ROADWORKS SUMMARY
Winwick Lane, WARRINGTON, WA3 7EP

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Winwick Lane, WA3 7EP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Winwick Lane, WARRINGTON, WA3 7EP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Winwick Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Until
13 Jan 2025
Details
View Map
Share
Follow
Winwick Link Road

St. Helens Council are carrying out Highway improvement works on Winwick Link Road, Winwick, Warrington.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 09:30 and could run through until 13 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by St. Helens Council on 30 Sep 2024 at 10:55.

Warrington Borough Council logo
LONG TERM
Between
29 Sep and 22 Nov 2024
Details
View Map
Share
Follow
Manchester Road

Warrington Borough Council are proposing to carry out Highway improvement works on Manchester Road, Woolston, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 25 Apr 2024 at 11:25.

Warrington Borough Council logo
LONG TERM
Until
22 Nov 2024
Details
View Map
Share
Follow
Manchester Road

Warrington Borough Council are carrying out Highway improvement works on Manchester Road, Woolston, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 20:00 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 1 Oct 2024 at 09:18.

Wigan Metropolitan Borough Council logo
LONG TERM
Until
21 Mar 2025
Details
View Map
Share
Follow
St Helens Road

Wigan Metropolitan Borough Council are carrying out Highway improvement works on St Helens Road, Leigh.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 09:00 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 4 Oct 2024 at 09:03.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Academy Way

Cadent Gas are carrying out Utility asset works on Academy Way, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 11:00 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:01.

Cadent Gas logo
LONG TERM
Between
4 Oct and 14 Nov 2024
Details
View Map
Share
Follow
Academy Street

Cadent Gas are proposing to carry out Utility asset works on Academy Street, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jul 2024 at 12:07.

Cadent Gas logo
LONG TERM
Between
4 Oct and 14 Nov 2024
Details
View Map
Share
Follow
Academy Street

Cadent Gas are proposing to carry out Utility asset works on Academy Street, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 15:38.

Cadent Gas logo
LONG TERM
Between
4 Oct and 7 Nov 2024
Details
View Map
Share
Follow
Academy Way

Cadent Gas are proposing to carry out Utility asset works on Academy Way, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2024 and could run through until 7 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jul 2024 at 12:08.

Warrington Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Mortimer Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Mortimer Avenue, Orford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 14 Jun 2024 at 12:37.

Warrington Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Mortimer Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Mortimer Avenue, Orford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 25 Sep 2024 at 10:46.

Warrington Borough Council logo
Finishing
Friday
Details
View Map
Share
Mortimer Avenue

Warrington Borough Council were proposing to carry out Highway improvement works on Mortimer Avenue, Orford, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 1 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 11 Oct 2024 at 15:29.

Warrington Borough Council logo
LONG TERM
Until
8 Nov 2024
Details
View Map
Share
Follow
Long Lane

Warrington Borough Council are carrying out Highway repair and maintenance works on Long Lane, Orford, Warrington.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 09:35 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 18 Oct 2024 at 09:14.

Warrington Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Hughes Avenue

Warrington Borough Council are proposing to carry out Highway repair and maintenance works on Hughes Avenue, Orford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 14 Jun 2024 at 12:34.

Warrington Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Hughes Avenue

Warrington Borough Council are proposing to carry out Highway repair and maintenance works on Hughes Avenue, Orford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 25 Sep 2024 at 10:45.

Warrington Borough Council logo
Finishing
Friday
Details
View Map
Share
Hughes Avenue

Warrington Borough Council were proposing to carry out Highway repair and maintenance works on Hughes Avenue, Orford, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 1 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 11 Oct 2024 at 15:28.

Cadent Gas logo
LONG TERM
Until
18 Nov 2024
Details
View Map
Share
Follow
Thames Road

Cadent Gas are carrying out Utility asset works on Thames Road, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 October 2024 at 12:00 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 10:51.

Cadent Gas logo
LONG TERM
Until
12 Nov 2024
Details
View Map
Share
Follow
Avon Road

Cadent Gas are carrying out Utility asset works on Avon Road, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 October 2024 at 08:00 and could run through until 12 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 10:50.

Cadent Gas logo
Between
14 Oct and 6 Nov 2024
Details
View Map
Share
Follow
Station Road

Cadent Gas are proposing to carry out Utility asset works on Station Road, Latchford, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jul 2024 at 13:52.

