ROADWORKS SUMMARY
Broseley Avenue, WARRINGTON, WA3 4HL

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Broseley Avenue, WA3 4HL and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Broseley Avenue, WARRINGTON, WA3 4HL

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Broseley Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Until
13 Jan 2025
Details
View Map
Share
Follow
Winwick Link Road

St. Helens Council are carrying out Highway improvement works on Winwick Link Road, Winwick, Warrington.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 09:30 and could run through until 13 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by St. Helens Council on 30 Sep 2024 at 10:55.

Electricity North West (NorWeb) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Bickershaw Lane

Electricity North West (NorWeb) are carrying out New service connection on Bickershaw Lane, Bickershaw.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 September 2024 at 08:30 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 15 Nov 2024 at 14:22.

Wigan Metropolitan Borough Council logo
LONG TERM
Until
21 Mar 2025
Details
View Map
Share
Follow
St Helens Road

Wigan Metropolitan Borough Council are carrying out Highway improvement works on St Helens Road, Leigh.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 09:00 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 4 Oct 2024 at 09:03.

Cadent Gas logo
LONG TERM
Between
4 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Thames Road

Cadent Gas are proposing to carry out Utility asset works on Thames Road, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 13:50.

Cadent Gas logo
LONG TERM
Between
4 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Thames Road

Cadent Gas are proposing to carry out Utility asset works on Thames Road, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 08:49.

Cadent Gas logo
Between
4 Nov and 4 Dec 2024
Details
View Map
Share
Follow
Avon Road

Cadent Gas are proposing to carry out Utility asset works on Avon Road, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 13:54.

Cadent Gas logo
Between
4 Nov and 4 Dec 2024
Details
View Map
Share
Follow
Avon Road

Cadent Gas are proposing to carry out Utility asset works on Avon Road, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 08:42.

ManWeb logo
Until
5 Dec 2024
Details
View Map
Share
Follow
Watkin Street

ManWeb are carrying out Utility repair and maintenance works on Watkin Street, Orford, Warrington.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 16:35 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 12 Nov 2024 at 07:57.

ManWeb logo
Between
11 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Cyril Street

ManWeb are proposing to carry out Utility repair and maintenance works on Cyril Street, Orford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 12 Sep 2024 at 15:05.

ManWeb logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Cyril Street

ManWeb are carrying out Utility repair and maintenance works on Cyril Street, Orford, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 16:35 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 12 Nov 2024 at 08:59.

Electricity North West (NorWeb) logo
Until
9 Dec 2024
Details
View Map
Share
Follow
Newton Lane

Electricity North West (NorWeb) are carrying out Diversionary works on Newton Lane, Newton-le-willows.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 16:45 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 12 Nov 2024 at 09:29.

Cadent Gas logo
Between
11 Nov and 11 Dec 2024
Details
View Map
Share
Manor Avenue

Cadent Gas were proposing to carry out Utility asset works on Manor Avenue, Golborne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 13:05.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Lancaster Avenue

Cadent Gas were proposing to carry out Utility asset works on Lancaster Avenue, Golborne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 27 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 13:05.

Electricity North West (NorWeb) logo
Until
11 Dec 2024
Details
View Map
Share
Follow
Smiths Lane

Electricity North West (NorWeb) are carrying out New service connection on Smiths Lane, Hindley Green.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 November 2024 at 16:45 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 15 Nov 2024 at 09:41.

BT logo
Until
5 Dec 2024
Details
View Map
Share
Follow
Watkin Street

BT are carrying out Utility repair and maintenance works on Watkin Street, Orford, Warrington.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 07:30 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Nov 2024 at 07:39.

Electricity North West (NorWeb) logo
Between
15 Nov and 12 Dec 2024
Details
View Map
Share
Follow
Smiths Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Smiths Lane, Hindley Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 6 Sep 2024 at 09:48.

Electricity North West (NorWeb) logo
LONG TERM
Between
15 Nov 2024 and 28 Jan 2025
Details
View Map
Share
Bickershaw Lane

Electricity North West (NorWeb) were proposing to carry out New service connection on Bickershaw Lane, Bickershaw.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 November 2024 and run through until 28 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 23 Aug 2024 at 09:14.

Electricity North West (NorWeb) logo
LONG TERM
Between
15 Nov 2024 and 14 Jan 2025
Details
View Map
Share
Follow
Bickershaw Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Bickershaw Lane, Bickershaw.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 14 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 6 Sep 2024 at 09:48.

