ROADWORKS SUMMARY
Sunbeam Close, RUNCORN, WA7 1GQ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Sunbeam Close, WA7 1GQ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Sunbeam Close, RUNCORN, WA7 1GQ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Sunbeam Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Knowsley Metropolitan Borough Council logo
LONG TERM
Until
22 Dec 2024
Details
View Map
Share
Follow
Foxs Bank Lane

Knowsley Metropolitan Borough Council are carrying out Section 50 on Foxs Bank Lane, Whiston.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 July 2023 at 09:15 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 3 Oct 2024 at 13:39.

United Utilities Water (formerly North West Water) logo
LONG TERM
Until
24 Apr 2025
Details
View Map
Share
Follow
Murdishaw Avenue

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Murdishaw Avenue, Runcorn.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 February 2024 at 12:00 and could run through until 24 April 2025. The works will impact the verge only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Apr 2024 at 11:49.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
21 May 2024 and 30 Jun 2025
Details
View Map
Share
Follow
Cronton Road

Knowsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Cronton Road, Huyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2024 and could run through until 30 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 18 Oct 2024 at 13:50.

Knowsley Metropolitan Borough Council logo
LONG TERM
Until
30 Jun 2026
Details
View Map
Share
Follow
Cronton Road

Knowsley Metropolitan Borough Council are carrying out Highway repair and maintenance works on Cronton Road, Huyton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 May 2024 at 09:30 and could run through until 30 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 25 Nov 2024 at 12:27.

Knowsley Metropolitan Borough Council logo
LONG TERM
Until
12 Aug 2025
Details
View Map
Share
Follow
Higher Road

Knowsley Metropolitan Borough Council are carrying out Highway repair and maintenance works on Higher Road, Halewood.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 July 2024 at 07:30 and could run through until 12 August 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 21 Nov 2024 at 14:54.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
22 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Finch Lane

Knowsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Finch Lane, Halewood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 31 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 18 Jul 2024 at 14:46.

Halton Borough Council logo
LONG TERM
Between
12 Aug 2024 and 15 Aug 2025
Details
View Map
Share
Follow
Daresbury Bypass

Halton Borough Council are proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.

These works are categorised as Major.

The works will start on or after 12 August 2024 and could run through until 15 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 11:59.

Halton Borough Council logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Daresbury Bypass

Halton Borough Council are carrying out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.

These works are categorised as Major.

The works started on 12 August 2024 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:25.

Halton Borough Council logo
LONG TERM
Between
12 Aug 2024 and 31 Oct 2025
Details
View Map
Share
Follow
Daresbury Bypass

Halton Borough Council are proposing to carry out Highway repair and maintenance works on Daresbury Bypass, Daresbury, Runcorn.

These works are categorised as Major.

The works will start on or after 12 August 2024 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 16 Feb 2024 at 13:40.

Halton Borough Council logo
LONG TERM
Between
12 Aug 2024 and 15 Aug 2025
Details
View Map
Share
Follow
Chester Road

Halton Borough Council are proposing to carry out Highway improvement works on Chester Road, Daresbury, Runcorn.

These works are categorised as Major.

The works will start on or after 12 August 2024 and could run through until 15 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 12:28.

Halton Borough Council logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Chester Road

Halton Borough Council are carrying out Highway improvement works on Chester Road, Daresbury, Runcorn.

These works are categorised as Major.

The works started on 12 August 2024 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:25.

Halton Borough Council logo
LONG TERM
Between
12 Aug 2024 and 15 Aug 2025
Details
View Map
Share
Follow
Eastern Expressway

Halton Borough Council are proposing to carry out Highway improvement works on Eastern Expressway, Runcorn.

These works are categorised as Major.

The works will start on or after 12 August 2024 and could run through until 15 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 12:24.

Halton Borough Council logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Eastern Expressway

Halton Borough Council are carrying out Highway improvement works on Eastern Expressway, Runcorn.

These works are categorised as Major.

The works started on 12 August 2024 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:25.

