ROADWORKS SUMMARY
Cardinal Avenue, BOREHAMWOOD, WD6 1ST
Introduction

View current and future planned roadworks and road closures for Cardinal Avenue, WD6 1ST and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Cardinal Avenue, BOREHAMWOOD, WD6 1ST
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Cardinal Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
4 Jun 2024 and 31 Mar 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
The works will start on or after 4 June 2024 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 8 Feb 2024 at 08:15.
25 Oct 2025
Thames Water are carrying out Utility repair and maintenance works on Barnet Road, Barnet.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 October 2024 at 09:30 and could run through until 25 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 09:25.
1 May and 22 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Albert Road, New Barnet, Barnet.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 27 Mar 2025 at 13:34.
1 May and 22 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Albert Road, New Barnet, Barnet.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 27 Mar 2025 at 13:41.
2 Jun and 21 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on North Street, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 10 Apr 2025 at 10:46.
Sunday
Cadent Gas are proposing to carry out Utility asset works on Burnt Oak Broadway, Edgware.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 6 May 2025 at 07:33.
Sunday
Cadent Gas are proposing to carry out Utility asset works on Burnt Oak Broadway, Edgware.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 1 Jul 2025 at 09:56.
Sunday
Cadent Gas are proposing to carry out Utility asset works on Burnt Oak Broadway, Edgware.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 7 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 3 Jul 2025 at 11:46.
21 Sep 2025
Cadent Gas are carrying out Utility asset works on Burnt Oak Broadway, Edgware.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 July 2025 at 06:26 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Aug 2025 at 09:28.
Sunday
Cadent Gas are proposing to carry out Utility asset works on High Street, Edgware.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 6 May 2025 at 07:33.
Sunday
Cadent Gas are proposing to carry out Utility asset works on High Street, Edgware.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 27 Jun 2025 at 09:05.
Sunday
Cadent Gas are proposing to carry out Utility asset works on High Street, Edgware.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 1 Jul 2025 at 10:02.
Sunday
Cadent Gas are proposing to carry out Utility asset works on High Street, Edgware.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 7 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 3 Jul 2025 at 11:39.
21 Sep 2025
Cadent Gas are carrying out Utility asset works on High Street, Edgware.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 July 2025 at 06:23 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Aug 2025 at 09:35.
24 Sep 2025
London Borough Of Barnet are carrying out Highway improvement works on North Street, Hendon, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 July 2025 at 15:00 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 17 Jul 2025 at 15:17.
21 Sep 2025
Cadent Gas are carrying out Utility asset works on Garratt Road, Edgware.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 July 2025 at 06:07 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Aug 2025 at 09:42.
16 Jul and 12 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Aerodrome Road, Colindale, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2025 and could run through until 12 September 2025. The works will impact the footway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 2 Jul 2025 at 10:20.
12 Sep 2025
London Borough Of Barnet are carrying out Highway improvement works on Aerodrome Road, Colindale, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 July 2025 at 00:00 and could run through until 12 September 2025. The works will impact the footway and footpath.
This roadwork event was last updated by London Borough Of Barnet on 17 Jul 2025 at 07:55.
20 Jul and 12 Sep 2025
Thames Water are proposing to carry out Utility asset works on Sunningfields Road, Hendon, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 July 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 14 May 2025 at 07:39.
21 Jul and 12 Sep 2025
Thames Water are proposing to carry out Utility asset works on Sunningfields Road, Hendon, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 2 May 2025 at 14:28.
21 Jul and 12 Sep 2025
Thames Water are proposing to carry out Utility asset works on Sunningfields Road, Hendon, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 15 May 2025 at 11:44.
12 Sep 2025
Thames Water are carrying out Utility asset works on Sunningfields Road, Hendon, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 July 2025 at 13:47 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Aug 2025 at 09:58.
19 Sep 2025
Hertfordshire County Council are carrying out Highway repair and maintenance works on Tylers Way, Watford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 July 2025 at 09:30 and could run through until 19 September 2025. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 20 Aug 2025 at 14:53.
