ROADWORKS SUMMARY
Elmwood Avenue, BOREHAMWOOD, WD6 1SZ
Introduction

View current and future planned roadworks and road closures for Elmwood Avenue, WD6 1SZ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Elmwood Avenue, BOREHAMWOOD, WD6 1SZ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Elmwood Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
4 Jun 2024 and 31 Mar 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
The works will start on or after 4 June 2024 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 8 Feb 2024 at 08:15.
25 Oct 2025
Thames Water are carrying out Utility repair and maintenance works on Barnet Road, Barnet.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 October 2024 at 09:30 and could run through until 25 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 09:25.
Monday
London Borough Of Barnet are proposing to carry out Highway improvement works on Albert Road, New Barnet, Barnet.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 27 Mar 2025 at 13:34.
Monday
London Borough Of Barnet are proposing to carry out Highway improvement works on Albert Road, New Barnet, Barnet.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 27 Mar 2025 at 13:41.
Sunday
London Borough Of Barnet are proposing to carry out Highway improvement works on North Street, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 10 Apr 2025 at 10:46.
Sunday
Cadent Gas are carrying out Utility asset works on Burnt Oak Broadway, Edgware.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 July 2025 at 06:26 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Aug 2025 at 09:28.
12 Oct 2025
Cadent Gas are carrying out Utility asset works on High Street, Edgware.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 July 2025 at 06:23 and could run through until 12 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Sep 2025 at 10:38.
5 Oct 2025
London Borough Of Barnet are carrying out Highway improvement works on North Street, Hendon, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 July 2025 at 15:00 and could run through until 5 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 9 Sep 2025 at 10:11.
Sunday
Cadent Gas are carrying out Utility asset works on Garratt Road, Edgware.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 July 2025 at 06:07 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Aug 2025 at 09:42.
Tomorrow
Hertfordshire County Council are carrying out Highway repair and maintenance works on Tylers Way, Watford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 July 2025 at 09:30 and could run through until 19 September 2025. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 20 Aug 2025 at 14:53.
28 Jul and 3 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Bushey Hall Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 18 Jun 2025 at 11:50.
4 Aug and 3 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:13.
4 Aug and 3 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 10 Jun 2025 at 16:10.
4 Aug and 3 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Common Road, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:14.
4 Aug and 3 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Common Road, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 11 Jun 2025 at 09:57.
Tomorrow
Cadent Gas are proposing to carry out Utility asset works on Rectory Lane, Shenley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 09:54.
13 Oct 2025
Cadent Gas are carrying out Utility asset works on Common Road, Stanmore.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 August 2025 at 08:00 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 09:16.
Tomorrow
Affinity Water are carrying out Utility asset works on Kenton Road, Harrow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 18 August 2025 at 09:15 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 11 Sep 2025 at 08:58.
10 Oct 2025
Cadent Gas are carrying out Utility asset works on Gateshead Road, Borehamwood.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 August 2025 at 05:56 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Aug 2025 at 08:12.
Wednesday
Cadent Gas are carrying out Utility repair and maintenance works on Booth Road, Colindale, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 August 2025 at 08:00 and could run through until 24 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 14:09.
Tomorrow
UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Page Street, Mill Hill, London.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 August 2025 at 12:18 and could run through until 19 September 2025. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks Eastern & London on 17 Sep 2025 at 09:32.
1 and 26 Sep 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Regents Park Road, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 16 Jul 2025 at 15:57.
1 Sep and 14 Nov 2025
Affinity Water were proposing to carry out Utility asset works on Queens Road, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 14 November 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 17 Jun 2025 at 14:53.
1 Sep and 14 Nov 2025
Affinity Water were proposing to carry out Utility asset works on Queens Road, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 14 November 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 6 Aug 2025 at 08:23.
1 Sep and 10 Oct 2025
Affinity Water were proposing to carry out Utility asset works on Granville Road, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 10 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 13 Aug 2025 at 10:15.