Cadent Gas logo
Between
14 Oct and 12 Nov 2024
Details
View Map
Share
Follow
Wash Lane

Cadent Gas are proposing to carry out Utility asset works on Wash Lane, Latchford, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 12 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jul 2024 at 13:51.

ManWeb logo
Until
8 Nov 2024
Details
View Map
Share
Follow
Clegge Street

ManWeb are carrying out Utility repair and maintenance works on Clegge Street, Orford, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 16:35 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 15 Oct 2024 at 09:05.

ManWeb logo
Finishing
Friday
Details
View Map
Share
Follow
Winwick Road

ManWeb are carrying out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 16:35 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 23 Oct 2024 at 14:50.

ManWeb logo
Finishing
Friday
Details
View Map
Share
Follow
Winwick Road

ManWeb are carrying out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 16:35 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 23 Oct 2024 at 14:49.

ManWeb logo
Finishing
Today
Details
View Map
Share
Collins Green Lane

ManWeb were proposing to carry out Utility repair and maintenance works on Collins Green Lane, Burtonwood And Westbrook, Warrington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 October 2024 and run through until 30 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 26 Sep 2024 at 16:26.

ManWeb logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Collins Green Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Collins Green Lane, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2024 and could run through until 31 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 21 Aug 2024 at 14:11.

ManWeb logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Collins Green Lane

ManWeb are carrying out Utility repair and maintenance works on Collins Green Lane, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 October 2024 at 10:00 and could run through until 31 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 17 Oct 2024 at 10:59.

Finishing
Saturday
Details
View Map
Share
Follow
Winwick Link Road

St. Helens Council are carrying out Remedial works on Winwick Link Road, Winwick, Warrington.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 21:00 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 22 Oct 2024 at 11:13.

Cadent Gas logo
Until
6 Nov 2024
Details
View Map
Share
Follow
Ackers Road

Cadent Gas are carrying out Utility repair and maintenance works on Ackers Road, Stockton Heath, Warrington.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 09:45 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 12:35.

BT logo
Finishing
Tuesday
Details
View Map
Share
Follow
Heather Close

BT are proposing to carry out Utility asset works on Heather Close, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 5 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 29 Aug 2024 at 14:12.

BT logo
Finishing
Tuesday
Details
View Map
Share
Follow
Heather Close

BT are proposing to carry out Utility asset works on Heather Close, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 5 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 6 Aug 2024 at 13:52.

BT logo
Finishing
Tuesday
Details
View Map
Share
Follow
Heather Close

BT are proposing to carry out Utility asset works on Heather Close, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 5 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 20 Aug 2024 at 14:02.

ManWeb logo
LONG TERM
Between
23 Oct and 31 Dec 2024
Details
View Map
Share
Follow
Penkford Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Penkford Lane, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 20 Aug 2024 at 16:01.

ManWeb logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Penkford Lane

ManWeb are carrying out Utility repair and maintenance works on Penkford Lane, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 11:15 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 23 Oct 2024 at 13:23.

United Utilities Water (formerly North West Water) logo
Friday
Details
View Map
Share
Tan House Lane

United Utilities Water (formerly North West Water) carried out Utility repair and maintenance works on Tan House Lane, Burtonwood And Westbrook, Warrington.

Two-way signals were in place for some or all of the period.

The works were originally planned between 26 Oct 2024 and 1 Nov 2024 and were actually completed between 26 Oct 2024 (08:21) and 30 Oct 2024 (12:57). The works impacted the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 30 Oct 2024 at 13:16.

Cadent Gas logo
Until
15 Nov 2024
Details
View Map
Share
Follow
Academy Street

Cadent Gas are carrying out Utility asset works on Academy Street, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 12:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 12:12.

Finishing
Sunday
Details
View Map
Share
Follow
Broad Oak Road

St. Helens Council are proposing to carry out Highway repair and maintenance works on Broad Oak Road, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2024 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 18 Oct 2024 at 13:27.

Finishing
Sunday
Details
View Map
Share
Follow
Broad Oak Road

St. Helens Council are carrying out Highway repair and maintenance works on Broad Oak Road, St Helens.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 October 2024 at 08:00 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 28 Oct 2024 at 08:24.

Cadent Gas logo
Until
6 Nov 2024
Details
View Map
Share
Follow
Folly Lane

Cadent Gas are carrying out Utility repair and maintenance works on Folly Lane, Bewsey And Whitecross, Warrington.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:57 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 16:35.

