ROADWORKS SUMMARY
Bridgeside Drive, FRODSHAM, WA6 0BS
Introduction
View current and future planned roadworks and road closures for Bridgeside Drive, WA6 0BS and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Bridgeside Drive, FRODSHAM, WA6 0BS
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Bridgeside Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
Tuesday
Cadent Gas are proposing to carry out Utility asset works on St Peters Way, Mickle Trafford, Chester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 16:00.
19 Jan 2025
Cadent Gas are carrying out Utility asset works on St Peters Way, Mickle Trafford, Chester.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 08:19 and could run through until 19 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 13:42.
Tomorrow
Cheshire West And Chester Council are proposing to carry out Highway improvement works on Milton Road, Ellesmere Port.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 28 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cheshire West And Chester Council on 26 Nov 2024 at 11:43.
16 Dec 2024 and 6 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Plemstall Close, Mickle Trafford, Chester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 14:25.
United Utilities Water (formerly North West Water) carried out Utility repair and maintenance works on Manley Road, Frodsham.
The road was closed for some or all of the period.
The works were originally planned between 24 Dec 2024 and 2 Jan 2025 and were actually completed between 24 Dec 2024 (09:00) and 27 Dec 2024 (06:50). The works impacted the verge only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Dec 2024 at 07:05.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Busway Halton Lea E, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 5 Nov 2024 at 09:54.
2 Jan and 7 Mar 2025
Halton Borough Council were proposing to carry out Highway repair and maintenance works on Busway Palace Fields Dc, Runcorn.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 10 Oct 2024 at 13:47.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Palace Fields Avenue, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 23 Oct 2024 at 08:21.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Busway Halton Lea G, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 09:10.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Busway Halton Lea G, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 5 Nov 2024 at 09:54.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Busway Halton Lea G, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 15 Nov 2024 at 15:27.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Busway Halton Lea E, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 09:12.
2 and 27 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Station Lane, Mickle Trafford, Chester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 14:18.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Busway Halton Lea E, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 20 Nov 2024 at 08:48.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Busway Castlefields Ea, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 11:04.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Busway Castlefields Ea, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 5 Nov 2024 at 09:52.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Busway Castlefields Ea, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 20 Nov 2024 at 08:54.
2 and 27 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Station Lane, Mickle Trafford, Chester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 10:51.
2 Jan and 5 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on St Peters Way, Mickle Trafford, Chester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 10:52.
13 and 29 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Plemstall Close, Mickle Trafford, Chester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 10:52.
27 Jan and 16 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Howey Lane, Frodsham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 09:13.
10 Feb and 2 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Howey Lane, Frodsham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:32.
10 Feb and 18 Apr 2025
Halton Borough Council were proposing to carry out Highway improvement works on East Lane, Runcorn.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 18 April 2025. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Halton Borough Council on 6 Nov 2024 at 10:44.
10 Feb and 20 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Chester Road, Frodsham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:32.
10 Feb and 2 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Orchard Close, Frodsham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:21.
10 and 12 Feb 2025
BT were proposing to carry out Utility repair and maintenance works on The Uplands, Runcorn.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 20 Nov 2024 at 13:18.
10 Feb and 5 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Carriage Drive, Frodsham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:31.
11 and 26 Feb 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Sandy Lane, Runcorn.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 12 Dec 2024 at 12:10.
15 and 23 Feb 2025
Halton Borough Council were proposing to carry out Highway repair and maintenance works on Cypress Grove, Runcorn.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 24 Dec 2024 at 11:50.
15 and 23 Feb 2025
Halton Borough Council were proposing to carry out Highway repair and maintenance works on Laburnum Grove, Runcorn.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 24 Dec 2024 at 11:51.
15 and 23 Feb 2025
Halton Borough Council were proposing to carry out Highway repair and maintenance works on Poplar Avenue, Runcorn.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 24 Dec 2024 at 11:55.
15 and 23 Feb 2025
Halton Borough Council were proposing to carry out Highway repair and maintenance works on Pine Road, Runcorn.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 24 Dec 2024 at 11:53.
15 and 23 Feb 2025
Halton Borough Council are proposing to carry out Highway repair and maintenance works on Thorn Road, Runcorn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 2 Dec 2024 at 15:39.
15 and 23 Feb 2025
Halton Borough Council are proposing to carry out Highway repair and maintenance works on Linkway, Runcorn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 2 Dec 2024 at 14:49.
15 and 23 Feb 2025
Halton Borough Council are proposing to carry out Highway repair and maintenance works on Grangeway, Runcorn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 2 Dec 2024 at 14:42.
17 and 19 Feb 2025
BT were proposing to carry out Utility repair and maintenance works on Wenlock Road, Runcorn.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 20 Nov 2024 at 13:25.
20 Feb and 13 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Chester Road, Helsby, Frodsham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:26.
20 Feb and 19 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Callender Way, Frodsham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:27.
24 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Cable Drive, Frodsham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:54.
3 and 5 Mar 2025
Cheshire West And Chester Council are proposing to carry out Highway improvement works on Church Street, Frodsham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cheshire West And Chester Council on 30 Oct 2024 at 08:46.
3 and 5 Mar 2025
Cheshire West And Chester Council are proposing to carry out Highway improvement works on Church Street, Frodsham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cheshire West And Chester Council on 28 Oct 2024 at 15:31.
4 and 10 Mar 2025
Network Rail are proposing to carry out Works for Rail Purposes on Bridges Road, Ellesmere Port.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 10 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 5 Dec 2024 at 09:13.
10 Mar and 9 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Carriage Drive, Frodsham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:18.
12 and 14 Mar 2025
BT are proposing to carry out Utility asset works on Ashbourne Avenue, Runcorn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 17 Dec 2024 at 14:24.
19 and 21 Mar 2025
BT are proposing to carry out Utility asset works on Ashbourne Avenue, Runcorn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 27 Dec 2024 at 12:08.
19 and 21 Mar 2025
BT are proposing to carry out Utility asset works on Ashbourne Avenue, Runcorn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 23 Dec 2024 at 13:49.
Roadworks Map near to Bridgeside Drive, FRODSHAM, WA6 0BS
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Bridgeside Drive, FRODSHAM, WA6 0BS (0 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.