Saturday
London Borough Of Barnet are proposing to carry out Highway improvement works on Hadley Green, Barnet.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 6 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 29 Jan 2025 at 13:51.
Saturday
London Borough Of Barnet are proposing to carry out Highway improvement works on Hadley Green, Barnet.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 6 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 18 Feb 2025 at 08:21.
Saturday
London Borough Of Barnet are proposing to carry out Highway improvement works on Hadley Green, Barnet.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 6 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 7 Jul 2025 at 13:41.
Saturday
London Borough Of Barnet are proposing to carry out Highway improvement works on Hadley Green, Barnet.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 6 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 14 Jul 2025 at 14:51.
Saturday
London Borough Of Barnet are proposing to carry out Highway improvement works on Hadley Green, Barnet.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 6 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 17 Jul 2025 at 09:48.
Saturday
London Borough Of Barnet are carrying out Highway improvement works on Hadley Green, Barnet.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 July 2025 at 09:30 and could run through until 6 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 21 Jul 2025 at 10:28.
Friday
London Borough Of Barnet are proposing to carry out Highway improvement works on Aerodrome Road, Colindale, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 22 Oct 2024 at 12:07.
Sunday
Cadent Gas are proposing to carry out Utility asset works on Bacon Lane, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 7 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 4 Jun 2025 at 10:45.
Friday
Cadent Gas were proposing to carry out Utility asset works on The Avenue, Bushey.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Aug 2025 at 08:55.
28 Jul and 3 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Bushey Hall Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 18 Jun 2025 at 11:50.
4 Aug and 3 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:13.
4 Aug and 3 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Jun 2025 at 16:10.
4 Aug and 15 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Old Redding, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:12.
4 Aug and 15 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Old Redding, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Jun 2025 at 16:05.
4 Aug and 3 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Common Road, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:14.
4 Aug and 3 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Common Road, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Jun 2025 at 09:57.
Today
London Borough Of Barnet are proposing to carry out Highway improvement works on High Street, Barnet.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 24 Jul 2025 at 14:23.
4 Aug and 19 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Rectory Lane, Shenley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 09:54.
Today
London Borough Of Barnet are proposing to carry out New service connection on Raleigh Drive, Whetstone, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 3 September 2025. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Barnet on 6 May 2025 at 15:19.
13 Oct 2025
Cadent Gas are carrying out Utility asset works on Common Road, Stanmore.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 August 2025 at 08:00 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 09:16.
11 Sep 2025
London Borough Of Barnet are carrying out Highway improvement works on High Street, Barnet.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 11 August 2025 at 09:00 and could run through until 11 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 20 Aug 2025 at 12:28.
15 Aug and 15 Sep 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Mountfield Road, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 16 Jul 2025 at 14:50.
15 Aug and 15 Sep 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on North Crescent, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 16 Jul 2025 at 14:50.
15 Aug and 15 Sep 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Cyprus Road, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 16 Jul 2025 at 14:50.
15 Aug and 15 Sep 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on East End Road, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 16 Jul 2025 at 14:50.
15 Aug and 15 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Regents Park Road, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 18 Jul 2025 at 08:46.
15 Aug and 15 Sep 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Gravel Hill, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 16 Jul 2025 at 14:50.
Monday
Affinity Water are proposing to carry out Utility asset works on Kenton Road, Harrow.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 8 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 7 Aug 2025 at 10:57.
12 Sep 2025
Affinity Water are carrying out Utility asset works on Kenton Road, Harrow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 18 August 2025 at 09:15 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 1 Sep 2025 at 16:30.
10 Oct 2025
Cadent Gas are carrying out Utility asset works on Gateshead Road, Borehamwood.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 August 2025 at 05:56 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Aug 2025 at 08:12.
10 Sep 2025
Cadent Gas are carrying out Utility repair and maintenance works on Wood Street, Barnet.
The works started on 26 August 2025 at 14:31 and could run through until 10 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Aug 2025 at 10:14.
12 Sep 2025
Cadent Gas are carrying out Utility repair and maintenance works on Booth Road, Colindale, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 August 2025 at 08:00 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 10:48.
