ROADWORKS SUMMARY
West Lane, KNUTSFORD, WA16 6UF

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for West Lane, WA16 6UF and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to West Lane, KNUTSFORD, WA16 6UF

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for West Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Chapel Lane

Trafford Metropolitan Borough Council are carrying out Highway repair and maintenance works on Chapel Lane, Partington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 March 2024 at 08:30 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Trafford Metropolitan Borough Council on 17 Feb 2025 at 07:40.

Network Rail logo
LONG TERM
Until
11 Apr 2025
Details
View Map
Share
Follow
Ashley Road

Network Rail are carrying out Works for Rail Purposes on Ashley Road, Hale Barns.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 September 2024 at 09:00 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 14 Mar 2025 at 09:21.

Cadent Gas logo
LONG TERM
Between
17 Feb and 16 Apr 2025
Details
View Map
Share
Follow
Gig Lane

Cadent Gas are proposing to carry out Utility asset works on Gig Lane, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 16 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 08:37.

Warrington Borough Council logo
Finishing
Today
Details
View Map
Share
Follow
Broad Lane

Warrington Borough Council are proposing to carry out Highway improvement works on Broad Lane, Grappenhall And Thelwall, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 18 Dec 2024 at 15:06.

Warrington Borough Council logo
Between
13 Mar and 10 Apr 2025
Details
View Map
Share
Follow
Broad Lane

Warrington Borough Council are proposing to carry out Highway improvement works on Broad Lane, Grappenhall And Thelwall, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 19 Dec 2024 at 10:54.

Cadent Gas logo
Between
24 Mar and 9 Apr 2025
Details
View Map
Share
Follow
Ivy Road

Cadent Gas are proposing to carry out Utility asset works on Ivy Road, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 12:21.

Warrington Borough Council logo
LONG TERM
Between
24 Mar and 16 May 2025
Details
View Map
Share
Follow
Higher Lane

Warrington Borough Council are proposing to carry out Highway improvement works on Higher Lane, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 19 Feb 2025 at 11:34.

Warrington Borough Council logo
LONG TERM
Until
16 May 2025
Details
View Map
Share
Follow
Higher Lane

Warrington Borough Council are carrying out Highway improvement works on Higher Lane, Lymm, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 19:30 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 25 Mar 2025 at 09:39.

ManWeb logo
Finishing
Today
Details
View Map
Share
Moss Lane

ManWeb were proposing to carry out Remedial works on Moss Lane, Mere, Knutsford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 March 2025 and run through until 28 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 17 Mar 2025 at 09:52.

ManWeb logo
Finishing
Today
Details
View Map
Share
Follow
Moss Lane

ManWeb are proposing to carry out Remedial works on Moss Lane, Mere, Knutsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 6 Feb 2025 at 15:41.

Cadent Gas logo
Between
31 Mar and 16 Apr 2025
Details
View Map
Share
Follow
Maple Road

Cadent Gas are proposing to carry out Utility asset works on Maple Road, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 16 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 12:30.

United Utilities Water (formerly North West Water) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Booths Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Booths Lane, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 19 Feb 2025 at 09:00.

ManWeb logo
Finishing
Wednesday
Details
View Map
Share
Follow
Moss Lane

ManWeb are proposing to carry out Remedial works on Moss Lane, Mere, Knutsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 21 Mar 2025 at 11:42.

Cadent Gas logo
Between
7 and 30 Apr 2025
Details
View Map
Share
Follow
Holes Lane

Cadent Gas are proposing to carry out Utility asset works on Holes Lane, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Mar 2025 at 14:26.

Cadent Gas logo
Between
7 Apr and 2 May 2025
Details
View Map
Share
Follow
Holes Lane

Cadent Gas are proposing to carry out Utility asset works on Holes Lane, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 14:51.

Cadent Gas logo
Between
7 and 25 Apr 2025
Details
View Map
Share
Follow
Hillock Lane

Cadent Gas are proposing to carry out Utility asset works on Hillock Lane, Woolston, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 14:49.

Cadent Gas logo
Between
7 and 25 Apr 2025
Details
View Map
Share
Follow
Hillock Lane

Cadent Gas are proposing to carry out Utility asset works on Hillock Lane, Woolston, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Mar 2025 at 08:38.

Warrington Borough Council logo
LONG TERM
Between
14 Apr and 6 Jun 2025
Details
View Map
Share
Follow
Higher Lane

Warrington Borough Council are proposing to carry out Highway improvement works on Higher Lane, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 29 Jan 2025 at 15:40.