1 Sep and 14 Nov 2025
Affinity Water were proposing to carry out Utility asset works on Queens Road, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 14 November 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 17 Jun 2025 at 14:48.
8 Sep and 9 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Jun 2025 at 09:40.
Wednesday
Cadent Gas are carrying out Utility repair and maintenance works on Colindale Avenue, Colindale, London.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 September 2025 at 13:53 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 14:17.
1 Oct 2025
Thames Water are carrying out Utility repair and maintenance works on Riverdene, Edgware.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 September 2025 at 09:30 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Sep 2025 at 09:07.
2 Oct 2025
Thames Water are carrying out Utility repair and maintenance works on Woodside Grange Road, North Finchley, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 September 2025 at 09:30 and could run through until 2 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Sep 2025 at 14:48.
11 Nov 2025
Cadent Gas are carrying out Utility asset works on Stanmore Hill, Stanmore.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 September 2025 at 13:56 and could run through until 11 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 14:19.
Today
London Borough Of Barnet are proposing to carry out Highway improvement works on Church Hill Road, East Barnet, Barnet.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 30 May 2025 at 13:51.
15 Sep and 27 Oct 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2025 at 13:10.
15 Sep and 27 Oct 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on The Hyde, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 19 Jun 2025 at 14:49.
15 Sep and 3 Oct 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 24 Jul 2025 at 15:12.
15 Sep and 9 Oct 2025
Cadent Gas were proposing to carry out Utility asset works on Mollison Way, Edgware.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 9 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2025 at 11:31.
London Borough Of Barnet carried out Highway improvement works on Woodgrange Avenue, North Finchley, London.
These works were categorised as Major.
The road was closed for some or all of the period.
The works were originally planned between 15 Sep 2025 and 18 Sep 2025 and were actually completed between 15 Sep 2025 (08:00) and 18 Sep 2025 (16:02). The works impacted the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 18 Sep 2025 at 16:02.
Monday
London Borough Of Barnet were proposing to carry out Highway improvement works on Lawrence Street, Mill Hill, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 22 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2025 at 15:25.
Monday
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Lawrence Street, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 19 Jun 2025 at 14:36.
Monday
London Borough Of Barnet are proposing to carry out Remedial works on Lawrence Street, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 23 Jul 2025 at 13:14.
15 and 26 Sep 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Leicester Road, East Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 22 Jul 2025 at 10:48.
15 and 26 Sep 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Leicester Road, East Finchley, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Affinity Water on 5 Sep 2025 at 14:20.
15 and 26 Sep 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Leicester Road, New Barnet, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Affinity Water on 10 Sep 2025 at 14:25.
15 Sep and 7 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Shenleybury, Shenley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 7 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 5 Aug 2025 at 11:30.
15 Sep and 7 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Shenleybury, Shenley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 7 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 6 Aug 2025 at 14:24.
7 Nov 2025
Cadent Gas are carrying out Utility asset works on Shenleybury, Shenley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 September 2025 at 12:32 and could run through until 7 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 12:35.
16 and 26 Sep 2025
London Borough Of Brent were proposing to carry out Highway repair and maintenance works on Princes Avenue, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 16 Sep 2025 at 13:50.
16 Sep and 7 Oct 2025
National Highways were proposing to carry out Works for road purposes on Great North Way, Hendon, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 September 2025 and run through until 7 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by National Highways on 11 Sep 2025 at 15:28.
16 Sep and 7 Oct 2025
National Highways were proposing to carry out Works for road purposes on Great North Way, Hendon, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 September 2025 and run through until 7 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by National Highways on 16 Sep 2025 at 11:45.
16 Sep and 7 Oct 2025
National Highways were proposing to carry out Works for road purposes on Great North Way, Hendon, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 September 2025 and run through until 7 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by National Highways on 18 Sep 2025 at 15:12.
