ROADWORKS SUMMARY
McKinley Street, WARRINGTON, WA5 8GR
Introduction

View current and future planned roadworks and road closures for McKinley Street, WA5 8GR and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to McKinley Street, WARRINGTON, WA5 8GR
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for McKinley Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
31 Dec 2025
Halton Borough Council are carrying out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.
These works are categorised as Major.
The works started on 12 August 2024 at 08:00 and could run through until 31 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 9 Jun 2025 at 08:20.
12 Aug 2024 and 31 Oct 2025
Halton Borough Council are proposing to carry out Highway repair and maintenance works on Daresbury Bypass, Daresbury, Runcorn.
These works are categorised as Major.
The works will start on or after 12 August 2024 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Halton Borough Council on 16 Feb 2024 at 13:40.
31 Dec 2025
Halton Borough Council are carrying out Highway improvement works on Chester Road, Daresbury, Runcorn.
These works are categorised as Major.
The works started on 12 August 2024 at 08:00 and could run through until 31 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 9 Jun 2025 at 08:20.
31 Dec 2025
Halton Borough Council are carrying out Highway improvement works on Eastern Expressway, Runcorn.
These works are categorised as Major.
The works started on 12 August 2024 at 08:00 and could run through until 31 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 9 Jun 2025 at 08:20.
12 Aug 2024 and 13 Oct 2025
Halton Borough Council are proposing to carry out Highway repair and maintenance works on Chester Road, Daresbury, Runcorn.
These works are categorised as Major.
The works will start on or after 12 August 2024 and could run through until 13 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Halton Borough Council on 13 May 2024 at 08:31.
2 Jan and 1 Dec 2025
ManWeb were proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 1 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 19 Sep 2024 at 14:17.
3 Mar 2025 and 31 Mar 2026
St. Helens Council are proposing to carry out Highway improvement works on Earle Street, Newton Le Willows, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by St. Helens Council on 2 Dec 2024 at 10:00.
3 Mar 2025 and 31 Mar 2026
St. Helens Council are proposing to carry out Highway improvement works on Queen Street, Newton Le Willows, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by St. Helens Council on 2 Dec 2024 at 09:59.
3 Mar 2025 and 31 Mar 2026
St. Helens Council are proposing to carry out Highway improvement works on Bridge Street, Newton Le Willows, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by St. Helens Council on 2 Dec 2024 at 09:58.
3 Mar 2025 and 31 Mar 2026
St. Helens Council are proposing to carry out Highway improvement works on Stanley Street, Newton Le Willows, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by St. Helens Council on 2 Dec 2024 at 10:00.
3 Mar 2025 and 31 Mar 2026
St. Helens Council are proposing to carry out Highway improvement works on Oxford Street, Newton Le Willows, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by St. Helens Council on 2 Dec 2024 at 09:59.
3 Mar 2025 and 31 Mar 2026
St. Helens Council are proposing to carry out Highway improvement works on Market Street, Newton Le Willows, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by St. Helens Council on 2 Dec 2024 at 09:59.
3 Mar 2025 and 31 Mar 2026
St. Helens Council are proposing to carry out Highway improvement works on Haydock Street, Newton Le Willows, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by St. Helens Council on 2 Dec 2024 at 09:59.
19 Dec 2025
Warrington Borough Council are carrying out Highway improvement works on Winwick Road, Warrington.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 6 May 2025 at 09:30 and could run through until 19 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 6 May 2025 at 11:42.
19 Dec 2025
Warrington Borough Council are carrying out Highway improvement works on Long Lane, Orford, Warrington.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 6 May 2025 at 09:30 and could run through until 19 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 6 May 2025 at 11:43.
19 Dec 2025
Warrington Borough Council are carrying out Highway improvement works on Alder Lane, Orford, Warrington.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 8 May 2025 at 09:30 and could run through until 19 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 8 May 2025 at 09:44.
