ROADWORKS SUMMARY
Cassiobury Drive, WATFORD, WD17 3AW
Introduction

View current and future planned roadworks and road closures for Cassiobury Drive, WD17 3AW and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Cassiobury Drive, WATFORD, WD17 3AW
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Cassiobury Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
8 Aug 2025
Hertfordshire County Council are carrying out Highway improvement works on Denham Way, Maple Cross.
These works are categorised as Major.
The works started on 3 February 2025 at 08:00 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 30 Apr 2025 at 09:56.
20 Jun 2025
Hertfordshire County Council are carrying out Highway repair and maintenance works on Tylers Way, Watford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 March 2025 at 09:30 and could run through until 20 June 2025. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 15 May 2025 at 10:37.
27 Jun 2025
Cadent Gas are carrying out Utility asset works on Loom Lane, Radlett.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 March 2025 at 10:18 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 May 2025 at 16:30.
20 Jun 2025
Cadent Gas are carrying out Utility asset works on Eastbury Avenue, Northwood.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 April 2025 at 09:59 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 May 2025 at 11:36.
28 Apr and 4 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Rushton Avenue, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 09:06.
28 Apr and 4 Jul 2025
Cadent Gas were proposing to carry out Utility asset works on Rushton Avenue, Watford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 April 2025 and run through until 4 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Jan 2025 at 11:01.
13 Jun 2025
Hertfordshire County Council are carrying out Highway improvement works on Denham Way, Maple Cross.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 29 April 2025 at 09:30 and could run through until 13 June 2025. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 28 May 2025 at 15:02.
5 May and 13 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Watford Road, Croxley Green.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 20 Dec 2024 at 10:57.
5 May and 13 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Watford Road, Croxley Green.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 10:22.
5 May and 13 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Watford Road, Croxley Green.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 10:24.
5 May and 13 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Watford Road, Croxley Green.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 11:31.
Thursday
Cadent Gas are carrying out Utility asset works on Watford Road, Croxley Green.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 May 2025 at 13:45 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 28 May 2025 at 15:01.
19 May and 13 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Money Hill Road, Rickmansworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Mar 2025 at 15:54.
19 May and 19 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Rectory Road, Rickmansworth.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 19 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Apr 2025 at 10:41.
19 May and 19 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Park Road, Rickmansworth.
These works are categorised as Major.
The works will start on or after 19 May 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Apr 2025 at 10:41.
Friday
Cadent Gas are proposing to carry out Utility asset works on Ashfields, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 10:38.
19 May and 11 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on High Road, Leavesden, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 10:33.
13 Sep 2025
Hertfordshire County Council are carrying out roadworks on Aerodrome Way, Leavesden.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 09:00 and could run through until 13 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Hertfordshire County Council on 19 May 2025 at 11:09.
Monday
Last Mile Electricity (formerly Global Utility Connections) are carrying out New service connection on High Street, Rickmansworth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 May 2025 at 08:30 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 20 May 2025 at 08:35.
26 May and 1 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Rushton Avenue, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Feb 2025 at 09:19.
Friday
Cadent Gas are proposing to carry out Utility asset works on North Approach, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 May 2025 at 11:33.
13 Jun 2025
Hertfordshire County Council are carrying out roadworks on North Western Avenue, Woodside, Watford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 07:30 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 28 May 2025 at 12:48.
13 Jun 2025
Hertfordshire County Council are carrying out roadworks on North Western Avenue Hempstead Road Roundabout, Abbots Langley.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 07:30 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 28 May 2025 at 12:48.
13 Jun 2025
Hertfordshire County Council are carrying out roadworks on Hempstead Road, Hunton Bridge.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 07:30 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 28 May 2025 at 12:47.
10 Jun 2025
Last Mile Electricity (formerly Global Utility Connections) are carrying out New service connection on Rickmansworth Footpath 027, Rickmansworth.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 May 2025 at 09:30 and could run through until 10 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 29 May 2025 at 09:44.
Tomorrow
Affinity Water are carrying out Utility repair and maintenance works on Hemming Way, Watford.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 May 2025 at 19:09 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 2 Jun 2025 at 09:17.
2 and 13 Jun 2025
Hertfordshire County Council are proposing to carry out Section 50 on Eastglade, Northwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 16:12.