7 Oct 2025
National Highways are carrying out Works for road purposes on Great North Way, Hendon, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2025 at 22:00 and could run through until 7 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 17 Sep 2025 at 16:34.
16 Sep and 7 Oct 2025
National Highways are proposing to carry out Works for road purposes on Ashley Lane, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2025 and could run through until 7 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 21 Aug 2025 at 11:12.
7 Oct 2025
National Highways are carrying out Works for road purposes on Ashley Lane, Hendon, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2025 at 22:40 and could run through until 7 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 17 Sep 2025 at 11:16.
7 Oct 2025
National Highways are carrying out Works for road purposes on Ashley Lane, Hendon, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2025 at 22:00 and could run through until 7 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 18 Sep 2025 at 14:30.
7 Oct 2025
National Highways are carrying out Works for road purposes on Downage, Hendon, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2025 at 22:00 and could run through until 7 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 18 Sep 2025 at 14:37.
16 Sep and 7 Oct 2025
National Highways are proposing to carry out Works for road purposes on Downage, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2025 and could run through until 7 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 21 Aug 2025 at 11:12.
7 Oct 2025
National Highways are carrying out Works for road purposes on Downage, Hendon, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2025 at 22:40 and could run through until 7 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 17 Sep 2025 at 11:07.
16 Sep and 7 Oct 2025
National Highways are proposing to carry out Works for road purposes on Chatsworth Avenue, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2025 and could run through until 7 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 21 Aug 2025 at 11:12.
7 Oct 2025
National Highways are carrying out Works for road purposes on Chatsworth Avenue, Hendon, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2025 at 22:40 and could run through until 7 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 17 Sep 2025 at 11:07.
7 Oct 2025
National Highways are carrying out Works for road purposes on Chatsworth Avenue, Hendon, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2025 at 22:00 and could run through until 7 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 18 Sep 2025 at 14:34.
16 Sep and 11 Oct 2025
National Highways are proposing to carry out Works for road purposes on Sunny Gardens Road, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2025 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 21 Aug 2025 at 11:12.
7 Oct 2025
National Highways are carrying out Works for road purposes on Sunny Gardens Road, Hendon, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2025 at 22:40 and could run through until 7 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 17 Sep 2025 at 11:07.
7 Oct 2025
National Highways are carrying out Works for road purposes on Sunny Gardens Road, Hendon, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2025 at 22:00 and could run through until 7 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 18 Sep 2025 at 14:32.
16 Sep and 7 Oct 2025
National Highways were proposing to carry out Works for road purposes on Watford Way, Mill Hill, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 September 2025 and run through until 7 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by National Highways on 16 Sep 2025 at 11:48.
16 Sep and 7 Oct 2025
National Highways were proposing to carry out Works for road purposes on Watford Way, Mill Hill, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 September 2025 and run through until 7 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by National Highways on 18 Sep 2025 at 15:12.
Monday
London Borough Of Barnet are proposing to carry out Highway improvement works on Grove Road, New Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2025 at 13:55.
Wednesday
Cadent Gas are carrying out Utility repair and maintenance works on Dury Road, Barnet.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2025 at 12:16 and could run through until 24 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 11:48.
Tuesday
Affinity Water are proposing to carry out Utility asset works on Palmerston Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2025 and could run through until 23 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 9 Jul 2025 at 12:18.
Tuesday
Affinity Water are carrying out Utility repair and maintenance works on Orchard Drive, Edgware.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2025 at 19:00 and could run through until 23 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 18 Sep 2025 at 14:33.
Tuesday
London Borough Of Barnet are proposing to carry out Highway improvement works on Grove Road, New Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2025 and could run through until 23 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2025 at 15:06.
Tuesday
London Borough Of Barnet are carrying out Highway improvement works on Grove Road, New Barnet, Barnet.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2025 at 08:00 and could run through until 23 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 17 Sep 2025 at 08:07.
