ROADWORKS SUMMARY
Gig Lane, WARRINGTON, WA4 6UW

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Gig Lane, WA4 6UW and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Gig Lane, WARRINGTON, WA4 6UW

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Gig Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

United Utilities Water (formerly North West Water) logo
LONG TERM
Until
24 Apr 2025
Details
View Map
Share
Follow
Murdishaw Avenue

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Murdishaw Avenue, Runcorn.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 February 2024 at 12:00 and could run through until 24 April 2025. The works will impact the verge only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Apr 2024 at 11:49.

Halton Borough Council logo
LONG TERM
Between
12 Aug 2024 and 15 Aug 2025
Details
View Map
Share
Follow
Daresbury Bypass

Halton Borough Council are proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.

These works are categorised as Major.

The works will start on or after 12 August 2024 and could run through until 15 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 11:59.

Halton Borough Council logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Daresbury Bypass

Halton Borough Council are carrying out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.

These works are categorised as Major.

The works started on 12 August 2024 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:25.

Halton Borough Council logo
LONG TERM
Between
12 Aug 2024 and 31 Oct 2025
Details
View Map
Share
Follow
Daresbury Bypass

Halton Borough Council are proposing to carry out Highway repair and maintenance works on Daresbury Bypass, Daresbury, Runcorn.

These works are categorised as Major.

The works will start on or after 12 August 2024 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 16 Feb 2024 at 13:40.

Halton Borough Council logo
LONG TERM
Between
12 Aug 2024 and 15 Aug 2025
Details
View Map
Share
Follow
Chester Road

Halton Borough Council are proposing to carry out Highway improvement works on Chester Road, Daresbury, Runcorn.

These works are categorised as Major.

The works will start on or after 12 August 2024 and could run through until 15 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 12:28.

Halton Borough Council logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Chester Road

Halton Borough Council are carrying out Highway improvement works on Chester Road, Daresbury, Runcorn.

These works are categorised as Major.

The works started on 12 August 2024 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:25.

Halton Borough Council logo
LONG TERM
Between
12 Aug 2024 and 15 Aug 2025
Details
View Map
Share
Follow
Eastern Expressway

Halton Borough Council are proposing to carry out Highway improvement works on Eastern Expressway, Runcorn.

These works are categorised as Major.

The works will start on or after 12 August 2024 and could run through until 15 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 12:24.

Halton Borough Council logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Eastern Expressway

Halton Borough Council are carrying out Highway improvement works on Eastern Expressway, Runcorn.

These works are categorised as Major.

The works started on 12 August 2024 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:25.

Halton Borough Council logo
LONG TERM
Between
12 Aug 2024 and 13 Oct 2025
Details
View Map
Share
Follow
Chester Road

Halton Borough Council are proposing to carry out Highway repair and maintenance works on Chester Road, Daresbury, Runcorn.

These works are categorised as Major.

The works will start on or after 12 August 2024 and could run through until 13 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 13 May 2024 at 08:31.

Halton Borough Council logo
LONG TERM
Between
2 Oct 2024 and 12 Mar 2025
Details
View Map
Share
Daresbury Bypass

Halton Borough Council were proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.

These works were categorised as Major.

The works were originally planned to start 2 October 2024 and run through until 12 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:37.

Halton Borough Council logo
LONG TERM
Between
2 Oct 2024 and 12 Mar 2025
Details
View Map
Share
Chester Road

Halton Borough Council were proposing to carry out Highway improvement works on Chester Road, Daresbury, Runcorn.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2024 and run through until 12 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:38.

Halton Borough Council logo
LONG TERM
Between
2 Oct 2024 and 12 Mar 2025
Details
View Map
Share
Eastern Expressway

Halton Borough Council were proposing to carry out Highway improvement works on Eastern Expressway, Runcorn.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2024 and run through until 12 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:38.

Warrington Borough Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Weaste Lane

Warrington Borough Council are proposing to carry out Utility asset works on Weaste Lane, Grappenhall And Thelwall, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Warrington Borough Council on 16 Sep 2024 at 14:24.

Halton Borough Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Footpath Astmoor Road Between Goddard Road And Access Road

Halton Borough Council are proposing to carry out Highway repair and maintenance works on Footpath Astmoor Road Between Goddard Road And Access Road, Runcorn.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 December 2024. The works will impact the footpath only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 16 Sep 2024 at 09:05.