BT logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Watkin Street

BT are proposing to carry out Utility repair and maintenance works on Watkin Street, Orford, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 30 Oct 2024 at 09:33.

Finishing
Today
Details
View Map
Share
Follow
Waterworks Lane

St. Helens Council are carrying out Remedial works on Waterworks Lane, Winwick, Warrington.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 21:00 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 21 Nov 2024 at 14:59.

Finishing
Today
Details
View Map
Share
Follow
Winwick Link Road

St. Helens Council are carrying out Remedial works on Winwick Link Road, Winwick, Warrington.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 21:00 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 21 Nov 2024 at 15:01.

Warrington Borough Council logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Winwick Link Road

Warrington Borough Council are proposing to carry out Highway improvement works on Winwick Link Road, Winwick, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 23 May 2024 at 13:16.

Warrington Borough Council logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Winwick Link Road

Warrington Borough Council are proposing to carry out Highway improvement works on Winwick Link Road, Winwick, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 15 Oct 2024 at 11:15.

Cadent Gas logo
Between
18 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Avon Road

Cadent Gas are proposing to carry out Utility asset works on Avon Road, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Aug 2024 at 09:43.

Cadent Gas logo
Between
18 Nov and 4 Dec 2024
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 14:49.

Cadent Gas logo
Between
18 Nov and 4 Dec 2024
Details
View Map
Share
Follow
Walton Road

Cadent Gas are proposing to carry out Utility asset works on Walton Road, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 08:52.

Finishing
Wednesday
Details
View Map
Share
Follow
Penny Lane

St. Helens Council are carrying out Highway repair and maintenance works on Penny Lane, Haydock, St Helens.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 19:00 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 20 Nov 2024 at 09:52.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Lowton Road

Cadent Gas are carrying out Utility repair and maintenance works on Lowton Road, Golborne.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 November 2024 at 14:38 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 23 Nov 2024 at 14:40.

Network Rail logo
Between
25 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Lythgoes Lane

Network Rail are proposing to carry out Works for Rail Purposes on Lythgoes Lane, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 10 Sep 2024 at 13:44.

Network Rail logo
Between
25 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Lythgoes Lane

Network Rail are proposing to carry out Works for Rail Purposes on Lythgoes Lane, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 6 Nov 2024 at 15:46.

BT logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Watkin Street

BT are proposing to carry out Works for road purposes on Watkin Street, Orford, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 5 Nov 2024 at 11:36.

Electricity North West (NorWeb) logo
Between
27 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Rob Lane

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Rob Lane, Newton Le Willows, St Helens.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 7 Nov 2024 at 15:03.

Electricity North West (NorWeb) logo
Between
27 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Rob Lane

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Rob Lane, Newton Le Willows, St Helens.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 8 Nov 2024 at 10:03.

Electricity North West (NorWeb) logo
Between
27 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Rob Lane

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Rob Lane, Newton Le Willows, St Helens.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 11 Nov 2024 at 12:41.

BT logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Watkin Street

BT are proposing to carry out Works for road purposes on Watkin Street, Orford, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 30 Oct 2024 at 09:39.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Watkin Street

ManWeb were proposing to carry out Utility repair and maintenance works on Watkin Street, Orford, Warrington.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 7 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 6 Nov 2024 at 11:03.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 4 Oct 2024 at 10:54.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 8 Oct 2024 at 10:23.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 4 Oct 2024 at 10:55.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Winwick Road

ManWeb were proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 7 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 6 Nov 2024 at 11:06.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 27 Jan 2025
Details
View Map
Share
Follow
Berkshire Drive

Cadent Gas are proposing to carry out Utility asset works on Berkshire Drive, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 12:26.

United Utilities Water (formerly North West Water) logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Barnfield Road

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Barnfield Road, Woolston, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 29 Aug 2024 at 15:47.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 4 Oct 2024 at 10:53.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 4 Oct 2024 at 16:08.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Winwick Road

ManWeb were proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 7 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 11 Oct 2024 at 09:31.

Cadent Gas logo
Between
2 and 18 Dec 2024
Details
View Map
Share
Follow
Shaw Street

Cadent Gas are proposing to carry out Utility asset works on Shaw Street, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 10:46.

ManWeb logo
LONG TERM
Between
3 Dec 2024 and 8 Jan 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 4 Oct 2024 at 10:57.