25 Sep 2025
Cadent Gas are carrying out Utility repair and maintenance works on Shenleybury, Shenley.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2025 at 14:49 and could run through until 25 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 18 Sep 2025 at 08:50.
Monday
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on The Fairway, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by T-Mobile (UK) on 26 Jun 2025 at 15:38.
19 and 26 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Church Hill Road, East Barnet, Barnet.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 30 May 2025 at 13:51.
22 Sep and 21 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 15:21.
22 Sep and 3 Oct 2025
Affinity Water were proposing to carry out Utility asset works on Granville Road, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 September 2025 and run through until 3 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 6 Aug 2025 at 08:24.
Wednesday
BT are proposing to carry out Utility repair and maintenance works on Camlet Way, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 12 Aug 2025 at 09:36.
23 and 25 Sep 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Lawrence Street, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 19 Jun 2025 at 14:36.
23 and 26 Sep 2025
Affinity Water are proposing to carry out Utility asset works on The Courtway, Carpenders Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 2 Jul 2025 at 10:22.
23 and 26 Sep 2025
Affinity Water are proposing to carry out Utility asset works on The Courtway, Carpenders Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 8 Sep 2025 at 09:49.
24 and 26 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Hartley Avenue, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 1 Sep 2025 at 09:30.
24 and 26 Sep 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Elm Avenue, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 15 Jul 2025 at 10:43.
24 and 26 Sep 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Elm Avenue, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 8 Sep 2025 at 15:04.
24 Sep and 7 Oct 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on York Road, New Barnet, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 September 2025 and run through until 7 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2025 at 12:48.
24 Sep and 9 Oct 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on York Road, New Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2025 and could run through until 9 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2025 at 12:50.
25 and 29 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Ellesmere Avenue, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 6 Aug 2025 at 15:13.
29 Sep and 3 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Crummock Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Jun 2025 at 15:09.
29 Sep and 3 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Crummock Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Sep 2025 at 15:05.
29 Sep 2025 and 23 Jan 2026
Cadent Gas are proposing to carry out Utility asset works on Whitchurch Lane, Edgware.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 23 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Jul 2025 at 12:39.
29 Sep 2025 and 23 Jan 2026
Cadent Gas are proposing to carry out Utility asset works on Whitchurch Lane, Edgware.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 23 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Sep 2025 at 00:10.
29 Sep and 2 Oct 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Pike Road, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2025 at 13:59.
29 Sep and 2 Oct 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Pike Road, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2025 at 07:33.
29 Sep and 2 Oct 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Fernside Avenue, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2025 at 13:26.
29 Sep and 2 Oct 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Fernside Avenue, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2025 at 13:52.
29 Sep and 2 Oct 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Fernside Avenue, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2025 at 07:33.
29 Sep and 16 Oct 2025
London Borough Of Barnet are proposing to carry out New service connection on Raleigh Drive, Whetstone, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 2 Jul 2025 at 11:00.
29 Sep and 16 Oct 2025
London Borough Of Barnet are proposing to carry out New service connection on Raleigh Drive, Whetstone, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 19 Aug 2025 at 12:23.
29 Sep and 16 Oct 2025
London Borough Of Barnet are proposing to carry out New service connection on Raleigh Drive, Whetstone, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 21 Aug 2025 at 13:14.
29 Sep and 2 Oct 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Ellesmere Avenue, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2025 at 14:07.
29 Sep and 2 Oct 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Ellesmere Avenue, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 5 Sep 2025 at 11:54.
29 Sep and 2 Oct 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Ellesmere Avenue, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2025 at 07:33.
2 and 7 Oct 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Alexandra Road, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2025 and could run through until 7 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 11 Sep 2025 at 10:32.
6 and 24 Oct 2025
Electricity Network Company are proposing to carry out Utility asset works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 16 Sep 2025 at 12:33.
6 and 24 Oct 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 24 Jul 2025 at 15:12.