19 Dec 2025
Warrington Borough Council are carrying out Highway improvement works on Jubilee Way, Orford, Warrington.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 8 May 2025 at 09:30 and could run through until 19 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 8 May 2025 at 09:44.
28 May 2025 and 12 Jan 2026
Warrington Borough Council are proposing to carry out Highway improvement works on Long Lane, Orford, Warrington.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 12 January 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Warrington Borough Council on 11 Mar 2025 at 16:04.
29 May and 19 Dec 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Winwick Road, Warrington.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 19 December 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Warrington Borough Council on 11 Mar 2025 at 16:26.
29 May and 19 Dec 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Alder Lane, Orford, Warrington.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 19 December 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Warrington Borough Council on 11 Mar 2025 at 15:50.
29 May and 19 Dec 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Jubilee Way, Orford, Warrington.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 19 December 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Warrington Borough Council on 11 Mar 2025 at 15:56.
17 Oct 2025
Warrington Borough Council are carrying out Highway repair and maintenance works on Witherwin Avenue, Warrington.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 July 2025 at 13:10 and could run through until 17 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Warrington Borough Council on 16 Sep 2025 at 10:49.
31 Jul 2025 and 31 Mar 2026
St. Helens Council are proposing to carry out Highway improvement works on Stanley Street, Newton Le Willows, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by St. Helens Council on 7 May 2025 at 12:03.
4 Aug and 26 Sep 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Hill Street, Bewsey And Whitecross, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Warrington Borough Council on 1 Jul 2025 at 15:23.
1 Oct 2025
Warrington Borough Council are carrying out Highway improvement works on Hill Street, Bewsey And Whitecross, Warrington.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 August 2025 at 13:00 and could run through until 1 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Warrington Borough Council on 7 Aug 2025 at 14:55.
4 Aug and 26 Sep 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Town Hill, Bewsey And Whitecross, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Warrington Borough Council on 1 Jul 2025 at 15:22.
1 Oct 2025
Warrington Borough Council are carrying out Highway improvement works on Town Hill, Bewsey And Whitecross, Warrington.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 August 2025 at 13:00 and could run through until 1 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Warrington Borough Council on 7 Aug 2025 at 14:54.
10 Nov 2025
Warrington Borough Council are carrying out Highway improvement works on Kingsway South, Latchford, Warrington.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 August 2025 at 16:00 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Warrington Borough Council on 19 Aug 2025 at 15:21.
30 Sep 2025
Cadent Gas are carrying out Utility asset works on Longshaw Street, Bewsey And Whitecross, Warrington.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 August 2025 at 08:00 and could run through until 30 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 11:35.
1 Oct 2025
Cadent Gas are carrying out Utility asset works on Leach Lane, Sutton Leach, St Helens.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 August 2025 at 11:37 and could run through until 1 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2025 at 13:48.
Wednesday
Cadent Gas are proposing to carry out Utility asset works on Reginald Road, Sutton Leach, St Helens.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 May 2025 at 08:00.
Wednesday
Cadent Gas are carrying out Utility asset works on Reginald Road, Sutton Leach, St Helens.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 August 2025 at 10:47 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 10:47.
26 Aug and 3 Oct 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Livingstone Close, Great Sankey, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 4 Jun 2025 at 11:25.
26 Aug and 3 Oct 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Hudson Close, Burtonwood And Westbrook, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 4 Jun 2025 at 11:22.
Tomorrow
Last Mile Gas are proposing to carry out Utility asset works on Golborne Road, Winwick, Warrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Gas on 16 Jul 2025 at 10:09.
Tomorrow
Last Mile Gas are proposing to carry out Utility asset works on Golborne Road, Winwick, Warrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Gas on 16 Jul 2025 at 13:12.
Tomorrow
Last Mile Gas are proposing to carry out Utility asset works on Golborne Road, Winwick, Warrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Gas on 7 Aug 2025 at 10:56.
Tomorrow
Last Mile Gas are proposing to carry out Utility asset works on Golborne Road, Winwick, Warrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Gas on 26 Aug 2025 at 14:39.
