ROADWORKS SUMMARY
McKinley Street, WARRINGTON, WA5 8GR

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for McKinley Street, WA5 8GR and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to McKinley Street, WARRINGTON, WA5 8GR

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for McKinley Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Halton Borough Council logo
LONG TERM
Until
31 Dec 2025
Details
View Map
Share
Follow
Daresbury Bypass

Halton Borough Council are carrying out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.

These works are categorised as Major.

The works started on 12 August 2024 at 08:00 and could run through until 31 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 9 Jun 2025 at 08:20.

Halton Borough Council logo
LONG TERM
Between
12 Aug 2024 and 31 Oct 2025
Details
View Map
Share
Follow
Daresbury Bypass

Halton Borough Council are proposing to carry out Highway repair and maintenance works on Daresbury Bypass, Daresbury, Runcorn.

These works are categorised as Major.

The works will start on or after 12 August 2024 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 16 Feb 2024 at 13:40.

Halton Borough Council logo
LONG TERM
Until
31 Dec 2025
Details
View Map
Share
Follow
Chester Road

Halton Borough Council are carrying out Highway improvement works on Chester Road, Daresbury, Runcorn.

These works are categorised as Major.

The works started on 12 August 2024 at 08:00 and could run through until 31 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 9 Jun 2025 at 08:20.

Halton Borough Council logo
LONG TERM
Until
31 Dec 2025
Details
View Map
Share
Follow
Eastern Expressway

Halton Borough Council are carrying out Highway improvement works on Eastern Expressway, Runcorn.

These works are categorised as Major.

The works started on 12 August 2024 at 08:00 and could run through until 31 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 9 Jun 2025 at 08:20.

Halton Borough Council logo
LONG TERM
Between
12 Aug 2024 and 13 Oct 2025
Details
View Map
Share
Follow
Chester Road

Halton Borough Council are proposing to carry out Highway repair and maintenance works on Chester Road, Daresbury, Runcorn.

These works are categorised as Major.

The works will start on or after 12 August 2024 and could run through until 13 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 13 May 2024 at 08:31.

ManWeb logo
LONG TERM
Between
2 Jan and 1 Dec 2025
Details
View Map
Share
Winwick Road

ManWeb were proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 1 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 19 Sep 2024 at 14:17.

LONG TERM
Between
3 Mar 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Earle Street

St. Helens Council are proposing to carry out Highway improvement works on Earle Street, Newton Le Willows, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by St. Helens Council on 2 Dec 2024 at 10:00.

LONG TERM
Between
3 Mar 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Queen Street

St. Helens Council are proposing to carry out Highway improvement works on Queen Street, Newton Le Willows, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by St. Helens Council on 2 Dec 2024 at 09:59.

LONG TERM
Between
3 Mar 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Bridge Street

St. Helens Council are proposing to carry out Highway improvement works on Bridge Street, Newton Le Willows, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by St. Helens Council on 2 Dec 2024 at 09:58.

LONG TERM
Between
3 Mar 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Stanley Street

St. Helens Council are proposing to carry out Highway improvement works on Stanley Street, Newton Le Willows, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by St. Helens Council on 2 Dec 2024 at 10:00.

LONG TERM
Between
3 Mar 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Oxford Street

St. Helens Council are proposing to carry out Highway improvement works on Oxford Street, Newton Le Willows, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by St. Helens Council on 2 Dec 2024 at 09:59.

LONG TERM
Between
3 Mar 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Market Street

St. Helens Council are proposing to carry out Highway improvement works on Market Street, Newton Le Willows, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by St. Helens Council on 2 Dec 2024 at 09:59.

LONG TERM
Between
3 Mar 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Haydock Street

St. Helens Council are proposing to carry out Highway improvement works on Haydock Street, Newton Le Willows, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by St. Helens Council on 2 Dec 2024 at 09:59.

Warrington Borough Council logo
LONG TERM
Until
19 Dec 2025
Details
View Map
Share
Follow
Winwick Road

Warrington Borough Council are carrying out Highway improvement works on Winwick Road, Warrington.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 09:30 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 6 May 2025 at 11:42.

Warrington Borough Council logo
LONG TERM
Until
19 Dec 2025
Details
View Map
Share
Follow
Long Lane

Warrington Borough Council are carrying out Highway improvement works on Long Lane, Orford, Warrington.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 09:30 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 6 May 2025 at 11:43.

Warrington Borough Council logo
LONG TERM
Until
19 Dec 2025
Details
View Map
Share
Follow
Alder Lane

Warrington Borough Council are carrying out Highway improvement works on Alder Lane, Orford, Warrington.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 May 2025 at 09:30 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 8 May 2025 at 09:44.

Warrington Borough Council logo
LONG TERM
Until
19 Dec 2025
Details
View Map
Share
Follow
Jubilee Way

Warrington Borough Council are carrying out Highway improvement works on Jubilee Way, Orford, Warrington.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 May 2025 at 09:30 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 8 May 2025 at 09:44.

Warrington Borough Council logo
LONG TERM
Between
28 May 2025 and 12 Jan 2026
Details
View Map
Share
Follow
Long Lane

Warrington Borough Council are proposing to carry out Highway improvement works on Long Lane, Orford, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 12 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Warrington Borough Council on 11 Mar 2025 at 16:04.

