ROADWORKS SUMMARY
The Parade, High Street, WATFORD, WD17 1BS
Introduction
View current and future planned roadworks and road closures for The Parade, High Street, WD17 1BS and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to The Parade, High Street, WATFORD, WD17 1BS
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for The Parade, High Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
18 Mar 2025
Thames Water are carrying out Utility repair and maintenance works on M25 J19 Leave E, Three Rivers.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 March 2023 at 23:25 and could run through until 18 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 17 Mar 2023 at 23:22.
Friday
Cadent Gas are carrying out Utility asset works on Northwood Way, Northwood.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 July 2024 at 11:03 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 14:52.
Tuesday
National Highways are carrying out Highway repair and maintenance works on Bushey Bridleway And Footpath 040, Bushey.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 12 August 2024 at 00:00 and could run through until 26 November 2024. The works will impact the verge only.
This roadwork event was last updated by National Highways on 11 Nov 2024 at 15:02.
20 Dec 2024
Cadent Gas are carrying out Utility asset works on Sandy Lane, Northwood.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 September 2024 at 23:21 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 08:05.
30 Sep and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Primrose Hill, Kings Langley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 10 Jul 2024 at 11:10.
10 Jan 2025
Cadent Gas are carrying out Utility asset works on North Approach, Watford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 10:20 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 13:17.
2 Dec 2024
Cadent Gas are carrying out Utility asset works on Swiss Avenue, Watford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 October 2024 at 10:22 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:03.
16 Oct and 17 Dec 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Otterspool Way, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2024 and could run through until 17 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Aug 2024 at 12:56.
16 Oct and 17 Dec 2024
UK Power Networks Eastern & London were proposing to carry out New service connection on Otterspool Way, Watford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 October 2024 and run through until 17 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Sep 2024 at 10:53.
Tuesday
Leep Utilities Electric are carrying out Permanent reinstatement on Woodmere Avenue, Watford.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 08:00 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leep Utilities Electric on 19 Nov 2024 at 08:50.
21 Oct and 12 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Cheney Street, Eastcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 25 Jul 2024 at 10:00.
12 Dec 2024
Cadent Gas are carrying out Utility asset works on Cheney Street, Eastcote.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 13:05 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 13:28.
21 Oct and 20 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Bushey Hall Road, Bushey.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 12:26.
Tomorrow
Leep Utilities Electric are carrying out Permanent reinstatement on Berry Grove Lane, Bushey.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 08:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leep Utilities Electric on 30 Oct 2024 at 16:30.
Friday
Cadent Gas are carrying out Utility asset works on Toms Lane, Kings Langley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 08:26 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 08:33.
15 Jan 2025
Cadent Gas are carrying out Utility asset works on Primrose Hill, Kings Langley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 08:27 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 08:34.
17 Dec 2024
UK Power Networks Eastern & London are carrying out New service connection on Otterspool Way, Watford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 October 2024 at 11:30 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Oct 2024 at 12:25.
Saturday
UK Power Networks Eastern & London are carrying out New service connection on Park Road, Rickmansworth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 08:45 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Nov 2024 at 14:04.
28 Oct 2024 and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Park Avenue, Bushey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Jul 2024 at 07:58.
28 Oct 2024 and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Park Avenue, Bushey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 16:00.
28 Oct and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Rushton Avenue, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Jun 2024 at 10:37.
Friday
Thames Water are carrying out Utility repair and maintenance works on London Road, Stanmore.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 October 2024 at 12:00 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:58.
Saturday
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Fore Street, Eastcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:56.
1 Nov and 1 Dec 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on High Road, Eastcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:53.
1 Nov and 1 Dec 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Fore Street, Eastcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:59.
1 Nov and 1 Dec 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Kings Close, Northwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:51.
13 Dec 2024
Cadent Gas are carrying out Utility asset works on Woodlands Road, Bushey.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 November 2024 at 09:04 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 13:59.
6 Dec 2024
Hertfordshire County Council are carrying out Section 50 on Victoria Close, Rickmansworth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 November 2024 at 07:56 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 22 Nov 2024 at 08:59.
Friday
Cadent Gas are proposing to carry out Utility asset works on Vale Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 09:58.
4 Nov and 6 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Gade Avenue, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 13:02.
Friday
UK Power Networks Eastern & London are carrying out Utility asset works on Moss Lane, Pinner.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 10:00 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 15:49.