3 Oct 2025
Warrington Borough Council are carrying out Highway improvement works on Beech Road, Stockton Heath, Warrington.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 13:30 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 1 Sep 2025 at 15:13.
3 Oct 2025
Warrington Borough Council are carrying out Highway improvement works on Farrell Road, Stockton Heath, Warrington.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 13:45 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 1 Sep 2025 at 15:13.
1 Sep and 10 Oct 2025
Warrington Borough Council are proposing to carry out Highway improvement works on North Park Brook Road, Burtonwood And Westbrook, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 4 Jun 2025 at 11:29.
10 Oct 2025
Warrington Borough Council are carrying out Highway improvement works on North Park Brook Road, Burtonwood And Westbrook, Warrington.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 13:45 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 1 Sep 2025 at 15:14.
1 Sep and 10 Oct 2025
Warrington Borough Council are proposing to carry out Highway repair and maintenance works on St Davids Drive, Burtonwood And Westbrook, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 4 Jun 2025 at 11:35.
10 Oct 2025
Warrington Borough Council are carrying out Highway repair and maintenance works on St Davids Drive, Burtonwood And Westbrook, Warrington.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 13:45 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 1 Sep 2025 at 15:14.
1 Sep and 10 Oct 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Tenby Close, Burtonwood And Westbrook, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 4 Jun 2025 at 11:37.
10 Oct 2025
Warrington Borough Council are carrying out Highway improvement works on Tenby Close, Burtonwood And Westbrook, Warrington.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 13:45 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 1 Sep 2025 at 15:15.
25 Sep 2025
Last Mile Gas are carrying out Utility asset works on Golborne Road, Winwick, Warrington.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 September 2025 at 10:10 and could run through until 25 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Gas on 3 Sep 2025 at 10:24.
Sunday
ManWeb are proposing to carry out Utility repair and maintenance works on Kingsway South, Latchford, Warrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 4 Sep 2025 at 16:04.
13 Oct 2025
Warrington Borough Council are carrying out Highway improvement works on Nicholls Street, Grappenhall And Thelwall, Warrington.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 September 2025 at 10:45 and could run through until 13 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 9 Sep 2025 at 12:32.
13 Oct 2025
Warrington Borough Council are carrying out Highway improvement works on Georges Crescent, Grappenhall And Thelwall, Warrington.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 September 2025 at 10:45 and could run through until 13 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 9 Sep 2025 at 12:32.
26 Sep 2025
Warrington Borough Council are carrying out Utility asset works on Skyline Drive, Warrington.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 08:00 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Warrington Borough Council on 11 Sep 2025 at 12:45.
1 Oct 2025
Cadent Gas are carrying out Utility asset works on Park Street, Haydock, St Helens.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 09:02 and could run through until 1 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 09:02.
12 Sep and 24 Oct 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Nicholls Street, Grappenhall And Thelwall, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 2 Jul 2025 at 11:20.
12 Sep and 24 Oct 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Georges Crescent, Grappenhall And Thelwall, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 2 Jul 2025 at 13:03.
15 Sep and 24 Oct 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Beech Road, Stockton Heath, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 23 Jun 2025 at 14:54.
15 Sep and 24 Oct 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Farrell Road, Stockton Heath, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 23 Jun 2025 at 15:27.
15 Sep and 8 Oct 2025
Cadent Gas were proposing to carry out Utility asset works on Sandy Lane, Stockton Heath, Warrington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 8 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Aug 2025 at 13:01.
21 Oct 2025
Warrington Borough Council are carrying out Highway improvement works on Hudson Close, Burtonwood And Westbrook, Warrington.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2025 at 12:45 and could run through until 21 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 17 Sep 2025 at 14:36.
15 Sep and 1 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Harpers Road, Poulton-with-fearnhead, Warrington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Jun 2025 at 12:00.
Monday
Halton Borough Council are proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 17 Mar 2025 at 10:03.
