ROADWORKS SUMMARY
Telford Close, WIDNES, WA8 9GS

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Telford Close, WA8 9GS and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Telford Close, WIDNES, WA8 9GS

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Telford Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Knowsley Metropolitan Borough Council logo
LONG TERM
Until
30 Jun 2026
Details
View Map
Share
Follow
Cronton Road

Knowsley Metropolitan Borough Council are carrying out Highway repair and maintenance works on Cronton Road, Huyton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 May 2024 at 09:30 and could run through until 30 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 29 Sep 2025 at 13:38.

Knowsley Metropolitan Borough Council logo
LONG TERM
Until
30 Jun 2026
Details
View Map
Share
Follow
M62 J6 Roundabout

Knowsley Metropolitan Borough Council are carrying out Highway repair and maintenance works on M62 J6 Roundabout, Knowsley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 09:30 and could run through until 30 June 2026. The works will impact the carriageway only.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 18 Oct 2024 at 11:09.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
25 Nov 2024 and 30 Jun 2026
Details
View Map
Share
Follow
Roby Road

Knowsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Roby Road, Roby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 30 June 2026. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 13 Nov 2024 at 11:01.

Knowsley Metropolitan Borough Council logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Lyneham

Knowsley Metropolitan Borough Council are carrying out Section 50 on Lyneham, Whiston.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 08:00 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 6 Oct 2025 at 11:55.

Knowsley Metropolitan Borough Council logo
LONG TERM
Until
31 Dec 2026
Details
View Map
Share
Follow
M62 J6 Join E

Knowsley Metropolitan Borough Council are carrying out Highway repair and maintenance works on M62 J6 Join E, Knowsley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 January 2025 at 09:30 and could run through until 31 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 9 May 2025 at 16:30.

Knowsley Metropolitan Borough Council logo
LONG TERM
Until
1 May 2026
Details
View Map
Share
Follow
M62 J6 Leave W

Knowsley Metropolitan Borough Council are carrying out Highway repair and maintenance works on M62 J6 Leave W, Knowsley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 05:00 and could run through until 1 May 2026. The works will impact the carriageway only.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 17 Jul 2025 at 16:30.

Knowsley Metropolitan Borough Council logo
LONG TERM
Until
30 Jun 2026
Details
View Map
Share
Follow
Roby Road

Knowsley Metropolitan Borough Council are carrying out Highway repair and maintenance works on Roby Road, Roby.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 February 2025 at 23:00 and could run through until 30 June 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 5 Feb 2025 at 10:36.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
28 Feb 2025 and 31 Oct 2026
Details
View Map
Share
Follow
M62 J6 Roundabout

Knowsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on M62 J6 Roundabout, Knowsley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 31 October 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 28 Feb 2025 at 09:40.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
28 Feb 2025 and 31 Dec 2026
Details
View Map
Share
Follow
M62 J6 Roundabout

Knowsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on M62 J6 Roundabout, Knowsley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 31 December 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 11 Aug 2025 at 16:30.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
1 Apr and 30 Oct 2025
Details
View Map
Share
Follow
Speke Road

Knowsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Speke Road, Knowsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 21 Mar 2025 at 16:51.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
1 Apr and 31 Oct 2025
Details
View Map
Share
Follow
Speke Road

Knowsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Speke Road, Knowsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 21 Mar 2025 at 16:49.

Knowsley Metropolitan Borough Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Roseheath Drive

Knowsley Metropolitan Borough Council were proposing to carry out Highway improvement works on Roseheath Drive, Halewood.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 April 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 15 May 2025 at 12:41.

Knowsley Metropolitan Borough Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Woodland Road

Knowsley Metropolitan Borough Council were proposing to carry out Highway improvement works on Woodland Road, Halewood.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 April 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 15 May 2025 at 12:26.

Knowsley Metropolitan Borough Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Oakwood Road

Knowsley Metropolitan Borough Council were proposing to carry out Highway improvement works on Oakwood Road, Halewood.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 April 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 15 May 2025 at 12:30.

Knowsley Metropolitan Borough Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Beechwood Avenue

Knowsley Metropolitan Borough Council were proposing to carry out Highway improvement works on Beechwood Avenue, Halewood.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 April 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 15 May 2025 at 12:34.

Knowsley Metropolitan Borough Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Leathers Lane

Knowsley Metropolitan Borough Council were proposing to carry out Highway improvement works on Leathers Lane, Halewood.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 April 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 28 Jul 2025 at 15:49.

Knowsley Metropolitan Borough Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Wood Road

Knowsley Metropolitan Borough Council were proposing to carry out Highway improvement works on Wood Road, Halewood.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 April 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 15 May 2025 at 12:19.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
4 May and 2 Nov 2025
Details
View Map
Share
Higher Road

Knowsley Metropolitan Borough Council were proposing to carry out Highway improvement works on Higher Road, Halewood.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 May 2025 and run through until 2 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 6 Aug 2025 at 10:11.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
4 May and 2 Nov 2025
Details
View Map
Share
Wood Road

Knowsley Metropolitan Borough Council were proposing to carry out Highway improvement works on Wood Road, Halewood.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 May 2025 and run through until 2 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 23 May 2025 at 14:42.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
4 May and 2 Nov 2025
Details
View Map
Share
Follow
Higher Road

Knowsley Metropolitan Borough Council are proposing to carry out Highway improvement works on Higher Road, Halewood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 May 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 26 Feb 2025 at 13:58.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
4 May and 2 Nov 2025
Details
View Map
Share
Blackburne Drive

Knowsley Metropolitan Borough Council were proposing to carry out Highway improvement works on Blackburne Drive, Halewood.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 May 2025 and run through until 2 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 5 Aug 2025 at 14:41.

