ROADWORKS SUMMARY
Anglian Close, WATFORD, WD24 4RF
Introduction

View current and future planned roadworks and road closures for Anglian Close, WD24 4RF and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Anglian Close, WATFORD, WD24 4RF
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Anglian Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
13 Sep 2025
Hertfordshire County Council are carrying out roadworks on Aerodrome Way, Leavesden.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 09:00 and could run through until 13 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Hertfordshire County Council on 19 May 2025 at 11:09.
23 Jun and 12 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Rushton Avenue, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 14:29.
29 Sep 2025
Cadent Gas are carrying out Utility asset works on Rushton Avenue, Watford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 July 2025 at 10:41 and could run through until 29 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Jul 2025 at 15:42.
19 Sep 2025
Hertfordshire County Council are carrying out Highway repair and maintenance works on Tylers Way, Watford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 July 2025 at 09:30 and could run through until 19 September 2025. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 20 Aug 2025 at 14:53.
Friday
Cadent Gas were proposing to carry out Utility asset works on The Avenue, Bushey.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Aug 2025 at 08:55.
28 Jul and 3 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Bushey Hall Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 18 Jun 2025 at 11:50.
Tuesday
Cadent Gas are proposing to carry out Utility repair and maintenance works on Station Road, Bricket Wood.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 9 September 2025. The works will impact the verge only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 12 Jun 2025 at 15:11.
4 Aug and 3 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:13.
4 Aug and 3 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Jun 2025 at 16:10.
4 Aug and 15 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Old Redding, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:12.
4 Aug and 15 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Old Redding, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Jun 2025 at 16:05.
4 Aug and 3 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Common Road, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:14.
4 Aug and 3 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Common Road, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Jun 2025 at 09:57.
5 Aug and 12 Sep 2025
Cadent Gas are proposing to carry out roadworks on Station Road, Bricket Wood.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 14:54.
Today
Affinity Water are proposing to carry out Utility repair and maintenance works on Abbots Road, Abbots Langley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 August 2025 and could run through until 3 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 20 Jun 2025 at 16:17.
19 Sep 2025
Affinity Water are carrying out Utility repair and maintenance works on Abbots Road, Abbots Langley.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 August 2025 at 10:15 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 2 Sep 2025 at 13:02.
13 Oct 2025
Cadent Gas are carrying out Utility asset works on Common Road, Stanmore.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 August 2025 at 08:00 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 09:16.
25 Aug and 12 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Chorleywood Road, Rickmansworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Mar 2025 at 09:30.
Friday
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility asset works on High Street, Abbots Langley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 August 2025 and run through until 5 September 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 24 Jul 2025 at 14:53.
16 Sep 2025
Affinity Water are carrying out Utility repair and maintenance works on St Lawrence Close, Abbots Langley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 August 2025 at 12:00 and could run through until 16 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 27 Aug 2025 at 09:36.
10 Sep 2025
Affinity Water are carrying out Utility repair and maintenance works on Hempstead Road, Kings Langley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 August 2025 at 10:10 and could run through until 10 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 2 Sep 2025 at 09:43.
Network Rail carried out Works for Rail Purposes on Hunton Bridge Hill, Hunton Bridge.
The road was closed for some or all of the period.
The works were originally planned between 30 Aug 2025 and 3 Sep 2025 and were actually completed between 30 Aug 2025 (21:00) and 3 Sep 2025 (05:00). The works impacted the carriageway only.
This roadwork event was last updated by Network Rail on 3 Sep 2025 at 09:01.
1 Sep and 21 Nov 2025
Affinity Water are proposing to carry out Utility asset works on Meredith Close, Hatch End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 8 Jul 2025 at 13:37.
1 Sep and 21 Nov 2025
Affinity Water are proposing to carry out Utility asset works on Meredith Close, Hatch End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 7 Aug 2025 at 14:17.
21 Nov 2025
Affinity Water are carrying out Utility asset works on Meredith Close, Hatch End.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 11:32 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 1 Sep 2025 at 11:39.