Halton Borough Council logo
LONG TERM
Between
12 Aug 2024 and 13 Oct 2025
Details
View Map
Share
Follow
Chester Road

Halton Borough Council are proposing to carry out Highway repair and maintenance works on Chester Road, Daresbury, Runcorn.

These works are categorised as Major.

The works will start on or after 12 August 2024 and could run through until 13 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 13 May 2024 at 08:31.

ManWeb logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Moorfield Road

ManWeb are carrying out Utility repair and maintenance works on Moorfield Road, Widnes.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2024 at 10:53 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 7 Nov 2024 at 09:02.

ManWeb logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Stretton Way

ManWeb are carrying out Utility repair and maintenance works on Stretton Way, Huyton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 09:30 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 16 Sep 2024 at 11:22.

Knowsley Metropolitan Borough Council logo
LONG TERM
Until
30 Jun 2026
Details
View Map
Share
Follow
M62 J6 Roundabout

Knowsley Metropolitan Borough Council are carrying out Highway repair and maintenance works on M62 J6 Roundabout, Knowsley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 09:30 and could run through until 30 June 2026. The works will impact the carriageway only.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 18 Oct 2024 at 11:09.

Liverpool City Council logo
LONG TERM
Between
30 Sep 2024 and 31 Jan 2025
Details
View Map
Share
Alder Wood Avenue

Liverpool City Council were proposing to carry out Highway improvement works on Alder Wood Avenue, Liverpool.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 30 Sep 2024 at 13:20.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
30 Sep 2024 and 7 Feb 2025
Details
View Map
Share
Follow
M62 J6 Join E

Knowsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on M62 J6 Join E, Knowsley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 7 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 19 Jun 2024 at 06:55.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
30 Sep 2024 and 7 Feb 2025
Details
View Map
Share
Follow
M62 J6 Join E

Knowsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on M62 J6 Join E, Knowsley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 7 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 31 Jul 2024 at 13:29.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
30 Sep 2024 and 7 Feb 2025
Details
View Map
Share
Follow
Windy Arbor Road

Knowsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Windy Arbor Road, Whiston.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 7 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 26 Jun 2024 at 12:52.

Halton Borough Council logo
LONG TERM
Between
2 Oct 2024 and 12 Mar 2025
Details
View Map
Share
Daresbury Bypass

Halton Borough Council were proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.

These works were categorised as Major.

The works were originally planned to start 2 October 2024 and run through until 12 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:37.

Halton Borough Council logo
LONG TERM
Between
2 Oct 2024 and 12 Mar 2025
Details
View Map
Share
Chester Road

Halton Borough Council were proposing to carry out Highway improvement works on Chester Road, Daresbury, Runcorn.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2024 and run through until 12 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:38.

Halton Borough Council logo
LONG TERM
Between
2 Oct 2024 and 12 Mar 2025
Details
View Map
Share
Eastern Expressway

Halton Borough Council were proposing to carry out Highway improvement works on Eastern Expressway, Runcorn.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2024 and run through until 12 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:38.

ManWeb logo
LONG TERM
Between
17 Oct and 12 Dec 2024
Details
View Map
Share
Follow
Moorfield Road

ManWeb are proposing to carry out Utility repair and maintenance works on Moorfield Road, Widnes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by ManWeb on 7 Aug 2024 at 08:37.

Liverpool City Council logo
LONG TERM
Between
21 Oct 2024 and 17 Jan 2025
Details
View Map
Share
Speke Church Road

Liverpool City Council were proposing to carry out Highway improvement works on Speke Church Road, Liverpool.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Liverpool City Council on 30 Sep 2024 at 13:21.

Liverpool City Council logo
LONG TERM
Between
21 Oct 2024 and 17 Jan 2025
Details
View Map
Share
Blackrod Avenue

Liverpool City Council were proposing to carry out Highway improvement works on Blackrod Avenue, Liverpool.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Liverpool City Council on 30 Sep 2024 at 13:21.