Halton Borough Council logo
LONG TERM
Between
2 Dec 2024 and 8 Jan 2025
Details
View Map
Share
Follow
Footpath Astmoor Road Between Goddard Road And Access Road

Halton Borough Council are proposing to carry out Highway repair and maintenance works on Footpath Astmoor Road Between Goddard Road And Access Road, Runcorn.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 8 January 2025. The works will impact the footpath only.

This roadwork event was last updated by Halton Borough Council on 9 Sep 2024 at 14:56.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 15 Jan 2025
Details
View Map
Share
Follow
Academy Street

Cadent Gas are proposing to carry out Utility asset works on Academy Street, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 08:49.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Watkin Street

ManWeb were proposing to carry out Utility repair and maintenance works on Watkin Street, Orford, Warrington.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 7 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 6 Nov 2024 at 11:03.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 4 Oct 2024 at 10:54.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Winwick Road

ManWeb were proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 7 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 9 Dec 2024 at 09:11.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 4 Oct 2024 at 10:55.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Winwick Road

ManWeb were proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 7 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 6 Nov 2024 at 11:06.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 4 Oct 2024 at 10:53.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 4 Oct 2024 at 16:08.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Winwick Road

ManWeb were proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 7 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 11 Oct 2024 at 09:31.

ManWeb logo
LONG TERM
Between
3 Dec 2024 and 8 Jan 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 4 Oct 2024 at 10:57.

ManWeb logo
LONG TERM
Between
3 Dec 2024 and 8 Jan 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 8 Oct 2024 at 15:09.

ManWeb logo
LONG TERM
Between
3 Dec 2024 and 8 Jan 2025
Details
View Map
Share
Winwick Road

ManWeb were proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 8 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 11 Oct 2024 at 09:35.

Cadent Gas logo
LONG TERM
Between
9 Dec 2024 and 29 Jan 2025
Details
View Map
Share
Follow
Halton Brow

Cadent Gas are proposing to carry out Utility asset works on Halton Brow, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 10:20.

Cadent Gas logo
LONG TERM
Between
9 Dec 2024 and 29 Jan 2025
Details
View Map
Share
Follow
Halton Brow

Cadent Gas are proposing to carry out Utility asset works on Halton Brow, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 11:57.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Wash Lane

Cadent Gas are proposing to carry out Utility asset works on Wash Lane, Latchford, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 11:36.

ManWeb logo
Between
9 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Withycombe Road

ManWeb are proposing to carry out Utility repair and maintenance works on Withycombe Road, Penketh, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 11 Oct 2024 at 11:01.

United Utilities Water (formerly North West Water) logo
Until
3 Jan 2025
Details
View Map
Share
Follow
Footpath 10ap

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Footpath 10ap, Widnes.

The works started on 20 December 2024 at 14:24 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 24 Dec 2024 at 09:26.

ManWeb logo
Between
31 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Arley Road

ManWeb are proposing to carry out Utility repair and maintenance works on Arley Road, Appleton, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 9 Oct 2024 at 09:52.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Busway Palace Fields Dc

Halton Borough Council were proposing to carry out Highway repair and maintenance works on Busway Palace Fields Dc, Runcorn.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 10 Oct 2024 at 13:47.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Norton Bd

Halton Borough Council are proposing to carry out Highway improvement works on Busway Norton Bd, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 12:43.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Norton Bd

Halton Borough Council are proposing to carry out Highway improvement works on Busway Norton Bd, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 30 Oct 2024 at 09:14.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Palace Fields Avenue

Halton Borough Council are proposing to carry out Highway improvement works on Palace Fields Avenue, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 23 Oct 2024 at 08:21.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Halton Lea G

Halton Borough Council are proposing to carry out Highway improvement works on Busway Halton Lea G, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 09:10.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Halton Lea G

Halton Borough Council are proposing to carry out Highway improvement works on Busway Halton Lea G, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 5 Nov 2024 at 09:54.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Halton Lea G

Halton Borough Council are proposing to carry out Highway improvement works on Busway Halton Lea G, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 15 Nov 2024 at 15:27.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Halton Lea E

