway

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on The Fairway, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by T-Mobile (UK) on 26 Jun 2025 at 15:38.

Hertfordshire County Council logo
Between
22 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Heysham Drive

Hertfordshire County Council are proposing to carry out Section 50 on Heysham Drive, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Aug 2025 at 11:32.

Hertfordshire County Council logo
Between
22 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Heysham Drive

Hertfordshire County Council are proposing to carry out Section 50 on Heysham Drive, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Aug 2025 at 11:36.

Hertfordshire County Council logo
Between
22 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Foxgrove Path

Hertfordshire County Council are proposing to carry out Section 50 on Foxgrove Path, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 19 Aug 2025 at 14:34.

Hertfordshire County Council logo
Between
22 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Prestwick Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Prestwick Road, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Jul 2025 at 10:21.

Hertfordshire County Council logo
Between
22 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Prestwick Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Prestwick Road, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 13 Aug 2025 at 16:36.

Hertfordshire County Council logo
Between
22 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Hayling Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Hayling Road, Hayling, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Jul 2025 at 10:27.

Hertfordshire County Council logo
Between
22 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Hayling Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Hayling Road, Hayling, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 13 Aug 2025 at 16:35.

Hertfordshire County Council logo
Between
22 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Brookdene Avenue

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Brookdene Avenue, Oxhey Hall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Jul 2025 at 10:23.

Hertfordshire County Council logo
Between
22 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Brookdene Avenue

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Brookdene Avenue, Oxhey Hall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 13 Aug 2025 at 16:36.

Affinity Water logo
Between
22 Sep and 3 Oct 2025
Details
View Map
Share
Granville Road

Affinity Water were proposing to carry out Utility asset works on Granville Road, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 3 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 6 Aug 2025 at 08:24.

BT logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Camlet Way

BT are proposing to carry out Utility repair and maintenance works on Camlet Way, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 12 Aug 2025 at 09:36.

Hertfordshire County Council logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Norfolk Avenue

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Norfolk Avenue, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 Aug 2025 at 14:49.

Hertfordshire County Council logo
Between
22 Sep and 11 Oct 2025
Details
View Map
Share
Follow
York Way

Hertfordshire County Council are proposing to carry out roadworks on York Way, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 1 Sep 2025 at 13:17.

London Borough Of Barnet logo
Between
23 and 25 Sep 2025
Details
View Map
Share
Follow
Lawrence Street

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Lawrence Street, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 19 Jun 2025 at 14:36.

Affinity Water logo
Between
23 and 26 Sep 2025
Details
View Map
Share
Follow
The Courtway

Affinity Water are proposing to carry out Utility asset works on The Courtway, Carpenders Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 2 Jul 2025 at 10:22.

London Borough Of Barnet logo
Between
24 and 26 Sep 2025
Details
View Map
Share
Follow
Hartley Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Hartley Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 1 Sep 2025 at 09:30.

Affinity Water logo
Between
24 and 26 Sep 2025
Details
View Map
Share
Follow
Elm Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Elm Avenue, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 15 Jul 2025 at 10:43.

Hertfordshire County Council logo
Between
24 and 26 Sep 2025
Details
View Map
Share
Norfolk Avenue

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Norfolk Avenue, Watford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 22 Apr 2025 at 15:41.

Hertfordshire County Council logo
Between
24 and 26 Sep 2025
Details
View Map
Share
Follow
Sixth Avenue

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sixth Avenue, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 Aug 2025 at 14:58.

Hertfordshire County Council logo
Between
24 and 26 Sep 2025
Details
View Map
Share
Follow
Garston Drive

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Garston Drive, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 Aug 2025 at 08:41.

Hertfordshire County Council logo
Between
24 and 26 Sep 2025
Details
View Map
Share
Follow
Gwent Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Gwent Close, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 Aug 2025 at 08:44.

London Borough Of Barnet logo
Between
25 and 29 Sep 2025
Details
View Map
Share
Follow
Ellesmere Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Ellesmere Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 6 Aug 2025 at 15:13.