ManWeb logo
LONG TERM
Between
3 Dec 2024 and 8 Jan 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 8 Oct 2024 at 15:09.

ManWeb logo
LONG TERM
Between
3 Dec 2024 and 8 Jan 2025
Details
View Map
Share
Winwick Road

ManWeb were proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 8 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 11 Oct 2024 at 09:35.

Electricity North West (NorWeb) logo
LONG TERM
Between
4 Dec 2024 and 3 Mar 2025
Details
View Map
Share
Ashton Road

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Ashton Road, Newton Le Willows, St Helens.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 3 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 16 Oct 2024 at 13:43.

Electricity North West (NorWeb) logo
LONG TERM
Between
4 Dec 2024 and 3 Mar 2025
Details
View Map
Share
Ashton Road

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Ashton Road, Newton Le Willows, St Helens.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 3 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 12 Nov 2024 at 15:50.

Cadent Gas logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Briar Walk

Cadent Gas were proposing to carry out Utility asset works on Briar Walk, Golborne.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 23 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 13:06.

Cadent Gas logo
Between
16 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Rectory Avenue

Cadent Gas are proposing to carry out Utility asset works on Rectory Avenue, Lowton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 10:56.

Cadent Gas logo
Between
16 and 27 Dec 2024
Details
View Map
Share
Follow
Battersby Street

Cadent Gas are proposing to carry out Utility asset works on Battersby Street, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 27 December 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 20 Sep 2024 at 11:00.

Cadent Gas logo
Between
16 and 27 Dec 2024
Details
View Map
Share
Follow
Battersby Street

Cadent Gas are proposing to carry out Utility asset works on Battersby Street, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 27 December 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 14:59.

Cadent Gas logo
LONG TERM
Between
19 Dec 2024 and 10 Feb 2025
Details
View Map
Share
Follow
St Helens Road

Cadent Gas are proposing to carry out Utility asset works on St Helens Road, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 12:57.

Electricity North West (NorWeb) logo
Between
27 Dec 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Liscard Street

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Liscard Street, Atherton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 7 Oct 2024 at 09:25.

ManWeb logo
LONG TERM
Between
2 Jan and 1 Dec 2025
Details
View Map
Share
Winwick Road

ManWeb were proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 1 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 19 Sep 2024 at 14:17.

Cadent Gas logo
Between
2 and 20 Jan 2025
Details
View Map
Share
Follow
Shaw Street

Cadent Gas are proposing to carry out Utility asset works on Shaw Street, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 15:27.

Cadent Gas logo
LONG TERM
Between
6 Jan and 10 Mar 2025
Details
View Map
Share
Follow
Pasture Lane Segregated Footpath

Cadent Gas are proposing to carry out Utility asset works on Pasture Lane Segregated Footpath, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 6 January 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 14:20.

Cadent Gas logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Fearnhead Lane

Cadent Gas are proposing to carry out Utility asset works on Fearnhead Lane, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 16:13.

Cadent Gas logo
Between
6 and 22 Jan 2025
Details
View Map
Share
Braithwaite Road

Cadent Gas were proposing to carry out Utility asset works on Braithwaite Road, Lowton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 22 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 11:00.

Cadent Gas logo
LONG TERM
Between
6 Jan and 12 Feb 2025
Details
View Map
Share
Slag Lane

Cadent Gas were proposing to carry out Utility asset works on Slag Lane, Lowton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 12 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 11:01.

United Utilities Water (formerly North West Water) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Glebe Street Back Service Road East 82 - 144

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Glebe Street Back Service Road East 82 - 144, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 1 Oct 2024 at 10:15.

Electricity North West (NorWeb) logo
LONG TERM
Between
8 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Birchwood Park Avenue

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Birchwood Park Avenue, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 11 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 13 Nov 2024 at 09:28.

The Environment Agency logo
LONG TERM
Between
8 Jan and 25 Apr 2025
Details
View Map
Share
Follow
Alexandra Road

The Environment Agency are proposing to carry out Statutory Infrastructure Works on Alexandra Road, Ashton-in-makerfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by The Environment Agency on 20 Jun 2024 at 08:50.

Electricity North West (NorWeb) logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Daten Avenue

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Daten Avenue, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 13 Nov 2024 at 09:28.

Electricity North West (NorWeb) logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Daten Avenue

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Daten Avenue, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 13 Nov 2024 at 09:28.

Electricity North West (NorWeb) logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Warrington Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Warrington Road, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 13 Nov 2024 at 09:29.