6 Oct 2025 and 6 Nov 2026
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Brockenhurst Gardens, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Jul 2025 at 11:32.
6 and 13 Oct 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on The Courtway, Carpenders Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Jul 2025 at 11:58.
6 and 13 Oct 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on The Courtway, Carpenders Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jul 2025 at 11:29.
6 and 13 Oct 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on The Courtway, Carpenders Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Aug 2025 at 09:49.
6 and 24 Oct 2025
Affinity Water were proposing to carry out Utility asset works on Argyle Road, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2025 and run through until 24 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 13 Aug 2025 at 10:17.
6 and 8 Oct 2025
London Borough Of Enfield were proposing to carry out Highway improvement works on Waggon Road, Enfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2025 and run through until 8 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Enfield on 9 Jul 2025 at 09:19.
7 and 11 Oct 2025
National Highways are proposing to carry out Works for road purposes on Watford Way, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 11 Sep 2025 at 15:11.
7 and 9 Oct 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Hartsbourne Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 3 Jul 2025 at 10:08.
8 and 11 Oct 2025
London Borough Of Brent are proposing to carry out Highway improvement works on Hay Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 18 Aug 2025 at 14:19.
8 and 10 Oct 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Mimms Lane, Ridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 4 Sep 2025 at 09:54.
8 and 10 Oct 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Earls Lane, South Mimms.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 4 Sep 2025 at 09:54.
13 and 24 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Jellicoe Gardens, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2025 at 09:53.
13 and 16 Oct 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Millway, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 15 Sep 2025 at 13:47.
13 and 16 Oct 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Millway, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 17 Sep 2025 at 12:56.
13 and 15 Oct 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Lower Paddock Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 15 Jul 2025 at 14:24.
13 and 15 Oct 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Lower Paddock Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 2 Sep 2025 at 10:36.
13 and 16 Oct 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Watling Street, Elstree.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 5 Sep 2025 at 13:58.
13 and 19 Oct 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Galley Lane, Arkley Barnet Section, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 19 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by London Borough Of Barnet on 30 Jun 2025 at 15:06.
13 Oct and 21 Nov 2025
Affinity Water are proposing to carry out Utility asset works on Granville Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 21 Aug 2025 at 09:17.
13 and 15 Oct 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Dancers Hill Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Sep 2025 at 12:01.
14 and 16 Oct 2025
Virgin Media are proposing to carry out Utility asset works on Park Way, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 29 Jul 2025 at 09:01.
14 Oct and 15 Nov 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Friary Road, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2025 and could run through until 15 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 15 Jul 2025 at 15:06.
14 Oct and 15 Nov 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Friary Road, North Finchley, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2025 and run through until 15 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2025 at 15:29.
14 and 17 Oct 2025
BT are proposing to carry out Utility repair and maintenance works on Darlands Drive, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 12 Sep 2025 at 15:29.
20 Oct and 28 Nov 2025
Affinity Water are proposing to carry out Utility asset works on Granville Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 9 Sep 2025 at 08:49.
20 Oct and 7 Nov 2025
Affinity Water were proposing to carry out Utility asset works on Kings Road, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 13 Aug 2025 at 10:31.
20 Oct and 21 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Black Lion Hill, Shenley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 10:32.
21 Oct 2025 and 20 Mar 2026
Affinity Water are proposing to carry out Utility asset works on Kitts End Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2025 and could run through until 20 March 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 27 May 2025 at 09:57.
21 Oct 2025 and 20 Mar 2026
Affinity Water were proposing to carry out Utility asset works on Kitts End Road, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2025 and run through until 20 March 2026. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 17 Jul 2025 at 10:31.
21 Oct 2025 and 20 Mar 2026
Affinity Water are proposing to carry out Utility asset works on Kitts End Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2025 and could run through until 20 March 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 1 Aug 2025 at 10:57.