Halton Borough Council are proposing to carry out Highway improvement works on Busway Halton Lea E, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 09:12.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Halton Lea E

Halton Borough Council are proposing to carry out Highway improvement works on Busway Halton Lea E, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 5 Nov 2024 at 09:54.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Halton Lea E

Halton Borough Council are proposing to carry out Highway improvement works on Busway Halton Lea E, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 20 Nov 2024 at 08:48.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Norton Bc

Halton Borough Council are proposing to carry out Highway improvement works on Busway Norton Bc, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 14:23.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Norton Bc

Halton Borough Council are proposing to carry out Highway improvement works on Busway Norton Bc, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 30 Oct 2024 at 09:15.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Castlefields Ea

Halton Borough Council are proposing to carry out Highway improvement works on Busway Castlefields Ea, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 11:04.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Castlefields Ea

Halton Borough Council are proposing to carry out Highway improvement works on Busway Castlefields Ea, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 5 Nov 2024 at 09:52.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Castlefields Ea

Halton Borough Council are proposing to carry out Highway improvement works on Busway Castlefields Ea, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 20 Nov 2024 at 08:54.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Windmill Hill Bb

Halton Borough Council are proposing to carry out Highway improvement works on Busway Windmill Hill Bb, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 14:20.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Windmill Hill Bb

Halton Borough Council are proposing to carry out Highway improvement works on Busway Windmill Hill Bb, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 30 Oct 2024 at 09:22.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Norton Priory B

Halton Borough Council are proposing to carry out Highway improvement works on Busway Norton Priory B, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 14:14.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Norton Priory B

Halton Borough Council are proposing to carry out Highway improvement works on Busway Norton Priory B, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 30 Oct 2024 at 10:43.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Tyrrell Way

Halton Borough Council are proposing to carry out Highway improvement works on Tyrrell Way, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 11:42.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Tyrrell Way

Halton Borough Council are proposing to carry out Highway improvement works on Tyrrell Way, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 30 Oct 2024 at 10:46.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Windmill Hill Ba

Halton Borough Council are proposing to carry out Highway improvement works on Busway Windmill Hill Ba, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 14:18.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Windmill Hill Ba

Halton Borough Council are proposing to carry out Highway improvement works on Busway Windmill Hill Ba, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 30 Oct 2024 at 09:24.

ManWeb logo
Between
2 and 6 Jan 2025
Details
View Map
Share
Follow
Arley Road

ManWeb are proposing to carry out Utility repair and maintenance works on Arley Road, Appleton, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 15 Oct 2024 at 10:03.

Cadent Gas logo
Between
2 and 29 Jan 2025
Details
View Map
Share
Follow
Winwick Road

Cadent Gas are proposing to carry out Utility asset works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 11:23.

Cadent Gas logo
Between
2 and 29 Jan 2025
Details
View Map
Share
Follow
Long Lane

Cadent Gas are proposing to carry out Utility asset works on Long Lane, Orford, Warrington.

These works are categorised as Major.

The works will start on or after 2 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 13:56.

ManWeb logo
LONG TERM
Between
2 Jan and 1 Dec 2025
Details
View Map
Share
Winwick Road

ManWeb were proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 1 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 19 Sep 2024 at 14:17.

United Utilities Water (formerly North West Water) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Aston Lane South

United Utilities Water (formerly North West Water) are proposing to carry out Remedial works on Aston Lane South, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Oct 2024 at 12:31.

United Utilities Water (formerly North West Water) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Aston Lane South

United Utilities Water (formerly North West Water) are proposing to carry out Remedial works on Aston Lane South, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Nov 2024 at 09:10.

Halton Borough Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Daresbury Bypass

Halton Borough Council are proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 23 May 2024 at 09:50.

Halton Borough Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Chester Road

Halton Borough Council are proposing to carry out Highway improvement works on Chester Road, Daresbury, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 23 May 2024 at 10:05.

Halton Borough Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Eastern Expressway

Halton Borough Council are proposing to carry out Highway improvement works on Eastern Expressway, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 19 Jun 2024 at 10:59.

Network Rail logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Victoria Road

Network Rail are proposing to carry out roadworks on Victoria Road, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 22 Oct 2024 at 11:45.