2 and 13 Jun 2025
Hertfordshire County Council are proposing to carry out Section 50 on Eastglade, Northwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 16:20.
2 and 12 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Eastglade, Northwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 May 2025 at 16:05.
2 Jun and 4 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Meadow Way, Rickmansworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 26 Mar 2025 at 09:20.
Tomorrow
Virgin Media were proposing to carry out Remedial works on Station Road, Rickmansworth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 25 Feb 2025 at 15:38.
Tomorrow
Virgin Media were proposing to carry out Utility asset works on Station Road, Rickmansworth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 7 Mar 2025 at 15:42.
Thursday
Hertfordshire County Council are proposing to carry out Highway improvement works on Whippendell Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 9 Apr 2025 at 14:57.
Thursday
Hertfordshire County Council are proposing to carry out Highway improvement works on Whippendell Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 30 May 2025 at 14:59.
2 and 13 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Rickmansworth Road, Watford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 May 2025 at 12:36.
Friday
BT are proposing to carry out Utility asset works on Rousebarn Lane, Croxley Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 5 Mar 2025 at 15:19.
Friday
BT are proposing to carry out Utility asset works on Fir Tree Hill, Chandlers Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 5 Mar 2025 at 15:20.
2 Jun and 8 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Rushton Avenue, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Apr 2025 at 10:54.
2 and 20 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Rushton Avenue, Watford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 20 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Jan 2025 at 11:02.
2 and 13 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Kingswood Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 4 Apr 2025 at 12:18.
2 and 13 Jun 2025
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out New service connection on High Street, Abbots Langley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 13 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 2 Jun 2025 at 10:25.
Monday
Cadent Gas are carrying out Utility repair and maintenance works on Pinner Road, Northwood.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 June 2025 at 09:27 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 11:17.
Monday
Cadent Gas are carrying out Utility repair and maintenance works on The Avenue, Northwood.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 June 2025 at 08:41 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 11:55.
3 and 30 Jun 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Denham Way, Maple Cross.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 June 2025 and run through until 30 June 2025. The works were due to impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 17 Feb 2025 at 10:05.
Monday
Affinity Water are carrying out Utility repair and maintenance works on Scots Hill, Croxley Green.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 June 2025 at 00:45 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 3 Jun 2025 at 09:19.
Thursday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Green, Croxley Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 3 Dec 2024 at 14:39.
Friday
Hertfordshire County Council are carrying out Highway repair and maintenance works on Langleybury Lane, Langleybury.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 June 2025 at 09:30 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 3 Jun 2025 at 09:50.
Monday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Ainsdale Road, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 28 Feb 2025 at 09:51.
Monday
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Ainsdale Road, South Oxhey.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 June 2025 and run through until 9 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 6 May 2025 at 14:01.
Monday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Otley Way, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 28 Feb 2025 at 09:53.
Monday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Otley Way, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 6 May 2025 at 10:12.
Friday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Richfield Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 May 2025 at 11:43.
Friday
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Richfield Road, Bushey.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 June 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 May 2025 at 12:38.
Friday
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Ivinghoe Road, Bushey.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 June 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 09:46.
Friday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Grange Lane, Letchmore Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 Apr 2025 at 13:25.
Friday
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Grange Lane, Letchmore Heath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 June 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 May 2025 at 12:50.
Friday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Langleybury Lane, Langleybury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 19 Nov 2024 at 13:36.
Saturday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Watford Road, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 14 Nov 2024 at 12:52.
Saturday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Watford Road, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 4 Mar 2025 at 15:30.
Friday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Noke Lane, Bricket Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 1 Apr 2025 at 09:44.
Friday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Noke Lane, Bricket Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 8 May 2025 at 08:46.
5 and 13 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Rickmansworth Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 May 2025 at 14:27.
5 and 13 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Rickmansworth Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 May 2025 at 13:28.
5 and 13 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Cassiobury Park Avenue, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 May 2025 at 14:08.
5 and 13 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Cassiobury Park Avenue, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 11:40.
5 and 10 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Radlett Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 29 Nov 2024 at 14:14.
5 and 10 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Radlett Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 4 Mar 2025 at 08:21.
9 and 11 Jun 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Hagden Lane, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 17 Mar 2025 at 11:13.
9 and 11 Jun 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Hagden Lane, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 30 May 2025 at 10:12.
9 and 15 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Stephenson Way, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 15 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 11 Mar 2025 at 13:17.