11 Nov and 17 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Whippendell Road, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Mar 2024 at 11:00.
11 Nov and 13 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Bushey Hall Road, Bushey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 15:21.
16 Dec 2024
Cadent Gas are carrying out Utility asset works on Bushey Hall Road, Bushey.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 November 2024 at 11:14 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 11:16.
11 Nov and 13 Dec 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Berry Grove Lane, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Aug 2024 at 14:35.
16 Dec 2024
Leep Utilities Electric are carrying out New service connection on Bedmond Road, Abbots Langley.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 November 2024 at 09:30 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Leep Utilities Electric on 18 Nov 2024 at 10:24.
14 Nov and 10 Dec 2024
Hertfordshire County Council are proposing to carry out Highway improvement works on North Western Avenue, Bushey.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2024 and could run through until 10 December 2024. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 26 Sep 2024 at 15:24.
10 Dec 2024
Hertfordshire County Council are carrying out Highway improvement works on North Western Avenue, Bushey.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 22:00 and could run through until 10 December 2024. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 15 Nov 2024 at 07:14.
14 Nov and 10 Dec 2024
Hertfordshire County Council are proposing to carry out Highway improvement works on Otterspool Way, Watford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2024 and could run through until 10 December 2024. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 26 Sep 2024 at 15:22.
10 Dec 2024
Hertfordshire County Council are carrying out Highway improvement works on Otterspool Way, Watford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 22:00 and could run through until 10 December 2024. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 15 Nov 2024 at 07:14.
14 Nov and 10 Dec 2024
Hertfordshire County Council are proposing to carry out Highway improvement works on North Western Avenue Colne Way, Watford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2024 and could run through until 10 December 2024. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 26 Sep 2024 at 11:19.
10 Dec 2024
Hertfordshire County Council are carrying out Highway improvement works on North Western Avenue Colne Way, Watford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 22:00 and could run through until 10 December 2024. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 15 Nov 2024 at 07:14.
Friday
UK Power Networks Eastern & London are proposing to carry out New service connection on Otterspool Way, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Oct 2024 at 14:16.
Friday
UK Power Networks Eastern & London are carrying out New service connection on Otterspool Way, Watford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 November 2024 at 11:30 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Nov 2024 at 13:09.
Today
BT are proposing to carry out Utility asset works on Marlborough Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 24 Oct 2024 at 08:30.
Today
BT are proposing to carry out Utility asset works on Marlborough Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 16 Oct 2024 at 10:47.
Today
BT are carrying out Utility asset works on Marlborough Road, Watford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 November 2024 at 09:41 and could run through until 24 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 17 Nov 2024 at 09:41.
18 Nov and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Rickmansworth Road, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 14:50.
Friday
Cadent Gas are proposing to carry out Utility asset works on Fuller Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 10:52.
18 Nov and 6 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Perivale Gardens, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Jun 2024 at 10:30.
18 Nov and 16 Dec 2024
Leep Utilities Electric are proposing to carry out New service connection on Bedmond Road, Abbots Langley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Leep Utilities Electric on 18 Nov 2024 at 09:25.
16 Dec 2024
Leep Utilities Electric are carrying out New service connection on Bedmond Road, Abbots Langley.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 09:00 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Leep Utilities Electric on 18 Nov 2024 at 10:39.
Today
London Borough Of Harrow are carrying out Highway improvement works on Pinner Green, Pinner.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 20:00 and could run through until 24 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 20 Nov 2024 at 08:35.
Friday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Heather Lane, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 8 Nov 2024 at 13:37.
Thursday
Affinity Water are carrying out Utility repair and maintenance works on Bushey Hall Road, Bushey.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 November 2024 at 10:30 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 22 Nov 2024 at 11:15.
Wednesday
London Borough Of Harrow are proposing to carry out Highway improvement works on West End Lane, Pinner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2024 at 11:55.
Thursday
London Borough Of Harrow are proposing to carry out Highway improvement works on West End Lane, Pinner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 4 Sep 2024 at 14:34.
Wednesday
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Manor Park Drive, North Harrow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 27 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 31 Oct 2024 at 08:34.
Wednesday
Affinity Water are proposing to carry out Utility repair and maintenance works on Parkfield Avenue, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 6 Sep 2024 at 10:19.
Wednesday
Affinity Water are proposing to carry out Utility repair and maintenance works on Parkfield Avenue, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 13 Nov 2024 at 14:59.