21 Oct 2025 and 20 Mar 2026
Affinity Water are proposing to carry out Utility asset works on Kitts End Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2025 and could run through until 20 March 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 16 Sep 2025 at 13:47.
22 Oct and 10 Nov 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Cat Hill, East Barnet Road To Brookhill Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 10 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 15 Jul 2025 at 11:04.
22 Oct and 10 Nov 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Brookhill Road, New Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 10 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 15 Jul 2025 at 11:46.
22 Oct and 10 Nov 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Cat Hill, Brookhill Road To Borough Boundary, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 10 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 15 Jul 2025 at 11:46.
22 Oct and 10 Nov 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Park Road, New Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 10 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 15 Jul 2025 at 11:46.
23 Oct and 2 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Shenleybury, Shenley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 2 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 13:35.
25 and 29 Oct 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Holden Avenue, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 2 Sep 2025 at 15:24.
25 and 29 Oct 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Ashbourne Close, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 2 Sep 2025 at 15:24.
25 and 29 Oct 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Woodside Park Road, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 2 Sep 2025 at 15:24.
25 and 29 Oct 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Woodside Grange Road, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 2 Sep 2025 at 15:24.
25 Oct and 3 Nov 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Friary Road, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 1 Aug 2025 at 14:28.
25 Oct and 14 Nov 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Mays Lane, Underhill, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 31 Jul 2025 at 10:49.
25 Oct and 14 Nov 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Barnet Lane, Underhill, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 31 Jul 2025 at 10:49.
25 Oct and 14 Nov 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Underhill, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 31 Jul 2025 at 10:49.
26 and 31 Oct 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 21 Aug 2025 at 12:58.
26 and 29 Oct 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on St Albans Road, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Affinity Water on 13 Jun 2025 at 09:34.
27 Oct and 7 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Chartley Avenue, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2025 at 09:56.
27 Oct and 7 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Aug 2025 at 10:00.
27 Oct and 7 Nov 2025
Cadent Gas were proposing to carry out Utility asset works on Masefield Avenue, Stanmore.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 10:23.
27 Oct and 21 Nov 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Argyle Road, North Finchley, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 19 Aug 2025 at 10:29.
27 Oct and 21 Nov 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Argyle Road, North Finchley, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 5 Sep 2025 at 10:44.
27 Oct and 21 Nov 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Argyle Road, North Finchley, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 15 Sep 2025 at 09:22.
27 Oct and 21 Nov 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Argyle Road, North Finchley, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 15 Sep 2025 at 14:08.
27 and 31 Oct 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Wood Street, Barnet.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 23 Jul 2025 at 15:20.
27 Oct and 14 Nov 2025
Affinity Water were proposing to carry out Utility asset works on Regina Close, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 14 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 6 Aug 2025 at 08:22.
27 and 29 Oct 2025
BT are proposing to carry out Utility repair and maintenance works on Camlet Way, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 13 Aug 2025 at 14:04.
27 and 31 Oct 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Drop Lane, Bricket Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 27 Aug 2025 at 08:31.
28 and 30 Oct 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Hartsbourne Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 3 Jul 2025 at 14:24.
28 and 30 Oct 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Hartsbourne Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 18 Sep 2025 at 14:53.
31 Oct and 4 Nov 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Dancers Hill Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 27 Aug 2025 at 09:06.
3 and 17 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2025 at 09:59.
3 and 17 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Chenduit Way, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 12:22.
3 and 25 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2025 at 09:04.
3 and 25 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2025 at 09:35.
3 and 25 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2025 at 13:41.
3 and 25 Nov 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 25 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2025 at 10:15.
3 and 25 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Watford Way, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 13:19.
3 and 25 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Watford Way, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:18.
3 and 25 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Edgware Way, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 13:21.
3 and 25 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Edgware Way, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:18.
3 and 25 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Barnet Way, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 13:21.
3 and 25 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Barnet Way, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:18.
3 and 25 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Northway Circus, Apex Corner, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 13:20.