Liverpool City Council logo
LONG TERM
Between
22 Oct 2024 and 10 Jan 2025
Details
View Map
Share
Speke Hall Avenue

Liverpool City Council were proposing to carry out Highway improvement works on Speke Hall Avenue, Liverpool.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 October 2024 and run through until 10 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 30 Sep 2024 at 13:23.

ManWeb logo
LONG TERM
Between
24 Oct 2024 and 3 Feb 2025
Details
View Map
Share
Follow
Stretton Way

ManWeb are proposing to carry out Utility repair and maintenance works on Stretton Way, Huyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 3 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by ManWeb on 7 Aug 2024 at 13:32.

ManWeb logo
LONG TERM
Between
24 Oct 2024 and 3 Feb 2025
Details
View Map
Share
Follow
Stretton Way

ManWeb are proposing to carry out Utility repair and maintenance works on Stretton Way, Huyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 3 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by ManWeb on 8 Aug 2024 at 09:28.

Halton Borough Council logo
LONG TERM
Between
4 Nov and 12 Dec 2024
Details
View Map
Share
Follow
Busway Norton Bd

Halton Borough Council are proposing to carry out Highway improvement works on Busway Norton Bd, Runcorn.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 12 December 2024. The works will impact the verge only.

This roadwork event was last updated by Halton Borough Council on 10 Sep 2024 at 11:09.

Cadent Gas logo
LONG TERM
Between
4 Nov and 17 Dec 2024
Details
View Map
Share
Follow
Halton Brow

Cadent Gas are proposing to carry out Utility asset works on Halton Brow, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 14:12.

Cadent Gas logo
LONG TERM
Between
4 Nov and 17 Dec 2024
Details
View Map
Share
Halton Brow

Cadent Gas were proposing to carry out Utility asset works on Halton Brow, Runcorn.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 17 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 13:11.

Liverpool City Council logo
LONG TERM
Between
4 Nov 2024 and 7 Mar 2025
Details
View Map
Share
Follow
Alder Wood Avenue

Liverpool City Council are proposing to carry out Highway improvement works on Alder Wood Avenue, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Liverpool City Council on 25 Oct 2024 at 11:45.

Liverpool City Council logo
LONG TERM
Until
7 Mar 2025
Details
View Map
Share
Follow
Alder Wood Avenue

Liverpool City Council are carrying out Highway improvement works on Alder Wood Avenue, Liverpool.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 07:30 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Liverpool City Council on 26 Nov 2024 at 09:57.

Knowsley Metropolitan Borough Council logo
Finishing
Tuesday
Details
View Map
Share
Cronton Road

Knowsley Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Cronton Road, Tarbock Green.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 November 2024 and run through until 3 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 28 Oct 2024 at 12:45.

Knowsley Metropolitan Borough Council logo
Finishing
Tuesday
Details
View Map
Share
M62 J6 Roundabout

Knowsley Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on M62 J6 Roundabout, Knowsley.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 November 2024 and run through until 3 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 11 Oct 2024 at 13:13.

Knowsley Metropolitan Borough Council logo
Finishing
Tuesday
Details
View Map
Share
Windy Arbor Road

Knowsley Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Windy Arbor Road, Whiston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 November 2024 and run through until 3 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 14 Oct 2024 at 14:47.

ManWeb logo
Finishing
Tuesday
Details
View Map
Share
Follow
Bishops Way

ManWeb are carrying out Utility repair and maintenance works on Bishops Way, Widnes.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 16:55 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 19 Nov 2024 at 07:58.

Halton Borough Council logo
LONG TERM
Until
3 Jan 2025
Details
View Map
Share
Follow
Footpath Astmoor Road Between Goddard Road And Access Road

Halton Borough Council are carrying out Highway repair and maintenance works on Footpath Astmoor Road Between Goddard Road And Access Road, Runcorn.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:35 and could run through until 3 January 2025. The works will impact the footpath only.

This roadwork event was last updated by Halton Borough Council on 25 Nov 2024 at 09:41.