19 Sep and 10 Oct 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Hallfields Road, Orford, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 29 Aug 2025 at 10:35.
22 Sep and 19 Oct 2025
Halton Borough Council are proposing to carry out Highway improvement works on Busway Windmill Hill Bb, Runcorn.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 19 October 2025. The works will impact the cycleway only.
This roadwork event was last updated by Halton Borough Council on 18 Aug 2025 at 16:17.
22 Sep and 17 Oct 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Delph Lane, Daresbury, Runcorn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Sep 2025 at 13:09.
22 Sep and 17 Oct 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Delph Lane, Daresbury, Runcorn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Sep 2025 at 15:18.
22 Sep and 22 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Sycamore Avenue, Widnes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Jun 2025 at 11:38.
22 Sep and 22 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Sycamore Avenue, Widnes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2025 at 00:10.
Wednesday
BT were proposing to carry out Utility repair and maintenance works on Vulcan Close, Poulton-with-fearnhead, Warrington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 September 2025 and run through until 24 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 7 Jul 2025 at 10:23.
22 and 25 Sep 2025
St. Helens Council are proposing to carry out Remedial works on Winwick Link Road, Winwick, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by St. Helens Council on 9 Jul 2025 at 15:23.
22 and 25 Sep 2025
St. Helens Council are proposing to carry out Remedial works on M6 J22 Leave N, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by St. Helens Council on 14 Jul 2025 at 09:12.
22 and 25 Sep 2025
St. Helens Council are proposing to carry out Remedial works on M6 J22 Join S, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by St. Helens Council on 14 Jul 2025 at 09:12.
22 and 25 Sep 2025
St. Helens Council are proposing to carry out Remedial works on M6 J22 Join N, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by St. Helens Council on 14 Jul 2025 at 09:12.
22 and 25 Sep 2025
St. Helens Council are proposing to carry out Remedial works on M6 J22 Leave S, St. Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by St. Helens Council on 14 Jul 2025 at 09:12.
24 Sep and 24 Oct 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Livingstone Close, Great Sankey, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 17 Sep 2025 at 15:00.
26 and 29 Sep 2025
Halton Borough Council are proposing to carry out Highway improvement works on Chester Road, Daresbury, Runcorn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 11 Sep 2025 at 15:39.
26 and 29 Sep 2025
Halton Borough Council are proposing to carry out Highway improvement works on Chester Road, Daresbury, Runcorn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 18 Sep 2025 at 10:09.
26 and 29 Sep 2025
Halton Borough Council are proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 17 Mar 2025 at 10:04.
26 and 29 Sep 2025
Halton Borough Council are proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 13 May 2025 at 08:23.
29 Sep and 12 Dec 2025
Halton Borough Council are proposing to carry out Highway improvement works on Keckwick Lane, Daresbury, Runcorn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 12 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 18 Jun 2025 at 09:06.
29 Sep and 12 Dec 2025
Halton Borough Council are proposing to carry out Highway improvement works on Keckwick Lane, Daresbury, Runcorn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 12 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 24 Jun 2025 at 10:33.
29 Sep and 14 Nov 2025
Warrington Borough Council are proposing to carry out Highway repair and maintenance works on Witherwin Avenue, Warrington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 14 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Warrington Borough Council on 8 Jul 2025 at 13:27.
29 Sep and 10 Oct 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Alness Drive, Rainhill, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 19 Jun 2025 at 09:07.
29 Sep and 22 Oct 2025
Cadent Gas were proposing to carry out Utility asset works on Clock Face Road, Clock Face, St Helens.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 22 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Aug 2025 at 11:44.
1 and 7 Oct 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Winmarleigh Street, Bewsey And Whitecross, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2025 and could run through until 7 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 9 Jul 2025 at 15:04.
1 and 22 Oct 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Winmarleigh Street, Bewsey And Whitecross, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 17 Sep 2025 at 14:59.