Cadent Gas logo
Between
14 Apr and 9 May 2025
Details
View Map
Share
Follow
Holes Lane

Cadent Gas are proposing to carry out Utility asset works on Holes Lane, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jan 2025 at 11:13.

Cadent Gas logo
Between
14 Apr and 1 May 2025
Details
View Map
Share
Follow
Urban Road

Cadent Gas are proposing to carry out Utility asset works on Urban Road, Altrincham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 1 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Feb 2025 at 08:19.

Cadent Gas logo
Between
14 Apr and 1 May 2025
Details
View Map
Share
Follow
Urban Road

Cadent Gas are proposing to carry out Utility asset works on Urban Road, Altrincham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 1 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Feb 2025 at 11:38.

United Utilities Water (formerly North West Water) logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Stockton Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Stockton Lane, Grappenhall And Thelwall, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Jan 2025 at 13:14.

United Utilities Water (formerly North West Water) logo
Between
6 and 8 May 2025
Details
View Map
Share
Follow
Booths Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Booths Lane, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Feb 2025 at 14:06.

Electricity North West (NorWeb) logo
Between
14 May and 2 Jun 2025
Details
View Map
Share
Glazebrook Lane

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Glazebrook Lane, Rixton-with-glazebrook, Warrington.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 May 2025 and run through until 2 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 13 Mar 2025 at 08:12.

Electricity North West (NorWeb) logo
Between
14 May and 2 Jun 2025
Details
View Map
Share
Follow
Glazebrook Lane

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Glazebrook Lane, Rixton-with-glazebrook, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 2 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 12 Mar 2025 at 14:07.

United Utilities Water (formerly North West Water) logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Star Lane

United Utilities Water (formerly North West Water) are proposing to carry out Remedial works on Star Lane, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Mar 2025 at 15:43.

United Utilities Water (formerly North West Water) logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Star Lane

United Utilities Water (formerly North West Water) are proposing to carry out Remedial works on Star Lane, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 14 Mar 2025 at 13:35.

United Utilities Water (formerly North West Water) logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Star Lane

United Utilities Water (formerly North West Water) are proposing to carry out Remedial works on Star Lane, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Mar 2025 at 12:57.

United Utilities Water (formerly North West Water) logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Star Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Star Lane, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 4 Mar 2025 at 15:55.

Electricity North West (NorWeb) logo
Between
6 and 24 Jun 2025
Details
View Map
Share
Glazebrook Lane

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Glazebrook Lane, Rixton-with-glazebrook, Warrington.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 June 2025 and run through until 24 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 24 Mar 2025 at 14:12.

Cadent Gas logo
Between
16 and 27 Jun 2025
Details
View Map
Share
Follow
Thelwall New Road

Cadent Gas are proposing to carry out Utility asset works on Thelwall New Road, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Mar 2025 at 12:00.

Cadent Gas logo
Between
16 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Bridge Lane

Cadent Gas are proposing to carry out Utility asset works on Bridge Lane, Appleton, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 2 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 14:00.

Electricity North West (NorWeb) logo
Between
16 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Glazebrook Lane

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Glazebrook Lane, Rixton-with-glazebrook, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 2 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 24 Mar 2025 at 14:17.

ManWeb logo
Between
19 and 23 Jun 2025
Details
View Map
Share
Follow
Arley Road

ManWeb are proposing to carry out Utility repair and maintenance works on Arley Road, Appleton, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 27 Mar 2025 at 12:56.

United Utilities Water (formerly North West Water) logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Star Lane

United Utilities Water (formerly North West Water) are proposing to carry out Remedial works on Star Lane, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 18 Mar 2025 at 11:52.


Roadworks Map near to West Lane, KNUTSFORD, WA16 6UF

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 28 Mar 2025 08:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to West Lane, KNUTSFORD, WA16 6UF (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Warrington Borough Council logo
MAJOR
  
HIGHER LANE, LYMM 
(0.6 miles)
Warrington Borough Council
Highway improvement works - Carriageway - Road closure
Planned
Scheduled: 24 Mar 2025 - 16 May 2025
0.6
Details
Share
Follow
2
Warrington Borough Council logo
MAJOR
  
HIGHER LANE, LYMM 
(0.6 miles)
Warrington Borough Council
Highway improvement works - Carriageway - Road closure
In Progress
Since: 24 Mar 2025 19:30
(Scheduled: 24 Mar 2025 - 16 May 2025)
0.6
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.