Hertfordshire County Council logo
Between
25 and 27 Sep 2025
Details
View Map
Share
Sixth Avenue

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Sixth Avenue, Watford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 September 2025 and run through until 27 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 22 Apr 2025 at 15:44.

Hertfordshire County Council logo
Between
25 and 27 Sep 2025
Details
View Map
Share
Follow
The Pippins

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Pippins, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 Aug 2025 at 08:45.

Hertfordshire County Council logo
Between
25 and 27 Sep 2025
Details
View Map
Share
Gwent Close

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Gwent Close, Watford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 September 2025 and run through until 27 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 22 Apr 2025 at 15:45.

Hertfordshire County Council logo
Between
26 and 28 Sep 2025
Details
View Map
Share
Garston Drive

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Garston Drive, Watford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 September 2025 and run through until 28 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 22 Apr 2025 at 15:48.

Thames Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Crummock Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Crummock Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Jun 2025 at 15:09.

Thames Water logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Hindes Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hindes Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Jul 2025 at 14:01.

Thames Water logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Hindes Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hindes Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 08:17.

Affinity Water logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Nibthwaite Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Nibthwaite Road, Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 2 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 3 Jul 2025 at 15:14.

Cadent Gas logo
LONG TERM
Between
29 Sep 2025 and 23 Jan 2026
Details
View Map
Share
Follow
Whitchurch Lane

Cadent Gas are proposing to carry out Utility asset works on Whitchurch Lane, Edgware.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 23 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Jul 2025 at 12:39.

London Borough Of Barnet logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Pike Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Pike Road, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Aug 2025 at 14:57.

London Borough Of Barnet logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Fernside Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Fernside Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2025 at 13:26.

London Borough Of Barnet logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Fernside Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Fernside Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Aug 2025 at 15:00.

Cadent Gas logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on High Street, Watford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Aug 2025 at 11:13.

Hertfordshire County Council logo
Between
29 Sep and 4 Oct 2025
Details
View Map
Share
Follow
Meriden Way

Hertfordshire County Council are proposing to carry out roadworks on Meriden Way, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Aug 2025 at 12:19.

Hertfordshire County Council logo
Between
29 Sep and 4 Oct 2025
Details
View Map
Share
Follow
The Gossamers

Hertfordshire County Council are proposing to carry out roadworks on The Gossamers, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Aug 2025 at 12:19.

Affinity Water logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Compton Place

Affinity Water are proposing to carry out Utility repair and maintenance works on Compton Place, Carpenders Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 1 Jul 2025 at 11:53.

London Borough Of Barnet logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 24 Jul 2025 at 15:12.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Oct 2025 and 6 Nov 2026
Details
View Map
Share
Follow
Brockenhurst Gardens

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Brockenhurst Gardens, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Jul 2025 at 11:32.

UK Power Networks Eastern & London logo
Between
6 and 13 Oct 2025
Details
View Map
Share
Follow
The Courtway

UK Power Networks Eastern & London are proposing to carry out New service connection on The Courtway, Carpenders Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Jul 2025 at 11:58.

UK Power Networks Eastern & London logo
Between
6 and 13 Oct 2025
Details
View Map
Share
Follow
The Courtway

UK Power Networks Eastern & London are proposing to carry out New service connection on The Courtway, Carpenders Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jul 2025 at 11:29.

UK Power Networks Eastern & London logo
Between
6 and 13 Oct 2025
Details
View Map
Share
Follow
The Courtway

UK Power Networks Eastern & London are proposing to carry out New service connection on The Courtway, Carpenders Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Aug 2025 at 09:49.

Affinity Water logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Argyle Road

Affinity Water were proposing to carry out Utility asset works on Argyle Road, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 24 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 13 Aug 2025 at 10:17.

Affinity Water logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
The Square

Affinity Water are proposing to carry out Utility repair and maintenance works on The Square, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 15 Jul 2025 at 10:50.