12 Sep 2025
Thames Water are carrying out Utility repair and maintenance works on The Avenue, Hatch End.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 13:00 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Sep 2025 at 12:18.
Tomorrow
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sandy Lane, Northwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 4 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 24 Jun 2025 at 13:45.
Tomorrow
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sandy Lane, Northwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 4 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 8 Jul 2025 at 11:01.
1 and 26 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Nightingale Road, Rickmansworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Jun 2025 at 11:21.
1 and 26 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Nightingale Road, Rickmansworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 16:20.
1 and 19 Sep 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Church Street, Rickmansworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 21 Jan 2025 at 14:26.
19 Sep 2025
Hertfordshire County Council are carrying out Highway improvement works on Church Street, Rickmansworth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 09:30 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 2 Sep 2025 at 13:49.
1 and 19 Sep 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Talbot Road, Rickmansworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 21 Jan 2025 at 14:24.
19 Sep 2025
Hertfordshire County Council are carrying out Highway improvement works on Talbot Road, Rickmansworth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 09:30 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 2 Sep 2025 at 13:49.
1 and 19 Sep 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on High Street, Rickmansworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 21 Jan 2025 at 14:25.
19 Sep 2025
Hertfordshire County Council are carrying out Highway improvement works on High Street, Rickmansworth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 09:30 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 2 Sep 2025 at 13:49.
1 and 19 Sep 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Northway, Rickmansworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 21 Jan 2025 at 14:24.
19 Sep 2025
Hertfordshire County Council are carrying out Highway improvement works on Northway, Rickmansworth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 09:30 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 2 Sep 2025 at 13:50.
1 and 19 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Nightingale Road, Rickmansworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Jul 2025 at 09:48.
19 Sep 2025
Cadent Gas are carrying out Utility asset works on Nightingale Road, Rickmansworth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 13:30 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 13:37.
12 Dec 2025
Cadent Gas are carrying out Utility asset works on Chorleywood Road, Rickmansworth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 13:30 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 13:33.
1 and 12 Sep 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Drop Lane, Bricket Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 31 Jul 2025 at 13:40.
Friday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Watford Road, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 9 May 2025 at 14:50.
Friday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on High Street, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 9 May 2025 at 14:48.
Friday
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on London Road, Hemel Hempstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 5 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 16:26.
Friday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Hempstead Road, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 9 May 2025 at 14:28.
Friday
Hertfordshire County Council are carrying out Highway repair and maintenance works on Hempstead Road, Kings Langley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 20:00 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 2 Sep 2025 at 10:21.
3 and 17 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Little Oxhey Lane, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Jul 2025 at 10:17.
18 Sep 2025
Hertfordshire County Council are carrying out Highway repair and maintenance works on Little Oxhey Lane, South Oxhey.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 September 2025 at 09:30 and could run through until 18 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 3 Sep 2025 at 10:54.
3 and 17 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Prestwick Road, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Jul 2025 at 10:12.
18 Sep 2025
Hertfordshire County Council are carrying out Highway repair and maintenance works on Prestwick Road, South Oxhey.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 September 2025 at 09:30 and could run through until 18 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 3 Sep 2025 at 10:53.
11 Sep 2025
Cadent Gas are carrying out Utility repair and maintenance works on Elstree Hill North, Elstree.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 September 2025 at 13:12 and could run through until 11 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 13:15.
Saturday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Watling Street, Elstree.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2025 and could run through until 6 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 27 May 2025 at 10:30.
Saturday
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Dennis Lane, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 September 2025 and could run through until 6 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 26 Jun 2025 at 16:02.
Monday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Windmill Lane, Bushey Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 September 2025 and could run through until 8 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 9 Jun 2025 at 09:16.
Monday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Grange Lane, Letchmore Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 September 2025 and could run through until 8 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 9 Jun 2025 at 09:15.
8 and 10 Sep 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Ducks Hill Road, Northwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 6 Jun 2025 at 11:01.
8 and 10 Sep 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Ducks Hill Road, Northwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 25 Jun 2025 at 07:59.