Warrington Borough Council logo
LONG TERM
Between
29 May and 19 Dec 2025
Details
View Map
Share
Follow
Winwick Road

Warrington Borough Council are proposing to carry out Highway improvement works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Warrington Borough Council on 11 Mar 2025 at 16:26.

Warrington Borough Council logo
LONG TERM
Between
29 May and 19 Dec 2025
Details
View Map
Share
Follow
Alder Lane

Warrington Borough Council are proposing to carry out Highway improvement works on Alder Lane, Orford, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Warrington Borough Council on 11 Mar 2025 at 15:50.

Warrington Borough Council logo
LONG TERM
Between
29 May and 19 Dec 2025
Details
View Map
Share
Follow
Jubilee Way

Warrington Borough Council are proposing to carry out Highway improvement works on Jubilee Way, Orford, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Warrington Borough Council on 11 Mar 2025 at 15:56.

Warrington Borough Council logo
LONG TERM
Until
17 Oct 2025
Details
View Map
Share
Follow
Witherwin Avenue

Warrington Borough Council are carrying out Highway repair and maintenance works on Witherwin Avenue, Warrington.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 13:10 and could run through until 17 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Warrington Borough Council on 16 Sep 2025 at 10:49.

LONG TERM
Between
31 Jul 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Stanley Street

St. Helens Council are proposing to carry out Highway improvement works on Stanley Street, Newton Le Willows, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by St. Helens Council on 7 May 2025 at 12:03.

Warrington Borough Council logo
LONG TERM
Between
4 Aug and 26 Sep 2025
Details
View Map
Share
Follow
Hill Street

Warrington Borough Council are proposing to carry out Highway improvement works on Hill Street, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Warrington Borough Council on 1 Jul 2025 at 15:23.

Warrington Borough Council logo
LONG TERM
Until
1 Oct 2025
Details
View Map
Share
Follow
Hill Street

Warrington Borough Council are carrying out Highway improvement works on Hill Street, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 August 2025 at 13:00 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Warrington Borough Council on 7 Aug 2025 at 14:55.

Warrington Borough Council logo
LONG TERM
Between
4 Aug and 26 Sep 2025
Details
View Map
Share
Follow
Town Hill

Warrington Borough Council are proposing to carry out Highway improvement works on Town Hill, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Warrington Borough Council on 1 Jul 2025 at 15:22.

Warrington Borough Council logo
LONG TERM
Until
1 Oct 2025
Details
View Map
Share
Follow
Town Hill

Warrington Borough Council are carrying out Highway improvement works on Town Hill, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 August 2025 at 13:00 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Warrington Borough Council on 7 Aug 2025 at 14:54.

Warrington Borough Council logo
LONG TERM
Until
10 Nov 2025
Details
View Map
Share
Follow
Kingsway South

Warrington Borough Council are carrying out Highway improvement works on Kingsway South, Latchford, Warrington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 16:00 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Warrington Borough Council on 19 Aug 2025 at 15:21.

Cadent Gas logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Longshaw Street

Cadent Gas are carrying out Utility asset works on Longshaw Street, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 08:00 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 11:35.

Cadent Gas logo
LONG TERM
Until
1 Oct 2025
Details
View Map
Share
Follow
Leach Lane

Cadent Gas are carrying out Utility asset works on Leach Lane, Sutton Leach, St Helens.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 August 2025 at 11:37 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2025 at 13:48.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Reginald Road

Cadent Gas are proposing to carry out Utility asset works on Reginald Road, Sutton Leach, St Helens.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 May 2025 at 08:00.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Reginald Road

Cadent Gas are carrying out Utility asset works on Reginald Road, Sutton Leach, St Helens.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 August 2025 at 10:47 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 10:47.

Warrington Borough Council logo
LONG TERM
Between
26 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Livingstone Close

Warrington Borough Council are proposing to carry out Highway improvement works on Livingstone Close, Great Sankey, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 4 Jun 2025 at 11:25.

Warrington Borough Council logo
LONG TERM
Between
26 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Hudson Close

Warrington Borough Council are proposing to carry out Highway improvement works on Hudson Close, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 4 Jun 2025 at 11:22.

Finishing
Tomorrow
Details
View Map
Share
Follow
Golborne Road

Last Mile Gas are proposing to carry out Utility asset works on Golborne Road, Winwick, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Gas on 16 Jul 2025 at 10:09.

Finishing
Tomorrow
Details
View Map
Share
Follow
Golborne Road

Last Mile Gas are proposing to carry out Utility asset works on Golborne Road, Winwick, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Gas on 16 Jul 2025 at 13:12.

Finishing
Tomorrow
Details
View Map
Share
Follow
Golborne Road

Last Mile Gas are proposing to carry out Utility asset works on Golborne Road, Winwick, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Gas on 7 Aug 2025 at 10:56.

Finishing
Tomorrow
Details
View Map
Share
Follow
Golborne Road

Last Mile Gas are proposing to carry out Utility asset works on Golborne Road, Winwick, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Gas on 26 Aug 2025 at 14:39.