Network Rail logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Victoria Road

Network Rail are proposing to carry out Works for Rail Purposes on Victoria Road, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 24 Oct 2024 at 11:43.

Network Rail logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Victoria Road

Network Rail are proposing to carry out Works for Rail Purposes on Victoria Road, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 16 Dec 2024 at 13:25.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Yates Close

BT are proposing to carry out Utility asset works on Yates Close, Great Sankey, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 24 Oct 2024 at 12:26.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Yates Close

BT are proposing to carry out Utility asset works on Yates Close, Great Sankey, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 30 Oct 2024 at 14:53.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Yates Close

BT were proposing to carry out Utility asset works on Yates Close, Great Sankey, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Dec 2024 at 10:23.

ManWeb logo
LONG TERM
Between
6 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 16 Dec 2024 at 10:52.

United Utilities Water (formerly North West Water) logo
Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Appleton Village

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Appleton Village, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 7 Oct 2024 at 14:37.

ManWeb logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Arley Road

ManWeb were proposing to carry out Utility repair and maintenance works on Arley Road, Appleton, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 January 2025 and run through until 16 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 29 Oct 2024 at 15:08.

ManWeb logo
Between
16 and 22 Jan 2025
Details
View Map
Share
Green Lane

ManWeb were proposing to carry out Utility repair and maintenance works on Green Lane, Appleton, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 24 Oct 2024 at 15:48.

ManWeb logo
Between
16 and 22 Jan 2025
Details
View Map
Share
Follow
Appleton Bridleway 26

ManWeb are proposing to carry out Utility repair and maintenance works on Appleton Bridleway 26, Appleton, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 28 Oct 2024 at 10:35.

Warrington Borough Council logo
Between
19 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Cromwell Avenue

Warrington Borough Council are proposing to carry out Highway repair and maintenance works on Cromwell Avenue, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 January 2025 and could run through until 2 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Warrington Borough Council on 11 Dec 2024 at 10:58.

ManWeb logo
LONG TERM
Between
20 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Mill Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Mill Lane, Widnes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by ManWeb on 5 Dec 2024 at 10:07.

Warrington Borough Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Marina Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Marina Avenue, Great Sankey, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 18 Nov 2024 at 13:45.

Warrington Borough Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Marina Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Marina Avenue, Great Sankey, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 17 Dec 2024 at 10:17.

Warrington Borough Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Cromwell Avenue

Warrington Borough Council are proposing to carry out Highway repair and maintenance works on Cromwell Avenue, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Warrington Borough Council on 11 Dec 2024 at 11:00.

ManWeb logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Arley Road

ManWeb were proposing to carry out Utility repair and maintenance works on Arley Road, Appleton, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 18 Dec 2024 at 14:52.

Warrington Borough Council logo
Between
23 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Reaper Close

Warrington Borough Council are proposing to carry out Highway improvement works on Reaper Close, Great Sankey, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 25 Nov 2024 at 11:09.

Warrington Borough Council logo
Between
23 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Reaper Close

Warrington Borough Council are proposing to carry out Highway improvement works on Reaper Close, Great Sankey, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 23 Dec 2024 at 15:17.

Warrington Borough Council logo
Between
23 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Keith Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Keith Avenue, Great Sankey, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 25 Nov 2024 at 09:02.

Halton Borough Council logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Priory Road

Halton Borough Council were proposing to carry out Highway improvement works on Priory Road, Runcorn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 29 Oct 2024 at 14:10.

United Utilities Water (formerly North West Water) logo
Between
27 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Waring Avenue

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Waring Avenue, Latchford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 29 Oct 2024 at 15:30.

United Utilities Water (formerly North West Water) logo
Between
27 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Waring Avenue

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Waring Avenue, Latchford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 30 Oct 2024 at 11:50.

Warrington Borough Council logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Hughes Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Hughes Avenue, Orford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 19 Nov 2024 at 10:28.

Warrington Borough Council logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Hughes Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Hughes Avenue, Orford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 23 Dec 2024 at 14:14.

ManWeb logo
Between
29 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Watkin Street

ManWeb are proposing to carry out Utility repair and maintenance works on Watkin Street, Orford, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 8 Nov 2024 at 14:44.