Affinity Water logo
Between
7 and 9 Oct 2025
Details
View Map
Share
Follow
Hartsbourne Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Hartsbourne Road, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 3 Jul 2025 at 10:08.

London Borough Of Brent logo
Between
8 and 11 Oct 2025
Details
View Map
Share
Follow
Hay Lane

London Borough Of Brent are proposing to carry out Highway improvement works on Hay Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 18 Aug 2025 at 14:19.

Cadent Gas logo
Between
13 and 24 Oct 2025
Details
View Map
Share
Follow
Jellicoe Gardens

Cadent Gas are proposing to carry out Utility asset works on Jellicoe Gardens, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2025 at 09:30.

Affinity Water logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Lower Paddock Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Lower Paddock Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 15 Jul 2025 at 14:24.

Affinity Water logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Lower Paddock Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Lower Paddock Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 2 Sep 2025 at 10:36.

London Borough Of Barnet logo
Between
13 and 19 Oct 2025
Details
View Map
Share
Follow
Galley Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Galley Lane, Arkley Barnet Section, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 19 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by London Borough Of Barnet on 30 Jun 2025 at 15:06.

Affinity Water logo
LONG TERM
Between
13 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Granville Road

Affinity Water are proposing to carry out Utility asset works on Granville Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 21 Aug 2025 at 09:17.

Hertfordshire County Council logo
Between
13 and 18 Oct 2025
Details
View Map
Share
Brocklesbury Close

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Brocklesbury Close, Watford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Jul 2025 at 09:02.

Virgin Media logo
Between
14 and 16 Oct 2025
Details
View Map
Share
Follow
Park Way

Virgin Media are proposing to carry out Utility asset works on Park Way, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 29 Jul 2025 at 09:01.

BT logo
Between
14 and 17 Oct 2025
Details
View Map
Share
Follow
Darlands Drive

BT are proposing to carry out Utility repair and maintenance works on Darlands Drive, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 3 Sep 2025 at 11:44.

Between
15 and 17 Oct 2025
Details
View Map
Share
Kingsfield Avenue

London Borough Of Harrow were proposing to carry out Highway improvement works on Kingsfield Avenue, North Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 22 Jul 2025 at 11:37.

Between
15 and 17 Oct 2025
Details
View Map
Share
Southfield Park

London Borough Of Harrow were proposing to carry out Highway improvement works on Southfield Park, North Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2025 at 07:35.

Between
15 and 17 Oct 2025
Details
View Map
Share
Station Road

London Borough Of Harrow were proposing to carry out Highway improvement works on Station Road, Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 22 Jul 2025 at 11:42.

Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Southfield Park

London Borough Of Harrow are proposing to carry out Highway improvement works on Southfield Park, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 22 Jul 2025 at 11:56.

Affinity Water logo
Between
20 and 23 Oct 2025
Details
View Map
Share
Follow
Priory Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Priory Way, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 16 Jul 2025 at 09:21.

Affinity Water logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Kings Road

Affinity Water were proposing to carry out Utility asset works on Kings Road, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 13 Aug 2025 at 10:31.

Hertfordshire County Council logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Brocklesbury Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Brocklesbury Close, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Jul 2025 at 14:17.

Cadent Gas logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Radlett Road

Cadent Gas are proposing to carry out Utility asset works on Radlett Road, Watford.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the cycleway only.

This roadwork event was last updated by Cadent Gas on 25 Jul 2025 at 10:50.

Cadent Gas logo
LONG TERM
Between
20 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Black Lion Hill

Cadent Gas are proposing to carry out Utility asset works on Black Lion Hill, Shenley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 10:32.

Affinity Water logo
LONG TERM
Between
21 Oct 2025 and 20 Mar 2026
Details
View Map
Share
Follow
Kitts End Road

Affinity Water are proposing to carry out Utility asset works on Kitts End Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 20 March 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 27 May 2025 at 09:57.

