ROADWORKS SUMMARY
Stanhope Road, ALTRINCHAM, WA14 3LB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Stanhope Road, WA14 3LB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Stanhope Road, ALTRINCHAM, WA14 3LB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Stanhope Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Chapel Lane

Trafford Metropolitan Borough Council are carrying out Highway repair and maintenance works on Chapel Lane, Partington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 March 2024 at 08:30 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Trafford Metropolitan Borough Council on 22 Oct 2024 at 08:20.

Warrington Borough Council logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Pepper Street

Warrington Borough Council are carrying out Highway improvement works on Pepper Street, Lymm, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 July 2024 at 10:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 24 Oct 2024 at 15:43.

Cadent Gas logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Grove Lane

Cadent Gas are proposing to carry out Utility asset works on Grove Lane, Timperley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 5 Aug 2024 at 07:02.

Network Rail logo
LONG TERM
Until
14 Feb 2025
Details
View Map
Share
Follow
Ashley Road

Network Rail are carrying out Works for Rail Purposes on Ashley Road, Hale Barns.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 September 2024 at 09:00 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 16 Sep 2024 at 07:19.

Cadent Gas logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Grove Lane

Cadent Gas are carrying out Utility asset works on Grove Lane, Timperley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 07:05 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 12:39.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Back Lane

Cadent Gas are proposing to carry out Utility asset works on Back Lane, Dunham Massey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 10:50.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Back Lane

Cadent Gas are proposing to carry out Utility asset works on Back Lane, Dunham Massey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 10:06.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Lawrence Road

Cadent Gas are carrying out Utility repair and maintenance works on Lawrence Road, Altrincham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 13:49 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 14:34.

Finishing
Tomorrow
Details
View Map
Share
Follow
Rushgreen Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Rushgreen Road, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 10 Oct 2024 at 15:17.

Finishing
Tomorrow
Details
View Map
Share
Follow
Rushgreen Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Rushgreen Road, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 21 Oct 2024 at 14:08.

Finishing
Tuesday
Details
View Map
Share
Follow
Rushgreen Road

Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Rushgreen Road, Lymm, Warrington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:37 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 20 Nov 2024 at 11:44.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Whitbarrow Road

Cadent Gas are proposing to carry out Utility asset works on Whitbarrow Road, Lymm, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 10:22.

Manchester City Council logo
LONG TERM
Between
11 Nov 2024 and 25 Apr 2025
Details
View Map
Share
Follow
Thorley Lane

Manchester City Council are proposing to carry out Highway improvement works on Thorley Lane, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Manchester City Council on 7 Nov 2024 at 15:59.

Manchester City Council logo
LONG TERM
Between
11 Nov 2024 and 25 Apr 2025
Details
View Map
Share
Follow
Runger Lane

Manchester City Council are proposing to carry out Highway improvement works on Runger Lane, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Manchester City Council on 7 Nov 2024 at 15:58.

Manchester City Council logo
LONG TERM
Between
11 Nov 2024 and 25 Apr 2025
Details
View Map
Share
Follow
Thorley Lane

Manchester City Council are proposing to carry out Highway improvement works on Thorley Lane, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Manchester City Council on 7 Nov 2024 at 15:59.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Neath Avenue

Cadent Gas are carrying out Utility repair and maintenance works on Neath Avenue, Manchester.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 November 2024 at 09:32 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:08.

Electricity North West (NorWeb) logo
Until
2 Dec 2024
Details
View Map
Share
Follow
Claremont Road

Electricity North West (NorWeb) are carrying out New service connection on Claremont Road, Sale.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 11:20 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 19 Nov 2024 at 13:15.

Electricity North West (NorWeb) logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Claremont Road

Electricity North West (NorWeb) were proposing to carry out New service connection on Claremont Road, Sale.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 4 Oct 2024 at 11:54.

Electricity North West (NorWeb) logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Claremont Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Claremont Road, Sale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 4 Oct 2024 at 12:50.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Neath Avenue

Cadent Gas were proposing to carry out Utility repair and maintenance works on Neath Avenue, Manchester.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 22 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 14:21.

Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Dane Bank Road East

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Dane Bank Road East, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 7 Nov 2024 at 12:45.

Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Dane Bank Road East

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Dane Bank Road East, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 6 Nov 2024 at 10:20.

Between
18 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Dane Bank Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Dane Bank Road, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 10 Oct 2024 at 15:26.

Between
18 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Dane Bank Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Dane Bank Road, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 30 Oct 2024 at 13:08.

Between
19 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Rushgreen Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Rushgreen Road, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 27 Aug 2024 at 15:27.

Cheshire East Council logo
Until
28 Nov 2024
Details
View Map
Share
Follow
Church Hill

Cheshire East Council are carrying out Highway repair and maintenance works on Church Hill, Knutsford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 16:30 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cheshire East Council on 20 Nov 2024 at 15:24.

Between
19 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Dane Bank Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Dane Bank Road, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 27 Aug 2024 at 15:27.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Warburton Lane

Cadent Gas are carrying out Utility repair and maintenance works on Warburton Lane, Partington.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 13:00 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 14:29.

Manchester City Council logo
LONG TERM
Between
25 Nov 2024 and 25 Apr 2025
Details
View Map
Share
Follow
Thorley Lane

Manchester City Council are proposing to carry out Highway improvement works on Thorley Lane, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Manchester City Council on 5 Sep 2024 at 15:18.

Cadent Gas logo
Between
25 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Whitbarrow Road

Cadent Gas are proposing to carry out Utility asset works on Whitbarrow Road, Lymm, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 10:52.

Manchester City Council logo
LONG TERM
Between
25 Nov 2024 and 25 Apr 2025
Details
View Map
Share
Follow
Thorley Lane

Manchester City Council are proposing to carry out Highway improvement works on Thorley Lane, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Manchester City Council on 5 Sep 2024 at 15:31.

Manchester City Council logo
LONG TERM
Between
25 Nov 2024 and 25 Apr 2025
Details
View Map
Share
Follow
Runger Lane

Manchester City Council are proposing to carry out Highway improvement works on Runger Lane, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Manchester City Council on 5 Sep 2024 at 15:18.

Electricity North West (NorWeb) logo
Between
27 Nov and 13 Dec 2024
Details
View Map
Share
Follow
York Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on York Road, Sale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 7 Nov 2024 at 07:51.

Electricity North West (NorWeb) logo
Between
27 Nov and 13 Dec 2024
Details
View Map
Share
Follow
York Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on York Road, Sale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 6 Nov 2024 at 13:56.

Electricity North West (NorWeb) logo
Between
27 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Ashton Lane

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Ashton Lane, Sale.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 7 Nov 2024 at 11:18.

Electricity North West (NorWeb) logo
Between
27 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Ashton Lane

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Ashton Lane, Sale.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 6 Nov 2024 at 14:52.

Electricity North West (NorWeb) logo
Between
27 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Ashton Lane

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Ashton Lane, Sale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 6 Nov 2024 at 14:30.

Electricity North West (NorWeb) logo
Between
28 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Stamford Park Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Stamford Park Road, Altrincham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 6 Sep 2024 at 11:49.

Electricity North West (NorWeb) logo
Between
28 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Charter Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Charter Road, Altrincham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 5 Sep 2024 at 14:40.

Electricity North West (NorWeb) logo
Between
28 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Stamford Park Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Stamford Park Road, Altrincham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 6 Sep 2024 at 11:47.

Electricity North West (NorWeb) logo
Between
29 Nov and 19 Dec 2024
Details
View Map
Share
Follow
Stamford Park Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Stamford Park Road, Altrincham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 9 Sep 2024 at 08:24.

Electricity North West (NorWeb) logo
Between
29 Nov and 19 Dec 2024
Details
View Map
Share
Follow
Borough Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Borough Road, Altrincham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 10 Sep 2024 at 07:40.

Electricity North West (NorWeb) logo
Between
29 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Charter Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Charter Road, Altrincham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 9 Sep 2024 at 08:26.

Electricity North West (NorWeb) logo
Between
29 Nov and 19 Dec 2024
Details
View Map
Share
Follow
Stamford Park Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Stamford Park Road, Altrincham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 9 Sep 2024 at 08:24.

Cadent Gas logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Bradnor Road

Cadent Gas are proposing to carry out Utility asset works on Bradnor Road, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 08:15.