8 and 10 Sep 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Ducks Hill Road, Northwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 9 Jul 2025 at 09:30.
8 and 10 Sep 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Ducks Hill Road, Northwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 28 Aug 2025 at 13:26.
8 Sep and 9 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Jun 2025 at 09:40.
8 Sep and 7 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Jul 2025 at 14:14.
8 and 10 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Beethoven Road, Elstree.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 4 Aug 2025 at 13:29.
8 and 10 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Beethoven Road, Elstree.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Aug 2025 at 11:58.
9 and 12 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Langleybury Lane, Langleybury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2025 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 11 Aug 2025 at 11:49.
15 and 17 Sep 2025
BT are proposing to carry out Utility asset works on Copse Wood Way, Northwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 25 Jun 2025 at 08:00.
15 and 17 Sep 2025
BT are proposing to carry out Utility asset works on Copse Wood Way, Northwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 9 Jul 2025 at 09:30.
15 and 17 Sep 2025
BT are proposing to carry out Utility asset works on Copse Wood Way, Northwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 2 Sep 2025 at 15:32.
15 Sep and 6 Oct 2025
Hertfordshire County Council are proposing to carry out Section 50 on Foxgrove Path, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 11 Aug 2025 at 12:16.
15 Sep and 10 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Nightingale Road, Rickmansworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Aug 2025 at 09:10.
15 Sep and 28 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on The Drive, Rickmansworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 13:37.
15 Sep and 19 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Rickmansworth Road, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Jun 2025 at 10:39.
15 and 17 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Hempstead Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 28 Aug 2025 at 10:10.
15 and 17 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Mandeville Close, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 6 May 2025 at 14:36.
15 and 17 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Norfolk Avenue, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 23 Apr 2025 at 10:59.
16 and 18 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sycamore Close, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 6 May 2025 at 14:28.
17 and 19 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sixth Avenue, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 2 May 2025 at 10:28.
17 and 19 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Garston Drive, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 8 May 2025 at 11:54.
17 and 19 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Gwent Close, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 23 Apr 2025 at 11:02.
17 Sep and 6 Oct 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Abbots Road, Abbots Langley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 17 Jun 2025 at 15:26.
17 Sep and 6 Oct 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Abbots Road, Abbots Langley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 19 Jun 2025 at 12:43.
18 and 22 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Albans View, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 7 May 2025 at 15:01.
22 Sep and 13 Oct 2025
Hertfordshire County Council are proposing to carry out Section 50 on Heysham Drive, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 29 Aug 2025 at 11:32.
22 Sep and 13 Oct 2025
Hertfordshire County Council are proposing to carry out Section 50 on Heysham Drive, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 29 Aug 2025 at 11:36.
22 Sep and 13 Oct 2025
Hertfordshire County Council are proposing to carry out Section 50 on Foxgrove Path, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 19 Aug 2025 at 14:34.
22 Sep and 6 Oct 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Prestwick Road, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Jul 2025 at 10:21.
22 Sep and 6 Oct 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Prestwick Road, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 13 Aug 2025 at 16:36.
22 Sep and 6 Oct 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Hayling Road, Hayling, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Jul 2025 at 10:27.
22 Sep and 6 Oct 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Hayling Road, Hayling, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 13 Aug 2025 at 16:35.
22 Sep and 10 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Park Way, Rickmansworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Mar 2025 at 11:43.
22 Sep and 6 Oct 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Brookdene Avenue, Oxhey Hall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Jul 2025 at 10:23.
22 Sep and 6 Oct 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Brookdene Avenue, Oxhey Hall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 13 Aug 2025 at 16:36.
22 and 24 Sep 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Kenilworth Drive, Croxley Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 19 Jun 2025 at 16:01.
22 and 24 Sep 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Kenilworth Drive, Croxley Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 6 Aug 2025 at 12:30.
22 and 24 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Mandeville Close, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 8 Aug 2025 at 13:17.
22 and 24 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Norfolk Avenue, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Aug 2025 at 14:49.
