ROADWORKS SUMMARY
WD3 1XQ
Introduction
View current and future planned roadworks and road closures for WD3 1XQ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to WD3 1XQ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
18 Mar 2025
Thames Water are carrying out Utility repair and maintenance works on M25 J19 Leave E, Three Rivers.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 March 2023 at 23:25 and could run through until 18 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 17 Mar 2023 at 23:22.
30 Jul 2024
Hertfordshire County Council are carrying out roadworks on Westland Road, Watford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 May 2023 at 08:00 and could run through until 30 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 8 Jan 2024 at 10:58.
28 Jun 2024
Affinity Water are carrying out Utility asset works on Rickmansworth Road, Northwood.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 January 2024 at 13:12 and could run through until 28 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 24 Apr 2024 at 15:30.
10 Jun 2024
Thames Water are carrying out Utility asset works on Denham Way, Maple Cross.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 February 2024 at 10:00 and could run through until 10 June 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 25 Apr 2024 at 11:54.
Tomorrow
Cadent Gas are carrying out Utility asset works on Berry Lane, Rickmansworth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 March 2024 at 07:58 and could run through until 28 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 19 Apr 2024 at 14:47.
10 May 2024
Affinity Water are carrying out Utility asset works on Hayling Road, Hayling, South Oxhey.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 March 2024 at 08:40 and could run through until 10 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 24 Apr 2024 at 14:28.
Tuesday
Cadent Gas are proposing to carry out Utility asset works on Denham Lane, Chalfont St Peter.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 30 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Mar 2024 at 15:22.
28 Jun 2024
Cadent Gas are carrying out Utility asset works on Berry Lane, Rickmansworth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 07:48 and could run through until 28 June 2024. The works will impact the carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 15 Apr 2024 at 07:50.
9 Jun 2024
Cadent Gas are carrying out Utility asset works on Cuckoo Hill, Eastcote.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 08:13 and could run through until 9 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Apr 2024 at 08:21.
6 May 2024
Thames Water are carrying out Utility repair and maintenance works on High Street, Chalfont St Peter.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 16:00 and could run through until 6 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Apr 2024 at 07:21.
6 May 2024
Thames Water are carrying out Utility repair and maintenance works on Chalfont St Peter Bypass, Chalfont St Peter.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 16:00 and could run through until 6 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Apr 2024 at 07:12.
13 Jun 2024
Cadent Gas are carrying out Utility asset works on Appletree Walk, Watford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 April 2024 at 11:24 and could run through until 13 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 22 Apr 2024 at 11:26.
Monday
Cadent Gas are carrying out Utility asset works on Dog Kennel Lane, Chorleywood.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 April 2024 at 08:09 and could run through until 29 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 08:44.
10 May 2024
Thames Water are carrying out Utility repair and maintenance works on Stag Lane, Chorleywood.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 April 2024 at 08:30 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Apr 2024 at 09:57.
27 Apr and 12 May 2024
Hertfordshire County Council are proposing to carry out roadworks on Clarendon Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2024 and could run through until 12 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 2 Apr 2024 at 12:59.
27 Apr and 19 May 2024
BT are proposing to carry out Utility asset works on Pinner Hill Road, Pinner.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 28 Mar 2024 at 15:01.
28 Apr and 16 May 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Meadow Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 16 May 2024. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 19 Apr 2024 at 12:42.
28 Apr and 23 May 2024
Cadent Gas are proposing to carry out Utility asset works on Chestnut Walk, Watford.
These works are categorised as Major.
There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.
The works will start on or after 28 April 2024 and could run through until 23 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Apr 2024 at 13:08.
29 Apr and 5 May 2024
Hertfordshire County Council are proposing to carry out Highway improvement works on Hagden Lane, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 5 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 27 Mar 2024 at 08:37.
2 and 7 May 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Turnberry Court, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 May 2024 and could run through until 7 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 28 Mar 2024 at 13:59.
4 and 15 May 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Kings Close, Chalfont St Giles.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 May 2024 and could run through until 15 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 29 Jan 2024 at 13:22.
6 May and 11 Aug 2024
Hertfordshire County Council are proposing to carry out Works for road purposes on Little Green Lane, Croxley Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 11 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 18 Apr 2024 at 15:15.
6 and 9 May 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Denham Way, Maple Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 9 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 5 Apr 2024 at 14:44.
7 and 30 May 2024
Leep Utilities Electric are proposing to carry out New service connection on Meriden Way, Watford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leep Utilities Electric on 12 Apr 2024 at 09:38.
8 and 12 May 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Harefield Road, East, Rickmansworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 May 2024 and could run through until 12 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 26 Apr 2024 at 14:36.