Halton Borough Council logo
LONG TERM
Between
25 Nov and 27 Dec 2024
Details
View Map
Share
Follow
Footpath Astmoor Road Between Goddard Road And Access Road

Halton Borough Council are proposing to carry out Highway repair and maintenance works on Footpath Astmoor Road Between Goddard Road And Access Road, Runcorn.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 December 2024. The works will impact the footpath only.

This roadwork event was last updated by Halton Borough Council on 16 Sep 2024 at 09:05.

Liverpool City Council logo
LONG TERM
Between
25 Nov 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Alderfield Drive

Liverpool City Council are proposing to carry out Highway improvement works on Alderfield Drive, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Liverpool City Council on 31 Oct 2024 at 07:45.

Liverpool City Council logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Alderfield Drive

Liverpool City Council are carrying out Highway improvement works on Alderfield Drive, Liverpool.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 07:30 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Liverpool City Council on 26 Nov 2024 at 09:57.

Liverpool City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Bray Road

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Bray Road, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 13 Nov 2024 at 11:27.

Liverpool City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Bray Road

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Bray Road, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 13 Nov 2024 at 11:41.

Knowsley Metropolitan Borough Council logo
Finishing
Tuesday
Details
View Map
Share
M62 J6 Join E

Knowsley Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on M62 J6 Join E, Knowsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2024 and run through until 3 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 2 Oct 2024 at 15:23.

Halton Borough Council logo
LONG TERM
Between
2 Dec 2024 and 8 Jan 2025
Details
View Map
Share
Follow
Footpath Astmoor Road Between Goddard Road And Access Road

Halton Borough Council are proposing to carry out Highway repair and maintenance works on Footpath Astmoor Road Between Goddard Road And Access Road, Runcorn.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 8 January 2025. The works will impact the footpath only.

This roadwork event was last updated by Halton Borough Council on 9 Sep 2024 at 14:56.

BT logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Follow
Stone Barn Lane

BT are proposing to carry out New service connection on Stone Barn Lane, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 13 Sep 2024 at 15:27.

BT logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Follow
Stone Barn Lane

BT are proposing to carry out New service connection on Stone Barn Lane, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 20 Nov 2024 at 09:09.

BT logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Ellesmere Street

BT were proposing to carry out New service connection on Ellesmere Street, Runcorn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 20 Sep 2024 at 10:33.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
4 Dec 2024 and 14 Jan 2025
Details
View Map
Share
Cronton Road

Knowsley Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Cronton Road, Huyton.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 14 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 28 Oct 2024 at 12:22.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
4 Dec 2024 and 14 Jan 2025
Details
View Map
Share
Cronton Road

Knowsley Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Cronton Road, Huyton.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 14 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 28 Oct 2024 at 12:21.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
4 Dec 2024 and 29 Apr 2025
Details
View Map
Share
Follow
M62 J6 Join E

Knowsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on M62 J6 Join E, Knowsley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 25 Sep 2024 at 16:30.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
4 Dec 2024 and 29 Apr 2025
Details
View Map
Share
Windy Arbor Road

Knowsley Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Windy Arbor Road, Whiston.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 29 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 28 Oct 2024 at 12:34.

Knowsley Metropolitan Borough Council logo
Between
6 and 12 Dec 2024
Details
View Map
Share
Speke Boulevard

Knowsley Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Speke Boulevard, Halewood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 December 2024 and run through until 12 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 15 Nov 2024 at 13:47.

Cadent Gas logo
LONG TERM
Between
9 Dec 2024 and 29 Jan 2025
Details
View Map
Share
Follow
Halton Brow

Cadent Gas are proposing to carry out Utility asset works on Halton Brow, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 10:20.

Cadent Gas logo
LONG TERM
Between
9 Dec 2024 and 29 Jan 2025
Details
View Map
Share
Follow
Halton Brow

Cadent Gas are proposing to carry out Utility asset works on Halton Brow, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 11:57.