ManWeb logo
Finishing
Friday
Details
View Map
Share
Follow
Holes Lane

ManWeb are carrying out Utility repair and maintenance works on Holes Lane, Woolston, Warrington.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 18:00 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 29 Oct 2024 at 09:32.

Finishing
Friday
Details
View Map
Share
Follow
Mill Lane

St. Helens Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Newton Le Willows, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 7 Oct 2024 at 09:08.

Finishing
Friday
Details
View Map
Share
Follow
Mill Lane

St. Helens Council are carrying out Highway repair and maintenance works on Mill Lane, Newton Le Willows, St Helens.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:30 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 28 Oct 2024 at 13:39.

Finishing
Friday
Details
View Map
Share
Follow
Mercer Street

St. Helens Council are proposing to carry out Highway repair and maintenance works on Mercer Street, Newton Le Willows, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 5 Oct 2024 at 07:35.

Finishing
Friday
Details
View Map
Share
Follow
Mercer Street

St. Helens Council are carrying out Highway repair and maintenance works on Mercer Street, Newton Le Willows, St Helens.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 08:00 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 29 Oct 2024 at 08:42.

Between
1 and 6 Nov 2024
Details
View Map
Share
Follow
Queens Road

St. Helens Council are proposing to carry out Highway repair and maintenance works on Queens Road, Haydock, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 21 Oct 2024 at 09:15.

Between
1 and 6 Nov 2024
Details
View Map
Share
Follow
Queens Road

St. Helens Council are proposing to carry out Highway repair and maintenance works on Queens Road, Haydock, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 23 Oct 2024 at 08:45.

Between
3 and 10 Nov 2024
Details
View Map
Share
Follow
Clipsley Lane

St. Helens Council are proposing to carry out Highway repair and maintenance works on Clipsley Lane, Haydock, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2024 and could run through until 10 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 21 Oct 2024 at 09:25.

Cadent Gas logo
Between
4 and 20 Nov 2024
Details
View Map
Share
Follow
Station Road

Cadent Gas are proposing to carry out Utility asset works on Station Road, Latchford, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Aug 2024 at 14:11.

Cadent Gas logo
Between
4 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Wash Lane

Cadent Gas are proposing to carry out Utility asset works on Wash Lane, Latchford, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 14:13.

Cadent Gas logo
Between
4 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Wash Lane

Cadent Gas are proposing to carry out Utility asset works on Wash Lane, Latchford, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Aug 2024 at 14:14.

Cadent Gas logo
Between
4 and 20 Nov 2024
Details
View Map
Share
Follow
Hurley Close Segregated Footpath

Cadent Gas are proposing to carry out Utility asset works on Hurley Close Segregated Footpath, Great Sankey, Warrington.

These works are categorised as Major.

The works will start on or after 4 November 2024 and could run through until 20 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 15:16.

Cadent Gas logo
LONG TERM
Between
4 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Thames Road

Cadent Gas are proposing to carry out Utility asset works on Thames Road, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 13:50.

Cadent Gas logo
LONG TERM
Between
4 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Thames Road

Cadent Gas are proposing to carry out Utility asset works on Thames Road, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 08:49.

Cadent Gas logo
Between
4 Nov and 4 Dec 2024
Details
View Map
Share
Follow
Avon Road

Cadent Gas are proposing to carry out Utility asset works on Avon Road, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 13:54.

Cadent Gas logo
Between
4 Nov and 4 Dec 2024
Details
View Map
Share
Follow
Avon Road

Cadent Gas are proposing to carry out Utility asset works on Avon Road, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 08:42.

Cadent Gas logo
Between
4 and 20 Nov 2024
Details
View Map
Share
Follow
Thames Road

Cadent Gas are proposing to carry out Utility asset works on Thames Road, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 08:44.

Cadent Gas logo
Between
4 and 20 Nov 2024
Details
View Map
Share
Follow
Thames Road

Cadent Gas are proposing to carry out Utility asset works on Thames Road, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 11:22.

Cadent Gas logo
Between
4 and 20 Nov 2024
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 14:52.

Cadent Gas logo
Between
4 and 20 Nov 2024
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 11:51.

Cadent Gas logo
Between
4 and 20 Nov 2024
Details
View Map
Share
Follow
Shaw Street

Cadent Gas are proposing to carry out Utility asset works on Shaw Street, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 09:33.