22 Sep and 11 Oct 2025
Hertfordshire County Council are proposing to carry out roadworks on York Way, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 1 Sep 2025 at 13:17.
22 and 28 Sep 2025
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Louvain Way, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 28 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 21 Jul 2025 at 15:11.
22 and 28 Sep 2025
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Louvain Way, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 28 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 7 Aug 2025 at 15:27.
23 and 26 Sep 2025
Affinity Water are proposing to carry out Utility asset works on The Courtway, Carpenders Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 2 Jul 2025 at 10:22.
23 and 25 Sep 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Mandeville Close, Watford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 September 2025 and run through until 25 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 Apr 2025 at 15:38.
23 and 25 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sycamore Close, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Aug 2025 at 14:48.
24 and 26 Sep 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Elm Avenue, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 15 Jul 2025 at 10:43.
24 and 26 Sep 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Norfolk Avenue, Watford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 Apr 2025 at 15:41.
24 and 26 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sixth Avenue, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Aug 2025 at 14:58.
24 and 26 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Garston Drive, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Aug 2025 at 08:41.
24 and 26 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Gwent Close, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Aug 2025 at 08:44.
25 and 27 Sep 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Sixth Avenue, Watford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 September 2025 and run through until 27 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 Apr 2025 at 15:44.
25 and 27 Sep 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Sycamore Close, Watford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 September 2025 and run through until 27 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 Apr 2025 at 15:42.
25 and 27 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Pippins, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Aug 2025 at 08:45.
25 and 27 Sep 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Gwent Close, Watford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 September 2025 and run through until 27 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 Apr 2025 at 15:45.
25 and 27 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Albans View, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Aug 2025 at 14:49.
25 and 27 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Love Lane, Abbots Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 1 Sep 2025 at 10:21.
26 and 28 Sep 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Garston Drive, Watford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 September 2025 and run through until 28 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 Apr 2025 at 15:48.
26 and 28 Sep 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Albans View, Watford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 September 2025 and run through until 28 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 Apr 2025 at 15:49.
26 and 28 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Garden Road, Bulls Green, Abbots Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Apr 2025 at 14:57.
27 and 29 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Kindersley Way, Abbots Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 Apr 2025 at 11:52.
27 and 29 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Manor House Gardens, Abbots Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 Apr 2025 at 11:39.
29 Sep and 31 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Meadow Way, Rickmansworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 16:44.
29 Sep and 3 Oct 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on High Street, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 19 Aug 2025 at 11:13.
29 Sep and 4 Oct 2025
Hertfordshire County Council are proposing to carry out roadworks on Meriden Way, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 4 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 29 Aug 2025 at 12:19.
29 Sep and 4 Oct 2025
Hertfordshire County Council are proposing to carry out roadworks on The Gossamers, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 4 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 29 Aug 2025 at 12:19.
29 Sep and 1 Oct 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on St Lawrence Way, Bricket Wood.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 16 Apr 2025 at 10:24.
29 Sep and 1 Oct 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Beechfield, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 Apr 2025 at 12:57.
29 Sep and 1 Oct 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Love Lane, Abbots Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 Apr 2025 at 11:44.
30 Sep and 2 Oct 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Compton Place, Carpenders Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 1 Jul 2025 at 11:53.
30 Sep and 2 Oct 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Le Corte Close, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 Apr 2025 at 13:37.
6 and 13 Oct 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on The Courtway, Carpenders Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Jul 2025 at 11:58.
6 and 13 Oct 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on The Courtway, Carpenders Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jul 2025 at 11:29.
6 and 13 Oct 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on The Courtway, Carpenders Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Aug 2025 at 09:49.
6 and 24 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Elm Way, Rickmansworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Mar 2025 at 14:32.
6 and 8 Oct 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Loudwater Lane, Loudwater.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 Aug 2025 at 09:41.
6 and 8 Oct 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on The Square, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 15 Jul 2025 at 10:50.
6 Oct and 7 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Gullet Wood Road, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 12:14.