Knowsley Metropolitan Borough Council logo
LONG TERM
Until
1 May 2026
Details
View Map
Share
Follow
M57 Slip Off To Tarbock Sb

Knowsley Metropolitan Borough Council are carrying out Highway repair and maintenance works on M57 Slip Off To Tarbock Sb, Knowsley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 22:00 and could run through until 1 May 2026. The works will impact the carriageway only.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 29 Jul 2025 at 16:30.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
15 Jul 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Blacklow Brow

Knowsley Metropolitan Borough Council are proposing to carry out Highway improvement works on Blacklow Brow, Huyton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 3 Mar 2025 at 12:16.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
15 Jul 2025 and 31 Mar 2026
Details
View Map
Share
Follow
St Agnes Road

Knowsley Metropolitan Borough Council are proposing to carry out Highway improvement works on St Agnes Road, Huyton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 3 Mar 2025 at 12:19.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
15 Jul 2025 and 31 Mar 2026
Details
View Map
Share
Wilson Road

Knowsley Metropolitan Borough Council were proposing to carry out Highway improvement works on Wilson Road, Huyton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2025 and run through until 31 March 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 24 Jul 2025 at 14:04.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
15 Jul 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Grahams Road

Knowsley Metropolitan Borough Council are proposing to carry out Highway improvement works on Grahams Road, Huyton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 3 Mar 2025 at 12:18.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
15 Jul 2025 and 31 Mar 2026
Details
View Map
Share
Follow
The Orchard

Knowsley Metropolitan Borough Council are proposing to carry out Highway improvement works on The Orchard, Huyton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 3 Mar 2025 at 12:10.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
15 Jul 2025 and 31 Mar 2026
Details
View Map
Share
Follow
St Marys Road

Knowsley Metropolitan Borough Council are proposing to carry out Highway improvement works on St Marys Road, Huyton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 3 Mar 2025 at 12:14.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
4 Aug and 28 Nov 2025
Details
View Map
Share
Windy Arbor Road

Knowsley Metropolitan Borough Council were proposing to carry out Highway improvement works on Windy Arbor Road, Whiston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 28 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 27 May 2025 at 15:35.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
4 Aug and 28 Nov 2025
Details
View Map
Share
Follow
Windy Arbor Road

Knowsley Metropolitan Borough Council are proposing to carry out Highway improvement works on Windy Arbor Road, Whiston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 27 May 2025 at 15:56.

Cadent Gas logo
LONG TERM
Between
25 Aug and 22 Oct 2025
Details
View Map
Share
Follow
Hale Gate Road

Cadent Gas are proposing to carry out Utility asset works on Hale Gate Road, Widnes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 27 Jun 2025 at 14:26.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Reginald Road

Cadent Gas are carrying out Utility asset works on Reginald Road, Sutton Leach, St Helens.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 August 2025 at 10:47 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2025 at 12:18.

Liverpool City Council logo
LONG TERM
Between
1 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Critchley Road

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Critchley Road, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Liverpool City Council on 18 Sep 2025 at 10:47.

Cadent Gas logo
LONG TERM
Between
1 Sep and 29 Oct 2025
Details
View Map
Share
Follow
Hale Gate Road

Cadent Gas are proposing to carry out Utility asset works on Hale Gate Road, Widnes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 10:56.

Cadent Gas logo
LONG TERM
Between
1 Sep and 29 Oct 2025
Details
View Map
Share
Follow
Hale Gate Road

Cadent Gas are proposing to carry out Utility asset works on Hale Gate Road, Widnes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 10 Jun 2025 at 09:50.

Cadent Gas logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Clapgate Crescent

Cadent Gas are proposing to carry out Utility asset works on Clapgate Crescent, Widnes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 10:53.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Higher Road

Knowsley Metropolitan Borough Council are proposing to carry out Highway improvement works on Higher Road, Halewood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 6 Aug 2025 at 10:23.

Liverpool City Council logo
LONG TERM
Between
8 Sep 2025 and 10 Sep 2026
Details
View Map
Share
Follow
Western Avenue

Liverpool City Council are proposing to carry out Section 50 on Western Avenue, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Liverpool City Council on 29 Jul 2025 at 15:47.

Liverpool City Council logo
LONG TERM
Between
8 Sep 2025 and 10 Sep 2026
Details
View Map
Share
Follow
Western Avenue

Liverpool City Council are proposing to carry out Section 50 on Western Avenue, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Liverpool City Council on 29 Jul 2025 at 16:03.

Cadent Gas logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Hale Road

Cadent Gas are proposing to carry out Utility asset works on Hale Road, Widnes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 18 Jul 2025 at 09:36.

Halton Borough Council logo
LONG TERM
Until
21 Oct 2025
Details
View Map
Share
Follow
Bridgewater Expressway

Halton Borough Council are carrying out Works for road purposes on Bridgewater Expressway, Runcorn.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 13:12 and could run through until 21 October 2025. The works will impact the verge only.

This roadwork event was last updated by Halton Borough Council on 8 Oct 2025 at 08:43.

Knowsley Metropolitan Borough Council logo
Finishing
Monday
Details
View Map
Share
Follow
Salerno Drive

Knowsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Salerno Drive, Huyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 12 Aug 2025 at 13:08.

ManWeb logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Canal Street

ManWeb are proposing to carry out Utility repair and maintenance works on Canal Street, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 7 Jun 2025 at 08:58.

Cadent Gas logo
LONG TERM
Until
29 Oct 2025
Details
View Map
Share
Follow
Hale Road

Cadent Gas are carrying out Utility asset works on Hale Road, Widnes.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 September 2025 at 10:20 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2025 at 10:20.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
22 Sep 2025 and 29 May 2026
Details
View Map
Share
Follow
Higher Road

Knowsley Metropolitan Borough Council are proposing to carry out Highway improvement works on Higher Road, Halewood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 29 May 2026. The works will impact the carriageway only.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 3 Sep 2025 at 11:59.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Liverpool Road

Cadent Gas are proposing to carry out Utility asset works on Liverpool Road, Widnes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jul 2025 at 08:58.

Cadent Gas logo
Between
22 Sep and 22 Oct 2025
Details
View Map
Share
Follow
Sycamore Avenue

Cadent Gas are proposing to carry out Utility asset works on Sycamore Avenue, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jun 2025 at 11:38.

Cadent Gas logo
Until
22 Oct 2025
Details
View Map
Share
Follow
Sycamore Avenue

Cadent Gas are carrying out Utility asset works on Sycamore Avenue, Widnes.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 11:07 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Sep 2025 at 09:00.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Hall Lane

Cadent Gas are proposing to carry out Utility asset works on Hall Lane, Huyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jul 2025 at 12:09.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Wood Lane

Cadent Gas are proposing to carry out Utility asset works on Wood Lane, Huyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jul 2025 at 12:11.