Warrington Borough Council logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Beech Road

Warrington Borough Council are carrying out Highway improvement works on Beech Road, Stockton Heath, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 13:30 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 1 Sep 2025 at 15:13.

Warrington Borough Council logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Farrell Road

Warrington Borough Council are carrying out Highway improvement works on Farrell Road, Stockton Heath, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 13:45 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 1 Sep 2025 at 15:13.

Warrington Borough Council logo
LONG TERM
Between
1 Sep and 10 Oct 2025
Details
View Map
Share
Follow
North Park Brook Road

Warrington Borough Council are proposing to carry out Highway improvement works on North Park Brook Road, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 4 Jun 2025 at 11:29.

Warrington Borough Council logo
LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
North Park Brook Road

Warrington Borough Council are carrying out Highway improvement works on North Park Brook Road, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 13:45 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 1 Sep 2025 at 15:14.

Warrington Borough Council logo
LONG TERM
Between
1 Sep and 10 Oct 2025
Details
View Map
Share
Follow
St Davids Drive

Warrington Borough Council are proposing to carry out Highway repair and maintenance works on St Davids Drive, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 4 Jun 2025 at 11:35.

Warrington Borough Council logo
LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
St Davids Drive

Warrington Borough Council are carrying out Highway repair and maintenance works on St Davids Drive, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 13:45 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 1 Sep 2025 at 15:14.

Warrington Borough Council logo
LONG TERM
Between
1 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Tenby Close

Warrington Borough Council are proposing to carry out Highway improvement works on Tenby Close, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 4 Jun 2025 at 11:37.

Warrington Borough Council logo
LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Tenby Close

Warrington Borough Council are carrying out Highway improvement works on Tenby Close, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 13:45 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 1 Sep 2025 at 15:15.

Until
25 Sep 2025
Details
View Map
Share
Follow
Golborne Road

Last Mile Gas are carrying out Utility asset works on Golborne Road, Winwick, Warrington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 September 2025 at 10:10 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Gas on 3 Sep 2025 at 10:24.

ManWeb logo
Finishing
Sunday
Details
View Map
Share
Follow
Kingsway South

ManWeb are proposing to carry out Utility repair and maintenance works on Kingsway South, Latchford, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 4 Sep 2025 at 16:04.

Warrington Borough Council logo
LONG TERM
Until
13 Oct 2025
Details
View Map
Share
Follow
Nicholls Street

Warrington Borough Council are carrying out Highway improvement works on Nicholls Street, Grappenhall And Thelwall, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 10:45 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 9 Sep 2025 at 12:32.

Warrington Borough Council logo
LONG TERM
Until
13 Oct 2025
Details
View Map
Share
Follow
Georges Crescent

Warrington Borough Council are carrying out Highway improvement works on Georges Crescent, Grappenhall And Thelwall, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 10:45 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 9 Sep 2025 at 12:32.

Warrington Borough Council logo
Until
26 Sep 2025
Details
View Map
Share
Follow
Skyline Drive

Warrington Borough Council are carrying out Utility asset works on Skyline Drive, Warrington.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 08:00 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Warrington Borough Council on 11 Sep 2025 at 12:45.

Cadent Gas logo
Until
1 Oct 2025
Details
View Map
Share
Follow
Park Street

Cadent Gas are carrying out Utility asset works on Park Street, Haydock, St Helens.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 09:02 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 09:02.

Warrington Borough Council logo
LONG TERM
Between
12 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Nicholls Street

Warrington Borough Council are proposing to carry out Highway improvement works on Nicholls Street, Grappenhall And Thelwall, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 2 Jul 2025 at 11:20.

Warrington Borough Council logo
LONG TERM
Between
12 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Georges Crescent

Warrington Borough Council are proposing to carry out Highway improvement works on Georges Crescent, Grappenhall And Thelwall, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 2 Jul 2025 at 13:03.

Warrington Borough Council logo
LONG TERM
Between
15 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Beech Road

Warrington Borough Council are proposing to carry out Highway improvement works on Beech Road, Stockton Heath, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 23 Jun 2025 at 14:54.

Warrington Borough Council logo
LONG TERM
Between
15 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Farrell Road

Warrington Borough Council are proposing to carry out Highway improvement works on Farrell Road, Stockton Heath, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 23 Jun 2025 at 15:27.

Cadent Gas logo
Between
15 Sep and 8 Oct 2025
Details
View Map
Share
Sandy Lane

Cadent Gas were proposing to carry out Utility asset works on Sandy Lane, Stockton Heath, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 8 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2025 at 13:01.

Warrington Borough Council logo
LONG TERM
Until
21 Oct 2025
Details
View Map
Share
Follow
Hudson Close

Warrington Borough Council are carrying out Highway improvement works on Hudson Close, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 12:45 and could run through until 21 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 17 Sep 2025 at 14:36.

Cadent Gas logo
Between
15 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Harpers Road

Cadent Gas are proposing to carry out Utility asset works on Harpers Road, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jun 2025 at 12:00.