ManWeb logo
Between
9 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Withycombe Road

ManWeb are proposing to carry out Utility repair and maintenance works on Withycombe Road, Penketh, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 11 Oct 2024 at 11:01.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Busway Palace Fields Dc

Halton Borough Council were proposing to carry out Highway repair and maintenance works on Busway Palace Fields Dc, Runcorn.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 10 Oct 2024 at 13:47.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Norton Bd

Halton Borough Council are proposing to carry out Highway improvement works on Busway Norton Bd, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 12:43.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Norton Bd

Halton Borough Council are proposing to carry out Highway improvement works on Busway Norton Bd, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 30 Oct 2024 at 09:14.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Palace Fields Avenue

Halton Borough Council are proposing to carry out Highway improvement works on Palace Fields Avenue, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 23 Oct 2024 at 08:21.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Halton Lea G

Halton Borough Council are proposing to carry out Highway improvement works on Busway Halton Lea G, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 09:10.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Halton Lea G

Halton Borough Council are proposing to carry out Highway improvement works on Busway Halton Lea G, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 5 Nov 2024 at 09:54.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Halton Lea G

Halton Borough Council are proposing to carry out Highway improvement works on Busway Halton Lea G, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 15 Nov 2024 at 15:27.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Halton Lea E

Halton Borough Council are proposing to carry out Highway improvement works on Busway Halton Lea E, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 09:12.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Halton Lea E

Halton Borough Council are proposing to carry out Highway improvement works on Busway Halton Lea E, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 5 Nov 2024 at 09:54.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Halton Lea E

Halton Borough Council are proposing to carry out Highway improvement works on Busway Halton Lea E, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 20 Nov 2024 at 08:48.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Norton Bc

Halton Borough Council are proposing to carry out Highway improvement works on Busway Norton Bc, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 14:23.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Norton Bc

Halton Borough Council are proposing to carry out Highway improvement works on Busway Norton Bc, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 30 Oct 2024 at 09:15.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Castlefields Ea

Halton Borough Council are proposing to carry out Highway improvement works on Busway Castlefields Ea, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 11:04.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Castlefields Ea

Halton Borough Council are proposing to carry out Highway improvement works on Busway Castlefields Ea, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 5 Nov 2024 at 09:52.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Castlefields Ea

Halton Borough Council are proposing to carry out Highway improvement works on Busway Castlefields Ea, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 20 Nov 2024 at 08:54.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Windmill Hill Bb

Halton Borough Council are proposing to carry out Highway improvement works on Busway Windmill Hill Bb, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 14:20.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Windmill Hill Bb

Halton Borough Council are proposing to carry out Highway improvement works on Busway Windmill Hill Bb, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 30 Oct 2024 at 09:22.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Norton Priory B

Halton Borough Council are proposing to carry out Highway improvement works on Busway Norton Priory B, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 14:14.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Norton Priory B

Halton Borough Council are proposing to carry out Highway improvement works on Busway Norton Priory B, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 30 Oct 2024 at 10:43.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Tyrrell Way

Halton Borough Council are proposing to carry out Highway improvement works on Tyrrell Way, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 11:42.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Tyrrell Way

Halton Borough Council are proposing to carry out Highway improvement works on Tyrrell Way, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 30 Oct 2024 at 10:46.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Windmill Hill Ba

Halton Borough Council are proposing to carry out Highway improvement works on Busway Windmill Hill Ba, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 14:18.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Windmill Hill Ba

Halton Borough Council are proposing to carry out Highway improvement works on Busway Windmill Hill Ba, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 30 Oct 2024 at 09:24.

United Utilities Water (formerly North West Water) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Aston Lane South

United Utilities Water (formerly North West Water) are proposing to carry out Remedial works on Aston Lane South, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Oct 2024 at 12:31.

United Utilities Water (formerly North West Water) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Aston Lane South

United Utilities Water (formerly North West Water) are proposing to carry out Remedial works on Aston Lane South, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Nov 2024 at 09:10.

Halton Borough Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Daresbury Bypass

Halton Borough Council are proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 23 May 2024 at 09:50.