2 and 8 Oct 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Winmarleigh Street, Bewsey And Whitecross, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 7 Aug 2025 at 12:42.
2 and 8 Oct 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Winmarleigh Street, Bewsey And Whitecross, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 19 Aug 2025 at 11:02.
3 and 6 Oct 2025
Halton Borough Council are proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2025 and could run through until 6 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 3 Jul 2025 at 08:52.
6 and 22 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Thelwall New Road, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Apr 2025 at 14:25.
6 and 24 Oct 2025
Electricity Network Company are proposing to carry out Utility asset works on Tavistock Road, Penketh, Warrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 4 Sep 2025 at 13:05.
6 Oct and 14 Nov 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Bostock Street, Bewsey And Whitecross, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 4 Jun 2025 at 10:46.
6 Oct and 14 Nov 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Bostock Street, Bewsey And Whitecross, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 17 Sep 2025 at 12:11.
6 Oct and 14 Nov 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Wellfield Street, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 5 Jun 2025 at 11:30.
6 Oct and 14 Nov 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Wellfield Street, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 17 Sep 2025 at 12:05.
6 Oct and 14 Nov 2025
Warrington Borough Council are proposing to carry out Highway repair and maintenance works on Bagot Avenue, Bewsey And Whitecross, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 4 Jun 2025 at 10:44.
6 Oct and 14 Nov 2025
Warrington Borough Council are proposing to carry out Highway repair and maintenance works on Bagot Avenue, Bewsey And Whitecross, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 17 Sep 2025 at 12:07.
6 Oct and 14 Nov 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Westbrook Way, Burtonwood And Westbrook, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 4 Aug 2025 at 13:01.
6 Oct and 14 Nov 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Westbrook Way, Burtonwood And Westbrook, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 17 Sep 2025 at 11:59.
6 Oct and 14 Nov 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Callands Road, Burtonwood And Westbrook, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 4 Aug 2025 at 12:52.
6 Oct and 14 Nov 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Callands Road, Burtonwood And Westbrook, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 17 Sep 2025 at 12:14.
6 Oct and 14 Nov 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Westbrook Crescent, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 4 Aug 2025 at 12:57.
6 Oct and 14 Nov 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Westbrook Crescent, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 2 Sep 2025 at 10:36.
6 and 8 Oct 2025
BT were proposing to carry out Utility repair and maintenance works on Valiant Close Segregated Footpath, Poulton-with-fearnhead, Warrington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2025 and run through until 8 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 8 Jul 2025 at 16:05.
6 Oct and 14 Nov 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Cromwell Avenue, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 4 Aug 2025 at 12:33.
6 Oct and 14 Nov 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Cromwell Avenue, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 2 Sep 2025 at 10:42.
6 Oct and 3 Dec 2025
Cadent Gas were proposing to carry out Utility asset works on Leach Lane, Sutton Leach, St Helens.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2025 and run through until 3 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Jul 2025 at 11:51.
8 Oct and 14 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Leach Lane, Sutton Leach, St Helens.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 14:10.
13 and 15 Oct 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Rock Road, Latchford, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 30 Jul 2025 at 15:07.
13 Oct and 5 Dec 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Vaudrey Drive, Woolston, Warrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 15 Sep 2025 at 15:12.
13 and 17 Oct 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Pennine Close, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 7 Jul 2025 at 09:35.
13 and 17 Oct 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Pennine Close, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 7 Jul 2025 at 11:33.
20 Oct and 7 Nov 2025
Electricity Network Company are proposing to carry out Utility asset works on Tavistock Road, Penketh, Warrington.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 17 Jul 2025 at 11:38.
20 and 31 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Padgate Lane, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Aug 2025 at 14:32.
20 and 31 Oct 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Old Wargrave Road, Newton Le Willows, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 23 Jul 2025 at 08:26.
20 and 31 Oct 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Old Wargrave Road, Newton Le Willows, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 23 Jul 2025 at 11:59.