Warrington Borough Council logo
Between
29 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Mortimer Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Mortimer Avenue, Orford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 25 Nov 2024 at 09:48.

Warrington Borough Council logo
Between
29 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Mortimer Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Mortimer Avenue, Orford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 24 Dec 2024 at 08:41.

Warrington Borough Council logo
Between
29 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Mortimer Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Mortimer Avenue, Orford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 25 Nov 2024 at 09:47.

Warrington Borough Council logo
Between
29 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Mortimer Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Mortimer Avenue, Orford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 24 Dec 2024 at 08:40.

ManWeb logo
Between
31 Jan and 14 Feb 2025
Details
View Map
Share
Lower Wash Lane

ManWeb were proposing to carry out Utility repair and maintenance works on Lower Wash Lane, Latchford, Warrington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 January 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 8 Nov 2024 at 14:29.

ManWeb logo
Between
31 Jan and 14 Feb 2025
Details
View Map
Share
Grange Avenue

ManWeb were proposing to carry out Utility repair and maintenance works on Grange Avenue, Latchford, Warrington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 January 2025 and run through until 14 February 2025. The works were due to impact the verge only.

This roadwork event was last updated by ManWeb on 8 Nov 2024 at 14:24.

Warrington Borough Council logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Broad Lane

Warrington Borough Council are proposing to carry out Highway improvement works on Broad Lane, Grappenhall And Thelwall, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 20 Dec 2024 at 08:56.

Halton Borough Council logo
LONG TERM
Between
3 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Albert Road

Halton Borough Council are proposing to carry out Highway improvement works on Albert Road, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 6 Nov 2024 at 13:26.

United Utilities Water (formerly North West Water) logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Glebe Avenue

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Glebe Avenue, Grappenhall And Thelwall, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Nov 2024 at 11:30.

United Utilities Water (formerly North West Water) logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Glebe Avenue

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Glebe Avenue, Grappenhall And Thelwall, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Nov 2024 at 14:05.

Cadent Gas logo
Between
3 and 26 Feb 2025
Details
View Map
Share
Follow
Knutsford Road

Cadent Gas are proposing to carry out Utility asset works on Knutsford Road, Latchford, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:37.

Warrington Borough Council logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Lowe Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Lowe Avenue, Latchford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 19 Dec 2024 at 14:57.

United Utilities Water (formerly North West Water) logo
Between
3 and 11 Feb 2025
Details
View Map
Share
Follow
Haig Avenue

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Haig Avenue, Great Sankey, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 30 Oct 2024 at 12:15.

United Utilities Water (formerly North West Water) logo
Between
3 and 11 Feb 2025
Details
View Map
Share
Follow
Haig Avenue

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Haig Avenue, Great Sankey, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 6 Nov 2024 at 10:02.

Warrington Borough Council logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Honister Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Honister Avenue, Poplars And Hulme, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 18 Nov 2024 at 13:29.

Warrington Borough Council logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Honister Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Honister Avenue, Poplars And Hulme, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 24 Dec 2024 at 08:43.

Warrington Borough Council logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Buttermere Crescent

Warrington Borough Council are proposing to carry out Highway improvement works on Buttermere Crescent, Poplars And Hulme, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 18 Nov 2024 at 13:24.

Warrington Borough Council logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Buttermere Crescent

Warrington Borough Council are proposing to carry out Highway improvement works on Buttermere Crescent, Poplars And Hulme, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 24 Dec 2024 at 08:42.

BT logo
Between
10 and 12 Feb 2025
Details
View Map
Share
The Uplands

BT were proposing to carry out Utility repair and maintenance works on The Uplands, Runcorn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 20 Nov 2024 at 13:18.

Halton Borough Council logo
LONG TERM
Between
10 Feb and 18 Apr 2025
Details
View Map
Share
East Lane

Halton Borough Council were proposing to carry out Highway improvement works on East Lane, Runcorn.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 18 April 2025. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Halton Borough Council on 6 Nov 2024 at 10:44.

Warrington Borough Council logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Elizabeth Drive

Warrington Borough Council are proposing to carry out Highway improvement works on Elizabeth Drive, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 13 Nov 2024 at 13:46.

Warrington Borough Council logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Elizabeth Drive

Warrington Borough Council are proposing to carry out Highway improvement works on Elizabeth Drive, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 24 Dec 2024 at 08:45.