ManWeb logo
LONG TERM
Between
22 Sep and 26 Oct 2025
Details
View Map
Share
Follow
Knowsley Road

ManWeb are proposing to carry out Utility repair and maintenance works on Knowsley Road, St Helens.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 7 Jun 2025 at 08:52.

Cadent Gas logo
Between
23 Sep and 21 Oct 2025
Details
View Map
Share
Follow
Windsor Road

Cadent Gas are proposing to carry out Utility asset works on Windsor Road, Roby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2025 at 17:34.

ManWeb logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Hale Road

ManWeb are proposing to carry out Utility repair and maintenance works on Hale Road, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 3 Jul 2025 at 11:51.

Cadent Gas logo
Between
29 Sep and 22 Oct 2025
Details
View Map
Share
Clock Face Road

Cadent Gas were proposing to carry out Utility asset works on Clock Face Road, Clock Face, St Helens.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 22 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2025 at 11:44.

Cadent Gas logo
LONG TERM
Between
29 Sep and 5 Nov 2025
Details
View Map
Share
Prescot Road

Cadent Gas were proposing to carry out Utility asset works on Prescot Road, St Helens.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 5 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Jul 2025 at 12:55.

LONG TERM
Between
4 Oct 2025 and 5 Oct 2026
Details
View Map
Share
Follow
Lascelles Street

St. Helens Council are proposing to carry out Highway repair and maintenance works on Lascelles Street, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2025 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by St. Helens Council on 22 Sep 2025 at 15:55.

Cadent Gas logo
LONG TERM
Between
6 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Hough Green Road

Cadent Gas are proposing to carry out Utility asset works on Hough Green Road, Widnes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jun 2025 at 10:11.

Cadent Gas logo
LONG TERM
Between
6 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Hough Green Road

Cadent Gas are proposing to carry out Utility asset works on Hough Green Road, Widnes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jul 2025 at 09:06.

Cadent Gas logo
Between
6 and 22 Oct 2025
Details
View Map
Share
Follow
Netherley Road

Cadent Gas are proposing to carry out Utility asset works on Netherley Road, Tarbock Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Sep 2025 at 12:59.

Electricity Network Company logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Tavistock Road

Electricity Network Company are proposing to carry out Utility asset works on Tavistock Road, Penketh, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 4 Sep 2025 at 13:05.

Knowsley Metropolitan Borough Council logo
LONG TERM
Until
23 Jan 2026
Details
View Map
Share
Follow
Windy Arbor Road

Knowsley Metropolitan Borough Council are carrying out Highway improvement works on Windy Arbor Road, Whiston.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 09:30 and could run through until 23 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 7 Oct 2025 at 21:19.

ManWeb logo
LONG TERM
Until
5 Dec 2025
Details
View Map
Share
Follow
Wilson Road

ManWeb are carrying out Utility repair and maintenance works on Wilson Road, Huyton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 16:45 and could run through until 5 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by ManWeb on 7 Oct 2025 at 08:23.

Cadent Gas logo
Until
27 Oct 2025
Details
View Map
Share
Follow
Hall Lane

Cadent Gas are carrying out Utility asset works on Hall Lane, Huyton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 17:35 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2025 at 09:51.

Cadent Gas logo
Until
27 Oct 2025
Details
View Map
Share
Follow
Wood Lane

Cadent Gas are carrying out Utility asset works on Wood Lane, Huyton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 17:35 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2025 at 09:30.

Cadent Gas logo
Between
6 and 27 Oct 2025
Details
View Map
Share
Follow
Pluckington Road

Cadent Gas are proposing to carry out Utility asset works on Pluckington Road, Huyton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jun 2025 at 16:09.

Cadent Gas logo
Between
6 and 27 Oct 2025
Details
View Map
Share
Follow
Pluckington Road

Cadent Gas are proposing to carry out Utility asset works on Pluckington Road, Huyton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 15:48.

Cadent Gas logo
Between
6 and 27 Oct 2025
Details
View Map
Share
Follow
Longview Drive

Cadent Gas are proposing to carry out Utility asset works on Longview Drive, Huyton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jul 2025 at 12:05.

Cadent Gas logo
LONG TERM
Between
6 Oct and 3 Dec 2025
Details
View Map
Share
Leach Lane

Cadent Gas were proposing to carry out Utility asset works on Leach Lane, Sutton Leach, St Helens.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 3 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jul 2025 at 11:51.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
6 Oct and 14 Nov 2025
Details
View Map
Share
Moss Street

Knowsley Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Moss Street, Prescot.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 14 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 31 Jul 2025 at 13:59.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
6 Oct and 14 Nov 2025
Details
View Map
Share
Eaton Street

Knowsley Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Eaton Street, Prescot.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 14 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 31 Jul 2025 at 13:57.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
6 Oct and 14 Nov 2025
Details
View Map
Share
Hope Street

Knowsley Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Hope Street, Prescot.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 14 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 31 Jul 2025 at 13:58.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
6 Oct and 14 Nov 2025
Details
View Map
Share
Evans Street

Knowsley Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Evans Street, Prescot.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 14 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 31 Jul 2025 at 13:57.

ManWeb logo
Between
6 and 26 Oct 2025
Details
View Map
Share
Follow
Bold Street

ManWeb are proposing to carry out Utility repair and maintenance works on Bold Street, St Helens.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 7 Jun 2025 at 08:59.

Vodafone logo
Between
11 and 19 Oct 2025
Details
View Map
Share
Follow
Evans Road

Vodafone are proposing to carry out Utility asset works on Evans Road, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 10 Jul 2025 at 09:01.

Vodafone logo
Between
11 and 19 Oct 2025
Details
View Map
Share
Follow
Evans Road

Vodafone are proposing to carry out Utility asset works on Evans Road, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 15 Jul 2025 at 10:53.

United Utilities Water (formerly North West Water) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Slip Off To Halton Brook (Northbound)

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Slip Off To Halton Brook (Northbound), Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 22 Jul 2025 at 13:22.