Halton Borough Council logo
Finishing
Monday
Details
View Map
Share
Follow
Daresbury Bypass

Halton Borough Council are proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 17 Mar 2025 at 10:03.

Warrington Borough Council logo
Between
19 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Hallfields Road

Warrington Borough Council are proposing to carry out Highway improvement works on Hallfields Road, Orford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 29 Aug 2025 at 10:35.

Halton Borough Council logo
Between
22 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Busway Windmill Hill Bb

Halton Borough Council are proposing to carry out Highway improvement works on Busway Windmill Hill Bb, Runcorn.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 19 October 2025. The works will impact the cycleway only.

This roadwork event was last updated by Halton Borough Council on 18 Aug 2025 at 16:17.

United Utilities Water (formerly North West Water) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Delph Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Delph Lane, Daresbury, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Sep 2025 at 13:09.

United Utilities Water (formerly North West Water) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Delph Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Delph Lane, Daresbury, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Sep 2025 at 15:18.

Cadent Gas logo
Between
22 Sep and 22 Oct 2025
Details
View Map
Share
Follow
Sycamore Avenue

Cadent Gas are proposing to carry out Utility asset works on Sycamore Avenue, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jun 2025 at 11:38.

Cadent Gas logo
Between
22 Sep and 22 Oct 2025
Details
View Map
Share
Follow
Sycamore Avenue

Cadent Gas are proposing to carry out Utility asset works on Sycamore Avenue, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2025 at 00:10.

BT logo
Finishing
Wednesday
Details
View Map
Share
Vulcan Close

BT were proposing to carry out Utility repair and maintenance works on Vulcan Close, Poulton-with-fearnhead, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 24 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 7 Jul 2025 at 10:23.

Between
22 and 25 Sep 2025
Details
View Map
Share
Follow
Winwick Link Road

St. Helens Council are proposing to carry out Remedial works on Winwick Link Road, Winwick, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 9 Jul 2025 at 15:23.

Between
22 and 25 Sep 2025
Details
View Map
Share
Follow
M6 J22 Leave N

St. Helens Council are proposing to carry out Remedial works on M6 J22 Leave N, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 14 Jul 2025 at 09:12.

Between
22 and 25 Sep 2025
Details
View Map
Share
Follow
M6 J22 Join S

St. Helens Council are proposing to carry out Remedial works on M6 J22 Join S, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 14 Jul 2025 at 09:12.

Between
22 and 25 Sep 2025
Details
View Map
Share
Follow
M6 J22 Join N

St. Helens Council are proposing to carry out Remedial works on M6 J22 Join N, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 14 Jul 2025 at 09:12.

Between
22 and 25 Sep 2025
Details
View Map
Share
Follow
M6 J22 Leave S

St. Helens Council are proposing to carry out Remedial works on M6 J22 Leave S, St. Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 14 Jul 2025 at 09:12.

Warrington Borough Council logo
Between
24 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Livingstone Close

Warrington Borough Council are proposing to carry out Highway improvement works on Livingstone Close, Great Sankey, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 17 Sep 2025 at 15:00.

Halton Borough Council logo
Between
26 and 29 Sep 2025
Details
View Map
Share
Follow
Chester Road

Halton Borough Council are proposing to carry out Highway improvement works on Chester Road, Daresbury, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 11 Sep 2025 at 15:39.

Halton Borough Council logo
Between
26 and 29 Sep 2025
Details
View Map
Share
Follow
Chester Road

Halton Borough Council are proposing to carry out Highway improvement works on Chester Road, Daresbury, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 18 Sep 2025 at 10:09.

Halton Borough Council logo
Between
26 and 29 Sep 2025
Details
View Map
Share
Follow
Daresbury Bypass

Halton Borough Council are proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 17 Mar 2025 at 10:04.

Halton Borough Council logo
Between
26 and 29 Sep 2025
Details
View Map
Share
Follow
Daresbury Bypass

Halton Borough Council are proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 13 May 2025 at 08:23.

Halton Borough Council logo
LONG TERM
Between
29 Sep and 12 Dec 2025
Details
View Map
Share
Follow
Keckwick Lane

Halton Borough Council are proposing to carry out Highway improvement works on Keckwick Lane, Daresbury, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 18 Jun 2025 at 09:06.

Halton Borough Council logo
LONG TERM
Between
29 Sep and 12 Dec 2025
Details
View Map
Share
Follow
Keckwick Lane

Halton Borough Council are proposing to carry out Highway improvement works on Keckwick Lane, Daresbury, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 24 Jun 2025 at 10:33.

Warrington Borough Council logo
LONG TERM
Between
29 Sep and 14 Nov 2025
Details
View Map
Share
Follow
Witherwin Avenue

Warrington Borough Council are proposing to carry out Highway repair and maintenance works on Witherwin Avenue, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 14 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Warrington Borough Council on 8 Jul 2025 at 13:27.

ManWeb logo
Between
29 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Alness Drive

ManWeb are proposing to carry out Utility repair and maintenance works on Alness Drive, Rainhill, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 19 Jun 2025 at 09:07.

Cadent Gas logo
Between
29 Sep and 22 Oct 2025
Details
View Map
Share
Clock Face Road

Cadent Gas were proposing to carry out Utility asset works on Clock Face Road, Clock Face, St Helens.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 22 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2025 at 11:44.