Affinity Water logo
LONG TERM
Between
21 Oct 2025 and 20 Mar 2026
Details
View Map
Share
Kitts End Road

Affinity Water were proposing to carry out Utility asset works on Kitts End Road, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2025 and run through until 20 March 2026. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 17 Jul 2025 at 10:31.

Affinity Water logo
LONG TERM
Between
21 Oct 2025 and 20 Mar 2026
Details
View Map
Share
Follow
Kitts End Road

Affinity Water are proposing to carry out Utility asset works on Kitts End Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 20 March 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 1 Aug 2025 at 10:57.

Affinity Water logo
LONG TERM
Between
21 Oct 2025 and 20 Mar 2026
Details
View Map
Share
Follow
Kitts End Road

Affinity Water are proposing to carry out Utility asset works on Kitts End Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 20 March 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 13 Aug 2025 at 12:17.

Between
22 and 24 Oct 2025
Details
View Map
Share
Follow
Kingsfield Avenue

London Borough Of Harrow are proposing to carry out Highway improvement works on Kingsfield Avenue, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 22 Jul 2025 at 11:57.

Cadent Gas logo
Between
23 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Shenleybury

Cadent Gas are proposing to carry out Utility asset works on Shenleybury, Shenley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 2 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 13:35.

Affinity Water logo
Between
24 and 27 Oct 2025
Details
View Map
Share
Follow
Eastbury Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Eastbury Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 15 Jul 2025 at 15:15.

Hertfordshire County Council logo
Between
24 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Verulam Passage

Hertfordshire County Council are proposing to carry out Highway improvement works on Verulam Passage, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 15 May 2025 at 11:09.

Hertfordshire County Council logo
LONG TERM
Between
24 Oct 2025 and 13 Feb 2026
Details
View Map
Share
Follow
Verulam Passage

Hertfordshire County Council are proposing to carry out Highway improvement works on Verulam Passage, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 13 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 20 Aug 2025 at 09:08.

Hertfordshire County Council logo
Between
24 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Station Road

Hertfordshire County Council are proposing to carry out New service connection on Station Road, Watford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 May 2025 at 12:01.

Hertfordshire County Council logo
Between
24 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Station Road

Hertfordshire County Council are proposing to carry out New service connection on Station Road, Watford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 20 Aug 2025 at 09:08.

London Borough Of Barnet logo
Between
25 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Mays Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Mays Lane, Underhill, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 31 Jul 2025 at 10:49.

London Borough Of Barnet logo
Between
25 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Barnet Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Barnet Lane, Underhill, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 31 Jul 2025 at 10:49.

London Borough Of Barnet logo
Between
25 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Underhill

London Borough Of Barnet are proposing to carry out Highway improvement works on Underhill, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 31 Jul 2025 at 10:49.

London Borough Of Barnet logo
Between
26 and 31 Oct 2025
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 21 Aug 2025 at 12:58.

Affinity Water logo
Between
26 and 29 Oct 2025
Details
View Map
Share
St Albans Road

Affinity Water were proposing to carry out Utility repair and maintenance works on St Albans Road, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 13 Jun 2025 at 09:34.

BT logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Roxborough Avenue

BT were proposing to carry out Utility repair and maintenance works on Roxborough Avenue, Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 3 Sep 2025 at 09:25.

Thames Water logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Potter Street Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Potter Street Hill, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 14:12.

Cadent Gas logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Chartley Avenue

Cadent Gas are proposing to carry out Utility asset works on Chartley Avenue, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2025 at 11:00.

Cadent Gas logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2025 at 10:00.

Cadent Gas logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Masefield Avenue

Cadent Gas were proposing to carry out Utility asset works on Masefield Avenue, Stanmore.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 10:23.

London Borough Of Barnet logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Wood Street

London Borough Of Barnet are proposing to carry out Highway improvement works on Wood Street, Barnet.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 23 Jul 2025 at 15:20.

Affinity Water logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Regina Close

Affinity Water were proposing to carry out Utility asset works on Regina Close, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 14 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 6 Aug 2025 at 08:22.