United Utilities Water (formerly North West Water) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Slip Off To Halton Brook (Northbound)

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Slip Off To Halton Brook (Northbound), Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 23 Jul 2025 at 12:20.

United Utilities Water (formerly North West Water) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Slip Off To Halton Brook (Northbound)

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Slip Off To Halton Brook (Northbound), Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 19 Aug 2025 at 10:00.

United Utilities Water (formerly North West Water) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Slip Off To Halton Brook (Northbound)

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Slip Off To Halton Brook (Northbound), Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 17 Sep 2025 at 13:23.

United Utilities Water (formerly North West Water) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Halton Brow

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Halton Brow, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 22 Jul 2025 at 13:23.

United Utilities Water (formerly North West Water) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Halton Brow

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Halton Brow, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 23 Jul 2025 at 12:20.

United Utilities Water (formerly North West Water) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Halton Brow

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Halton Brow, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 19 Aug 2025 at 10:00.

United Utilities Water (formerly North West Water) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Halton Brow

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Halton Brow, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 17 Sep 2025 at 13:24.

United Utilities Water (formerly North West Water) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Slip On From Halton Brook (Northbound)

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Slip On From Halton Brook (Northbound), Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 22 Jul 2025 at 13:24.

United Utilities Water (formerly North West Water) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Slip On From Halton Brook (Northbound)

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Slip On From Halton Brook (Northbound), Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 23 Jul 2025 at 12:19.

United Utilities Water (formerly North West Water) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Slip On From Halton Brook (Northbound)

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Slip On From Halton Brook (Northbound), Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 19 Aug 2025 at 10:00.

United Utilities Water (formerly North West Water) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Slip On From Halton Brook (Northbound)

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Slip On From Halton Brook (Northbound), Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 17 Sep 2025 at 13:24.

Cadent Gas logo
Between
13 and 29 Oct 2025
Details
View Map
Share
Follow
Baguley Avenue

Cadent Gas are proposing to carry out Utility asset works on Baguley Avenue, Widnes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2025 at 15:24.

Vodafone logo
Between
13 and 19 Oct 2025
Details
View Map
Share
Follow
Evans Road

Vodafone are proposing to carry out Utility asset works on Evans Road, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 9 Sep 2025 at 13:33.

Cadent Gas logo
Between
13 and 29 Oct 2025
Details
View Map
Share
Follow
Footpath 03hg

Cadent Gas are proposing to carry out Utility asset works on Footpath 03hg, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 29 October 2025. The works will impact the footpath only.

This roadwork event was last updated by Cadent Gas on 21 Jul 2025 at 12:20.

Cadent Gas logo
Between
13 and 29 Oct 2025
Details
View Map
Share
Follow
Footpath 03hg

Cadent Gas are proposing to carry out Utility asset works on Footpath 03hg, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 29 October 2025. The works will impact the footpath only.

This roadwork event was last updated by Cadent Gas on 28 Jul 2025 at 10:39.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
13 Oct 2025 and 30 Jun 2026
Details
View Map
Share
Follow
Wilson Road

Knowsley Metropolitan Borough Council are proposing to carry out Highway improvement works on Wilson Road, Huyton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 30 June 2026. The works will impact the carriageway only.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 31 Jul 2025 at 09:18.

Knowsley Metropolitan Borough Council logo
Between
13 Oct and 10 Nov 2025
Details
View Map
Share
Salerno Drive

Knowsley Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Salerno Drive, Huyton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 10 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 6 Oct 2025 at 11:43.

Cadent Gas logo
LONG TERM
Between
13 Oct and 19 Nov 2025
Details
View Map
Share
Follow
Leach Lane

Cadent Gas are proposing to carry out Utility asset works on Leach Lane, Sutton Leach, St Helens.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2025 at 11:40.

ManWeb logo
LONG TERM
Between
13 Oct and 30 Nov 2025
Details
View Map
Share
Follow
Eccleston Street

ManWeb are proposing to carry out Utility repair and maintenance works on Eccleston Street, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 17 Jun 2025 at 11:56.

Cadent Gas logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Eccleston Street

Cadent Gas are proposing to carry out Utility asset works on Eccleston Street, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2025 at 16:00.

Cadent Gas logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Eccleston Street

Cadent Gas are proposing to carry out Utility asset works on Eccleston Street, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2025 at 08:53.

Telcom UK logo
Finishing
Friday
Details
View Map
Share
Follow
Vincent Street

Telcom UK are proposing to carry out Utility asset works on Vincent Street, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Telcom UK on 3 Oct 2025 at 09:02.

Telcom UK logo
Finishing
Friday
Details
View Map
Share
Follow
Vincent Street

Telcom UK are proposing to carry out Utility asset works on Vincent Street, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Telcom UK on 10 Oct 2025 at 10:17.

Cadent Gas logo
Between
16 and 31 Oct 2025
Details
View Map
Share
Follow
Pluckington Road

Cadent Gas are proposing to carry out Utility asset works on Pluckington Road, Huyton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2025 at 16:38.

Cadent Gas logo
Between
16 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Longview Drive

Cadent Gas are proposing to carry out Utility asset works on Longview Drive, Huyton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2025 at 16:38.

Cadent Gas logo
LONG TERM
Between
20 Oct and 4 Dec 2025
Details
View Map
Share
Follow
Hale Gate Road

Cadent Gas are proposing to carry out Utility asset works on Hale Gate Road, Widnes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 4 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2025 at 12:12.

Cadent Gas logo
Between
20 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Netherley Road

Cadent Gas are proposing to carry out Utility asset works on Netherley Road, Tarbock Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2025 at 12:45.

Electricity Network Company logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Tavistock Road

Electricity Network Company are proposing to carry out Utility asset works on Tavistock Road, Penketh, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 17 Jul 2025 at 11:38.

United Utilities Water (formerly North West Water) logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Herdman Close

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Herdman Close, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 18 Jul 2025 at 13:01.

United Utilities Water (formerly North West Water) logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Herdman Close

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Herdman Close, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Aug 2025 at 15:58.

ManWeb logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Wheatfield Road

ManWeb are proposing to carry out Utility repair and maintenance works on Wheatfield Road, Cronton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 9 Jul 2025 at 15:13.