9 and 15 Jun 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Stephenson Way, Watford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 15 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 2 May 2025 at 10:26.
9 and 14 Jun 2025
Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on North Western Avenue, Woodside, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 2 May 2025 at 10:20.
9 and 14 Jun 2025
Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on North Western Avenue, Woodside, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 6 May 2025 at 12:58.
9 and 14 Jun 2025
Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on North Western Avenue, Woodside, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 30 Apr 2025 at 12:37.
9 and 20 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Kingswood Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 6 May 2025 at 12:56.
9 and 13 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Queenswood Crescent, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Apr 2025 at 10:49.
9 and 13 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Queenswood Crescent, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Apr 2025 at 14:29.
9 and 13 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Queenswood Crescent, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Apr 2025 at 10:38.
9 and 13 Jun 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Queenswood Crescent, Watford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 13 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Apr 2025 at 10:43.
9 and 20 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Arundel Road, Abbots Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 14 Feb 2025 at 12:13.
9 and 20 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Arundel Road, Abbots Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 1 Apr 2025 at 09:54.
9 and 11 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Kindersley Way, Abbots Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 May 2025 at 13:54.
9 and 11 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Manor House Gardens, Abbots Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 May 2025 at 10:33.
9 and 13 Jun 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Toms Lane, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 28 Feb 2025 at 10:43.
9 and 13 Jun 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Toms Lane, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 6 May 2025 at 09:57.
10 and 12 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Mead Way, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 May 2025 at 11:34.
10 and 12 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Mead Way, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 27 May 2025 at 10:25.
11 and 13 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Dickinson Square, Croxley Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 May 2025 at 13:50.
11 and 13 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Dickinson Square, Croxley Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 May 2025 at 10:07.
11 and 13 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Love Lane, Abbots Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 16 May 2025 at 11:30.
13 and 18 Jun 2025
Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on North Western Avenue, Woodside, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 2 May 2025 at 10:18.
15 and 17 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Green, Croxley Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Dec 2024 at 09:48.
15 and 18 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Otterspool Way, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 14:54.
16 Jun and 25 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Watford Road, Croxley Green.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 12 Feb 2025 at 12:47.
16 and 20 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Orphanage Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 7 May 2025 at 12:18.
16 and 20 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Orphanage Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 7 May 2025 at 14:45.
16 and 18 Jun 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Bucks Hill, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 18 Feb 2025 at 10:24.
16 and 18 Jun 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Bucks Hill, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 27 Feb 2025 at 11:26.
16 and 18 Jun 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Bucks Hill, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 8 May 2025 at 10:32.
16 and 20 Jun 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on South Riding, Bricket Wood.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 June 2025 and run through until 20 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Apr 2025 at 15:05.
16 and 20 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on South Riding, Bricket Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 May 2025 at 10:32.
18 and 20 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Windmill Lane, Bushey Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 Apr 2025 at 13:47.
19 and 25 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Otterspool Way, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 7 Mar 2025 at 14:50.
20 and 24 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Green, Croxley Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 21 Jan 2025 at 11:50.
20 and 24 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sarratt Road, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 14 Feb 2025 at 12:32.
20 and 24 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sarratt Road, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 14 Mar 2025 at 15:05.
23 and 28 Jun 2025
Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on St Thomas' Drive, Hatch End.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 June 2025 and run through until 28 June 2025. The works were due to impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 6 May 2025 at 11:57.
23 and 28 Jun 2025
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on St Thomas' Drive, Hatch End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 28 June 2025. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 3 Jun 2025 at 11:31.
23 Jun and 3 Jul 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Eastglade, Northwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 11:46.
23 Jun and 3 Jul 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Eastglade, Northwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 May 2025 at 13:05.
23 and 25 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Mandeville Close, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 13:09.
23 and 25 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Norfolk Avenue, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 13:02.
23 and 27 Jun 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Chenies Mill Road, Chenies.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 3 Jun 2025 at 11:45.
23 Jun and 12 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Rushton Avenue, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 11:39.
23 Jun and 18 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Harris Road, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 11:54.
24 and 26 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sixth Avenue, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 13:03.
24 and 26 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sycamore Close, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 13:08.
25 and 28 Jun 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Langleybury Lane, Langleybury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 June 2025 and run through until 28 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 27 May 2025 at 15:25.