Halton Borough Council logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Cypress Grove

Halton Borough Council were proposing to carry out Highway repair and maintenance works on Cypress Grove, Runcorn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 24 Dec 2024 at 11:50.

Halton Borough Council logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Laburnum Grove

Halton Borough Council were proposing to carry out Highway repair and maintenance works on Laburnum Grove, Runcorn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 24 Dec 2024 at 11:51.

Halton Borough Council logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Poplar Avenue

Halton Borough Council were proposing to carry out Highway repair and maintenance works on Poplar Avenue, Runcorn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 24 Dec 2024 at 11:55.

Halton Borough Council logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Thorn Road

Halton Borough Council are proposing to carry out Highway repair and maintenance works on Thorn Road, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 2 Dec 2024 at 15:39.

Halton Borough Council logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Linkway

Halton Borough Council are proposing to carry out Highway repair and maintenance works on Linkway, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 2 Dec 2024 at 14:49.

Halton Borough Council logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Grangeway

Halton Borough Council are proposing to carry out Highway repair and maintenance works on Grangeway, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 2 Dec 2024 at 14:42.

Halton Borough Council logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Pine Road

Halton Borough Council were proposing to carry out Highway repair and maintenance works on Pine Road, Runcorn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 24 Dec 2024 at 11:53.

Cadent Gas logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Deacon Road

Cadent Gas were proposing to carry out Utility asset works on Deacon Road, Widnes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 February 2025 and run through until 23 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 11:42.

BT logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Wenlock Road

BT were proposing to carry out Utility repair and maintenance works on Wenlock Road, Runcorn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 20 Nov 2024 at 13:25.

United Utilities Water (formerly North West Water) logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Appleton Village

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Appleton Village, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Oct 2024 at 12:33.

United Utilities Water (formerly North West Water) logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Appleton Village

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Appleton Village, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 14 Oct 2024 at 09:33.

ManWeb logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Crow Wood Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Crow Wood Lane, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 17 Dec 2024 at 16:24.

ManWeb logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Crow Wood Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Crow Wood Lane, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 18 Dec 2024 at 09:37.

Halton Borough Council logo
Between
17 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Lancaster Road

Halton Borough Council are proposing to carry out Highway repair and maintenance works on Lancaster Road, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 24 Dec 2024 at 11:02.

Cadent Gas logo
Between
17 Feb and 12 Mar 2025
Details
View Map
Share
Knutsford Road

Cadent Gas were proposing to carry out Utility asset works on Knutsford Road, Latchford, Warrington.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 12 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 13:22.

Cadent Gas logo
Between
17 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Hillock Lane

Cadent Gas are proposing to carry out Utility asset works on Hillock Lane, Woolston, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 14:20.

Cadent Gas logo
Between
17 Feb and 5 Mar 2025
Details
View Map
Share
Hillock Lane

Cadent Gas were proposing to carry out Utility asset works on Hillock Lane, Woolston, Warrington.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 5 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 13:28.

Cadent Gas logo
Between
17 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Holes Lane

Cadent Gas are proposing to carry out Utility asset works on Holes Lane, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 09:02.

Halton Borough Council logo
Between
19 and 26 Feb 2025
Details
View Map
Share
Follow
Wellfield

Halton Borough Council are proposing to carry out Highway repair and maintenance works on Wellfield, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 19 Dec 2024 at 14:27.

ManWeb logo
Between
21 and 27 Feb 2025
Details
View Map
Share
Follow
Crow Wood Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Crow Wood Lane, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 29 Nov 2024 at 14:29.

Halton Borough Council logo
LONG TERM
Between
24 Feb and 18 Apr 2025
Details
View Map
Share
Follow
Albert Road

Halton Borough Council are proposing to carry out Highway improvement works on Albert Road, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 6 Nov 2024 at 14:14.

Halton Borough Council logo
Between
24 and 27 Feb 2025
Details
View Map
Share
Follow
Derby Road

Halton Borough Council are proposing to carry out Highway repair and maintenance works on Derby Road, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 20 Dec 2024 at 08:38.