Halton Borough Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Chester Road

Halton Borough Council are proposing to carry out Highway improvement works on Chester Road, Daresbury, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 23 May 2024 at 10:05.

Halton Borough Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Eastern Expressway

Halton Borough Council are proposing to carry out Highway improvement works on Eastern Expressway, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 19 Jun 2024 at 10:59.

Network Rail logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Victoria Road

Network Rail are proposing to carry out roadworks on Victoria Road, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 22 Oct 2024 at 11:45.

Network Rail logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Victoria Road

Network Rail are proposing to carry out Works for Rail Purposes on Victoria Road, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 24 Oct 2024 at 11:43.

ManWeb logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Derby Road

ManWeb are proposing to carry out Utility repair and maintenance works on Derby Road, Widnes.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 30 Oct 2024 at 11:43.

Knowsley Metropolitan Borough Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
M62 J6 Join E

Knowsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on M62 J6 Join E, Knowsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 26 Nov 2024 at 16:30.

United Utilities Water (formerly North West Water) logo
Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Appleton Village

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Appleton Village, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 7 Oct 2024 at 14:37.

United Utilities Water (formerly North West Water) logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
School Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on School Lane, Sutton Manor, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Oct 2024 at 09:18.

United Utilities Water (formerly North West Water) logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
School Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on School Lane, Sutton Manor, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 16 Oct 2024 at 09:19.

Liverpool City Council logo
LONG TERM
Between
20 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Speke Church Road

Liverpool City Council are proposing to carry out Highway improvement works on Speke Church Road, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Liverpool City Council on 23 Nov 2024 at 09:44.

Liverpool City Council logo
LONG TERM
Between
20 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Blackrod Avenue

Liverpool City Council are proposing to carry out Highway improvement works on Blackrod Avenue, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Liverpool City Council on 23 Nov 2024 at 09:40.

ManWeb logo
Between
20 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Mill Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Mill Lane, Widnes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by ManWeb on 30 Oct 2024 at 11:15.

Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Rainhill Stoops Roundabout

St. Helens Council are proposing to carry out Highway repair and maintenance works on Rainhill Stoops Roundabout, Rainhill, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 17 Oct 2024 at 12:48.

Liverpool City Council logo
LONG TERM
Between
21 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Speke Hall Avenue

Liverpool City Council are proposing to carry out Highway improvement works on Speke Hall Avenue, Liverpool.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 23 Nov 2024 at 09:45.

Warrington Borough Council logo
Between
23 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Keith Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Keith Avenue, Great Sankey, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 25 Nov 2024 at 09:02.

Halton Borough Council logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Priory Road

Halton Borough Council were proposing to carry out Highway improvement works on Priory Road, Runcorn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 29 Oct 2024 at 14:10.

Liverpool City Council logo
Between
27 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Speke Boulevard

Liverpool City Council are proposing to carry out roadworks on Speke Boulevard, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 26 Nov 2024 at 07:50.

Knowsley Metropolitan Borough Council logo
Between
27 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Speke Boulevard

Knowsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Speke Boulevard, Halewood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 15 Nov 2024 at 13:48.

Knowsley Metropolitan Borough Council logo
LONG TERM
Between
27 Jan and 16 May 2025
Details
View Map
Share
Follow
M62 J6 Leave W

Knowsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on M62 J6 Leave W, Knowsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Knowsley Metropolitan Borough Council on 8 Nov 2024 at 07:12.

Halton Borough Council logo
LONG TERM
Between
3 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Albert Road

Halton Borough Council are proposing to carry out Highway improvement works on Albert Road, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 6 Nov 2024 at 13:26.

Cadent Gas logo
LONG TERM
Between
10 Feb and 20 Mar 2025
Details
View Map
Share
Follow
Chester Road

Cadent Gas are proposing to carry out Utility asset works on Chester Road, Frodsham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:32.

Cadent Gas logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Orchard Close

Cadent Gas are proposing to carry out Utility asset works on Orchard Close, Frodsham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:21.