Wednesday
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on The Chase, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:44.
25 Nov and 3 Dec 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Eastglade, Northwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2024 at 15:54.
25 Nov and 20 Dec 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Townfield, Rickmansworth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Oct 2024 at 13:19.
25 Nov and 13 Dec 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Greenhill Crescent, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 11:21.
25 Nov and 23 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Gade Avenue, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 15:13.
25 Nov and 23 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Gade Avenue, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 09:10.
Wednesday
Affinity Water were proposing to carry out Utility repair and maintenance works on Marlborough Road, Watford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 27 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Affinity Water on 24 Sep 2024 at 10:18.
Wednesday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Solesbridge Lane, Chorleywood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 1 Nov 2024 at 11:25.
25 Nov and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Forest Walk, Bushey.
These works are categorised as Major.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 10:46.
25 Nov and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Forest Walk, Bushey.
These works are categorised as Major.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 15:34.
Friday
BT are proposing to carry out Utility asset works on Fir Tree Hill, Chandlers Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 22 Aug 2024 at 12:33.
25 Nov and 7 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Fuller Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 15:49.
Thursday
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Elmcroft Crescent, North Harrow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 November 2024 and run through until 28 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 29 Oct 2024 at 08:54.
Thursday
Affinity Water are proposing to carry out Utility repair and maintenance works on Springfield, Bushey Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 26 Sep 2024 at 10:54.
Thursday
Affinity Water are proposing to carry out Utility repair and maintenance works on Springfield, Bushey Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 14 Nov 2024 at 11:16.
Thursday
Affinity Water are proposing to carry out Utility repair and maintenance works on Springfield, Bushey Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 19 Nov 2024 at 11:55.
26 Nov and 23 Dec 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Berry Grove Lane, Bushey.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Nov 2024 at 14:01.
Friday
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on West End Avenue, Pinner.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 7 Oct 2024 at 08:49.
Friday
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Woodhall Avenue, Pinner.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 28 Oct 2024 at 08:55.
Friday
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Woodhall Drive, Pinner.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 7 Oct 2024 at 08:56.
Friday
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Hathaway Close, Harrow Weald.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 16 Oct 2024 at 10:36.
Friday
Affinity Water are proposing to carry out Utility repair and maintenance works on Bridle Path, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 22 Oct 2024 at 11:57.
Saturday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Waterfields Way, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 21 Nov 2024 at 13:18.
Saturday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Waterfields Way, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 21 Nov 2024 at 13:54.
30 Nov and 4 Dec 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Pinner Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 22 Nov 2024 at 14:23.
2 and 4 Dec 2024
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Milman Close, Pinner.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 7 Oct 2024 at 08:50.
2 and 4 Dec 2024
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Marsworth Avenue, Hatch End.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 7 Oct 2024 at 08:55.
2 and 13 Dec 2024
Hertfordshire County Council are proposing to carry out Highway improvement works on The Woods, Northwood.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 17 Oct 2024 at 14:18.
2 and 4 Dec 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Fallowfield, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 18 Jul 2024 at 09:08.
2 and 5 Dec 2024
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Fallowfield, Stanmore.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 5 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 5 Sep 2024 at 13:24.
2 and 5 Dec 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Fallowfield, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 24 Sep 2024 at 12:39.
2 and 4 Dec 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Heathbourne Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 6 Sep 2024 at 10:19.
2 and 4 Dec 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Heathbourne Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 11 Nov 2024 at 09:13.
2 and 4 Dec 2024
Cadent Gas are proposing to carry out New service connection on Bournehall Lane, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 09:44.
2 and 6 Dec 2024
BT are proposing to carry out Utility asset works on Fir Tree Hill, Chandlers Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 19 Sep 2024 at 11:35.
2 and 6 Dec 2024
BT are proposing to carry out Utility asset works on Fir Tree Hill, Chandlers Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 28 Oct 2024 at 12:16.
2 and 6 Dec 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Heather Lane, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 14 Nov 2024 at 13:11.
2 and 4 Dec 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Fourth Avenue, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 5 Nov 2024 at 15:43.
2 and 4 Dec 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Fourth Avenue, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 6 Nov 2024 at 12:22.
2 and 4 Dec 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on First Avenue, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 1 Aug 2024 at 12:12.
2 and 4 Dec 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on First Avenue, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 9 Aug 2024 at 11:35.