25 and 27 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Garston Drive, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 13:01.
25 and 27 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Gwent Close, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 13:03.
25 and 27 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Quickmoor Lane, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 16 Apr 2025 at 13:08.
25 and 27 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Quickmoor Lane, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 25 Apr 2025 at 10:36.
25 and 27 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Bucks Hill, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 16 Apr 2025 at 13:03.
25 and 27 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Bucks Hill, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 25 Apr 2025 at 10:36.
26 and 28 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Pippins, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 May 2025 at 12:30.
26 and 28 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Albans View, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 12:48.
28 Jun and 7 Jul 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Cassiobury Park Avenue, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 June 2025 and could run through until 7 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 14 May 2025 at 14:30.
28 Jun and 7 Jul 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Cassiobury Park Avenue, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 June 2025 and could run through until 7 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 2 Jun 2025 at 10:35.
30 Jun and 25 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Cedars Avenue, Rickmansworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Mar 2025 at 15:53.
30 Jun and 18 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Park Way, Rickmansworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 08:28.
30 Jun and 18 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Park Avenue, Bushey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 May 2025 at 15:48.
30 Jun and 2 Jul 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on The Green, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 26 Mar 2025 at 12:54.
30 Jun and 2 Jul 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on The Green, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 8 Apr 2025 at 13:25.
30 Jun and 2 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on The Green, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 26 Mar 2025 at 12:48.
30 Jun and 2 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on The Green, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 23 May 2025 at 09:46.
1 and 11 Jul 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Rickmansworth Road, Watford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 July 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 May 2025 at 12:05.
1 and 4 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Otterspool Way, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 14 Apr 2025 at 10:42.
1 and 4 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Otterspool Way, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 27 May 2025 at 09:43.
2 and 5 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Watford Road, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Apr 2025 at 10:50.
2 and 5 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Watford Road, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 27 May 2025 at 11:31.
3 and 7 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Uxbridge Road, Hatch End.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 7 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 15 Apr 2025 at 17:44.
3 and 7 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Woodhall Drive, Pinner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 7 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 1 May 2025 at 14:36.
4 and 8 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Langleybury Lane, Langleybury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 July 2025 and could run through until 8 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Apr 2025 at 10:39.
6 and 9 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Station Approach, Chorleywood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 22 Apr 2025 at 10:26.
6 and 9 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Station Approach, Chorleywood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 22 Apr 2025 at 10:30.
7 Jul and 1 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Nightingale Road, Rickmansworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 May 2025 at 14:56.
7 and 10 Jul 2025
Affinity Water are proposing to carry out Utility asset works on Aldenham Avenue, Radlett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 28 May 2025 at 11:11.
7 and 12 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on A41 Westbound From M25 Junc 20 To Junc With Two Waters Way, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 12 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 6 May 2025 at 15:20.
9 and 19 Jul 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Little Oxhey Lane, South Oxhey.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 July 2025 and run through until 19 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 29 May 2025 at 14:59.
9 and 19 Jul 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Prestwick Road, South Oxhey.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 July 2025 and run through until 19 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 29 May 2025 at 14:55.
10 and 15 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Radlett Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 15 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 23 Apr 2025 at 10:21.
10 and 15 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Radlett Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 15 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 29 May 2025 at 12:44.
14 and 18 Jul 2025
Affinity Water are proposing to carry out Utility asset works on Denham Way, Maple Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 15 Apr 2025 at 13:07.
14 and 16 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on The Rutts, Bushey Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 22 Apr 2025 at 11:10.
14 and 16 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Marlborough Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 1 May 2025 at 10:01.
15 and 17 Jul 2025
Affinity Water are proposing to carry out Utility asset works on Little Green Lane, Croxley Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 17 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 16 Apr 2025 at 13:13.
17 and 21 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Shepherds Lane, Chorleywood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 24 Mar 2025 at 10:26.
17 and 21 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Shepherds Lane, Chorleywood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 3 Jun 2025 at 11:05.
17 and 21 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Chipperfield Road, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 14 Mar 2025 at 09:25.
17 and 21 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Vicarage Lane, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 14 Mar 2025 at 09:26.
18 and 22 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Grange Lane, Letchmore Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 July 2025 and could run through until 22 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 2 Jun 2025 at 14:04.
21 and 31 Jul 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Prestwick Road, South Oxhey.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 31 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 29 May 2025 at 15:00.