ManWeb logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Wheatfield Road

ManWeb are proposing to carry out Utility repair and maintenance works on Wheatfield Road, Cronton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 1 Oct 2025 at 17:42.

Cadent Gas logo
Between
20 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Hall Lane

Cadent Gas are proposing to carry out Utility asset works on Hall Lane, Huyton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Aug 2025 at 17:49.

ManWeb logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Walpole Avenue

ManWeb are proposing to carry out Utility repair and maintenance works on Walpole Avenue, Whiston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 9 Jul 2025 at 14:59.

ManWeb logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Walpole Avenue

ManWeb are proposing to carry out Utility repair and maintenance works on Walpole Avenue, Whiston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 2 Oct 2025 at 14:06.

Cadent Gas logo
Between
20 Oct and 5 Nov 2025
Details
View Map
Share
Boundary Road

Cadent Gas were proposing to carry out Utility asset works on Boundary Road, St Helens.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 5 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Jul 2025 at 12:56.

Halton Borough Council logo
Between
22 and 24 Oct 2025
Details
View Map
Share
Follow
Ivy Street

Halton Borough Council are proposing to carry out Highway repair and maintenance works on Ivy Street, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 1 Aug 2025 at 11:51.

Cadent Gas logo
Between
22 Oct and 19 Nov 2025
Details
View Map
Share
Follow
Windsor Road

Cadent Gas are proposing to carry out Utility asset works on Windsor Road, Roby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2025 at 10:50.

Cadent Gas logo
Between
22 Oct and 19 Nov 2025
Details
View Map
Share
Follow
Windsor Road

Cadent Gas are proposing to carry out Utility asset works on Windsor Road, Roby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 17:08.

ManWeb logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Hale Road

ManWeb are proposing to carry out Utility repair and maintenance works on Hale Road, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 21 Jul 2025 at 14:42.

ManWeb logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Hale Road

ManWeb are proposing to carry out Utility repair and maintenance works on Hale Road, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 20 Aug 2025 at 10:11.

Between
25 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Chester Lane

St. Helens Council are proposing to carry out Section 50 on Chester Lane, Clock Face, St Helens.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by St. Helens Council on 5 Sep 2025 at 09:48.

Between
25 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Chester Lane

St. Helens Council are proposing to carry out Section 50 on Chester Lane, Clock Face, St Helens.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by St. Helens Council on 5 Sep 2025 at 09:58.

Cadent Gas logo
Between
27 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Palace Fields Avenue

Cadent Gas are proposing to carry out Utility asset works on Palace Fields Avenue, Runcorn.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Sep 2025 at 11:43.

Cadent Gas logo
Between
27 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Footpath 73pf

Cadent Gas are proposing to carry out Utility asset works on Footpath 73pf, Palacefields, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 12 November 2025. The works will impact the footpath only.

This roadwork event was last updated by Cadent Gas on 1 Aug 2025 at 09:34.

BT logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Cotton Lane

BT are proposing to carry out New service connection on Cotton Lane, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 1 Aug 2025 at 12:27.

BT logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Cotton Lane

BT are proposing to carry out New service connection on Cotton Lane, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Oct 2025 at 15:57.

ManWeb logo
Between
27 Oct and 15 Nov 2025
Details
View Map
Share
Follow
Brindley Street

ManWeb are proposing to carry out Utility repair and maintenance works on Brindley Street, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 7 Jul 2025 at 12:21.

Cadent Gas logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Liverpool Road

Cadent Gas are proposing to carry out Utility asset works on Liverpool Road, Widnes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2025 at 12:52.

Cadent Gas logo
Between
27 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Footpath G-1-3hg

Cadent Gas are proposing to carry out Utility asset works on Footpath G-1-3hg, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 12 November 2025. The works will impact the footpath only.

This roadwork event was last updated by Cadent Gas on 26 Sep 2025 at 12:50.

Cadent Gas logo
Between
27 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Footpath 05hg

Cadent Gas are proposing to carry out Utility asset works on Footpath 05hg, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 12 November 2025. The works will impact the footpath only.

This roadwork event was last updated by Cadent Gas on 21 Jul 2025 at 13:59.

Cadent Gas logo
Between
27 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Footpath 05hg

Cadent Gas are proposing to carry out Utility asset works on Footpath 05hg, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 12 November 2025. The works will impact the footpath only.

This roadwork event was last updated by Cadent Gas on 31 Jul 2025 at 11:02.

Knowsley Metropolitan Borough Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Cedar Crescent

Knowsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Cedar Crescent, Huyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 8 Sep 2025 at 14:38.

Knowsley Metropolitan Borough Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Cedar Crescent

Knowsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Cedar Crescent, Huyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 26 Sep 2025 at 15:37.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
27 Oct 2025 and 29 Jan 2027
Details
View Map
Share
Follow
Wilson Road

Knowsley Metropolitan Borough Council are proposing to carry out Highway improvement works on Wilson Road, Huyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 10 Oct 2025 at 11:34.

Cadent Gas logo
Between
27 Oct and 17 Nov 2025
Details
View Map
Share
Follow
Longview Drive

Cadent Gas are proposing to carry out Utility asset works on Longview Drive, Huyton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jul 2025 at 14:32.

Cadent Gas logo
LONG TERM
Between
27 Oct and 3 Dec 2025
Details
View Map
Share
Follow
Leach Lane

Cadent Gas are proposing to carry out Utility asset works on Leach Lane, Sutton Leach, St Helens.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jul 2025 at 08:31.

ManWeb logo
LONG TERM
Between
27 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Corporation Street

ManWeb are proposing to carry out Utility repair and maintenance works on Corporation Street, St Helens.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 6 Aug 2025 at 08:50.

ManWeb logo
Between
28 Oct and 3 Nov 2025
Details
View Map
Share
Wood Lane

ManWeb were proposing to carry out Utility repair and maintenance works on Wood Lane, Huyton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2025 and run through until 3 November 2025. The works were due to impact the carriageway and footpath.

This roadwork event was last updated by ManWeb on 31 Jul 2025 at 10:57.

ManWeb logo
Between
28 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Wood Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Wood Lane, Huyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 4 November 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by ManWeb on 28 Aug 2025 at 12:28.