29 Aug and 15 Sep 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Regents Park Road, Finchley, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 August 2025 and run through until 15 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 8 Aug 2025 at 08:47.
Tomorrow
UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Alexandra Road, Borehamwood.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 August 2025 at 13:49 and could run through until 4 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2025 at 09:02.
Saturday
London Borough Of Barnet were proposing to carry out Highway improvement works on The Hyde, Colindale, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 6 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 5 Jun 2025 at 14:34.
1 and 26 Sep 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Regents Park Road, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 16 Jul 2025 at 15:57.
Saturday
London Borough Of Barnet are proposing to carry out Highway improvement works on The Hyde, Colindale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 6 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 9 Jun 2025 at 08:31.
Friday
London Borough Of Barnet were proposing to carry out Highway improvement works on Church Hill Road, East Barnet, Barnet.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 5 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 30 May 2025 at 14:17.
Tomorrow
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Richmond Road, New Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 4 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 9 Jun 2025 at 09:49.
1 Sep and 14 Nov 2025
Affinity Water were proposing to carry out Utility asset works on Queens Road, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 14 November 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 17 Jun 2025 at 14:53.
1 Sep and 14 Nov 2025
Affinity Water were proposing to carry out Utility asset works on Queens Road, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 14 November 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 6 Aug 2025 at 08:23.
1 Sep and 10 Oct 2025
Affinity Water were proposing to carry out Utility asset works on Granville Road, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 10 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 13 Aug 2025 at 10:15.
1 Sep and 14 Nov 2025
Affinity Water were proposing to carry out Utility asset works on Queens Road, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 14 November 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 17 Jun 2025 at 14:48.
1 and 12 Sep 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Drop Lane, Bricket Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 31 Jul 2025 at 13:40.
Friday
BT were proposing to carry out Utility asset works on Barnet Lane, Totteridge, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 September 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 8 Aug 2025 at 15:45.
Saturday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Watling Street, Elstree.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2025 and could run through until 6 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 27 May 2025 at 10:30.
Saturday
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Dennis Lane, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 September 2025 and could run through until 6 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 26 Jun 2025 at 16:02.
Monday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Windmill Lane, Bushey Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 September 2025 and could run through until 8 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 9 Jun 2025 at 09:16.
Monday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Grange Lane, Letchmore Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 September 2025 and could run through until 8 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 9 Jun 2025 at 09:15.
6 and 11 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Church Hill Road, East Barnet, Barnet.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 September 2025 and could run through until 11 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 30 May 2025 at 13:50.
8 and 12 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Aerodrome Road, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 17 Mar 2025 at 11:14.
8 Sep and 9 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Jun 2025 at 09:40.
8 Sep and 7 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Jul 2025 at 14:14.
8 and 10 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Beethoven Road, Elstree.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 4 Aug 2025 at 13:29.
8 and 10 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Beethoven Road, Elstree.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Aug 2025 at 11:58.
8 and 10 Sep 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Mimms Lane, Ridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 September 2025 and run through until 10 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 29 Jul 2025 at 11:21.
8 and 10 Sep 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Earls Lane, South Mimms.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 September 2025 and run through until 10 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 29 Jul 2025 at 11:22.
9 and 11 Sep 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Canning Road, Wealdstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2025 and could run through until 11 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 25 Jun 2025 at 15:58.
9 and 12 Sep 2025
BT are proposing to carry out Utility repair and maintenance works on Darlands Drive, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 27 Jun 2025 at 11:53.
10 and 15 Sep 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Whitings Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2025 at 10:22.
10 and 15 Sep 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Chesterfield Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 12 Jun 2025 at 13:38.
10 and 15 Sep 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Bells Hill, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 12 Jun 2025 at 13:46.
10 and 15 Sep 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Trinder Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2025 at 10:22.
11 and 16 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Barnet Lane, Borehamwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 September 2025 and could run through until 16 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Aug 2025 at 12:09.
12 and 15 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Mountfield Road, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 11 Aug 2025 at 10:16.
12 and 15 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on North Crescent, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 11 Aug 2025 at 10:09.
12 and 15 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on North Crescent, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 15 Aug 2025 at 10:58.