12 May and 9 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Barrow Point Lane, Pinner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 9 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Apr 2024 at 09:10.
12 May and 22 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Courtlands Drive, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 22 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 26 Apr 2024 at 08:05.
12 and 27 May 2024
Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Pinner.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 27 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 23:10.
12 May and 2 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Upper Highway, Abbots Langley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 2 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 23:10.
12 and 16 May 2024
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Leggatts Wood Avenue, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 16 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Apr 2024 at 10:28.
12 and 16 May 2024
Cadent Gas are proposing to carry out New service connection on Cherry Tree Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 16 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Apr 2024 at 10:29.
13 and 17 May 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Albury Drive, Pinner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 17 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 26 Apr 2024 at 08:49.
13 and 15 May 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Souldern Street, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 15 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 18 Apr 2024 at 10:44.
13 and 15 May 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Banbury Street, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 15 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 18 Apr 2024 at 10:43.
13 May and 4 Jun 2024
Leep Utilities Electric are proposing to carry out New service connection on Garsmouth Way, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 4 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leep Utilities Electric on 12 Apr 2024 at 09:41.
13 and 15 May 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Queens Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 15 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 23 Apr 2024 at 08:58.
14 and 16 May 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Old Uxbridge Road, West Hyde.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2024 and could run through until 16 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 11 Apr 2024 at 08:44.
14 and 16 May 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Aynho Street, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2024 and could run through until 16 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 18 Apr 2024 at 10:41.
14 and 16 May 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Packhorse Road, Gerrards Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2024 and could run through until 16 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 31 Jan 2024 at 14:14.
18 May and 11 Jun 2024
Leep Utilities Electric are proposing to carry out New service connection on Phillipers, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 May 2024 and could run through until 11 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leep Utilities Electric on 12 Apr 2024 at 09:42.
20 and 22 May 2024
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Roughwood Lane, Chalfont St Giles.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 22 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 21 Feb 2024 at 16:51.
20 and 29 May 2024
BT are proposing to carry out Utility asset works on Bottom Lane, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 29 May 2024. The works will impact the verge only.
This roadwork event was last updated by BT on 25 Apr 2024 at 08:32.
20 May and 12 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on Barton Way, Croxley Green.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Mar 2024 at 12:39.
20 and 23 May 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Evans Avenue, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 23 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 24 Apr 2024 at 07:18.
22 and 29 May 2024
BT are proposing to carry out Utility asset works on Bottom Lane, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2024 and could run through until 29 May 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 21 Feb 2024 at 07:37.
22 and 24 May 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Oval Way, Chalfont St Peter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 31 Jan 2024 at 14:26.
27 and 29 May 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Bucks Hill, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 29 May 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 26 Apr 2024 at 15:28.
27 May and 5 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on Berry Lane, Rickmansworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 5 July 2024. The works will impact the carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 18 Apr 2024 at 09:43.
27 May and 5 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on Long Elms, Abbots Langley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 5 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Mar 2024 at 09:19.
28 May and 2 Jun 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on The Green, Croxley Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 2 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 12 Mar 2024 at 11:59.
30 May and 3 Jun 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on The Green, Chalfont St Giles.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 31 Jan 2024 at 14:40.
1 and 3 Jun 2024
Hertfordshire County Council are proposing to carry out roadworks on Clarendon Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2024 and could run through until 3 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 24 Apr 2024 at 12:19.
3 Jun and 16 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Sheepcot Lane, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 16 August 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 2 Feb 2024 at 12:58.
3 and 16 Jun 2024
Hertfordshire County Council are proposing to carry out Highway improvement works on Gallows Hill, Abbots Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 16 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 14 Mar 2024 at 09:30.
4 and 7 Jun 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Belgrave Avenue, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2024 and could run through until 7 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 15 Mar 2024 at 11:44.
4 and 7 Jun 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Hagden Lane, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2024 and could run through until 7 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 15 Mar 2024 at 09:53.
9 Jun and 14 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on Love Lane, Pinner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2024 and could run through until 14 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Apr 2024 at 09:09.
9 Jun and 25 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on Fuller Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2024 and could run through until 25 July 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 25 Apr 2024 at 12:13.
10 and 28 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Hornhill Road, Maple Cross.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Apr 2024 at 11:56.
16 Jun and 3 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Chapel Close, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2024 and could run through until 3 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Apr 2024 at 08:17.
18 Jun and 12 Jul 2024
Leep Utilities Electric are proposing to carry out New service connection on Otterspool Way, Watford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2024 and could run through until 12 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leep Utilities Electric on 5 Mar 2024 at 14:52.