ManWeb logo
Between
26 Feb and 4 Mar 2025
Details
View Map
Share
Crow Wood Lane

ManWeb were proposing to carry out Utility repair and maintenance works on Crow Wood Lane, Widnes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 February 2025 and run through until 4 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 17 Dec 2024 at 14:16.

Cadent Gas logo
Between
28 Feb and 27 Mar 2025
Details
View Map
Share
Follow
Long Lane

Cadent Gas are proposing to carry out Utility asset works on Long Lane, Orford, Warrington.

These works are categorised as Major.

The works will start on or after 28 February 2025 and could run through until 27 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 09:42.

ManWeb logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Milton Road

ManWeb are proposing to carry out Utility repair and maintenance works on Milton Road, Widnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 9 Dec 2024 at 14:10.

Warrington Borough Council logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Fothergill Street

Warrington Borough Council are proposing to carry out Highway improvement works on Fothergill Street, Fairfield And Howley, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 5 Nov 2024 at 15:17.

Warrington Borough Council logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Fothergill Street

Warrington Borough Council are proposing to carry out Highway improvement works on Fothergill Street, Fairfield And Howley, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 24 Dec 2024 at 08:47.

Warrington Borough Council logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Elaine Street

Warrington Borough Council are proposing to carry out Highway improvement works on Elaine Street, Fairfield And Howley, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 5 Nov 2024 at 15:04.

Warrington Borough Council logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Elaine Street

Warrington Borough Council are proposing to carry out Highway improvement works on Elaine Street, Fairfield And Howley, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 24 Dec 2024 at 08:47.

Warrington Borough Council logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Beresford Street

Warrington Borough Council are proposing to carry out Highway improvement works on Beresford Street, Fairfield And Howley, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 6 Nov 2024 at 12:18.

Warrington Borough Council logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Beresford Street

Warrington Borough Council are proposing to carry out Highway improvement works on Beresford Street, Fairfield And Howley, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 24 Dec 2024 at 08:46.

ManWeb logo
Between
5 Mar and 1 Apr 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 1 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 12 Dec 2024 at 10:24.

Warrington Borough Council logo
Between
7 and 28 Mar 2025
Details
View Map
Share
Follow
Broad Lane

Warrington Borough Council are proposing to carry out Highway improvement works on Broad Lane, Grappenhall And Thelwall, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 18 Dec 2024 at 15:06.

Warrington Borough Council logo
Between
7 and 21 Mar 2025
Details
View Map
Share
Follow
Keith Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Keith Avenue, Great Sankey, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 13 Dec 2024 at 10:01.

Warrington Borough Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Lowe Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Lowe Avenue, Latchford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 18 Dec 2024 at 12:19.

BT logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Vulcan Close

BT were proposing to carry out Utility repair and maintenance works on Vulcan Close, Poulton-with-fearnhead, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 13 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 19 Dec 2024 at 15:12.

BT logo
On
11 Mar 2025
Details
View Map
Share
Follow
Newton Bank

BT are proposing to carry out Utility asset works on Newton Bank, Daresbury, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 11 March 2025 and are due to last for only one day. The works will impact the verge only.

This roadwork event was last updated by BT on 23 Dec 2024 at 11:39.

BT logo
On
11 Mar 2025
Details
View Map
Share
Follow
Newton Bank

BT are proposing to carry out Utility asset works on Newton Bank, Daresbury, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 11 March 2025 and are due to last for only one day. The works will impact the verge only.

This roadwork event was last updated by BT on 24 Dec 2024 at 10:51.

BT logo
On
11 Mar 2025
Details
View Map
Share
Newton Bank

BT were proposing to carry out Utility asset works on Newton Bank, Daresbury, Runcorn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were scheduled for 11 March 2025 The works were due to impact the verge only.

This roadwork event was last updated by BT on 16 Dec 2024 at 12:57.

BT logo
Between
12 and 14 Mar 2025
Details
View Map
Share
Follow
Ashbourne Avenue

BT are proposing to carry out Utility asset works on Ashbourne Avenue, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 17 Dec 2024 at 14:24.

Halton Borough Council logo
LONG TERM
Between
13 Mar and 23 May 2025
Details
View Map
Share
Follow
Daresbury Bypass

Halton Borough Council are proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.

These works are categorised as Major.

The works will start on or after 13 March 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 23 May 2024 at 11:02.