12 and 15 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Cyprus Road, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 11 Aug 2025 at 10:09.
12 and 15 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Cyprus Road, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 15 Aug 2025 at 10:55.
12 and 15 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on East End Road, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 5 Aug 2025 at 13:22.
12 and 15 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Regents Park Road, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 11 Aug 2025 at 10:25.
12 and 15 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Regents Park Road, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 27 Aug 2025 at 15:01.
12 and 15 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Regents Park Road, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 27 Aug 2025 at 15:01.
12 and 15 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Gravel Hill, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 5 Aug 2025 at 13:14.
13 and 18 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Church Hill Road, East Barnet, Barnet.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 30 May 2025 at 13:51.
15 Sep and 27 Oct 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 20 Jun 2025 at 08:45.
15 Sep and 27 Oct 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on The Hyde, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 19 Jun 2025 at 14:49.
15 Sep and 3 Oct 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 24 Jul 2025 at 15:12.
15 Sep and 9 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Mollison Way, Edgware.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 12:57.
15 and 22 Sep 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Lawrence Street, Mill Hill, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 22 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2025 at 15:25.
15 and 22 Sep 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Lawrence Street, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 19 Jun 2025 at 14:36.
15 and 22 Sep 2025
London Borough Of Barnet are proposing to carry out Remedial works on Lawrence Street, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 23 Jul 2025 at 13:14.
15 and 26 Sep 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Leicester Road, East Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 22 Jul 2025 at 10:48.
15 and 26 Sep 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Leicester Road, East Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 1 Sep 2025 at 15:02.
15 Sep and 7 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Shenleybury, Shenley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 7 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 5 Aug 2025 at 11:30.
15 Sep and 7 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Shenleybury, Shenley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 7 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 6 Aug 2025 at 14:24.
15 Sep and 7 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Shenleybury, Shenley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 7 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 08:59.
16 and 26 Sep 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Princes Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 11 Jun 2025 at 17:39.
16 Sep and 7 Oct 2025
National Highways are proposing to carry out Works for road purposes on Ashley Lane, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2025 and could run through until 7 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 21 Aug 2025 at 11:12.
16 Sep and 7 Oct 2025
National Highways are proposing to carry out Works for road purposes on Downage, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2025 and could run through until 7 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 21 Aug 2025 at 11:12.
16 Sep and 7 Oct 2025
National Highways are proposing to carry out Works for road purposes on Chatsworth Avenue, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2025 and could run through until 7 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 21 Aug 2025 at 11:12.
16 Sep and 11 Oct 2025
National Highways are proposing to carry out Works for road purposes on Sunny Gardens Road, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2025 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 21 Aug 2025 at 11:12.
16 and 22 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Grove Road, New Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2025 at 13:55.
17 and 23 Sep 2025
Affinity Water are proposing to carry out Utility asset works on Palmerston Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2025 and could run through until 23 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 9 Jul 2025 at 12:18.
17 and 23 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Grove Road, New Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2025 and could run through until 23 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2025 at 15:06.
17 and 23 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Grove Road, New Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2025 and could run through until 23 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 27 Aug 2025 at 08:39.
18 and 22 Sep 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on The Fairway, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by T-Mobile (UK) on 26 Jun 2025 at 15:38.
19 and 26 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Church Hill Road, East Barnet, Barnet.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 30 May 2025 at 13:51.
22 Sep and 3 Oct 2025
Affinity Water were proposing to carry out Utility asset works on Granville Road, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 September 2025 and run through until 3 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 6 Aug 2025 at 08:24.
22 and 24 Sep 2025
BT are proposing to carry out Utility repair and maintenance works on Camlet Way, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 12 Aug 2025 at 09:36.
23 and 25 Sep 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Lawrence Street, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 19 Jun 2025 at 14:36.
23 and 26 Sep 2025
Affinity Water are proposing to carry out Utility asset works on The Courtway, Carpenders Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 2 Jul 2025 at 10:22.
24 and 26 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Hartley Avenue, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 1 Sep 2025 at 09:30.
24 and 26 Sep 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Elm Avenue, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 15 Jul 2025 at 10:43.