7 and 9 Oct 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Hartsbourne Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 3 Jul 2025 at 10:08.
7 and 24 Oct 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Abbots Road, Abbots Langley.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 October 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Affinity Water on 17 Jun 2025 at 10:55.
7 and 24 Oct 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Abbots Road, Abbots Langley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 24 Jun 2025 at 11:17.
7 and 24 Oct 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Abbots Road, Abbots Langley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 24 Jun 2025 at 11:56.
13 and 24 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Jellicoe Gardens, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Aug 2025 at 09:30.
13 Oct and 7 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Cedars Avenue, Rickmansworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Jun 2025 at 12:54.
13 and 15 Oct 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Lower Paddock Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 15 Jul 2025 at 14:24.
13 and 15 Oct 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Lower Paddock Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 2 Sep 2025 at 10:36.
13 and 18 Oct 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Brocklesbury Close, Watford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 October 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Jul 2025 at 09:02.
15 and 17 Oct 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Langley Hill, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 16 Jul 2025 at 10:44.
20 and 24 Oct 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Brocklesbury Close, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 Jul 2025 at 14:17.
20 and 24 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Radlett Road, Watford.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the cycleway only.
This roadwork event was last updated by Cadent Gas on 25 Jul 2025 at 10:50.
20 and 23 Oct 2025
Hertfordshire County Council are proposing to carry out Section 50 on Hempstead Road, Hunton Bridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 20 Aug 2025 at 12:44.
20 and 23 Oct 2025
Hertfordshire County Council are proposing to carry out Section 50 on Hempstead Road, Hunton Bridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 20 Aug 2025 at 21:21.
20 Oct and 9 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on North Orbital Road, Watford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 9 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 10:30.
21 and 24 Oct 2025
Affinity Water are proposing to carry out Utility asset works on The Green, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 22 Aug 2025 at 14:36.
22 and 24 Oct 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Common Lane, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 16 Jul 2025 at 10:20.
24 and 27 Oct 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Eastbury Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 15 Jul 2025 at 15:15.
24 Oct and 6 Nov 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Verulam Passage, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 15 May 2025 at 11:09.
24 Oct 2025 and 13 Feb 2026
Hertfordshire County Council are proposing to carry out Highway improvement works on Verulam Passage, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2025 and could run through until 13 February 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 20 Aug 2025 at 09:08.
24 Oct and 6 Nov 2025
Hertfordshire County Council are proposing to carry out New service connection on Station Road, Watford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 May 2025 at 12:01.
24 Oct and 6 Nov 2025
Hertfordshire County Council are proposing to carry out New service connection on Station Road, Watford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 20 Aug 2025 at 09:08.
25 Oct and 11 Nov 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Abbots Road, Abbots Langley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 11 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 24 Jun 2025 at 09:47.
25 Oct and 11 Nov 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Abbots Road, Abbots Langley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 11 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 24 Jun 2025 at 10:54.
26 and 31 Oct 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Langley Lane, Abbots Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 18 Aug 2025 at 15:27.
27 Oct and 7 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Potter Street Hill, Pinner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Sep 2025 at 14:12.
27 Oct and 7 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Chartley Avenue, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Aug 2025 at 11:00.
27 Oct and 7 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Aug 2025 at 10:00.
27 Oct and 7 Nov 2025
Cadent Gas were proposing to carry out Utility asset works on Masefield Avenue, Stanmore.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 10:23.
27 Oct 2025 and 30 Jan 2026
Cadent Gas are proposing to carry out Utility asset works on The Drive, Rickmansworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 30 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Jul 2025 at 15:32.
27 Oct and 28 Nov 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Baldwins Lane, Croxley Green.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 19 Aug 2025 at 15:17.
27 and 31 Oct 2025
T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Rickmansworth Road, Chorleywood.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by T-Mobile (UK) on 22 Jul 2025 at 11:45.
27 and 31 Oct 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Rickmansworth Road, Chorleywood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 20 Aug 2025 at 10:06.
27 Oct and 28 Nov 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Links Way, Croxley Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 23 Jul 2025 at 11:27.