Cadent Gas logo
Between
13 and 29 Jan 2025
Details
View Map
Share
The Grove

Cadent Gas were proposing to carry out Utility asset works on The Grove, Lowton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 29 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 11:02.

United Utilities Water (formerly North West Water) logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Twiss Green Lane

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Twiss Green Lane, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Nov 2024 at 14:27.

United Utilities Water (formerly North West Water) logo
Between
27 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Waring Avenue

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Waring Avenue, Latchford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 29 Oct 2024 at 15:30.

United Utilities Water (formerly North West Water) logo
Between
27 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Waring Avenue

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Waring Avenue, Latchford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 30 Oct 2024 at 11:50.

Cadent Gas logo
LONG TERM
Between
27 Jan and 19 Mar 2025
Details
View Map
Share
Follow
Berkshire Drive

Cadent Gas are proposing to carry out Utility asset works on Berkshire Drive, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 12:17.

Warrington Borough Council logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Hughes Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Hughes Avenue, Orford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 19 Nov 2024 at 10:28.

Warrington Borough Council logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Woolston Grange Avenue

Warrington Borough Council are proposing to carry out Highway repair and maintenance works on Woolston Grange Avenue, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 16 Oct 2024 at 09:05.

Warrington Borough Council logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Woolston Grange Avenue

Warrington Borough Council are proposing to carry out Highway repair and maintenance works on Woolston Grange Avenue, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 17 Oct 2024 at 14:18.

Electricity North West (NorWeb) logo
Between
27 Jan and 16 Feb 2025
Details
View Map
Share
Birchwood Park Avenue

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Birchwood Park Avenue, Birchwood, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 16 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 15 Nov 2024 at 08:46.

Electricity North West (NorWeb) logo
Between
27 Jan and 16 Feb 2025
Details
View Map
Share
Daten Avenue

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Daten Avenue, Birchwood, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 16 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 15 Nov 2024 at 08:38.

Electricity North West (NorWeb) logo
Between
27 Jan and 16 Feb 2025
Details
View Map
Share
Daten Avenue

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Daten Avenue, Birchwood, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 16 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 15 Nov 2024 at 08:42.

Electricity North West (NorWeb) logo
Between
27 Jan and 16 Feb 2025
Details
View Map
Share
Warrington Road

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Warrington Road, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 16 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Nov 2024 at 08:30.

Cadent Gas logo
Between
27 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Wash Lane

Cadent Gas are proposing to carry out Utility asset works on Wash Lane, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 13:57.

ManWeb logo
Between
29 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Watkin Street

ManWeb are proposing to carry out Utility repair and maintenance works on Watkin Street, Orford, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 8 Nov 2024 at 14:44.

Warrington Borough Council logo
Between
29 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Mortimer Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Mortimer Avenue, Orford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 29 Oct 2024 at 14:40.

Warrington Borough Council logo
Between
29 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Mortimer Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Mortimer Avenue, Orford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 29 Oct 2024 at 14:30.

The Environment Agency logo
LONG TERM
Between
29 Jan and 16 May 2025
Details
View Map
Share
Follow
Queens Road

The Environment Agency are proposing to carry out Statutory Infrastructure Works on Queens Road, Ashton-in-makerfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by The Environment Agency on 20 Jun 2024 at 08:45.

Electricity North West (NorWeb) logo
Between
30 Jan and 27 Feb 2025
Details
View Map
Share
Follow
Newton Lane

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Newton Lane, Newton-le-willows.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 7 Nov 2024 at 14:52.

Warrington Borough Council logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Honister Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Honister Avenue, Poplars And Hulme, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 18 Nov 2024 at 13:29.

Warrington Borough Council logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Buttermere Crescent

Warrington Borough Council are proposing to carry out Highway improvement works on Buttermere Crescent, Poplars And Hulme, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 18 Nov 2024 at 13:24.

United Utilities Water (formerly North West Water) logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Twiss Green Lane

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Twiss Green Lane, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Nov 2024 at 11:35.

Electricity North West (NorWeb) logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Beaumaris Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Beaumaris Road, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 29 Oct 2024 at 11:05.

Electricity North West (NorWeb) logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Beaumaris Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Beaumaris Road, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 29 Oct 2024 at 13:07.

Electricity North West (NorWeb) logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Pendennis Crescent

Electricity North West (NorWeb) are proposing to carry out New service connection on Pendennis Crescent, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 29 Oct 2024 at 11:05.