21 Jul and 15 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Sandy Lane, Northwood.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Mar 2025 at 11:38.
21 and 31 Jul 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Hayling Road, Hayling, South Oxhey.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 31 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 29 May 2025 at 15:01.
21 and 25 Jul 2025
T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Rickmansworth Road, Chorleywood.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by T-Mobile (UK) on 29 May 2025 at 11:12.
21 and 23 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on The Common, Chipperfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 10 Apr 2025 at 11:22.
22 and 24 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on The Common, Chipperfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 24 July 2025. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 22 Apr 2025 at 11:13.
22 and 24 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on The Common, Chipperfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 24 July 2025. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 24 Apr 2025 at 13:36.
23 and 26 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Green, Croxley Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 28 May 2025 at 16:10.
23 and 26 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sarratt Road, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 28 May 2025 at 16:09.
25 and 29 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Shepherds Lane, Chorleywood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 July 2025 and could run through until 29 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 28 May 2025 at 16:24.
25 and 29 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Shepherds Lane, Chorleywood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 July 2025 and could run through until 29 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 3 Jun 2025 at 11:06.
25 and 29 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Chipperfield Road, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 July 2025 and could run through until 29 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 27 May 2025 at 14:18.
26 and 28 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Loudwater Lane, Loudwater.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 25 Mar 2025 at 11:12.
26 and 28 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Loudwater Lane, Loudwater.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 9 Apr 2025 at 09:43.
27 Jul and 29 Aug 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Station Road, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 20 May 2025 at 10:47.
27 Jul and 29 Aug 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Langley Road, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 20 May 2025 at 10:37.
28 Jul and 29 Aug 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Rectory Road, Rickmansworth.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Apr 2025 at 10:50.
28 Jul and 29 Aug 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Rectory Road, Rickmansworth.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Apr 2025 at 13:10.
28 Jul and 3 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Bushey.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 May 2025 at 10:05.
28 Jul and 2 Sep 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Park Road, Rickmansworth.
These works are categorised as Major.
The works will start on or after 28 July 2025 and could run through until 2 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Apr 2025 at 10:50.
28 Jul and 2 Sep 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Park Road, Rickmansworth.
These works are categorised as Major.
The works will start on or after 28 July 2025 and could run through until 2 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Apr 2025 at 13:11.
28 Jul and 5 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on The Avenue, Bushey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Apr 2025 at 10:38.
28 Jul and 3 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Bushey Hall Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 May 2025 at 16:30.
28 and 31 Jul 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Rickmansworth Road, Chorleywood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 31 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by T-Mobile (UK) on 29 May 2025 at 11:10.
28 Jul and 29 Aug 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Station Road, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 23 Jan 2025 at 14:22.
28 Jul and 29 Aug 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Langley Road, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 23 Jan 2025 at 14:20.
28 Jul and 29 Aug 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on St Albans Road, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 23 Jan 2025 at 14:23.
28 Jul and 29 Aug 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on St Albans Road, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 20 May 2025 at 10:40.
28 and 30 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Church Lane, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 25 Apr 2025 at 11:25.
28 and 30 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Church Lane, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 7 May 2025 at 12:19.
28 Jul and 1 Aug 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on High Road, Leavesden, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 25 Feb 2025 at 11:42.
28 and 30 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Smug Oak Lane, Bricket Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 19 Mar 2025 at 10:07.
29 Jul and 1 Aug 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Scammell Way, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 15:36.
29 Jul and 1 Aug 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Vicarage Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 15:36.
29 Jul and 1 Aug 2025
Affinity Water are proposing to carry out Utility asset works on Loom Lane, Radlett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 15 May 2025 at 15:51.
30 Jul and 1 Aug 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Long Lane, Heronsgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 10 Apr 2025 at 10:58.
2 and 24 Aug 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Maxwell Road, Northwood.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 August 2025 and could run through until 24 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 24 Apr 2025 at 08:55.
4 Aug and 3 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:13.
4 Aug and 3 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 May 2025 at 10:11.
4 Aug and 15 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Old Redding, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:12.
4 Aug and 15 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Old Redding, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 May 2025 at 10:18.
4 Aug and 3 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Common Road, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:14.
4 Aug and 3 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Common Road, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 May 2025 at 10:17.