Electricity North West (NorWeb) logo
Between
4 and 22 Nov 2024
Details
View Map
Share
Follow
Nicol Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Nicol Road, Ashton-in-makerfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 10 Sep 2024 at 15:37.

Between
6 and 11 Nov 2024
Details
View Map
Share
Follow
Queens Drive

St. Helens Council are proposing to carry out Highway repair and maintenance works on Queens Drive, Newton Le Willows, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 11 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 21 Oct 2024 at 10:46.

Between
6 and 11 Nov 2024
Details
View Map
Share
Follow
Queens Drive

St. Helens Council are proposing to carry out Highway repair and maintenance works on Queens Drive, Newton Le Willows, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 11 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 21 Oct 2024 at 10:46.

ManWeb logo
Between
11 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Cyril Street

ManWeb are proposing to carry out Utility repair and maintenance works on Cyril Street, Orford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 12 Sep 2024 at 15:05.

ManWeb logo
Between
11 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Cyril Street

ManWeb are proposing to carry out Utility repair and maintenance works on Cyril Street, Orford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 19 Sep 2024 at 14:17.

United Utilities Water (formerly North West Water) logo
Between
11 and 17 Nov 2024
Details
View Map
Share
Follow
Mercer Street Passageway Rear Of 1 To 93

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Mercer Street Passageway Rear Of 1 To 93, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 17 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 6 Sep 2024 at 10:59.

United Utilities Water (formerly North West Water) logo
Between
11 and 17 Nov 2024
Details
View Map
Share
Follow
Mercer Street Passageway Rear Of 1 To 93

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Mercer Street Passageway Rear Of 1 To 93, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 17 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 2 Oct 2024 at 10:48.

Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Whiteside Road

St. Helens Council are proposing to carry out Highway repair and maintenance works on Whiteside Road, Haydock, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 21 Oct 2024 at 10:48.

Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Whiteside Road

St. Helens Council are proposing to carry out Highway repair and maintenance works on Whiteside Road, Haydock, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 21 Oct 2024 at 10:48.

Cadent Gas logo
Between
11 Nov and 11 Dec 2024
Details
View Map
Share
Manor Avenue

Cadent Gas were proposing to carry out Utility asset works on Manor Avenue, Golborne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 13:05.

Cadent Gas logo
Between
11 and 27 Nov 2024
Details
View Map
Share
Lancaster Avenue

Cadent Gas were proposing to carry out Utility asset works on Lancaster Avenue, Golborne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 27 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 13:05.

BT logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Payne Close

BT are proposing to carry out Utility asset works on Payne Close, Great Sankey, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 10 Sep 2024 at 15:35.

BT logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Payne Close

BT are proposing to carry out Utility asset works on Payne Close, Great Sankey, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 24 Oct 2024 at 11:16.

BT logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Watkin Street

BT are proposing to carry out Utility repair and maintenance works on Watkin Street, Orford, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 30 Oct 2024 at 09:33.

BT logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Watkin Street

BT are proposing to carry out Utility repair and maintenance works on Watkin Street, Orford, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 30 Oct 2024 at 13:39.

Warrington Borough Council logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Winwick Link Road

Warrington Borough Council are proposing to carry out Highway improvement works on Winwick Link Road, Winwick, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 23 May 2024 at 13:16.

Warrington Borough Council logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Winwick Link Road

Warrington Borough Council are proposing to carry out Highway improvement works on Winwick Link Road, Winwick, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 15 Oct 2024 at 11:15.

Cadent Gas logo
Between
18 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Avon Road

Cadent Gas are proposing to carry out Utility asset works on Avon Road, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Aug 2024 at 09:43.

Cadent Gas logo
Between
18 Nov and 4 Dec 2024
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 14:49.

Cadent Gas logo
Between
18 Nov and 4 Dec 2024
Details
View Map
Share
Follow
Walton Road

Cadent Gas are proposing to carry out Utility asset works on Walton Road, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 08:52.

Electricity North West (NorWeb) logo
Between
19 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Nicol Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Nicol Road, Ashton-in-makerfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 27 Aug 2024 at 14:53.

ManWeb logo
Between
22 Nov and 19 Dec 2024
Details
View Map
Share
Follow
Landseer Avenue

ManWeb are proposing to carry out Utility repair and maintenance works on Landseer Avenue, Latchford, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 3 Sep 2024 at 14:48.