3 and 25 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Northway Circus, Apex Corner, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:17.
3 Nov and 5 Dec 2025
Affinity Water were proposing to carry out Utility asset works on Cavendish Road, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 5 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 13 Aug 2025 at 10:32.
3 Nov and 19 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Dancers Hill Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 19 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 29 Aug 2025 at 08:51.
3 Nov and 19 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Rectory Lane, Shenley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 10:33.
3 Nov and 5 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Black Lion Hill, Shenley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 5 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 14 Aug 2025 at 10:17.
3 and 8 Nov 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on London Colney Bypass, St Albans.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 8 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 12:24.
3 and 8 Nov 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on London Colney Bypass, St Albans.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 8 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 29 May 2025 at 09:14.
5 and 19 Nov 2025
Electricity Network Company are proposing to carry out Utility asset works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 15 Sep 2025 at 11:56.
8 and 9 Nov 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Mays Lane, Underhill, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2025 and could run through until 9 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 9 Sep 2025 at 08:14.
10 and 12 Nov 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Hartley Avenue, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2025 at 13:20.
10 Nov and 26 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Old Redding, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 26 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Jun 2025 at 09:40.
10 and 12 Nov 2025
BT were proposing to carry out Utility asset works on Barnet Lane, Totteridge, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 November 2025 and run through until 12 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 8 Aug 2025 at 16:01.
10 and 12 Nov 2025
BT are proposing to carry out Utility asset works on Barnet Lane, Totteridge, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 22 Aug 2025 at 12:39.
10 Nov 2025 and 16 Jan 2026
Affinity Water are proposing to carry out Utility asset works on Granville Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 16 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 20 Jun 2025 at 10:44.
10 Nov and 12 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Black Lion Hill, Shenley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 13:00.
10 and 15 Nov 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on London Colney Bypass, St Albans.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 2 May 2025 at 11:45.
14 and 21 Nov 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Berkeley Crescent, New Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Aug 2025 at 08:26.
17 and 21 Nov 2025
Affinity Water are proposing to carry out roadworks on Silverston Way, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 18 Aug 2025 at 13:26.
17 and 21 Nov 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Silverston Way, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 15 Sep 2025 at 14:46.
17 Nov and 12 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Greyfell Close, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2025 at 13:15.
17 Nov and 12 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Stangate Gardens, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2025 at 13:03.
17 Nov and 12 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Hewett Close, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2025 at 13:01.
17 Nov and 10 Dec 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Friary Road, North Finchley, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 November 2025 and run through until 10 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 9 Sep 2025 at 12:41.
17 Nov and 22 Dec 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Friary Road, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 10 Sep 2025 at 15:34.
17 Nov 2025 and 16 Jan 2026
Cadent Gas are proposing to carry out Utility asset works on Stanmore Hill, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 16 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2025 at 13:29.
17 and 22 Nov 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Lawrence Street, Mill Hill, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 November 2025 and run through until 22 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2025 at 15:33.
17 and 22 Nov 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Lawrence Street, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 9 Sep 2025 at 11:53.
17 Nov and 5 Dec 2025
Affinity Water are proposing to carry out Utility asset works on Argyle Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 21 Aug 2025 at 09:17.
21 and 25 Nov 2025
Virgin Media are proposing to carry out Utility asset works on Crescent Road, Church End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 10 Sep 2025 at 14:04.
21 and 25 Nov 2025
Virgin Media are proposing to carry out Utility asset works on Crescent Road, Church End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 11 Sep 2025 at 12:37.
21 and 25 Nov 2025
Virgin Media are proposing to carry out Utility asset works on Dollis Road, Church End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 10 Sep 2025 at 14:04.
21 and 25 Nov 2025
Virgin Media are proposing to carry out Utility asset works on Dollis Road, Church End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 11 Sep 2025 at 12:36.