27 Oct and 28 Nov 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Links Way, Croxley Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 20 Aug 2025 at 11:52.
27 Oct and 19 Nov 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Orphanage Road, Watford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 Aug 2025 at 10:39.
27 Oct and 21 Nov 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Orphanage Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 Aug 2025 at 10:53.
27 and 31 Oct 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on The Green, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jul 2025 at 09:55.
27 and 31 Oct 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on The Green, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Aug 2025 at 16:45.
27 and 31 Oct 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Drop Lane, Bricket Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 27 Aug 2025 at 08:31.
28 and 30 Oct 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Hartsbourne Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 3 Jul 2025 at 14:24.
28 and 30 Oct 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Eastbury Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 2 Jul 2025 at 14:56.
28 and 31 Oct 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Rickmansworth Road, Chorleywood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2025 and could run through until 31 October 2025. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 30 Jul 2025 at 15:33.
29 and 31 Oct 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Leaford Crescent, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 15 Jul 2025 at 10:48.
3 and 17 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Aug 2025 at 12:00.
3 and 7 Nov 2025
Cadent Gas were proposing to carry out Utility asset works on Sandy Lane, Northwood.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 17:24.
3 and 17 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Chenduit Way, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Aug 2025 at 11:00.
3 Nov and 5 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Money Hill Road, Rickmansworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Jun 2025 at 11:32.
3 and 7 Nov 2025
Affinity Water are proposing to carry out Utility asset works on High Street, Rickmansworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 12 Aug 2025 at 14:03.
3 and 21 Nov 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Dalton Way, Watford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 27 Jun 2025 at 15:16.
3 and 28 Nov 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Dalton Way, Watford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 9 Jul 2025 at 09:50.
3 and 29 Nov 2025
National Highways are proposing to carry out Highway improvement works on St Albans Road, Garston.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 21 Aug 2025 at 09:23.
10 and 12 Nov 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Holmdene Avenue, North Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 3 Sep 2025 at 12:06.
10 Nov and 26 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Old Redding, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 26 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Jun 2025 at 09:40.
10 and 12 Nov 2025
Network Rail are proposing to carry out Works for Rail Purposes on Elfrida Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 12 Aug 2025 at 14:47.
17 Nov 2025 and 23 Jan 2026
Affinity Water are proposing to carry out Remedial works on Scot Grove, Hatch End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 23 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 8 Jul 2025 at 13:33.
17 Nov 2025 and 23 Jan 2026
Affinity Water are proposing to carry out Remedial works on Scot Grove, Hatch End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 23 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 2 Sep 2025 at 14:05.
17 Nov and 12 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Greyfell Close, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 15:00.
17 Nov and 12 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Stangate Gardens, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 14:30.
17 Nov and 12 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Hewett Close, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 14:30.
17 Nov 2025 and 16 Jan 2026
Cadent Gas are proposing to carry out Utility asset works on Stanmore Hill, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 16 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 14:30.
17 and 21 Nov 2025
Affinity Water were proposing to carry out Utility asset works on The Green, Sarratt.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 November 2025 and run through until 21 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Affinity Water on 22 Aug 2025 at 14:32.
24 and 27 Nov 2025
Affinity Water are proposing to carry out Utility asset works on Loom Lane, Radlett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 8 Jul 2025 at 08:52.
1 and 3 Dec 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Pinner Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 27 Aug 2025 at 13:30.
1 and 5 Dec 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Toms Lane, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2025 at 14:55.
Roadworks Map near to Anglian Close, WATFORD, WD24 4RF (Loading...)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Anglian Close, WATFORD, WD24 4RF (28 Events)
(Scheduled Dates)
(miles)
(Scheduled: 4 Aug 2025 - 1 Nov 2025)
(Scheduled: 2 Sep 2025 - 8 Sep 2025)
(Scheduled: 3 Sep 2025 - 5 Sep 2025)
(Scheduled: 18 Aug 2025 - 7 Sep 2025)
Contains public sector information licensed under the Open Government Licence v3.0.