Warrington Borough Council logo
Between
1 and 7 Oct 2025
Details
View Map
Share
Follow
Winmarleigh Street

Warrington Borough Council are proposing to carry out Highway improvement works on Winmarleigh Street, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 9 Jul 2025 at 15:04.

Warrington Borough Council logo
Between
1 and 22 Oct 2025
Details
View Map
Share
Follow
Winmarleigh Street

Warrington Borough Council are proposing to carry out Highway improvement works on Winmarleigh Street, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 17 Sep 2025 at 14:59.

Warrington Borough Council logo
Between
2 and 8 Oct 2025
Details
View Map
Share
Follow
Winmarleigh Street

Warrington Borough Council are proposing to carry out Highway improvement works on Winmarleigh Street, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 7 Aug 2025 at 12:42.

Warrington Borough Council logo
Between
2 and 8 Oct 2025
Details
View Map
Share
Follow
Winmarleigh Street

Warrington Borough Council are proposing to carry out Highway improvement works on Winmarleigh Street, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 19 Aug 2025 at 11:02.

Halton Borough Council logo
Between
3 and 6 Oct 2025
Details
View Map
Share
Follow
Daresbury Bypass

Halton Borough Council are proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 3 Jul 2025 at 08:52.

Cadent Gas logo
Between
6 and 22 Oct 2025
Details
View Map
Share
Follow
Thelwall New Road

Cadent Gas are proposing to carry out Utility asset works on Thelwall New Road, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Apr 2025 at 14:25.

Electricity Network Company logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Tavistock Road

Electricity Network Company are proposing to carry out Utility asset works on Tavistock Road, Penketh, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 4 Sep 2025 at 13:05.

Warrington Borough Council logo
LONG TERM
Between
6 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Bostock Street

Warrington Borough Council are proposing to carry out Highway improvement works on Bostock Street, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 4 Jun 2025 at 10:46.

Warrington Borough Council logo
LONG TERM
Between
6 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Bostock Street

Warrington Borough Council are proposing to carry out Highway improvement works on Bostock Street, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 17 Sep 2025 at 12:11.

Warrington Borough Council logo
LONG TERM
Between
6 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Wellfield Street

Warrington Borough Council are proposing to carry out Highway improvement works on Wellfield Street, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 5 Jun 2025 at 11:30.

Warrington Borough Council logo
LONG TERM
Between
6 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Wellfield Street

Warrington Borough Council are proposing to carry out Highway improvement works on Wellfield Street, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 17 Sep 2025 at 12:05.

Warrington Borough Council logo
LONG TERM
Between
6 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Bagot Avenue

Warrington Borough Council are proposing to carry out Highway repair and maintenance works on Bagot Avenue, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 4 Jun 2025 at 10:44.

Warrington Borough Council logo
LONG TERM
Between
6 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Bagot Avenue

Warrington Borough Council are proposing to carry out Highway repair and maintenance works on Bagot Avenue, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 17 Sep 2025 at 12:07.

Warrington Borough Council logo
LONG TERM
Between
6 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Westbrook Way

Warrington Borough Council are proposing to carry out Highway improvement works on Westbrook Way, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 4 Aug 2025 at 13:01.

Warrington Borough Council logo
LONG TERM
Between
6 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Westbrook Way

Warrington Borough Council are proposing to carry out Highway improvement works on Westbrook Way, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 17 Sep 2025 at 11:59.

Warrington Borough Council logo
LONG TERM
Between
6 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Callands Road

Warrington Borough Council are proposing to carry out Highway improvement works on Callands Road, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 4 Aug 2025 at 12:52.

Warrington Borough Council logo
LONG TERM
Between
6 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Callands Road

Warrington Borough Council are proposing to carry out Highway improvement works on Callands Road, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 17 Sep 2025 at 12:14.

Warrington Borough Council logo
LONG TERM
Between
6 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Westbrook Crescent

Warrington Borough Council are proposing to carry out Highway improvement works on Westbrook Crescent, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 4 Aug 2025 at 12:57.

Warrington Borough Council logo
LONG TERM
Between
6 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Westbrook Crescent

Warrington Borough Council are proposing to carry out Highway improvement works on Westbrook Crescent, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 2 Sep 2025 at 10:36.

BT logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Valiant Close Segregated Footpath

BT were proposing to carry out Utility repair and maintenance works on Valiant Close Segregated Footpath, Poulton-with-fearnhead, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 8 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 8 Jul 2025 at 16:05.

Warrington Borough Council logo
LONG TERM
Between
6 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Cromwell Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Cromwell Avenue, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 4 Aug 2025 at 12:33.

Warrington Borough Council logo
LONG TERM
Between
6 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Cromwell Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Cromwell Avenue, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 2 Sep 2025 at 10:42.

Cadent Gas logo
LONG TERM
Between
6 Oct and 3 Dec 2025
Details
View Map
Share
Leach Lane

Cadent Gas were proposing to carry out Utility asset works on Leach Lane, Sutton Leach, St Helens.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 3 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jul 2025 at 11:51.