Halton Borough Council logo
LONG TERM
Between
13 Mar and 15 Aug 2025
Details
View Map
Share
Daresbury Bypass

Halton Borough Council were proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.

These works were categorised as Major.

The works were originally planned to start 13 March 2025 and run through until 15 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:38.

Halton Borough Council logo
LONG TERM
Between
13 Mar and 23 May 2025
Details
View Map
Share
Chester Road

Halton Borough Council were proposing to carry out Highway improvement works on Chester Road, Daresbury, Runcorn.

These works were categorised as Major.

The works were originally planned to start 13 March 2025 and run through until 23 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:39.

Halton Borough Council logo
LONG TERM
Between
13 Mar and 15 Aug 2025
Details
View Map
Share
Eastern Expressway

Halton Borough Council were proposing to carry out Highway improvement works on Eastern Expressway, Runcorn.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 March 2025 and run through until 15 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:39.

Warrington Borough Council logo
Between
13 Mar and 10 Apr 2025
Details
View Map
Share
Follow
Broad Lane

Warrington Borough Council are proposing to carry out Highway improvement works on Broad Lane, Grappenhall And Thelwall, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 19 Dec 2024 at 10:54.

Cadent Gas logo
Between
17 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Poplars Avenue

Cadent Gas are proposing to carry out Utility asset works on Poplars Avenue, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 16:00.

BT logo
Between
19 and 21 Mar 2025
Details
View Map
Share
Follow
Ashbourne Avenue

BT are proposing to carry out Utility asset works on Ashbourne Avenue, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 23 Dec 2024 at 13:49.

BT logo
Between
19 and 21 Mar 2025
Details
View Map
Share
Follow
Ashbourne Avenue

BT are proposing to carry out Utility asset works on Ashbourne Avenue, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 27 Dec 2024 at 12:08.


Roadworks Map near to Gig Lane, WARRINGTON, WA4 6UW

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Dec 2024 17:55
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Gig Lane, WARRINGTON, WA4 6UW (7 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Halton Borough Council logo
MAJOR
  
CHESTER ROAD, DARESBURY 
(0.8 miles)
Halton Borough Council
Highway repair and maintenance works - Carriageway - Contra-flow
Planned
Scheduled: 12 Aug 2024 - 13 Oct 2025
0.8
Details
Share
Follow
2
Halton Borough Council logo
MAJOR
  
EASTERN EXPRESSWAY 
(0.8 miles)
Halton Borough Council
Highway improvement works - Carriageway - Contra-flow
Planned
Scheduled: 12 Aug 2024 - 15 Aug 2025
0.8
Details
Share
Follow
3
Halton Borough Council logo
MAJOR
  
EASTERN EXPRESSWAY 
(0.8 miles)
Halton Borough Council
Highway improvement works - Carriageway - Contra-flow
In Progress
Since: 12 Aug 2024 08:00
(Scheduled: 12 Aug 2024 - 15 Aug 2025)
0.8
Details
Share
Follow
4
Halton Borough Council logo
MAJOR
  
EASTERN EXPRESSWAY 
(0.8 miles)
Halton Borough Council
Highway improvement works - Carriageway - Lane closure
Cancelled
(Scheduled: 2 Oct 2024 - 12 Mar 2025)
0.8
Details
Share
5
Halton Borough Council logo
MAJOR
  
CHESTER ROAD, DARESBURY 
(0.8 miles)
Halton Borough Council
Highway improvement works - Carriageway - Contra-flow
Planned
Scheduled: 12 Aug 2024 - 15 Aug 2025
0.8
Details
Share
Follow
6
Halton Borough Council logo
MAJOR
  
CHESTER ROAD, DARESBURY 
(0.8 miles)
Halton Borough Council
Highway improvement works - Carriageway - Contra-flow
In Progress
Since: 12 Aug 2024 08:00
(Scheduled: 12 Aug 2024 - 15 Aug 2025)
0.8
Details
Share
Follow
7
Halton Borough Council logo
MAJOR
  
CHESTER ROAD, DARESBURY 
(0.8 miles)
Halton Borough Council
Highway improvement works - Carriageway - Lane closure
Cancelled
(Scheduled: 2 Oct 2024 - 12 Mar 2025)
0.8
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.