BT logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Camlet Way

BT are proposing to carry out Utility repair and maintenance works on Camlet Way, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 13 Aug 2025 at 14:04.

Hertfordshire County Council logo
Between
27 Oct and 19 Nov 2025
Details
View Map
Share
Orphanage Road

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Orphanage Road, Watford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 22 Aug 2025 at 10:39.

Hertfordshire County Council logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Orphanage Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Orphanage Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 22 Aug 2025 at 10:53.

Hertfordshire County Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Drop Lane

Hertfordshire County Council are proposing to carry out Highway improvement works on Drop Lane, Bricket Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hertfordshire County Council on 27 Aug 2025 at 08:31.

Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Station Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Station Road, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 22 Jul 2025 at 11:59.

Affinity Water logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Hartsbourne Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Hartsbourne Road, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 3 Jul 2025 at 14:24.

Affinity Water logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Eastbury Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Eastbury Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 2 Jul 2025 at 14:56.

LONG TERM
Between
1 Nov and 11 Dec 2025
Details
View Map
Share
Follow
Kingsfield Avenue

London Borough Of Harrow are proposing to carry out Highway improvement works on Kingsfield Avenue, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 11 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 31 Jul 2025 at 14:25.

LONG TERM
Between
1 Nov and 11 Dec 2025
Details
View Map
Share
Follow
Southfield Park

London Borough Of Harrow are proposing to carry out Highway improvement works on Southfield Park, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 11 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 31 Jul 2025 at 14:22.

Cadent Gas logo
Between
3 and 17 Nov 2025
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2025 at 12:00.

Cadent Gas logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Sandy Lane

Cadent Gas were proposing to carry out Utility asset works on Sandy Lane, Northwood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 17:24.

Cadent Gas logo
Between
3 and 17 Nov 2025
Details
View Map
Share
Follow
Chenduit Way

Cadent Gas are proposing to carry out Utility asset works on Chenduit Way, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2025 at 11:00.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Selvage Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2025 at 09:04.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Selvage Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2025 at 09:35.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Selvage Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2025 at 13:41.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Selvage Lane

Transport for London (TfL) were proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 25 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2025 at 10:15.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Watford Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Watford Way, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 13:19.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Watford Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Watford Way, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:18.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Edgware Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgware Way, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 13:21.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Edgware Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgware Way, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:18.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Barnet Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Barnet Way, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 13:21.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Barnet Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Barnet Way, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:18.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Northway Circus

Transport for London (TfL) are proposing to carry out Highway improvement works on Northway Circus, Apex Corner, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 13:20.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Northway Circus

Transport for London (TfL) are proposing to carry out Highway improvement works on Northway Circus, Apex Corner, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:17.

Hertfordshire County Council logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Dalton Way

Hertfordshire County Council are proposing to carry out Highway improvement works on Dalton Way, Watford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the verge only.

This roadwork event was last updated by Hertfordshire County Council on 27 Jun 2025 at 15:16.

Hertfordshire County Council logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
Dalton Way

Hertfordshire County Council are proposing to carry out Highway improvement works on Dalton Way, Watford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the verge only.

This roadwork event was last updated by Hertfordshire County Council on 9 Jul 2025 at 09:50.

Affinity Water logo
LONG TERM
Between
3 Nov and 5 Dec 2025
Details
View Map
Share
Cavendish Road

Affinity Water were proposing to carry out Utility asset works on Cavendish Road, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 5 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 13 Aug 2025 at 10:32.

Cadent Gas logo
LONG TERM
Between
3 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Rectory Lane

Cadent Gas are proposing to carry out Utility asset works on Rectory Lane, Shenley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 10:33.

Cadent Gas logo
LONG TERM
Between
3 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Black Lion Hill

Cadent Gas are proposing to carry out Utility asset works on Black Lion Hill, Shenley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 14 Aug 2025 at 10:17.

Affinity Water logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Holmdene Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Holmdene Avenue, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 3 Sep 2025 at 12:06.

London Borough Of Barnet logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Hartley Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Hartley Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2025 at 13:20.