2 and 21 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Perivale Gardens, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 15:54.
2 and 13 Dec 2024
Hertfordshire County Council are proposing to carry out Highway improvement works on Popes Road, Abbots Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 18 Sep 2024 at 12:11.
2 and 13 Dec 2024
Hertfordshire County Council are proposing to carry out Highway improvement works on Popes Road, Abbots Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 7 Nov 2024 at 14:47.
2 and 7 Dec 2024
Hertfordshire County Council are proposing to carry out Section 50 on Coniston Road, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 7 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 5 Nov 2024 at 08:39.
2 and 7 Dec 2024
Hertfordshire County Council are proposing to carry out Section 50 on Coniston Road, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 7 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 5 Nov 2024 at 08:41.
3 and 6 Dec 2024
Affinity Water were proposing to carry out Utility asset works on Orchard Drive, Park Street, St Albans.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 December 2024 and run through until 6 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 7 Nov 2024 at 15:43.
9 and 12 Dec 2024
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Parkfield Gardens, Harrow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 12 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 17 Oct 2024 at 11:29.
9 and 23 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Masefield Avenue, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:04.
9 and 11 Dec 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Magnaville Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 Nov 2024 at 11:29.
9 and 12 Dec 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Valley Road, Rickmansworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 17 Sep 2024 at 11:46.
9 and 12 Dec 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Valley Road, Rickmansworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 7 Nov 2024 at 14:40.
10 and 12 Dec 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Watford Heath, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 20 Sep 2024 at 12:40.
10 and 12 Dec 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Little Bushey Lane, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 17 Sep 2024 at 13:40.
2 Jan and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Batchworth Lane, Northwood.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 16 May 2024 at 13:54.
2 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Maythorne Close, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 14:46.
2 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Bushey Mill Lane, Bushey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 13:10.
2 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Park Avenue, Bushey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 10:31.
2 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Park Avenue, Bushey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 15:40.
2 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Rushton Avenue, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Jun 2024 at 11:36.
2 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Railway Terrace, Kings Langley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 10 Jul 2024 at 11:05.
3 Jan and 14 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Whippendell Road, Watford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 January 2025 and run through until 14 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 11:31.
3 Jan and 28 Feb 2025
Leep Utilities Electric are proposing to carry out New service connection on Hilfield Lane, Aldenham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leep Utilities Electric on 12 Nov 2024 at 15:50.
3 and 6 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Mount Pleasant Lane, Bricket Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2025 and could run through until 6 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 31 Oct 2024 at 11:51.
4 and 7 Jan 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on School Lane, Bushey.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 January 2025 and run through until 7 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Affinity Water on 25 Sep 2024 at 10:25.
6 and 8 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on London Road, Rickmansworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 11:52.
6 and 8 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on London Road, Rickmansworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 7 Nov 2024 at 13:28.
6 and 8 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Dickinson Square, Croxley Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 10:54.
6 and 8 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Dickinson Square, Croxley Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 7 Nov 2024 at 13:32.
6 and 16 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Water Lane, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 22 Nov 2024 at 09:55.
6 and 16 Jan 2025
Network Rail were proposing to carry out Works for Rail Purposes on Beechen Grove, Watford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 16 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 8 Nov 2024 at 10:39.
6 and 24 Jan 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Elton Way, Bushey.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 18 Oct 2024 at 07:33.
6 and 24 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Elton Way, Bushey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 10:49.
6 and 24 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Elton Way, Bushey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 5 Nov 2024 at 16:16.
6 and 8 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Louvain Way, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 12:35.
6 and 24 Jan 2025
Affinity Water are proposing to carry out Utility asset works on Orchard Drive, Park Street, St Albans.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 14 Oct 2024 at 07:42.
7 and 28 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Rectory Road, Rickmansworth.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Oct 2024 at 13:13.
7 and 9 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on North Western Avenue (Watford Bypass), Elstree.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 21 Oct 2024 at 09:08.
7 and 9 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Greenhills Close, Rickmansworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 10:47.
7 and 9 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Greenhills Close, Rickmansworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 8 Nov 2024 at 09:24.
7 and 10 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Berry Lane, Chorleywood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Oct 2024 at 11:04.
8 and 10 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Gypsy Lane, Abbots Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 11:11.
8 and 10 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Kindersley Way, Abbots Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 7 Oct 2024 at 16:17.