Cadent Gas logo
LONG TERM
Between
8 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Leach Lane

Cadent Gas are proposing to carry out Utility asset works on Leach Lane, Sutton Leach, St Helens.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 14:10.

United Utilities Water (formerly North West Water) logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Rock Road

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Rock Road, Latchford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 30 Jul 2025 at 15:07.

ManWeb logo
LONG TERM
Between
13 Oct and 5 Dec 2025
Details
View Map
Share
Follow
Vaudrey Drive

ManWeb are proposing to carry out Utility repair and maintenance works on Vaudrey Drive, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 15 Sep 2025 at 15:12.

ManWeb logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Pennine Close

ManWeb are proposing to carry out Utility repair and maintenance works on Pennine Close, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 7 Jul 2025 at 09:35.

ManWeb logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Pennine Close

ManWeb are proposing to carry out Utility repair and maintenance works on Pennine Close, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 7 Jul 2025 at 11:33.

Electricity Network Company logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Tavistock Road

Electricity Network Company are proposing to carry out Utility asset works on Tavistock Road, Penketh, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 17 Jul 2025 at 11:38.

Cadent Gas logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Padgate Lane

Cadent Gas are proposing to carry out Utility asset works on Padgate Lane, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2025 at 14:32.

United Utilities Water (formerly North West Water) logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Old Wargrave Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Old Wargrave Road, Newton Le Willows, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 23 Jul 2025 at 08:26.

United Utilities Water (formerly North West Water) logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Old Wargrave Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Old Wargrave Road, Newton Le Willows, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 23 Jul 2025 at 11:59.

ManWeb logo
LONG TERM
Between
21 Oct and 4 Dec 2025
Details
View Map
Share
Follow
Alder Road

ManWeb are proposing to carry out Utility repair and maintenance works on Alder Road, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 4 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 26 Aug 2025 at 10:11.

Warrington Borough Council logo
Between
21 and 23 Oct 2025
Details
View Map
Share
Follow
Hallfields Road

Warrington Borough Council are proposing to carry out Highway improvement works on Hallfields Road, Orford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 30 Jul 2025 at 10:50.

Warrington Borough Council logo
Between
23 and 27 Oct 2025
Details
View Map
Share
Follow
Hallfields Road

Warrington Borough Council are proposing to carry out Highway improvement works on Hallfields Road, Orford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 31 Jul 2025 at 15:02.

Halton Borough Council logo
Between
24 and 27 Oct 2025
Details
View Map
Share
Follow
Eastern Expressway

Halton Borough Council are proposing to carry out Highway repair and maintenance works on Eastern Expressway, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 22 Aug 2025 at 10:37.

Network Rail logo
Between
24 and 27 Oct 2025
Details
View Map
Share
Mill Lane

Network Rail were proposing to carry out Works for Rail Purposes on Mill Lane, Newton Le Willows, St Helens.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 October 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 May 2025 at 11:30.

Between
25 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Chester Lane

St. Helens Council are proposing to carry out Section 50 on Chester Lane, Clock Face, St Helens.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by St. Helens Council on 5 Sep 2025 at 09:48.

Between
25 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Chester Lane

St. Helens Council are proposing to carry out Section 50 on Chester Lane, Clock Face, St Helens.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by St. Helens Council on 5 Sep 2025 at 09:58.

ManWeb logo
Between
27 Oct and 23 Nov 2025
Details
View Map
Share
Follow
Norton Station Road

ManWeb are proposing to carry out Utility repair and maintenance works on Norton Station Road, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 28 Jul 2025 at 14:12.

ManWeb logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Lumb Brook Road

ManWeb were proposing to carry out Utility repair and maintenance works on Lumb Brook Road, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 29 Jul 2025 at 11:52.

ManWeb logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Lumb Brook Road

ManWeb are proposing to carry out Utility repair and maintenance works on Lumb Brook Road, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 20 Aug 2025 at 15:26.

Cadent Gas logo
LONG TERM
Between
27 Oct and 3 Dec 2025
Details
View Map
Share
Follow
Longshaw Street

Cadent Gas are proposing to carry out Utility asset works on Longshaw Street, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2025 at 10:08.

Cadent Gas logo
Between
27 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Lewis Avenue

Cadent Gas are proposing to carry out Utility asset works on Lewis Avenue, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2025 at 14:58.

BT logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Valiant Close Segregated Footpath

BT were proposing to carry out Utility repair and maintenance works on Valiant Close Segregated Footpath, Poulton-with-fearnhead, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 7 Aug 2025 at 09:53.

Cadent Gas logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Fearnhead Lane

Cadent Gas are proposing to carry out Utility asset works on Fearnhead Lane, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jul 2025 at 10:56.

Cadent Gas logo
LONG TERM
Between
27 Oct and 3 Dec 2025
Details
View Map
Share
Follow
Leach Lane

Cadent Gas are proposing to carry out Utility asset works on Leach Lane, Sutton Leach, St Helens.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jul 2025 at 08:31.

BT logo
Between
30 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Valiant Close Segregated Footpath

BT are proposing to carry out Utility repair and maintenance works on Valiant Close Segregated Footpath, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 20 Aug 2025 at 14:30.