Energy Assets Pipelines logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Thelwall Lane

Energy Assets Pipelines were proposing to carry out Utility asset works on Thelwall Lane, Warrington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Energy Assets Pipelines on 16 Sep 2024 at 12:15.

Energy Assets Pipelines logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Thelwall Lane

Energy Assets Pipelines are proposing to carry out Utility asset works on Thelwall Lane, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Pipelines on 23 Sep 2024 at 13:11.

Network Rail logo
Between
25 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Lythgoes Lane

Network Rail are proposing to carry out Works for Rail Purposes on Lythgoes Lane, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 10 Sep 2024 at 13:44.

ManWeb logo
Between
27 Nov and 10 Dec 2024
Details
View Map
Share
Landseer Avenue

ManWeb were proposing to carry out Utility repair and maintenance works on Landseer Avenue, Latchford, Warrington.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 10 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 20 Sep 2024 at 13:24.

United Utilities Water (formerly North West Water) logo
Between
29 Nov and 5 Dec 2024
Details
View Map
Share
Follow
Mercer Street Passageway Rear Of 1 To 93

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Mercer Street Passageway Rear Of 1 To 93, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Sep 2024 at 09:10.

ManWeb logo
Between
1 and 17 Dec 2024
Details
View Map
Share
Follow
Collins Green Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Collins Green Lane, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 25 Sep 2024 at 09:13.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 15 Jan 2025
Details
View Map
Share
Follow
Academy Street

Cadent Gas are proposing to carry out Utility asset works on Academy Street, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 08:49.

BT logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Watkin Street

BT are proposing to carry out Works for road purposes on Watkin Street, Orford, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 30 Oct 2024 at 09:39.

BT logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Watkin Street

BT are proposing to carry out Works for road purposes on Watkin Street, Orford, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 30 Oct 2024 at 13:44.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Watkin Street

ManWeb are proposing to carry out Utility repair and maintenance works on Watkin Street, Orford, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 9 Sep 2024 at 14:24.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 4 Oct 2024 at 10:54.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 8 Oct 2024 at 10:23.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 4 Oct 2024 at 10:55.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 8 Oct 2024 at 10:25.

United Utilities Water (formerly North West Water) logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Barnfield Road

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Barnfield Road, Woolston, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 29 Aug 2024 at 15:47.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 4 Oct 2024 at 10:53.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 4 Oct 2024 at 16:08.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Winwick Road

ManWeb were proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 7 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 11 Oct 2024 at 09:31.

ManWeb logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Helena Road

ManWeb are proposing to carry out Utility repair and maintenance works on Helena Road, Bold, St Helens.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 14 Oct 2024 at 12:48.

ManWeb logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Pennington Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Pennington Lane, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 26 Sep 2024 at 09:10.

ManWeb logo
LONG TERM
Between
3 Dec 2024 and 8 Jan 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 4 Oct 2024 at 10:57.

ManWeb logo
LONG TERM
Between
3 Dec 2024 and 8 Jan 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 8 Oct 2024 at 15:09.

ManWeb logo
LONG TERM
Between
3 Dec 2024 and 8 Jan 2025
Details
View Map
Share
Winwick Road

ManWeb were proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 8 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 11 Oct 2024 at 09:35.

Electricity North West (NorWeb) logo
LONG TERM
Between
4 Dec 2024 and 3 Mar 2025
Details
View Map
Share
Ashton Road

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Ashton Road, Newton Le Willows, St Helens.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 3 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 16 Oct 2024 at 13:43.

Electricity North West (NorWeb) logo
LONG TERM
Between
4 Dec 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Ashton Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Ashton Road, Newton Le Willows, St Helens.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 16 Oct 2024 at 13:45.

Cadent Gas logo
Between
9 and 27 Dec 2024
Details
View Map
Share
Follow
Wash Lane

Cadent Gas are proposing to carry out Utility asset works on Wash Lane, Latchford, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 11:36.

ManWeb logo
Between
9 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Withycombe Road

ManWeb are proposing to carry out Utility repair and maintenance works on Withycombe Road, Penketh, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 11 Oct 2024 at 11:01.

ManWeb logo
Between
9 and 31 Dec 2024
Details
View Map
Share
Follow
Pennington Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Pennington Lane, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 21 Aug 2024 at 14:06.