25 and 29 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Ellesmere Avenue, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 6 Aug 2025 at 15:13.
29 Sep and 3 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Crummock Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Jun 2025 at 15:09.
29 Sep 2025 and 23 Jan 2026
Cadent Gas are proposing to carry out Utility asset works on Whitchurch Lane, Edgware.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 23 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Jul 2025 at 12:39.
29 Sep and 2 Oct 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Pike Road, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 22 Aug 2025 at 14:57.
29 Sep and 2 Oct 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Fernside Avenue, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2025 at 13:26.
29 Sep and 2 Oct 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Fernside Avenue, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 22 Aug 2025 at 15:00.
29 Sep and 16 Oct 2025
London Borough Of Barnet are proposing to carry out New service connection on Raleigh Drive, Whetstone, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 2 Jul 2025 at 11:00.
29 Sep and 16 Oct 2025
London Borough Of Barnet are proposing to carry out New service connection on Raleigh Drive, Whetstone, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 19 Aug 2025 at 12:23.
29 Sep and 16 Oct 2025
London Borough Of Barnet are proposing to carry out New service connection on Raleigh Drive, Whetstone, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 21 Aug 2025 at 13:14.
6 and 24 Oct 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 24 Jul 2025 at 15:12.
6 Oct 2025 and 6 Nov 2026
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Brockenhurst Gardens, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Jul 2025 at 11:32.
6 and 13 Oct 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on The Courtway, Carpenders Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Jul 2025 at 11:58.
6 and 13 Oct 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on The Courtway, Carpenders Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jul 2025 at 11:29.
6 and 13 Oct 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on The Courtway, Carpenders Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Aug 2025 at 09:49.
6 and 24 Oct 2025
Affinity Water were proposing to carry out Utility asset works on Argyle Road, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2025 and run through until 24 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 13 Aug 2025 at 10:17.
6 and 8 Oct 2025
London Borough Of Enfield were proposing to carry out Highway improvement works on Waggon Road, Enfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2025 and run through until 8 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Enfield on 9 Jul 2025 at 09:19.
7 and 9 Oct 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Hartsbourne Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 3 Jul 2025 at 10:08.
8 and 11 Oct 2025
London Borough Of Brent are proposing to carry out Highway improvement works on Hay Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 18 Aug 2025 at 14:19.
13 and 24 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Jellicoe Gardens, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Aug 2025 at 09:30.
13 and 15 Oct 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Lower Paddock Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 15 Jul 2025 at 14:24.
13 and 15 Oct 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Lower Paddock Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 2 Sep 2025 at 10:36.
13 and 19 Oct 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Galley Lane, Arkley Barnet Section, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 19 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by London Borough Of Barnet on 30 Jun 2025 at 15:06.
13 Oct and 21 Nov 2025
Affinity Water are proposing to carry out Utility asset works on Granville Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 21 Aug 2025 at 09:17.
14 and 16 Oct 2025
Virgin Media are proposing to carry out Utility asset works on Park Way, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 29 Jul 2025 at 09:01.
14 and 17 Oct 2025
BT are proposing to carry out Utility repair and maintenance works on Darlands Drive, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 3 Sep 2025 at 11:44.
20 Oct and 7 Nov 2025
Affinity Water were proposing to carry out Utility asset works on Kings Road, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 13 Aug 2025 at 10:31.
20 Oct and 21 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Black Lion Hill, Shenley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 10:32.
21 Oct 2025 and 20 Mar 2026
Affinity Water are proposing to carry out Utility asset works on Kitts End Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2025 and could run through until 20 March 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 27 May 2025 at 09:57.
21 Oct 2025 and 20 Mar 2026
Affinity Water were proposing to carry out Utility asset works on Kitts End Road, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2025 and run through until 20 March 2026. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 17 Jul 2025 at 10:31.
21 Oct 2025 and 20 Mar 2026
Affinity Water are proposing to carry out Utility asset works on Kitts End Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2025 and could run through until 20 March 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 1 Aug 2025 at 10:57.
21 Oct 2025 and 20 Mar 2026
Affinity Water are proposing to carry out Utility asset works on Kitts End Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2025 and could run through until 20 March 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 13 Aug 2025 at 12:17.