ManWeb logo
Between
28 Oct and 4 Nov 2025
Details
View Map
Share
Follow
The Crescent

ManWeb are proposing to carry out Utility repair and maintenance works on The Crescent, Huyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 4 November 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by ManWeb on 12 Aug 2025 at 13:10.

ManWeb logo
Between
29 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Hale Road

ManWeb are proposing to carry out Utility repair and maintenance works on Hale Road, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 4 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 18 Aug 2025 at 12:43.

ManWeb logo
LONG TERM
Between
30 Oct and 31 Dec 2025
Details
View Map
Share
Follow
Wilson Road

ManWeb are proposing to carry out Utility repair and maintenance works on Wilson Road, Huyton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 31 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by ManWeb on 5 Aug 2025 at 10:47.

Cadent Gas logo
LONG TERM
Between
30 Oct and 30 Nov 2025
Details
View Map
Share
Follow
Windsor Road

Cadent Gas are proposing to carry out Utility asset works on Windsor Road, Roby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Oct 2025 at 15:33.

Cadent Gas logo
Between
3 and 19 Nov 2025
Details
View Map
Share
Follow
Footpath G-1-10hg

Cadent Gas are proposing to carry out Utility asset works on Footpath G-1-10hg, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 November 2025. The works will impact the footpath only.

This roadwork event was last updated by Cadent Gas on 21 Jul 2025 at 13:50.

Cadent Gas logo
Between
3 and 19 Nov 2025
Details
View Map
Share
Follow
Footpath G-1-10hg

Cadent Gas are proposing to carry out Utility asset works on Footpath G-1-10hg, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 November 2025. The works will impact the footpath only.

This roadwork event was last updated by Cadent Gas on 31 Jul 2025 at 11:13.

Cadent Gas logo
Between
3 Nov and 3 Dec 2025
Details
View Map
Share
Follow
Footpath G-1-7hg

Cadent Gas are proposing to carry out Utility asset works on Footpath G-1-7hg, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 3 December 2025. The works will impact the footpath only.

This roadwork event was last updated by Cadent Gas on 21 Jul 2025 at 13:47.

Cadent Gas logo
Between
3 Nov and 3 Dec 2025
Details
View Map
Share
Follow
Footpath G-1-7hg

Cadent Gas are proposing to carry out Utility asset works on Footpath G-1-7hg, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 3 December 2025. The works will impact the footpath only.

This roadwork event was last updated by Cadent Gas on 31 Jul 2025 at 11:47.

Cadent Gas logo
Between
3 and 19 Nov 2025
Details
View Map
Share
Follow
Footpath G-1-11hg

Cadent Gas are proposing to carry out Utility asset works on Footpath G-1-11hg, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 November 2025. The works will impact the footpath only.

This roadwork event was last updated by Cadent Gas on 21 Jul 2025 at 14:03.

Cadent Gas logo
Between
3 and 19 Nov 2025
Details
View Map
Share
Follow
Footpath G-1-11hg

Cadent Gas are proposing to carry out Utility asset works on Footpath G-1-11hg, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 November 2025. The works will impact the footpath only.

This roadwork event was last updated by Cadent Gas on 31 Jul 2025 at 11:11.

Warrington Borough Council logo
LONG TERM
Between
3 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Radlett Close

Warrington Borough Council are proposing to carry out Highway improvement works on Radlett Close, Penketh, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 4 Jun 2025 at 11:31.

Warrington Borough Council logo
LONG TERM
Between
3 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Radlett Close

Warrington Borough Council are proposing to carry out Highway improvement works on Radlett Close, Penketh, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 3 Oct 2025 at 09:37.

Warrington Borough Council logo
LONG TERM
Between
3 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Lynton Close

Warrington Borough Council are proposing to carry out Highway improvement works on Lynton Close, Penketh, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 4 Jun 2025 at 11:27.

Warrington Borough Council logo
LONG TERM
Between
3 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Lynton Close

Warrington Borough Council are proposing to carry out Highway improvement works on Lynton Close, Penketh, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 3 Oct 2025 at 09:36.

Warrington Borough Council logo
LONG TERM
Between
3 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Hillside Grove

Warrington Borough Council are proposing to carry out Highway improvement works on Hillside Grove, Penketh, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 4 Jun 2025 at 10:53.

Warrington Borough Council logo
LONG TERM
Between
3 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Hillside Grove

Warrington Borough Council are proposing to carry out Highway improvement works on Hillside Grove, Penketh, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 3 Oct 2025 at 09:35.

Warrington Borough Council logo
LONG TERM
Between
3 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Walsingham Road

Warrington Borough Council are proposing to carry out Highway improvement works on Walsingham Road, Penketh, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 5 Jun 2025 at 11:26.

Warrington Borough Council logo
LONG TERM
Between
3 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Walsingham Road

Warrington Borough Council are proposing to carry out Highway improvement works on Walsingham Road, Penketh, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 3 Oct 2025 at 09:38.

Cadent Gas logo
Between
3 and 24 Nov 2025
Details
View Map
Share
Follow
Pluckington Road

Cadent Gas are proposing to carry out Utility asset works on Pluckington Road, Huyton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 10:28.

ManWeb logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Honey Hall Road

ManWeb are proposing to carry out New service connection on Honey Hall Road, Halewood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 12 Aug 2025 at 13:11.

ManWeb logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Honey Hall Road

ManWeb are proposing to carry out New service connection on Honey Hall Road, Halewood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 8 Sep 2025 at 11:11.

ManWeb logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Honey Hall Road

ManWeb are proposing to carry out New service connection on Honey Hall Road, Halewood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 9 Sep 2025 at 14:50.

Cadent Gas logo
Between
10 Nov and 10 Dec 2025
Details
View Map
Share
Follow
Hough Green Road

Cadent Gas are proposing to carry out Utility asset works on Hough Green Road, Widnes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2025 at 11:29.

Cadent Gas logo
Between
10 Nov and 10 Dec 2025
Details
View Map
Share
Follow
Hough Green Road

Cadent Gas are proposing to carry out Utility asset works on Hough Green Road, Widnes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2025 at 11:27.

Cadent Gas logo
Between
10 and 26 Nov 2025
Details
View Map
Share
Follow
Footpath G-1-9hg

Cadent Gas are proposing to carry out Utility asset works on Footpath G-1-9hg, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 26 November 2025. The works will impact the footpath only.

