ROADWORKS SUMMARY
Ditchfield Lane, KNUTSFORD, WA16 0QN

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Ditchfield Lane, WA16 0QN and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Ditchfield Lane, KNUTSFORD, WA16 0QN

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Ditchfield Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Chapel Lane

Trafford Metropolitan Borough Council are carrying out Highway repair and maintenance works on Chapel Lane, Partington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 March 2024 at 08:30 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Trafford Metropolitan Borough Council on 22 Oct 2024 at 08:20.

Warrington Borough Council logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Pepper Street

Warrington Borough Council are carrying out Highway improvement works on Pepper Street, Lymm, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 July 2024 at 10:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 24 Oct 2024 at 15:43.

Network Rail logo
LONG TERM
Until
14 Feb 2025
Details
View Map
Share
Follow
Ashley Road

Network Rail are carrying out Works for Rail Purposes on Ashley Road, Hale Barns.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 September 2024 at 09:00 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 16 Sep 2024 at 07:19.

Warrington Borough Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Manchester Road

Warrington Borough Council are proposing to carry out Highway improvement works on Manchester Road, Woolston, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Warrington Borough Council on 25 Apr 2024 at 11:25.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Back Lane

Cadent Gas are proposing to carry out Utility asset works on Back Lane, Dunham Massey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 10:06.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Back Lane

Cadent Gas are proposing to carry out Utility asset works on Back Lane, Dunham Massey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 10:50.

Finishing
Tuesday
Details
View Map
Share
Follow
Rushgreen Road

Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Rushgreen Road, Lymm, Warrington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:37 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 20 Nov 2024 at 11:44.

Cadent Gas logo
Between
4 Nov and 4 Dec 2024
Details
View Map
Share
Follow
Statham Avenue

Cadent Gas are proposing to carry out Utility asset works on Statham Avenue, Lymm, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 15:24.

Finishing
Today
Details
View Map
Share
Follow
Rushgreen Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Rushgreen Road, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 10 Oct 2024 at 15:17.

Finishing
Today
Details
View Map
Share
Follow
Rushgreen Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Rushgreen Road, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 21 Oct 2024 at 14:08.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Whitbarrow Road

Cadent Gas are proposing to carry out Utility asset works on Whitbarrow Road, Lymm, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 10:22.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Lawrence Road

Cadent Gas are carrying out Utility repair and maintenance works on Lawrence Road, Altrincham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 13:49 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 14:34.

Warrington Borough Council logo
LONG TERM
Between
14 Nov and 27 Dec 2024
Details
View Map
Share
Follow
Weaste Lane

Warrington Borough Council are proposing to carry out Utility asset works on Weaste Lane, Grappenhall And Thelwall, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 16 Sep 2024 at 14:24.

Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Dane Bank Road East

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Dane Bank Road East, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 6 Nov 2024 at 10:20.

Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Dane Bank Road East

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Dane Bank Road East, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 7 Nov 2024 at 12:45.

Between
18 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Dane Bank Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Dane Bank Road, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 30 Oct 2024 at 13:08.

Between
18 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Dane Bank Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Dane Bank Road, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 10 Oct 2024 at 15:26.

Cheshire East Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Church Hill

Cheshire East Council are carrying out Highway repair and maintenance works on Church Hill, Knutsford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 16:30 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cheshire East Council on 20 Nov 2024 at 15:24.

Between
19 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Dane Bank Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Dane Bank Road, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 27 Aug 2024 at 15:27.

Between
19 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Rushgreen Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Rushgreen Road, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 27 Aug 2024 at 15:27.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Warburton Lane

Cadent Gas are carrying out Utility repair and maintenance works on Warburton Lane, Partington.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 13:00 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 14:29.

ManWeb logo
Finishing
Thursday
Details
View Map
Share
Follow
Appleton Bridleway 26

ManWeb are proposing to carry out Utility repair and maintenance works on Appleton Bridleway 26, Appleton, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 6 Nov 2024 at 13:33.

Energy Assets Pipelines logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Thelwall Lane

Energy Assets Pipelines were proposing to carry out Utility asset works on Thelwall Lane, Warrington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Energy Assets Pipelines on 16 Sep 2024 at 12:15.

Warrington Borough Council logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Weaste Lane

Warrington Borough Council are proposing to carry out Utility asset works on Weaste Lane, Grappenhall And Thelwall, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 6 Nov 2024 at 09:01.

Energy Assets Pipelines logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Thelwall Lane

Energy Assets Pipelines are proposing to carry out Utility asset works on Thelwall Lane, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Pipelines on 23 Sep 2024 at 13:11.