4 and 22 Aug 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Harcourt Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 3 Jun 2025 at 10:03.
4 and 12 Aug 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Comyne Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 12 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 May 2025 at 09:36.
4 and 25 Aug 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Newlands Avenue, Radlett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 25 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 2 Jun 2025 at 15:09.
4 and 8 Aug 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Drop Lane, Bricket Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 2 May 2025 at 14:46.
5 Aug and 12 Sep 2025
Cadent Gas are proposing to carry out roadworks on Station Road, Bricket Wood.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 14:54.
6 and 8 Aug 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Windmill Lane, Bushey Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 27 May 2025 at 10:31.
6 and 8 Aug 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Grange Lane, Letchmore Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 May 2025 at 11:03.
9 and 11 Aug 2025
Affinity Water are proposing to carry out Remedial works on Little Bushey Lane, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 August 2025 and could run through until 11 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 2 May 2025 at 09:26.
11 Aug and 8 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Denham Way, Maple Cross.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 8 September 2025. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 6 Mar 2025 at 11:16.
11 Aug and 8 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Denham Way, Maple Cross.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 8 September 2025. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 10 Mar 2025 at 10:24.
11 and 13 Aug 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Harwoods Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 20 May 2025 at 09:55.
11 and 13 Aug 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Harwoods Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 26 May 2025 at 11:48.
11 and 13 Aug 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Benskin Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 26 May 2025 at 11:47.
11 and 13 Aug 2025
Affinity Water are proposing to carry out Highway repair and maintenance works on Milton Street, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 13 May 2025 at 15:38.
11 and 13 Aug 2025
Affinity Water were proposing to carry out Highway repair and maintenance works on Copsewood Road, Watford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 13 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 1 May 2025 at 14:25.
11 and 13 Aug 2025
Affinity Water were proposing to carry out Highway repair and maintenance works on Copsewood Road, Watford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 13 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 13 May 2025 at 13:21.
11 and 15 Aug 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Drop Lane, Bricket Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 23 Apr 2025 at 09:02.
11 and 13 Aug 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Hyde Lane, Nash Mills.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 1 Apr 2025 at 15:10.
11 and 13 Aug 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Hyde Lane, Nash Mills.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 1 Apr 2025 at 15:32.
12 and 14 Aug 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Norfolk Road, Rickmansworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2025 and could run through until 14 August 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Affinity Water on 25 Apr 2025 at 11:32.
12 and 14 Aug 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Norfolk Road, Rickmansworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2025 and could run through until 14 August 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Affinity Water on 7 May 2025 at 08:36.
13 and 15 Aug 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Church Lane, Mill End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 6 May 2025 at 10:44.
15 and 19 Aug 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Green, Croxley Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2025 and could run through until 19 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Apr 2025 at 11:40.
15 and 19 Aug 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sarratt Road, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2025 and could run through until 19 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Apr 2025 at 11:36.
17 and 22 Aug 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Langley Lane, Abbots Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 2 May 2025 at 11:22.
18 and 22 Aug 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Potter Street, Pinner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 May 2025 at 10:28.
18 and 22 Aug 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on The Clump, Rickmansworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 May 2025 at 15:44.
18 and 29 Aug 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Langley Road, Chipperfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 Apr 2025 at 12:51.
18 and 29 Aug 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Chipperfield Road, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 16 Apr 2025 at 09:20.
19 and 22 Aug 2025
Vodafone are proposing to carry out New service connection on Clarendon Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Vodafone on 20 May 2025 at 09:07.
21 and 27 Aug 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Harrogate Road, Hayling, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 August 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 08:00.
25 Aug and 12 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Chorleywood Road, Rickmansworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Mar 2025 at 09:30.
26 and 29 Aug 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Scammell Way, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 23 Apr 2025 at 09:57.
26 and 29 Aug 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Vicarage Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 25 Apr 2025 at 08:36.
Roadworks Map near to Cassiobury Drive, WATFORD, WD17 3AW (Loading...)















- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Cassiobury Drive, WATFORD, WD17 3AW (17 Events)
(Scheduled Dates)
(miles)
(Scheduled: 29 Apr 2025 - 3 Jun 2025)
(Scheduled: 20 May 2025 - 14 Jul 2025)
(Scheduled: 3 Jun 2025)
Contains public sector information licensed under the Open Government Licence v3.0.