United Utilities Water (formerly North West Water) logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
River Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on River Road, Latchford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Aug 2025 at 13:01.

United Utilities Water (formerly North West Water) logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
River Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on River Road, Latchford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 28 Aug 2025 at 15:19.

Warrington Borough Council logo
LONG TERM
Between
3 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Radlett Close

Warrington Borough Council are proposing to carry out Highway improvement works on Radlett Close, Penketh, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 4 Jun 2025 at 11:31.

Warrington Borough Council logo
LONG TERM
Between
3 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Lynton Close

Warrington Borough Council are proposing to carry out Highway improvement works on Lynton Close, Penketh, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 4 Jun 2025 at 11:27.

Warrington Borough Council logo
LONG TERM
Between
3 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Hillside Grove

Warrington Borough Council are proposing to carry out Highway improvement works on Hillside Grove, Penketh, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 4 Jun 2025 at 10:53.

Warrington Borough Council logo
LONG TERM
Between
3 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Walsingham Road

Warrington Borough Council are proposing to carry out Highway improvement works on Walsingham Road, Penketh, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 5 Jun 2025 at 11:26.

Cadent Gas logo
Between
3 and 19 Nov 2025
Details
View Map
Share
Follow
Harpers Road

Cadent Gas are proposing to carry out Utility asset works on Harpers Road, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2025 at 13:34.

Cadent Gas logo
Between
3 and 26 Nov 2025
Details
View Map
Share
Follow
Park Street

Cadent Gas are proposing to carry out Utility asset works on Park Street, Haydock, St Helens.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Aug 2025 at 08:17.

Warrington Borough Council logo
LONG TERM
Between
10 Nov 2025 and 6 Feb 2026
Details
View Map
Share
Follow
Kingsway South

Warrington Borough Council are proposing to carry out Highway improvement works on Kingsway South, Latchford, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 6 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Warrington Borough Council on 11 Aug 2025 at 08:43.

Cadent Gas logo
Between
10 and 26 Nov 2025
Details
View Map
Share
Follow
Union Bank Lane

Cadent Gas are proposing to carry out Utility asset works on Union Bank Lane, Bold Heath, St Helens.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Aug 2025 at 13:47.

Cadent Gas logo
LONG TERM
Between
12 Nov and 16 Dec 2025
Details
View Map
Share
Follow
London Road

Cadent Gas are proposing to carry out Utility asset works on London Road, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 16 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 10:10.

ManWeb logo
LONG TERM
Between
17 Nov and 21 Dec 2025
Details
View Map
Share
Follow
Falstone Drive

ManWeb are proposing to carry out Utility repair and maintenance works on Falstone Drive, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 29 Jul 2025 at 08:27.

ManWeb logo
LONG TERM
Between
17 Nov and 21 Dec 2025
Details
View Map
Share
Follow
Falstone Drive

ManWeb are proposing to carry out Utility repair and maintenance works on Falstone Drive, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 6 Aug 2025 at 09:30.

Hutchinson 3G logo
Between
18 and 21 Nov 2025
Details
View Map
Share
Follow
Burtonwood Road

Hutchinson 3G are proposing to carry out Utility asset works on Burtonwood Road, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hutchinson 3G on 8 Sep 2025 at 16:27.

ManWeb logo
Between
20 Nov and 10 Dec 2025
Details
View Map
Share
Follow
Museum Street

ManWeb are proposing to carry out New service connection on Museum Street, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 28 Aug 2025 at 09:09.

ManWeb logo
Between
20 Nov and 10 Dec 2025
Details
View Map
Share
Follow
Bold Street

ManWeb are proposing to carry out New service connection on Bold Street, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 28 Aug 2025 at 09:28.

ManWeb logo
Between
20 Nov and 10 Dec 2025
Details
View Map
Share
Follow
Suez Street

ManWeb are proposing to carry out New service connection on Suez Street, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 28 Aug 2025 at 08:51.

ManWeb logo
Between
20 Nov and 10 Dec 2025
Details
View Map
Share
Egypt Street

ManWeb were proposing to carry out New service connection on Egypt Street, Bewsey And Whitecross, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 November 2025 and run through until 10 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 29 Aug 2025 at 16:14.

ManWeb logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Egypt Street

ManWeb are proposing to carry out New service connection on Egypt Street, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 29 Aug 2025 at 16:14.

Cadent Gas logo
Between
24 Nov and 10 Dec 2025
Details
View Map
Share
Follow
School Lane

Cadent Gas are proposing to carry out Utility asset works on School Lane, Bold Heath, St Helens.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 09:06.

Cadent Gas logo
Between
24 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Clock Face Road

Cadent Gas are proposing to carry out Utility asset works on Clock Face Road, Bold Heath, St Helens.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 09:08.

BT logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Follow
St Bridgets Close

BT are proposing to carry out New service connection on St Bridgets Close, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 20 Aug 2025 at 12:13.

BT logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Follow
St Bridgets Close

BT are proposing to carry out New service connection on St Bridgets Close, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 26 Aug 2025 at 15:22.