8 and 10 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Kindersley Way, Abbots Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 7 Nov 2024 at 14:28.
8 and 10 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Manor House Gardens, Abbots Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 7 Nov 2024 at 14:34.
8 and 10 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Love Lane, Abbots Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 14 Oct 2024 at 11:00.
8 and 10 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Love Lane, Abbots Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 8 Nov 2024 at 09:20.
8 Jan and 5 Feb 2025
Leep Utilities Electric are proposing to carry out Permanent reinstatement on Bedmond Road, Abbots Langley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leep Utilities Electric on 20 Nov 2024 at 16:04.
9 and 13 Jan 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Kindersley Way, Abbots Langley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 January 2025 and run through until 13 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 3 Oct 2024 at 13:40.
10 and 14 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Manor House Gardens, Abbots Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 7 Oct 2024 at 16:16.
13 and 15 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Clitheroe Gardens, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 7 Oct 2024 at 15:30.
13 and 15 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Clitheroe Gardens, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 7 Nov 2024 at 14:32.
13 and 15 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Watergate, Carpenders Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 7 Oct 2024 at 15:26.
13 and 15 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Watergate, Carpenders Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 7 Nov 2024 at 14:36.
13 and 17 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Brockley Hill, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Nov 2024 at 14:25.
13 and 19 Jan 2025
Affinity Water are proposing to carry out Utility asset works on Victoria Close, Rickmansworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 19 Nov 2024 at 14:31.
13 and 19 Jan 2025
Affinity Water are proposing to carry out Utility asset works on Victoria Close, Rickmansworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 19 Nov 2024 at 14:33.
13 and 17 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Sussex Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Nov 2024 at 11:51.
13 and 15 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sixth Avenue, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 1 Nov 2024 at 10:39.
13 and 15 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sixth Avenue, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 09:29.
13 and 17 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Drop Lane, Bricket Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 19 Jul 2024 at 10:15.
13 and 17 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Drop Lane, Bricket Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 28 Oct 2024 at 10:29.
13 and 15 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Garden Road, Bulls Green, Abbots Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 7 Oct 2024 at 16:12.
13 and 15 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Garden Road, Bulls Green, Abbots Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 7 Nov 2024 at 14:31.
13 and 15 Jan 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Manor House Gardens, Abbots Langley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 3 Oct 2024 at 13:41.
13 Jan and 10 Feb 2025
Leep Utilities Electric are proposing to carry out New service connection on Bedmond Road, Abbots Langley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leep Utilities Electric on 20 Nov 2024 at 16:04.
13 Jan and 10 Mar 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Orchard Drive, Park Street, St Albans.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 10 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 17 Oct 2024 at 10:13.
14 and 16 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Garston Drive, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 1 Nov 2024 at 10:34.
14 and 16 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Garston Drive, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 08:55.
14 and 16 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Gwent Close, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 1 Nov 2024 at 10:09.
14 and 16 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Gwent Close, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 08:56.
14 and 16 Jan 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Garden Road, Bulls Green, Abbots Langley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 January 2025 and run through until 16 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 3 Oct 2024 at 13:43.
15 and 17 Jan 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Clitheroe Gardens, South Oxhey.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 3 Oct 2024 at 13:44.
15 and 17 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Albans View, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 1 Nov 2024 at 10:05.
15 and 17 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Albans View, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 08:58.
15 and 17 Jan 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Smug Oak Lane, Bricket Wood.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 5 Nov 2024 at 10:23.
16 and 20 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Mandeville Close, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 1 Nov 2024 at 10:18.
16 and 20 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Mandeville Close, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 09:30.
16 and 20 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sycamore Close, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 1 Nov 2024 at 10:20.
16 and 20 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sycamore Close, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 08:57.
16 and 25 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Smug Oak Lane, Bricket Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 6 Nov 2024 at 14:41.
16 and 20 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Noke Lane, Bricket Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 09:32.
16 and 20 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Noke Lane, Bricket Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 6 Nov 2024 at 09:52.
18 and 20 Jan 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Elstree Road, Bushey Heath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 January 2025 and run through until 20 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Affinity Water on 25 Oct 2024 at 10:14.
20 Jan and 8 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Maythorne Close, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 8 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 11:30.
20 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Moss Road, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 15:27.
27 and 30 Jan 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Elstree Road, Bushey Heath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 30 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 14 Nov 2024 at 12:57.