This roadwork event was last updated by Cadent Gas on 21 Jul 2025 at 13:52.

Cadent Gas logo
Between
10 and 26 Nov 2025
Details
View Map
Share
Follow
Footpath G-1-9hg

Cadent Gas are proposing to carry out Utility asset works on Footpath G-1-9hg, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 26 November 2025. The works will impact the footpath only.

This roadwork event was last updated by Cadent Gas on 31 Jul 2025 at 11:27.

Cadent Gas logo
Between
10 and 26 Nov 2025
Details
View Map
Share
Follow
Footpath G-1-8hg

Cadent Gas are proposing to carry out Utility asset works on Footpath G-1-8hg, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 26 November 2025. The works will impact the footpath only.

This roadwork event was last updated by Cadent Gas on 21 Jul 2025 at 14:03.

Cadent Gas logo
Between
10 and 26 Nov 2025
Details
View Map
Share
Follow
Footpath G-1-8hg

Cadent Gas are proposing to carry out Utility asset works on Footpath G-1-8hg, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 26 November 2025. The works will impact the footpath only.

This roadwork event was last updated by Cadent Gas on 31 Jul 2025 at 11:31.

Cadent Gas logo
Between
10 and 26 Nov 2025
Details
View Map
Share
Follow
Union Bank Lane

Cadent Gas are proposing to carry out Utility asset works on Union Bank Lane, Bold Heath, St Helens.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Aug 2025 at 13:47.

Halton Borough Council logo
Between
11 and 18 Nov 2025
Details
View Map
Share
Follow
Second Avenue

Halton Borough Council are proposing to carry out Highway repair and maintenance works on Second Avenue, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 18 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 11 Sep 2025 at 13:01.

Halton Borough Council logo
Between
11 and 18 Nov 2025
Details
View Map
Share
Follow
Second Avenue

Halton Borough Council are proposing to carry out Highway repair and maintenance works on Second Avenue, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 18 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 29 Sep 2025 at 15:20.

Liverpool City Council logo
Between
17 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Roskell Road

Liverpool City Council are proposing to carry out Highway improvement works on Roskell Road, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Liverpool City Council on 3 Oct 2025 at 08:42.

Liverpool City Council logo
Between
17 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Roskell Road

Liverpool City Council are proposing to carry out Highway improvement works on Roskell Road, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Liverpool City Council on 3 Oct 2025 at 08:43.

Knowsley Metropolitan Borough Council logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Whiston Lane

Knowsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Whiston Lane, Huyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 10 Oct 2025 at 13:02.

Halton Borough Council logo
Between
19 and 26 Nov 2025
Details
View Map
Share
Follow
East Lane

Halton Borough Council are proposing to carry out Highway improvement works on East Lane, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 11 Sep 2025 at 12:56.

Halton Borough Council logo
Between
19 and 26 Nov 2025
Details
View Map
Share
Follow
East Lane

Halton Borough Council are proposing to carry out Highway improvement works on East Lane, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 29 Sep 2025 at 15:18.

ManWeb logo
Between
21 and 28 Nov 2025
Details
View Map
Share
Follow
Wood Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Wood Lane, Huyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by ManWeb on 26 Sep 2025 at 11:42.

ManWeb logo
Between
21 and 28 Nov 2025
Details
View Map
Share
Follow
The Crescent

ManWeb are proposing to carry out Utility repair and maintenance works on The Crescent, Huyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by ManWeb on 8 Sep 2025 at 11:08.

Cadent Gas logo
Between
24 Nov and 10 Dec 2025
Details
View Map
Share
Follow
School Lane

Cadent Gas are proposing to carry out Utility asset works on School Lane, Bold Heath, St Helens.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 09:06.

Cadent Gas logo
Between
24 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Clock Face Road

Cadent Gas are proposing to carry out Utility asset works on Clock Face Road, Bold Heath, St Helens.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 09:08.

ManWeb logo
Between
26 Nov and 4 Dec 2025
Details
View Map
Share
Follow
Elwyn Drive

ManWeb are proposing to carry out Utility repair and maintenance works on Elwyn Drive, Halewood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 4 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 2 Sep 2025 at 07:55.

United Utilities Water (formerly North West Water) logo
Between
1 and 3 Dec 2025
Details
View Map
Share
Follow
School Lane

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on School Lane, Woolton, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Sep 2025 at 11:46.

United Utilities Water (formerly North West Water) logo
Between
1 and 3 Dec 2025
Details
View Map
Share
Follow
School Lane

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on School Lane, Woolton, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 6 Oct 2025 at 07:57.

United Utilities Water (formerly North West Water) logo
Between
3 and 5 Dec 2025
Details
View Map
Share
Salcombe Drive

United Utilities Water (formerly North West Water) were proposing to carry out Disconnection or alteration of supply on Salcombe Drive, Liverpool.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2025 and run through until 5 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 2 Oct 2025 at 15:20.

Cadent Gas logo
LONG TERM
Between
8 Dec 2025 and 12 Jan 2026
Details
View Map
Share
Follow
Footpath G-1-7hg

Cadent Gas are proposing to carry out Utility asset works on Footpath G-1-7hg, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 12 January 2026. The works will impact the footpath only.

This roadwork event was last updated by Cadent Gas on 30 Sep 2025 at 08:37.

Halton Borough Council logo
Between
10 and 12 Dec 2025
Details
View Map
Share
Follow
Ivy Street

Halton Borough Council are proposing to carry out Highway repair and maintenance works on Ivy Street, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 24 Sep 2025 at 15:10.

Halton Borough Council logo
Between
10 and 12 Dec 2025
Details
View Map
Share
Follow
Ivy Street

Halton Borough Council are proposing to carry out Highway repair and maintenance works on Ivy Street, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 6 Oct 2025 at 11:17.

United Utilities Water (formerly North West Water) logo
Between
10 and 12 Dec 2025
Details
View Map
Share
Follow
Salcombe Drive

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Salcombe Drive, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 3 Oct 2025 at 10:10.