ManWeb logo
Between
9 and 31 Dec 2024
Details
View Map
Share
Follow
Pennington Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Pennington Lane, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 25 Sep 2024 at 12:14.

Cadent Gas logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Briar Walk

Cadent Gas were proposing to carry out Utility asset works on Briar Walk, Golborne.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 23 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 13:06.

ManWeb logo
Between
13 and 31 Dec 2024
Details
View Map
Share
Follow
Helena Road

ManWeb are proposing to carry out Utility repair and maintenance works on Helena Road, Bold, St Helens.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 8 Oct 2024 at 09:00.

BT logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Yates Close

BT were proposing to carry out Utility asset works on Yates Close, Great Sankey, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 18 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 26 Sep 2024 at 10:16.

Cadent Gas logo
Between
16 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Rectory Avenue

Cadent Gas are proposing to carry out Utility asset works on Rectory Avenue, Lowton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 10:56.

Cadent Gas logo
Between
16 and 27 Dec 2024
Details
View Map
Share
Follow
Battersby Street

Cadent Gas are proposing to carry out Utility asset works on Battersby Street, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 27 December 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 20 Sep 2024 at 11:00.

Cadent Gas logo
Between
16 and 27 Dec 2024
Details
View Map
Share
Follow
Battersby Street

Cadent Gas are proposing to carry out Utility asset works on Battersby Street, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 27 December 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 14:59.

Cadent Gas logo
LONG TERM
Between
19 Dec 2024 and 10 Feb 2025
Details
View Map
Share
Follow
St Helens Road

Cadent Gas are proposing to carry out Utility asset works on St Helens Road, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 12:57.

Between
30 Dec 2024 and 5 Jan 2025
Details
View Map
Share
Follow
Wargrave Road

St. Helens Council are proposing to carry out Highway repair and maintenance works on Wargrave Road, Newton Le Willows, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 5 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 21 Aug 2024 at 08:51.

ManWeb logo
LONG TERM
Between
2 Jan and 1 Dec 2025
Details
View Map
Share
Winwick Road

ManWeb were proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 1 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 19 Sep 2024 at 14:17.

Cadent Gas logo
Between
2 and 20 Jan 2025
Details
View Map
Share
Follow
Shaw Street

Cadent Gas are proposing to carry out Utility asset works on Shaw Street, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 15:27.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Yates Close

BT are proposing to carry out Utility asset works on Yates Close, Great Sankey, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 24 Oct 2024 at 12:26.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Yates Close

BT are proposing to carry out Utility asset works on Yates Close, Great Sankey, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 30 Oct 2024 at 14:53.

Cadent Gas logo
LONG TERM
Between
6 Jan and 10 Mar 2025
Details
View Map
Share
Follow
Pasture Lane Segregated Footpath

Cadent Gas are proposing to carry out Utility asset works on Pasture Lane Segregated Footpath, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 6 January 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 14:20.

Cadent Gas logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Fearnhead Lane

Cadent Gas are proposing to carry out Utility asset works on Fearnhead Lane, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 16:13.

Cadent Gas logo
Between
6 and 22 Jan 2025
Details
View Map
Share
Braithwaite Road

Cadent Gas were proposing to carry out Utility asset works on Braithwaite Road, Lowton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 22 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 11:00.

Cadent Gas logo
LONG TERM
Between
6 Jan and 12 Feb 2025
Details
View Map
Share
Slag Lane

Cadent Gas were proposing to carry out Utility asset works on Slag Lane, Lowton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 12 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 11:01.

United Utilities Water (formerly North West Water) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Glebe Street Back Service Road East 82 - 144

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Glebe Street Back Service Road East 82 - 144, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 1 Oct 2024 at 10:15.

Electricity North West (NorWeb) logo
LONG TERM
Between
8 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Birchwood Park Avenue

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Birchwood Park Avenue, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 11 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 16 Oct 2024 at 10:18.

The Environment Agency logo
LONG TERM
Between
8 Jan and 25 Apr 2025
Details
View Map
Share
Follow
Alexandra Road

The Environment Agency are proposing to carry out Statutory Infrastructure Works on Alexandra Road, Ashton-in-makerfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by The Environment Agency on 20 Jun 2024 at 08:50.

Electricity North West (NorWeb) logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Daten Avenue

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Daten Avenue, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 16 Oct 2024 at 09:45.

Electricity North West (NorWeb) logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Daten Avenue

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Daten Avenue, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 16 Oct 2024 at 09:56.