27 and 30 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Elstree Road, Bushey Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 14 Nov 2024 at 13:04.
27 Jan and 14 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Berry Grove Lane, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Oct 2024 at 09:27.
28 and 31 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Silk Mill Road, Oxhey Hall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 25 Oct 2024 at 12:05.
29 Jan and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Station Roundabout, Rickmansworth.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Oct 2024 at 13:12.
31 Jan and 3 Feb 2025
Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on Cassio Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 1 Aug 2024 at 11:01.
31 Jan and 3 Feb 2025
Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on Rickmansworth Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 1 Aug 2024 at 11:00.
3 and 20 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Little Bushey Lane, Bushey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 20 February 2025. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 8 Oct 2024 at 11:38.
3 and 20 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Little Bushey Lane, Bushey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 20 February 2025. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 15 Nov 2024 at 10:38.
3 Feb and 15 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Rickmansworth Road, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 15 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 11:30.
4 and 6 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Green, Croxley Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 14 Oct 2024 at 10:55.
4 and 6 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Green, Croxley Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 8 Nov 2024 at 15:30.
6 and 10 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Radlett Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 25 Oct 2024 at 12:48.
6 and 10 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Grange Lane, Letchmore Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 29 Oct 2024 at 13:20.
6 and 10 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Grange Lane, Letchmore Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 19 Nov 2024 at 10:00.
7 and 10 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Windmill Lane, Bushey Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 29 Oct 2024 at 09:16.
7 and 10 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Windmill Lane, Bushey Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 10:16.
7 and 12 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Radlett Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 Nov 2024 at 11:58.
7 and 11 Feb 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Otterspool Way, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 11 February 2025. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 22 Nov 2024 at 09:50.
10 and 12 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Park Avenue, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 1 Nov 2024 at 11:29.
10 and 23 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Grove Mill Lane, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 13 Nov 2024 at 10:53.
10 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Moss Road, Watford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 May 2024 at 09:14.
10 Feb and 16 May 2025
Cadent Gas are proposing to carry out Utility asset works on Tibbs Hill Road, Abbots Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 16 May 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 18 Jul 2024 at 10:41.
10 Feb and 16 May 2025
Cadent Gas are proposing to carry out Utility asset works on Tibbs Hill Road, Abbots Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 16 May 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 9 Aug 2024 at 09:40.
10 and 14 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Toms Lane, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Nov 2024 at 10:54.
11 and 13 Feb 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on North Western Avenue, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 22 Nov 2024 at 09:50.
12 and 17 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Moor Lane, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 11 Nov 2024 at 10:50.
12 and 17 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Moor Lane, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 19 Nov 2024 at 13:13.
13 and 15 Feb 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Otterspool Way, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 15 February 2025. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 22 Nov 2024 at 09:51.
13 and 17 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Beechfield, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 13:12.
13 and 17 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Le Corte Close, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 13:43.
13 and 17 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Chipperfield Road, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 24 Oct 2024 at 10:56.
14 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Chessington Court, Pinner.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 14:30.
14 and 18 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on North Hill, Chorleywood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 11 Nov 2024 at 10:41.
16 and 18 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Marlborough Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 13 Nov 2024 at 10:11.
17 Feb and 15 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Vale Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 15 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 11:30.
17 and 19 Feb 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Otterspool Way, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 15:59.
17 and 21 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on North Approach, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 22 Aug 2024 at 09:45.
17 and 21 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Mount Pleasant Lane, Bricket Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 13:25.
18 and 20 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Dene Road, Northwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 22 Nov 2024 at 10:41.
18 and 21 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Berry Lane, Chorleywood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Oct 2024 at 14:19.
18 and 21 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Berry Lane, Chorleywood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Oct 2024 at 14:22.
18 and 20 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Theobald Street, Borehamwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 09:46.
20 and 24 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Little Potters, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 10:16.
20 and 24 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Ivinghoe Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 10:09.
21 and 25 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Richfield Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 10:21.
Roadworks Map near to The Parade, High Street, WATFORD, WD17 1BS
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to The Parade, High Street, WATFORD, WD17 1BS (39 Events)
(Scheduled Dates)
(miles)
(Scheduled: 30 Jul 2024 - 5 Dec 2024)
(Scheduled: 17 Nov 2024 - 24 Nov 2024)
(Scheduled: 17 Nov 2024 - 24 Nov 2024)
(Scheduled: 21 Nov 2024 - 26 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.