BT logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Follow
Carrington Close

BT are proposing to carry out New service connection on Carrington Close, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 19 Aug 2025 at 09:46.

BT logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Follow
Carrington Close

BT are proposing to carry out New service connection on Carrington Close, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 26 Aug 2025 at 15:24.

Network Rail logo
Between
24 and 27 Nov 2025
Details
View Map
Share
Follow
Mill Lane

Network Rail are proposing to carry out Works for Rail Purposes on Mill Lane, Newton Le Willows, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 27 May 2025 at 12:40.

Cadent Gas logo
Between
1 and 21 Dec 2025
Details
View Map
Share
Follow
Clay Lane

Cadent Gas are proposing to carry out Utility asset works on Clay Lane, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Apr 2025 at 09:52.

Cadent Gas logo
Between
1 and 21 Dec 2025
Details
View Map
Share
Follow
Clay Lane

Cadent Gas are proposing to carry out Utility asset works on Clay Lane, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 10:33.

Warrington Borough Council logo
LONG TERM
Between
5 Dec 2025 and 5 Jan 2026
Details
View Map
Share
Follow
Winmarleigh Street

Warrington Borough Council are proposing to carry out Highway improvement works on Winmarleigh Street, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2025 and could run through until 5 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 11 Sep 2025 at 18:19.

Electricity North West (NorWeb) logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Follow
Ledger Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Ledger Road, Haydock, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 16 Sep 2025 at 09:05.

BT logo
Between
10 and 17 Dec 2025
Details
View Map
Share
Follow
Stonehaven Drive

BT are proposing to carry out New service connection on Stonehaven Drive, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 4 Sep 2025 at 10:48.

BT logo
Between
11 and 18 Dec 2025
Details
View Map
Share
Follow
Cavendish Close

BT are proposing to carry out New service connection on Cavendish Close, Great Sankey, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2025 and could run through until 18 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 11 Sep 2025 at 13:08.

United Utilities Water (formerly North West Water) logo
Between
15 and 17 Dec 2025
Details
View Map
Share
Follow
Parker Street Passageway Rear Of 36 To 50

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Parker Street Passageway Rear Of 36 To 50, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 17 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 18 Sep 2025 at 10:55.


Roadworks Map near to McKinley Street, WARRINGTON, WA5 8GR (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 18 Sep 2025 20:58
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to McKinley Street, WARRINGTON, WA5 8GR (31 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
United Utilities Water (formerly North West Water) logo
SANTA ROSA BOULEVARD, GREAT SANKEY 
(0.1 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Carriageway - Multi-way signals
Planned
Scheduled: 19 Sep 2025
0.1
Details
Share
Follow
2
United Utilities Water (formerly North West Water) logo
URGENT
  
MONTGOMERY CLOSE, GREAT SANKEY 
(0.2 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 14 Sep 2025 12:11
(Scheduled: 14 Sep 2025 - 19 Sep 2025)
0.2
Details
Share
Follow
3
BT logo
FIRMAN CLOSE, BURTONWOOD AND WESTBROOK 
(0.3 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
16 Sep 2025 08:10 - 10:34
0.3
Details
Share
4
BT logo
WASHINGTON DRIVE, GREAT SANKEY 
(0.4 miles)
BT
New service connection - Footway, Verge - Give and take
Planned
Scheduled: 17 Sep 2025 - 24 Sep 2025
0.4
Details
Share
Follow
5
United Utilities Water (formerly North West Water) logo
URGENT
  
DAKOTA DRIVE, GREAT SANKEY 
(0.5 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 15 Sep 2025 13:12
(Scheduled: 15 Sep 2025 - 19 Sep 2025)
0.5
Details
Share
Follow
6
Warrington Borough Council logo
EMERGENCY
  
WARD CLOSE, GREAT SANKEY 
(0.5 miles)
Warrington Borough Council
Highway repair and maintenance works - Carriageway - Some carriageway incursion
In Progress
Since: 18 Sep 2025 09:00
(Scheduled: 18 Sep 2025 - 22 Sep 2025)
0.5
Details
Share
Follow
7
United Utilities Water (formerly North West Water) logo
URGENT
  
TASMAN CLOSE, BURTONWOOD AND WESTBROOK 
(0.6 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Give and take
In Progress
Since: 12 Sep 2025 12:34
(Scheduled: 12 Sep 2025 - 18 Sep 2025)
0.6
Details
Share
Follow
8
Virgin Media logo
PARK ROAD, GREAT SANKEY 
(0.6 miles)
Virgin Media
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 17 Sep 2025 - 18 Sep 2025
0.6
Details
Share
Follow
9
United Utilities Water (formerly North West Water) logo
URGENT
  
LIVINGSTONE CLOSE, GREAT SANKEY 
(0.7 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 18 Sep 2025 15:10
(Scheduled: 18 Sep 2025 - 24 Sep 2025)
0.7
Details
Share
Follow
10
Warrington Borough Council logo
MAJOR
  
LIVINGSTONE CLOSE, GREAT SANKEY 
(0.7 miles)
Warrington Borough Council
Highway improvement works - Carriageway - Road closure
Planned
Scheduled: 26 Aug 2025 - 3 Oct 2025
0.7
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.