Cadent Gas logo
LONG TERM
Between
10 Nov and 26 Dec 2025
Details
View Map
Share
Follow
Old Redding

Cadent Gas are proposing to carry out Utility asset works on Old Redding, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 26 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jun 2025 at 09:40.

BT logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Barnet Lane

BT were proposing to carry out Utility asset works on Barnet Lane, Totteridge, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 12 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Aug 2025 at 16:01.

BT logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Barnet Lane

BT are proposing to carry out Utility asset works on Barnet Lane, Totteridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 22 Aug 2025 at 12:39.

Network Rail logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Elfrida Road

Network Rail are proposing to carry out Works for Rail Purposes on Elfrida Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 12 Aug 2025 at 14:47.

Affinity Water logo
LONG TERM
Between
10 Nov 2025 and 16 Jan 2026
Details
View Map
Share
Follow
Granville Road

Affinity Water are proposing to carry out Utility asset works on Granville Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 16 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 20 Jun 2025 at 10:44.

Cadent Gas logo
LONG TERM
Between
10 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Black Lion Hill

Cadent Gas are proposing to carry out Utility asset works on Black Lion Hill, Shenley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 13:00.

Affinity Water logo
LONG TERM
Between
17 Nov 2025 and 23 Jan 2026
Details
View Map
Share
Follow
Scot Grove

Affinity Water are proposing to carry out Remedial works on Scot Grove, Hatch End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 23 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 8 Jul 2025 at 13:33.

Affinity Water logo
LONG TERM
Between
17 Nov 2025 and 23 Jan 2026
Details
View Map
Share
Follow
Scot Grove

Affinity Water are proposing to carry out Remedial works on Scot Grove, Hatch End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 23 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 2 Sep 2025 at 14:05.

Affinity Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Silverston Way

Affinity Water are proposing to carry out roadworks on Silverston Way, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 18 Aug 2025 at 13:26.

Affinity Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Silverston Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Silverston Way, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 18 Aug 2025 at 14:36.

Cadent Gas logo
Between
17 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Greyfell Close

Cadent Gas are proposing to carry out Utility asset works on Greyfell Close, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 15:00.

Cadent Gas logo
Between
17 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Stangate Gardens

Cadent Gas are proposing to carry out Utility asset works on Stangate Gardens, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 14:30.

Cadent Gas logo
Between
17 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Hewett Close

Cadent Gas are proposing to carry out Utility asset works on Hewett Close, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 14:30.

Cadent Gas logo
LONG TERM
Between
17 Nov 2025 and 16 Jan 2026
Details
View Map
Share
Follow
Stanmore Hill

Cadent Gas are proposing to carry out Utility asset works on Stanmore Hill, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 16 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 14:30.

London Borough Of Barnet logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Lawrence Street

London Borough Of Barnet were proposing to carry out Highway improvement works on Lawrence Street, Mill Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 22 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2025 at 15:33.

Affinity Water logo
Between
17 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Argyle Road

Affinity Water are proposing to carry out Utility asset works on Argyle Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 21 Aug 2025 at 09:17.

Between
21 and 25 Nov 2025
Details
View Map
Share
Elmgrove Road

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Elmgrove Road, Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 November 2025 and run through until 25 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 21 Aug 2025 at 12:49.

London Borough Of Barnet logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Follow
Lawrence Street

London Borough Of Barnet are proposing to carry out Highway improvement works on Lawrence Street, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Aug 2025 at 10:55.

London Borough Of Barnet logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Follow
Highwood Hill

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Highwood Hill, Holcombe Hill To Marsh Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Aug 2025 at 10:55.

Affinity Water logo
Between
24 and 27 Nov 2025
Details
View Map
Share
Follow
Loom Lane

Affinity Water are proposing to carry out Utility asset works on Loom Lane, Radlett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 8 Jul 2025 at 08:52.

London Borough Of Brent logo
Between
1 and 13 Dec 2025
Details
View Map
Share
Follow
Fryent Way

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Fryent Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 13 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 26 Aug 2025 at 09:20.