24 and 26 Nov 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Lawrence Street, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 22 Aug 2025 at 10:55.
24 and 26 Nov 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Highwood Hill, Holcombe Hill To Marsh Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 22 Aug 2025 at 10:55.
24 Nov and 17 Dec 2025
Affinity Water are proposing to carry out Utility asset works on Argyle Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 9 Sep 2025 at 08:50.
24 and 27 Nov 2025
Affinity Water were proposing to carry out Utility asset works on Loom Lane, Radlett.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 November 2025 and run through until 27 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 15 Sep 2025 at 07:56.
1 and 13 Dec 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Fryent Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 13 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 26 Aug 2025 at 09:20.
1 and 13 Dec 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Fryent Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 13 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 16 Sep 2025 at 13:37.
1 and 3 Dec 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Pinner Road, Watford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 December 2025 and run through until 3 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 9 Sep 2025 at 15:39.
1 and 19 Dec 2025
Affinity Water are proposing to carry out Utility asset works on Kings Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 21 Aug 2025 at 09:17.
1 Dec 2025 and 23 Jan 2026
Affinity Water were proposing to carry out Utility asset works on Kings Road, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 December 2025 and run through until 23 January 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 13 Aug 2025 at 10:33.
1 and 5 Dec 2025
BT were proposing to carry out Utility repair and maintenance works on Christ Church Lane, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 December 2025 and run through until 5 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 2 Sep 2025 at 14:04.
1 and 5 Dec 2025
BT are proposing to carry out Utility repair and maintenance works on Christ Church Lane, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 17 Sep 2025 at 08:45.
1 and 5 Dec 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on North Western Avenue, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 18 Sep 2025 at 14:45.
8 and 11 Dec 2025
Thames Water were proposing to carry out Remedial works on Tenterden Grove, Hendon, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 December 2025 and run through until 11 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Sep 2025 at 13:34.
8 Dec 2025 and 9 Jan 2026
Affinity Water are proposing to carry out Utility asset works on Kings Road, Barnet.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 9 Sep 2025 at 08:55.
8 and 12 Dec 2025
BT are proposing to carry out Utility asset works on Buckettsland Lane, Borehamwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 27 Aug 2025 at 09:03.
8 and 12 Dec 2025
BT are proposing to carry out Utility asset works on Summerswood Lane, Borehamwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 27 Aug 2025 at 09:05.
8 and 12 Dec 2025
BT are proposing to carry out Utility asset works on Summerswood Lane, Borehamwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 27 Aug 2025 at 09:05.
8 and 19 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Pound Lane, Shenley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 13:01.
10 and 12 Dec 2025
Network Rail are proposing to carry out Works for Rail Purposes on Bunns Lane, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 27 Aug 2025 at 15:50.
15 and 18 Dec 2025
Thames Water are proposing to carry out Remedial works on Tenterden Grove, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Sep 2025 at 13:50.
15 and 18 Dec 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on The Broadway, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 14:58.
15 and 18 Dec 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Weymouth Avenue, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 14:57.
15 and 18 Dec 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Russell Grove, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 14:56.
15 and 18 Dec 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Millway, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 14:55.
15 and 18 Dec 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Selvage Lane, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 14:54.
15 and 18 Dec 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Marsh Lane, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 14:51.
15 and 17 Dec 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Pike Road, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2025 and could run through until 17 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 14:48.
15 and 18 Dec 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westfield Road, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 14:52.
15 and 18 Dec 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Courtland Avenue, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 14:53.
Roadworks Map near to Elmwood Avenue, BOREHAMWOOD, WD6 1SZ (Loading...)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Elmwood Avenue, BOREHAMWOOD, WD6 1SZ (6 Events)
(Scheduled Dates)
(miles)
(Scheduled: 18 Sep 2025 - 22 Sep 2025)
(Scheduled: 16 Sep 2025 - 23 Sep 2025)
Contains public sector information licensed under the Open Government Licence v3.0.