22 Oct and 10 Nov 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Cat Hill, East Barnet Road To Brookhill Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 10 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 15 Jul 2025 at 11:04.
22 Oct and 10 Nov 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Brookhill Road, New Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 10 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 15 Jul 2025 at 11:46.
22 Oct and 10 Nov 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Cat Hill, Brookhill Road To Borough Boundary, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 10 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 15 Jul 2025 at 11:46.
22 Oct and 10 Nov 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Park Road, New Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 10 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 15 Jul 2025 at 11:46.
23 Oct and 2 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Shenleybury, Shenley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 2 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 13:35.
25 and 29 Oct 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Holden Avenue, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 2 Sep 2025 at 15:24.
25 and 29 Oct 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Ashbourne Close, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 2 Sep 2025 at 15:24.
25 and 29 Oct 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Woodside Park Road, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 2 Sep 2025 at 15:24.
25 and 29 Oct 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Woodside Grange Road, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 2 Sep 2025 at 15:24.
25 Oct and 14 Nov 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Mays Lane, Underhill, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 31 Jul 2025 at 10:49.
25 Oct and 14 Nov 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Barnet Lane, Underhill, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 31 Jul 2025 at 10:49.
25 Oct and 14 Nov 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Underhill, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 31 Jul 2025 at 10:49.
26 and 31 Oct 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 21 Aug 2025 at 12:58.
26 and 29 Oct 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on St Albans Road, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Affinity Water on 13 Jun 2025 at 09:34.
27 Oct and 7 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Chartley Avenue, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Aug 2025 at 11:00.
27 Oct and 7 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Aug 2025 at 10:00.
27 Oct and 7 Nov 2025
Cadent Gas were proposing to carry out Utility asset works on Masefield Avenue, Stanmore.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 10:23.
27 Oct and 21 Nov 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Argyle Road, North Finchley, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 19 Aug 2025 at 10:29.
27 Oct and 21 Nov 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Argyle Road, North Finchley, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 19 Aug 2025 at 14:05.
27 and 31 Oct 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Wood Street, Barnet.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 23 Jul 2025 at 15:20.
27 Oct and 14 Nov 2025
Affinity Water were proposing to carry out Utility asset works on Regina Close, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 14 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 6 Aug 2025 at 08:22.
27 and 29 Oct 2025
BT are proposing to carry out Utility repair and maintenance works on Camlet Way, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 13 Aug 2025 at 14:04.
27 and 31 Oct 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Drop Lane, Bricket Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 27 Aug 2025 at 08:31.
28 and 30 Oct 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Hartsbourne Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 3 Jul 2025 at 14:24.
31 Oct and 4 Nov 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Dancers Hill Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 27 Aug 2025 at 09:06.
3 and 17 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Aug 2025 at 12:00.
3 and 17 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Chenduit Way, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Aug 2025 at 11:00.
3 and 25 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2025 at 09:04.
3 and 25 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2025 at 09:35.
3 and 25 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2025 at 13:41.
3 and 25 Nov 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 25 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2025 at 10:15.
3 and 25 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Watford Way, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 13:19.
3 and 25 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Watford Way, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:18.
3 and 25 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Edgware Way, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 13:21.
3 and 25 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Edgware Way, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:18.
3 and 25 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Barnet Way, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 13:21.
3 and 25 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Barnet Way, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:18.
3 and 25 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Northway Circus, Apex Corner, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 13:20.
3 and 25 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Northway Circus, Apex Corner, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:17.
3 Nov and 5 Dec 2025
Affinity Water were proposing to carry out Utility asset works on Cavendish Road, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 5 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 13 Aug 2025 at 10:32.
3 Nov and 19 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Dancers Hill Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 19 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 29 Aug 2025 at 08:51.
3 Nov and 19 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Rectory Lane, Shenley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 10:33.
3 Nov and 5 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Black Lion Hill, Shenley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 5 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 14 Aug 2025 at 10:17.
3 and 8 Nov 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on London Colney Bypass, St Albans.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 8 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 12:24.