United Utilities Water (formerly North West Water) logo
Between
10 and 12 Dec 2025
Details
View Map
Share
Follow
Salcombe Drive

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Salcombe Drive, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 6 Oct 2025 at 09:18.

Cadent Gas logo
Between
15 Dec 2025 and 5 Jan 2026
Details
View Map
Share
Union Bank Lane

Cadent Gas were proposing to carry out Utility asset works on Union Bank Lane, Bold Heath, St Helens.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 December 2025 and run through until 5 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Sep 2025 at 11:17.

ManWeb logo
Between
22 Dec 2025 and 2 Jan 2026
Details
View Map
Share
Follow
Elwyn Drive

ManWeb are proposing to carry out Utility repair and maintenance works on Elwyn Drive, Halewood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 December 2025 and could run through until 2 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 8 Oct 2025 at 14:41.

Halton Borough Council logo
LONG TERM
Between
1 Jan and 12 Mar 2026
Details
View Map
Share
Follow
Albert Road

Halton Borough Council are proposing to carry out Highway improvement works on Albert Road, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2026 and could run through until 12 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 5 Sep 2025 at 16:01.

BT logo
Between
5 and 7 Jan 2026
Details
View Map
Share
Follow
Stonelea

BT are proposing to carry out Utility asset works on Stonelea, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 7 January 2026. The works will impact the carriageway and footpath.

This roadwork event was last updated by BT on 7 Oct 2025 at 10:57.

Halton Borough Council logo
LONG TERM
Between
5 Jan and 10 Jul 2026
Details
View Map
Share
Follow
High Street

Halton Borough Council are proposing to carry out Highway improvement works on High Street, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 10 July 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Halton Borough Council on 24 Sep 2025 at 10:54.

Halton Borough Council logo
LONG TERM
Between
5 Jan and 10 Jul 2026
Details
View Map
Share
Follow
High Street

Halton Borough Council are proposing to carry out Highway improvement works on High Street, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 10 July 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Halton Borough Council on 6 Oct 2025 at 15:21.

Halton Borough Council logo
LONG TERM
Between
5 Jan and 10 Jul 2026
Details
View Map
Share
Follow
Access To Bus Station (High Street)

Halton Borough Council are proposing to carry out Highway improvement works on Access To Bus Station (High Street), Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 10 July 2026. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 24 Sep 2025 at 10:57.

Halton Borough Council logo
LONG TERM
Between
5 Jan and 10 Jul 2026
Details
View Map
Share
Follow
Access To Bus Station (High Street)

Halton Borough Council are proposing to carry out Highway improvement works on Access To Bus Station (High Street), Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 10 July 2026. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 6 Oct 2025 at 15:54.

Halton Borough Council logo
LONG TERM
Between
5 Jan and 10 Jul 2026
Details
View Map
Share
Follow
Albert Road

Halton Borough Council are proposing to carry out Highway improvement works on Albert Road, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 10 July 2026. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 6 Oct 2025 at 10:51.

Cadent Gas logo
Between
5 and 23 Jan 2026
Details
View Map
Share
Follow
Union Bank Lane

Cadent Gas are proposing to carry out Utility asset works on Union Bank Lane, Bold Heath, St Helens.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 23 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2025 at 13:28.

ManWeb logo
Between
5 and 9 Jan 2026
Details
View Map
Share
Follow
Ivy Farm Road

ManWeb are proposing to carry out New service connection on Ivy Farm Road, Rainhill, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 28 Sep 2025 at 16:30.

Cadent Gas logo
Between
5 Jan and 2 Feb 2026
Details
View Map
Share
Follow
Primrose Drive

Cadent Gas are proposing to carry out Utility asset works on Primrose Drive, Huyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 2 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2025 at 15:30.

Cadent Gas logo
Between
5 and 30 Jan 2026
Details
View Map
Share
Follow
Bedford Street

Cadent Gas are proposing to carry out Utility asset works on Bedford Street, St Helens.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 30 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2025 at 13:26.


Roadworks Map near to Telford Close, WIDNES, WA8 9GS (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 11 Oct 2025 00:53
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Telford Close, WIDNES, WA8 9GS (8 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
United Utilities Water (formerly North West Water) logo
URGENT
  
BELLFLOWER CLOSE 
(0.4 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Give and take
Complete
10 Oct 2025 08:55 - 10:32
0.4
Details
Share
2
BT logo
CHEDWORTH DRIVE 
(0.4 miles)
BT
Utility asset works - Footway, Carriageway, Verge - Give and take
In Progress
Since: 10 Oct 2025 13:50
(Scheduled: 9 Oct 2025 - 14 Oct 2025)
0.4
Details
Share
Follow
3
BT logo
MARCIEN WAY 
(0.6 miles)
BT
New service connection - Footway, Verge - No carriageway incursion
Cancelled
(Scheduled: 9 Oct 2025 - 13 Oct 2025)
0.6
Details
Share
4
BT logo
CRADLEY 
(0.7 miles)
BT
Utility asset works - Footway - Give and take
In Progress
Since: 8 Oct 2025 14:30
(Scheduled: 8 Oct 2025 - 14 Oct 2025)
0.7
Details
Share
Follow
5
ManWeb logo
HILL VIEW 
(0.7 miles)
ManWeb
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 6 Oct 2025 08:00
(Scheduled: 6 Oct 2025 - 17 Oct 2025)
0.7
Details
Share
Follow
6
United Utilities Water (formerly North West Water) logo
URGENT
  
LIVERPOOL ROAD 
(0.8 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Carriageway - Two-way signals
In Progress
Since: 10 Oct 2025 03:40
(Scheduled: 10 Oct 2025 - 14 Oct 2025)
0.8
Details
Share
Follow
7
ManWeb logo
LUNTS HEATH ROAD 
(1.0 miles)
ManWeb
Utility repair and maintenance works - Footway, Carriageway - Contra-flow
Cancelled
(Scheduled: 7 Oct 2025 - 14 Oct 2025)
1.0
Details
Share
8
BT logo
MARLING PARK 
(1.0 miles)
BT
Utility asset works - Carriageway - Give and take
In Progress
Since: 10 Oct 2025 12:35
(Scheduled: 9 Oct 2025 - 14 Oct 2025)
1.0
Details
Share
Follow