20 and 24 Jun 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Amersham Road, Chalfont St Giles.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2024 and could run through until 24 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 14 Mar 2024 at 08:31.
23 and 25 Jun 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Oxhey Lane, Carpenders Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2024 and could run through until 25 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 17 Apr 2024 at 10:29.
24 Jun and 14 Aug 2024
Cadent Gas are proposing to carry out Highway repair and maintenance works on Catlins Lane, Eastcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 14 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Apr 2024 at 13:16.
24 and 26 Jun 2024
BT are proposing to carry out Utility repair and maintenance works on Marsham Lane, Gerrards Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 26 June 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 17 Apr 2024 at 08:43.
25 Jun and 17 Jul 2024
Leep Utilities Electric are proposing to carry out New service connection on Berry Grove Lane, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2024 and could run through until 17 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leep Utilities Electric on 5 Mar 2024 at 14:57.
27 and 29 Jun 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Orphanage Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 June 2024 and could run through until 29 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 23 Apr 2024 at 09:43.
27 and 29 Jun 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Langleybury Lane, Langleybury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 June 2024 and could run through until 29 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 18 Apr 2024 at 14:44.
29 Jun and 30 Jul 2024
Leep Utilities Electric are proposing to carry out New service connection on Berry Grove Lane, Bushey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 June 2024 and could run through until 30 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leep Utilities Electric on 5 Mar 2024 at 15:03.
29 Jun and 30 Jul 2024
Leep Utilities Electric are proposing to carry out New service connection on Bushey Mill Lane, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 June 2024 and could run through until 30 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leep Utilities Electric on 5 Mar 2024 at 15:08.
1 Jul and 2 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Berry Lane, Rickmansworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 2 August 2024. The works will impact the carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 18 Apr 2024 at 09:43.
2 and 4 Jul 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on South Park, Gerrards Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 July 2024 and could run through until 4 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 23 Apr 2024 at 08:10.
4 and 8 Jul 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Roughwood Lane, Chalfont St Giles.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 July 2024 and could run through until 8 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 12 Mar 2024 at 13:18.
4 and 9 Jul 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Watford Road, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 July 2024 and could run through until 9 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 20 Feb 2024 at 14:38.
7 and 9 Jul 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Berry Lane, Rickmansworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2024 and could run through until 9 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 11 Apr 2024 at 08:48.
8 and 12 Jul 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Bucks Hill, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2024 and could run through until 12 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 18 Apr 2024 at 09:14.
9 and 11 Jul 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Village Road, Chenies.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2024 and could run through until 11 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 6 Mar 2024 at 12:00.
14 and 18 Jul 2024
Affinity Water are proposing to carry out Remedial works on Bucks Hill, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2024 and could run through until 18 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 15 Apr 2024 at 10:27.
14 and 16 Jul 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Croft Lane, Chipperfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2024 and could run through until 16 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 23 Apr 2024 at 09:14.
15 and 18 Jul 2024
Buckinghamshire Council are proposing to carry out Core Sampling on White Lion Road, Little Chalfont.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 18 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 23 Apr 2024 at 08:33.
15 and 18 Jul 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Healey Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 18 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 18 Apr 2024 at 08:15.
16 and 18 Jul 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Melbourne Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2024 and could run through until 18 July 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 24 Apr 2024 at 12:22.
16 and 18 Jul 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Moor Lane Crossing, Rickmansworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2024 and could run through until 18 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 24 Apr 2024 at 10:14.
16 and 19 Jul 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Bulstrode Way, Gerrards Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2024 and could run through until 19 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 14 Mar 2024 at 13:23.
17 and 19 Jul 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Southill Lane, Eastcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2024 and could run through until 19 July 2024. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 24 Apr 2024 at 14:38.
22 and 26 Jul 2024
Buckinghamshire Council are proposing to carry out Core Sampling on Village Road, Chenies.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 23 Apr 2024 at 08:30.
22 and 26 Jul 2024
Buckinghamshire Council are proposing to carry out Core Sampling on Roughwood Lane, Chalfont St Giles.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 23 Apr 2024 at 10:08.
22 Jul and 16 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Hazelwood Lane, Abbots Langley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 16 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Apr 2024 at 11:50.
23 and 26 Jul 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Romilly Drive, Carpenders Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 18 Apr 2024 at 11:23.
Roadworks Map near to WD3 1XQ
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to WD3 1XQ (1 Events)
(Scheduled Dates)
(miles)
(Scheduled: 22 Apr 2024 - 7 May 2024)
Contains public sector information licensed under the Open Government Licence v3.0.