Cadent Gas logo
Between
25 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Whitbarrow Road

Cadent Gas are proposing to carry out Utility asset works on Whitbarrow Road, Lymm, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 10:52.

Electricity North West (NorWeb) logo
Between
28 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Charter Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Charter Road, Altrincham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 5 Sep 2024 at 14:40.

Electricity North West (NorWeb) logo
Between
28 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Stamford Park Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Stamford Park Road, Altrincham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 6 Sep 2024 at 11:47.

Electricity North West (NorWeb) logo
Between
29 Nov and 19 Dec 2024
Details
View Map
Share
Follow
Borough Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Borough Road, Altrincham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 10 Sep 2024 at 07:40.

Electricity North West (NorWeb) logo
Between
29 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Charter Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Charter Road, Altrincham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 9 Sep 2024 at 08:26.

Electricity North West (NorWeb) logo
Between
29 Nov and 19 Dec 2024
Details
View Map
Share
Follow
Stamford Park Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Stamford Park Road, Altrincham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 9 Sep 2024 at 08:24.

Cheshire East Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Beggarmans Lane

Cheshire East Council are proposing to carry out Highway repair and maintenance works on Beggarmans Lane, Knutsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cheshire East Council on 28 Oct 2024 at 16:14.

Electricity North West (NorWeb) logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Charter Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Charter Road, Altrincham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 10 Sep 2024 at 07:40.

ManWeb logo
Between
6 and 10 Dec 2024
Details
View Map
Share
Arley Road

ManWeb were proposing to carry out Utility repair and maintenance works on Arley Road, Appleton, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 December 2024 and run through until 10 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 8 Oct 2024 at 15:37.

Cadent Gas logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Vicarage Lane

Cadent Gas are proposing to carry out Utility asset works on Vicarage Lane, Bowdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 07:05.

United Utilities Water (formerly North West Water) logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Bexton Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Bexton Road, Knutsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 17 Oct 2024 at 12:52.

United Utilities Water (formerly North West Water) logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Bexton Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Bexton Road, Knutsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 17 Oct 2024 at 12:13.

ManWeb logo
Between
31 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Arley Road

ManWeb are proposing to carry out Utility repair and maintenance works on Arley Road, Appleton, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 9 Oct 2024 at 09:52.

ManWeb logo
Between
2 and 6 Jan 2025
Details
View Map
Share
Follow
Arley Road

ManWeb are proposing to carry out Utility repair and maintenance works on Arley Road, Appleton, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 15 Oct 2024 at 10:03.

Cadent Gas logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Vicarage Lane

Cadent Gas are proposing to carry out Utility asset works on Vicarage Lane, Bowdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 14:18.

ManWeb logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Arley Road

ManWeb were proposing to carry out Utility repair and maintenance works on Arley Road, Appleton, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 January 2025 and run through until 16 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 29 Oct 2024 at 15:08.

ManWeb logo
Between
16 and 22 Jan 2025
Details
View Map
Share
Follow
Appleton Bridleway 26

ManWeb are proposing to carry out Utility repair and maintenance works on Appleton Bridleway 26, Appleton, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 28 Oct 2024 at 10:35.

ManWeb logo
Between
16 and 22 Jan 2025
Details
View Map
Share
Green Lane

ManWeb were proposing to carry out Utility repair and maintenance works on Green Lane, Appleton, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 24 Oct 2024 at 15:48.

ManWeb logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Arley Road

ManWeb are proposing to carry out Utility repair and maintenance works on Arley Road, Appleton, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 29 Oct 2024 at 15:10.

Cadent Gas logo
Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Vicarage Lane

Cadent Gas are proposing to carry out Utility asset works on Vicarage Lane, Bowdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 13:48.

United Utilities Water (formerly North West Water) logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Glebe Avenue

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Glebe Avenue, Grappenhall And Thelwall, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Nov 2024 at 14:05.

United Utilities Water (formerly North West Water) logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Glebe Avenue

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Glebe Avenue, Grappenhall And Thelwall, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Nov 2024 at 11:30.

Cadent Gas logo
LONG TERM
Between
17 Feb and 16 Apr 2025
Details
View Map
Share
Follow
Gig Lane

Cadent Gas are proposing to carry out Utility asset works on Gig Lane, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 16 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 12:30.

Cadent Gas logo
Between
17 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Manchester Road

Cadent Gas are proposing to carry out Utility asset works on Manchester Road, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 12:30.


Roadworks Map near to Ditchfield Lane, KNUTSFORD, WA16 0QN

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 22 Nov 2024 04:55
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Ditchfield Lane, KNUTSFORD, WA16 0QN (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.