Electricity North West (NorWeb) logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Warrington Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Warrington Road, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 16 Oct 2024 at 10:23.

Cadent Gas logo
Between
13 and 29 Jan 2025
Details
View Map
Share
The Grove

Cadent Gas were proposing to carry out Utility asset works on The Grove, Lowton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 29 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 11:02.

Warrington Borough Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Marina Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Marina Avenue, Great Sankey, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 28 Oct 2024 at 15:55.

Warrington Borough Council logo
Between
23 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Reaper Close

Warrington Borough Council are proposing to carry out Highway improvement works on Reaper Close, Great Sankey, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 29 Oct 2024 at 12:44.

Warrington Borough Council logo
Between
23 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Keith Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Keith Avenue, Great Sankey, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 28 Oct 2024 at 15:03.

United Utilities Water (formerly North West Water) logo
Between
27 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Waring Avenue

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Waring Avenue, Latchford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 29 Oct 2024 at 15:30.

United Utilities Water (formerly North West Water) logo
Between
27 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Waring Avenue

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Waring Avenue, Latchford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 30 Oct 2024 at 11:50.

Cadent Gas logo
LONG TERM
Between
27 Jan and 19 Mar 2025
Details
View Map
Share
Follow
Berkshire Drive

Cadent Gas are proposing to carry out Utility asset works on Berkshire Drive, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 12:00.

Warrington Borough Council logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Hughes Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Hughes Avenue, Orford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 29 Oct 2024 at 14:24.

Warrington Borough Council logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Woolston Grange Avenue

Warrington Borough Council are proposing to carry out Highway repair and maintenance works on Woolston Grange Avenue, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 16 Oct 2024 at 09:05.

Warrington Borough Council logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Woolston Grange Avenue

Warrington Borough Council are proposing to carry out Highway repair and maintenance works on Woolston Grange Avenue, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 17 Oct 2024 at 14:18.


Roadworks Map near to Winwick Lane, WARRINGTON, WA3 7EP

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 30 Oct 2024 17:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Winwick Lane, WARRINGTON, WA3 7EP (8 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
URGENT
  
WINWICK LINK ROAD, WINWICK 
(0.1 miles)
St. Helens Council
Remedial works - Carriageway - Road closure
In Progress
Since: 21 Oct 2024 21:00
(Scheduled: 21 Oct 2024 - 2 Nov 2024)
0.1
Details
Share
Follow
2
MAJOR
  
WINWICK LINK ROAD, WINWICK 
(0.3 miles)
St. Helens Council
Highway improvement works - Footway, Carriageway, Verge - Lane closure
In Progress
Since: 15 Jan 2024 09:30
(Scheduled: 15 Jan 2024 - 13 Jan 2025)
0.3
Details
Share
Follow
3
Warrington Borough Council logo
MYDDLETON LANE, WINWICK 
(0.6 miles)
Warrington Borough Council
Disconnection or alteration of supply - Verge - Two-way signals
Complete
28 Oct 2024 09:30 - 30 Oct 2024 15:30
0.6
Details
Share
4
United Utilities Water (formerly North West Water) logo
EMERGENCY
  
SOUTHWORTH LANE 
(0.6 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Two-way signals
Complete
30 Oct 2024 10:18 - 14:54
0.6
Details
Share
5
Warrington Borough Council logo
GOLBORNE ROAD, WINWICK 
(0.8 miles)
Warrington Borough Council
Disconnection or alteration of supply - Footway - Two-way signals
Complete
28 Oct 2024 09:30 - 30 Oct 2024 15:30
0.8
Details
Share
6
ManWeb logo
MAPLE ROAD, WINWICK 
(0.8 miles)
ManWeb
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 31 Oct 2024 - 6 Nov 2024
0.8
Details
Share
Follow
7
ManWeb logo
FALCONDALE ROAD, WINWICK 
(0.8 miles)
ManWeb
Utility repair and maintenance works - Footway - Two-way signals
Planned
Scheduled: 31 Oct 2024 - 6 Nov 2024
0.8
Details
Share
Follow
8
ManWeb logo
FALCONDALE ROAD, WINWICK 
(0.8 miles)
ManWeb
Utility repair and maintenance works - Footway - Two-way signals
Planned
Scheduled: 31 Oct 2024 - 6 Nov 2024
0.8
Details
Share
Follow