3 and 8 Nov 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on London Colney Bypass, St Albans.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 8 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 29 May 2025 at 09:14.
10 and 12 Nov 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Hartley Avenue, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2025 at 13:20.
10 Nov and 26 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Old Redding, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 26 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Jun 2025 at 09:40.
10 and 12 Nov 2025
BT were proposing to carry out Utility asset works on Barnet Lane, Totteridge, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 November 2025 and run through until 12 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 8 Aug 2025 at 16:01.
10 and 12 Nov 2025
BT are proposing to carry out Utility asset works on Barnet Lane, Totteridge, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 22 Aug 2025 at 12:39.
10 Nov 2025 and 16 Jan 2026
Affinity Water are proposing to carry out Utility asset works on Granville Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 16 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 20 Jun 2025 at 10:44.
10 Nov and 12 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Black Lion Hill, Shenley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 13:00.
10 and 15 Nov 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on London Colney Bypass, St Albans.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 2 May 2025 at 11:45.
14 and 21 Nov 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Berkeley Crescent, New Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Aug 2025 at 08:26.
17 and 21 Nov 2025
Affinity Water are proposing to carry out roadworks on Silverston Way, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 18 Aug 2025 at 13:26.
17 and 21 Nov 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Silverston Way, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 18 Aug 2025 at 14:36.
17 Nov and 12 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Greyfell Close, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 15:00.
17 Nov and 12 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Stangate Gardens, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 14:30.
17 Nov and 12 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Hewett Close, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 14:30.
17 Nov 2025 and 16 Jan 2026
Cadent Gas are proposing to carry out Utility asset works on Stanmore Hill, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 16 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 14:30.
17 and 22 Nov 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Lawrence Street, Mill Hill, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 November 2025 and run through until 22 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2025 at 15:33.
17 Nov and 5 Dec 2025
Affinity Water are proposing to carry out Utility asset works on Argyle Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 21 Aug 2025 at 09:17.
21 and 25 Nov 2025
Virgin Media are proposing to carry out Utility asset works on Crescent Road, Church End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 21 Aug 2025 at 10:09.
21 and 25 Nov 2025
Virgin Media are proposing to carry out Utility asset works on Dollis Road, Church End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 21 Aug 2025 at 08:56.
24 and 26 Nov 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Lawrence Street, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 22 Aug 2025 at 10:55.
24 and 26 Nov 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Highwood Hill, Holcombe Hill To Marsh Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 22 Aug 2025 at 10:55.
24 and 27 Nov 2025
Affinity Water are proposing to carry out Utility asset works on Loom Lane, Radlett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 8 Jul 2025 at 08:52.
1 and 13 Dec 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Fryent Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 13 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 26 Aug 2025 at 09:20.
1 and 3 Dec 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Pinner Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 27 Aug 2025 at 13:30.
1 and 19 Dec 2025
Affinity Water are proposing to carry out Utility asset works on Kings Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 21 Aug 2025 at 09:17.
1 Dec 2025 and 23 Jan 2026
Affinity Water were proposing to carry out Utility asset works on Kings Road, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 December 2025 and run through until 23 January 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 13 Aug 2025 at 10:33.
1 and 5 Dec 2025
BT were proposing to carry out Utility repair and maintenance works on Christ Church Lane, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 December 2025 and run through until 5 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 2 Sep 2025 at 14:04.
1 and 5 Dec 2025
BT are proposing to carry out Utility repair and maintenance works on Christ Church Lane, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 2 Sep 2025 at 14:30.
Roadworks Map near to Cardinal Avenue, BOREHAMWOOD, WD6 1ST (Loading...)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Cardinal Avenue, BOREHAMWOOD, WD6 1ST (10 Events)
(Scheduled Dates)
(miles)
(Scheduled: 1 Sep 2025 - 5 Sep 2025)
(Scheduled: 1 Sep 2025 - 5 Sep 2025)
(Scheduled: 2 Sep 2025 - 4 Sep 2025)
(Scheduled: 1 Sep 2025 - 3 Sep 2025)
(Scheduled: 21 Aug 2025 - 3 Sep 2025)
Contains public sector information licensed under the Open Government Licence v3.0.