Between
1 and 8 Dec 2025
Details
View Map
Share
Follow
Priory Way

London Borough Of Harrow are proposing to carry out Highway improvement works on Priory Way, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 8 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 Aug 2025 at 08:49.

Affinity Water logo
Between
1 and 3 Dec 2025
Details
View Map
Share
Follow
Pinner Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Pinner Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 27 Aug 2025 at 13:30.

Affinity Water logo
Between
1 and 19 Dec 2025
Details
View Map
Share
Follow
Kings Road

Affinity Water are proposing to carry out Utility asset works on Kings Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 21 Aug 2025 at 09:17.

Affinity Water logo
LONG TERM
Between
1 Dec 2025 and 23 Jan 2026
Details
View Map
Share
Kings Road

Affinity Water were proposing to carry out Utility asset works on Kings Road, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 23 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 13 Aug 2025 at 10:33.

BT logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Christ Church Lane

BT were proposing to carry out Utility repair and maintenance works on Christ Church Lane, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 5 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Sep 2025 at 14:04.

BT logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Christ Church Lane

BT are proposing to carry out Utility repair and maintenance works on Christ Church Lane, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Sep 2025 at 14:30.


Roadworks Map near to Britten Close, BOREHAMWOOD, WD6 3HT (8 Events)

Colour Codes
Planned
In Progress
Completed
Cancelled
Marker
Marker
Marker
Marker
Marker
Last Updated: 3 Sep 2025 13:15
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Britten Close, BOREHAMWOOD, WD6 3HT (8 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Hertfordshire County Council logo
MAJOR
  
SULLIVAN WAY 
(0.3 miles)
Hertfordshire County Council
Highway improvement works - Footway - Give and take
Planned
Scheduled: 4 Aug 2025 - 27 Oct 2025
0.3
Details
Share
Follow
2
Hertfordshire County Council logo
MAJOR
  
SULLIVAN WAY 
(0.3 miles)
Hertfordshire County Council
Highway improvement works - Footway - Give and take
Planned
Scheduled: 4 Aug 2025 - 27 Oct 2025
0.3
Details
Share
Follow
3
Hertfordshire County Council logo
MAJOR
  
SULLIVAN WAY 
(0.3 miles)
Hertfordshire County Council
Highway improvement works - Footway - Give and take
Complete
6 Aug 2025 08:00 - 29 Aug 2025 17:00
0.3
Details
Share
4
Cadent Gas logo
EMERGENCY
  
ELSTREE HILL NORTH 
(0.3 miles)
Cadent Gas
Utility repair and maintenance works - Carriageway - Two-way signals
In Progress
Since: 3 Sep 2025 13:12
(Scheduled: 3 Sep 2025 - 11 Sep 2025)
0.3
Details
Share
Follow
5
Hertfordshire County Council logo
MAJOR
  
WATLING STREET 
(0.6 miles)
Hertfordshire County Council
Highway repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 3 Sep 2025 - 6 Sep 2025
0.6
Details
Share
Follow
6
Hertfordshire County Council logo
TYLERS WAY 
(0.9 miles)
Hertfordshire County Council
Highway repair and maintenance works - Carriageway - Two-way signals
In Progress
Since: 1 Sep 2025 20:00
(Scheduled: 1 Sep 2025 - 5 Sep 2025)
0.9
Details
Share
Follow
7
BT logo
HARTFIELD AVENUE 
(1.0 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 1 Sep 2025 08:21
(Scheduled: 1 Sep 2025 - 3 Sep 2025)
1.0
Details
Share
Follow
8
Hertfordshire County Council logo
MAJOR
  
TYLERS WAY 
(1.0 miles)
Hertfordshire County Council
Highway repair and maintenance works - Verge - Multi-way signals
In Progress
Since: 21 Jul 2025 09:30
(Scheduled: 21 Jul 2025 - 19 Sep 2025)
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.