Electricity North West (NorWeb) logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Pendennis Crescent

Electricity North West (NorWeb) are proposing to carry out New service connection on Pendennis Crescent, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 29 Oct 2024 at 13:07.

Cadent Gas logo
LONG TERM
Between
6 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Wigan Road

Cadent Gas are proposing to carry out Utility asset works on Wigan Road, Golborne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:48.

Cadent Gas logo
LONG TERM
Between
6 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Wigan Road

Cadent Gas are proposing to carry out Utility asset works on Wigan Road, Golborne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 15:34.

Electricity North West (NorWeb) logo
Between
7 and 13 Feb 2025
Details
View Map
Share
Follow
Birchwood Park Avenue

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Birchwood Park Avenue, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 13 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 20 Nov 2024 at 14:36.

Electricity North West (NorWeb) logo
Between
7 and 13 Feb 2025
Details
View Map
Share
Follow
Birchwood Park Avenue

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Birchwood Park Avenue, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 13 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 22 Nov 2024 at 10:10.

Electricity North West (NorWeb) logo
Between
7 and 18 Feb 2025
Details
View Map
Share
Follow
Daten Avenue

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Daten Avenue, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 20 Nov 2024 at 14:33.

Electricity North West (NorWeb) logo
Between
7 and 18 Feb 2025
Details
View Map
Share
Follow
Daten Avenue

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Daten Avenue, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 22 Nov 2024 at 10:09.

Electricity North West (NorWeb) logo
Between
7 and 13 Feb 2025
Details
View Map
Share
Follow
Daten Avenue

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Daten Avenue, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 20 Nov 2024 at 14:35.

Electricity North West (NorWeb) logo
Between
7 and 13 Feb 2025
Details
View Map
Share
Follow
Daten Avenue

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Daten Avenue, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 22 Nov 2024 at 10:09.

Warrington Borough Council logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Elizabeth Drive

Warrington Borough Council are proposing to carry out Highway improvement works on Elizabeth Drive, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 13 Nov 2024 at 13:46.

Warrington Borough Council logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Anderson Close

Warrington Borough Council are proposing to carry out Highway improvement works on Anderson Close, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 6 Nov 2024 at 12:38.

Warrington Borough Council logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Anderson Close

Warrington Borough Council are proposing to carry out Highway improvement works on Anderson Close, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 6 Nov 2024 at 12:40.

Electricity North West (NorWeb) logo
LONG TERM
Between
10 Feb and 16 Mar 2025
Details
View Map
Share
Follow
High Street

Electricity North West (NorWeb) are proposing to carry out Diversionary works on High Street, Newton Le Willows, St Helens.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 31 Oct 2024 at 13:15.

Cadent Gas logo
Between
17 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Manchester Road

Cadent Gas are proposing to carry out Utility asset works on Manchester Road, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 12:30.

Cadent Gas logo
LONG TERM
Between
17 Feb and 16 Apr 2025
Details
View Map
Share
Follow
Gig Lane

Cadent Gas are proposing to carry out Utility asset works on Gig Lane, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 16 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 12:30.

Cadent Gas logo
Between
17 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Hillock Lane

Cadent Gas are proposing to carry out Utility asset works on Hillock Lane, Woolston, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 10:00.

Cadent Gas logo
Between
17 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Holes Lane

Cadent Gas are proposing to carry out Utility asset works on Holes Lane, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 10:00.


Roadworks Map near to Broseley Avenue, WARRINGTON, WA3 4HL

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 23 Nov 2024 14:47
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Broseley Avenue, WARRINGTON, WA3 4HL (4 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
United Utilities Water (formerly North West Water) logo
CAWLEY AVENUE, CULCHETH AND GLAZEBURY 
(0.4 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Give and take
Complete
22 Nov 2024 12:18 - 17:00
0.4
Details
Share
2
Cadent Gas logo
EMERGENCY
  
LANSDOWNE, CULCHETH AND GLAZEBURY 
(0.6 miles)
Cadent Gas
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
19 Nov 2024 13:36 - 22 Nov 2024 12:10
0.6
Details
Share
3
BT logo
WARRINGTON ROAD 
(0.7 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 21 Nov 2024 - 25 Nov 2024
0.7
Details
Share
Follow
4
BT logo
COMMON LANE, CULCHETH AND GLAZEBURY 
(0.7 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Cancelled
(Scheduled: 21 Nov 2024 - 25 Nov 2024)
0.7
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.