21 Oct and 4 Dec 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Alder Road, Woolston, Warrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2025 and could run through until 4 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 26 Aug 2025 at 10:11.
21 and 23 Oct 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Hallfields Road, Orford, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 30 Jul 2025 at 10:50.
23 and 27 Oct 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Hallfields Road, Orford, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 31 Jul 2025 at 15:02.
24 and 27 Oct 2025
Halton Borough Council are proposing to carry out Highway repair and maintenance works on Eastern Expressway, Runcorn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 22 Aug 2025 at 10:37.
24 and 27 Oct 2025
Network Rail were proposing to carry out Works for Rail Purposes on Mill Lane, Newton Le Willows, St Helens.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 October 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 20 May 2025 at 11:30.
25 Oct and 12 Nov 2025
St. Helens Council are proposing to carry out Section 50 on Chester Lane, Clock Face, St Helens.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by St. Helens Council on 5 Sep 2025 at 09:48.
25 Oct and 12 Nov 2025
St. Helens Council are proposing to carry out Section 50 on Chester Lane, Clock Face, St Helens.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by St. Helens Council on 5 Sep 2025 at 09:58.
27 Oct and 23 Nov 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Norton Station Road, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 28 Jul 2025 at 14:12.
27 and 29 Oct 2025
ManWeb were proposing to carry out Utility repair and maintenance works on Lumb Brook Road, Warrington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by ManWeb on 29 Jul 2025 at 11:52.
27 and 29 Oct 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Lumb Brook Road, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 20 Aug 2025 at 15:26.
27 Oct and 3 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Longshaw Street, Bewsey And Whitecross, Warrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Aug 2025 at 10:08.
27 Oct and 12 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Lewis Avenue, Bewsey And Whitecross, Warrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Aug 2025 at 14:58.
27 and 29 Oct 2025
BT were proposing to carry out Utility repair and maintenance works on Valiant Close Segregated Footpath, Poulton-with-fearnhead, Warrington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 7 Aug 2025 at 09:53.
27 Oct and 7 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Fearnhead Lane, Poulton-with-fearnhead, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Jul 2025 at 10:56.
27 Oct and 3 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Leach Lane, Sutton Leach, St Helens.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Jul 2025 at 08:31.
30 Oct and 3 Nov 2025
BT are proposing to carry out Utility repair and maintenance works on Valiant Close Segregated Footpath, Poulton-with-fearnhead, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 20 Aug 2025 at 14:30.
3 and 7 Nov 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on River Road, Latchford, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Aug 2025 at 13:01.
3 and 7 Nov 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on River Road, Latchford, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 28 Aug 2025 at 15:19.
3 Nov and 12 Dec 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Radlett Close, Penketh, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 4 Jun 2025 at 11:31.
3 Nov and 12 Dec 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Lynton Close, Penketh, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 4 Jun 2025 at 11:27.
3 Nov and 12 Dec 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Hillside Grove, Penketh, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 4 Jun 2025 at 10:53.
3 Nov and 12 Dec 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Walsingham Road, Penketh, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 5 Jun 2025 at 11:26.
3 and 19 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Harpers Road, Poulton-with-fearnhead, Warrington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Aug 2025 at 13:34.
3 and 26 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Park Street, Haydock, St Helens.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Aug 2025 at 08:17.
10 Nov 2025 and 6 Feb 2026
Warrington Borough Council are proposing to carry out Highway improvement works on Kingsway South, Latchford, Warrington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 6 February 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Warrington Borough Council on 11 Aug 2025 at 08:43.
10 and 26 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Union Bank Lane, Bold Heath, St Helens.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Aug 2025 at 13:47.
12 Nov and 16 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on London Road, Warrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2025 and could run through until 16 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 10:10.
17 Nov and 21 Dec 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Falstone Drive, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 29 Jul 2025 at 08:27.
17 Nov and 21 Dec 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Falstone Drive, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 6 Aug 2025 at 09:30.