Cadent Gas logo
Between
10 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Carriage Drive

Cadent Gas are proposing to carry out Utility asset works on Carriage Drive, Frodsham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:31.

Cadent Gas logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Howey Lane

Cadent Gas are proposing to carry out Utility asset works on Howey Lane, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:32.

BT logo
Between
10 and 12 Feb 2025
Details
View Map
Share
The Uplands

BT were proposing to carry out Utility repair and maintenance works on The Uplands, Runcorn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 20 Nov 2024 at 13:18.

Halton Borough Council logo
LONG TERM
Between
10 Feb and 18 Apr 2025
Details
View Map
Share
East Lane

Halton Borough Council were proposing to carry out Highway improvement works on East Lane, Runcorn.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 18 April 2025. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Halton Borough Council on 6 Nov 2024 at 10:44.

BT logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Wenlock Road

BT were proposing to carry out Utility repair and maintenance works on Wenlock Road, Runcorn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 20 Nov 2024 at 13:25.

United Utilities Water (formerly North West Water) logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Appleton Village

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Appleton Village, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Oct 2024 at 12:33.

United Utilities Water (formerly North West Water) logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Appleton Village

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Appleton Village, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 14 Oct 2024 at 09:33.

Halton Borough Council logo
LONG TERM
Between
24 Feb and 18 Apr 2025
Details
View Map
Share
Follow
Albert Road

Halton Borough Council are proposing to carry out Highway improvement works on Albert Road, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 6 Nov 2024 at 14:14.


Roadworks Map near to Sunbeam Close, RUNCORN, WA7 1GQ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Nov 2024 03:54
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Sunbeam Close, RUNCORN, WA7 1GQ (11 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
LOCKFIELD 
(0.2 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Cancelled
(Scheduled: 27 Nov 2024 - 28 Nov 2024)
0.2
Details
Share
2
Cadent Gas logo
REGENT STREET 
(0.4 miles)
Cadent Gas
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 25 Nov 2024 - 27 Nov 2024
0.4
Details
Share
Follow
3
Halton Borough Council logo
MAJOR
  
CHURCH STREET 
(0.5 miles)
Halton Borough Council
Highway improvement works - Footway - Give and take
Planned
Scheduled: 21 Oct 2024 - 29 Nov 2024
0.5
Details
Share
Follow
4
Virgin Media logo
VINE STREET 
(0.5 miles)
Virgin Media
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
21 Nov 2024 13:31 - 25 Nov 2024 14:33
0.5
Details
Share
5
BT logo
IRWELL STREET 
(0.6 miles)
BT
Remedial works - Footpath - Some carriageway incursion
In Progress
Since: 26 Nov 2024 09:55
(Scheduled: 25 Nov 2024 - 27 Nov 2024)
0.6
Details
Share
Follow
6
Cadent Gas logo
URGENT
  
IRWELL LANE 
(0.8 miles)
Cadent Gas
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 21 Nov 2024 12:00
(Scheduled: 21 Nov 2024 - 27 Nov 2024)
0.8
Details
Share
Follow
7
BT logo
LANGDALE ROAD 
(0.8 miles)
BT
Remedial works - Footway - Some carriageway incursion
Planned
Scheduled: 27 Nov 2024 - 28 Nov 2024
0.8
Details
Share
Follow
8
Virgin Media logo
KINGSLEY CRESCENT 
(0.8 miles)
Virgin Media
Utility repair and maintenance works - Footway, Carriageway - Give and take
Planned
Scheduled: 25 Nov 2024 - 29 Nov 2024
0.8
Details
Share
Follow
9
Virgin Media logo
POOLSIDE ROAD 
(0.8 miles)
Virgin Media
Utility repair and maintenance works - Footway - Give and take
Complete
25 Nov 2024 08:00 - 26 Nov 2024 15:20
0.8
Details
Share
10
BT logo
PICTON AVENUE 
(0.9 miles)
BT
Remedial works - Footway - Some carriageway incursion
Planned
Scheduled: 27 Nov 2024 - 28 Nov 2024
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.