18 and 21 Nov 2025
Hutchinson 3G are proposing to carry out Utility asset works on Burtonwood Road, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hutchinson 3G on 8 Sep 2025 at 16:27.
20 Nov and 10 Dec 2025
ManWeb are proposing to carry out New service connection on Museum Street, Bewsey And Whitecross, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2025 and could run through until 10 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 28 Aug 2025 at 09:09.
20 Nov and 10 Dec 2025
ManWeb are proposing to carry out New service connection on Bold Street, Bewsey And Whitecross, Warrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2025 and could run through until 10 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 28 Aug 2025 at 09:28.
20 Nov and 10 Dec 2025
ManWeb are proposing to carry out New service connection on Suez Street, Bewsey And Whitecross, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2025 and could run through until 10 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 28 Aug 2025 at 08:51.
20 Nov and 10 Dec 2025
ManWeb were proposing to carry out New service connection on Egypt Street, Bewsey And Whitecross, Warrington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 November 2025 and run through until 10 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by ManWeb on 29 Aug 2025 at 16:14.
24 and 28 Nov 2025
ManWeb are proposing to carry out New service connection on Egypt Street, Bewsey And Whitecross, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 29 Aug 2025 at 16:14.
24 Nov and 10 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on School Lane, Bold Heath, St Helens.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 09:06.
24 Nov and 19 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Clock Face Road, Bold Heath, St Helens.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 09:08.
24 and 26 Nov 2025
BT are proposing to carry out New service connection on St Bridgets Close, Poulton-with-fearnhead, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 20 Aug 2025 at 12:13.
24 and 26 Nov 2025
BT are proposing to carry out New service connection on St Bridgets Close, Poulton-with-fearnhead, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 26 Aug 2025 at 15:22.
24 and 26 Nov 2025
BT are proposing to carry out New service connection on Carrington Close, Birchwood, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 19 Aug 2025 at 09:46.
24 and 26 Nov 2025
BT are proposing to carry out New service connection on Carrington Close, Birchwood, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 26 Aug 2025 at 15:24.
24 and 27 Nov 2025
Network Rail are proposing to carry out Works for Rail Purposes on Mill Lane, Newton Le Willows, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 27 May 2025 at 12:40.
1 and 21 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Clay Lane, Burtonwood And Westbrook, Warrington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Apr 2025 at 09:52.
1 and 21 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Clay Lane, Burtonwood And Westbrook, Warrington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 May 2025 at 10:33.
5 Dec 2025 and 5 Jan 2026
Warrington Borough Council are proposing to carry out Highway improvement works on Winmarleigh Street, Bewsey And Whitecross, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2025 and could run through until 5 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 11 Sep 2025 at 18:19.
8 and 12 Dec 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Ledger Road, Haydock, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 16 Sep 2025 at 09:05.
10 and 17 Dec 2025
BT are proposing to carry out New service connection on Stonehaven Drive, Poulton-with-fearnhead, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 4 Sep 2025 at 10:48.
11 and 18 Dec 2025
BT are proposing to carry out New service connection on Cavendish Close, Great Sankey, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2025 and could run through until 18 December 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 11 Sep 2025 at 13:08.
15 and 17 Dec 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Parker Street Passageway Rear Of 36 To 50, Bewsey And Whitecross, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2025 and could run through until 17 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 18 Sep 2025 at 10:55.
Roadworks Map near to McKinley Street, WARRINGTON, WA5 8GR (Loading...)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to McKinley Street, WARRINGTON, WA5 8GR (31 Events)
(Scheduled Dates)
(miles)
(Scheduled: 14 Sep 2025 - 19 Sep 2025)
(Scheduled: 15 Sep 2025 - 19 Sep 2025)
(Scheduled: 18 Sep 2025 - 22 Sep 2025)
(Scheduled: 12 Sep 2025 - 18 Sep 2025)
(Scheduled: 18 Sep 2025 - 24 Sep 2025)
Contains public sector information licensed under the Open Government Licence v3.0.