Electricity North West (NorWeb) logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Charter Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Charter Road, Altrincham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 10 Sep 2024 at 07:40.

Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Norris Road

Trafford Metropolitan Borough Council are proposing to carry out Highway improvement works on Norris Road, Sale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Trafford Metropolitan Borough Council on 12 Nov 2024 at 07:30.

Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Norris Road

Trafford Metropolitan Borough Council are proposing to carry out Highway improvement works on Norris Road, Sale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Trafford Metropolitan Borough Council on 21 Nov 2024 at 10:00.

Cadent Gas logo
Between
9 and 24 Dec 2024
Details
View Map
Share
Follow
Paston Road

Cadent Gas are proposing to carry out Utility asset works on Paston Road, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 08:15.

Manchester City Council logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Chapel Road

Manchester City Council are proposing to carry out Highway improvement works on Chapel Road, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Manchester City Council on 5 Sep 2024 at 15:45.

Cadent Gas logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Vicarage Lane

Cadent Gas are proposing to carry out Utility asset works on Vicarage Lane, Bowdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 07:05.

Cadent Gas logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Bradnor Road

Cadent Gas are proposing to carry out Utility asset works on Bradnor Road, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 15:36.

Manchester City Council logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Rushey Road

Manchester City Council are proposing to carry out Highway improvement works on Rushey Road, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Manchester City Council on 30 Sep 2024 at 14:54.

Cadent Gas logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Vicarage Lane

Cadent Gas are proposing to carry out Utility asset works on Vicarage Lane, Bowdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 14:18.

Cadent Gas logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Broad Road

Cadent Gas are proposing to carry out Utility asset works on Broad Road, Sale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 07:31.

Manchester City Council logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Rackhouse Road

Manchester City Council are proposing to carry out Highway improvement works on Rackhouse Road, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Manchester City Council on 30 Sep 2024 at 14:54.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Broad Road

Cadent Gas are proposing to carry out Utility asset works on Broad Road, Sale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 14:09.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Broad Road

Cadent Gas are proposing to carry out Utility asset works on Broad Road, Sale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 07:25.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Moss Lane

Cadent Gas are proposing to carry out Utility asset works on Moss Lane, Altrincham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 14:17.

Cadent Gas logo
Between
20 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Paston Road

Cadent Gas are proposing to carry out Utility asset works on Paston Road, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 15:41.

Cadent Gas logo
Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Vicarage Lane

Cadent Gas are proposing to carry out Utility asset works on Vicarage Lane, Bowdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 13:48.

Cadent Gas logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
Whitehall Road

Cadent Gas are proposing to carry out Utility asset works on Whitehall Road, Sale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 08:36.

Cadent Gas logo
Between
17 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Whitehall Road

Cadent Gas are proposing to carry out Utility asset works on Whitehall Road, Sale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 07:24.


Roadworks Map near to Stanhope Road, ALTRINCHAM, WA14 3LB

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Nov 2024 20:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Stanhope Road, ALTRINCHAM, WA14 3LB (9 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
PINEWOOD 
(0.2 miles)
BT
Utility asset works - Footway - Give and take
In Progress
Since: 21 Nov 2024 09:39
(Scheduled: 21 Nov 2024 - 25 Nov 2024)
0.2
Details
Share
Follow
2
BT logo
PINEWOOD 
(0.2 miles)
BT
Utility asset works - Footway - Give and take
Planned
Scheduled: 21 Nov 2024 - 27 Nov 2024
0.2
Details
Share
Follow
3
Electricity North West (NorWeb) logo
LANGHAM ROAD 
(0.2 miles)
Electricity North West (NorWeb)
New service connection - Footway, Carriageway - Two-way signals
Complete
18 Nov 2024 16:45 - 21 Nov 2024 14:40
0.2
Details
Share
4
United Utilities Water (formerly North West Water) logo
THE FIRS 
(0.5 miles)
United Utilities Water (formerly North West Water)
Disconnection or alteration of supply - Footway, Carriageway - Two-way signals
In Progress
Since: 21 Nov 2024 09:56
(Scheduled: 21 Nov 2024 - 22 Nov 2024)
0.5
Details
Share
Follow
5
BT logo
ST MARGARETS ROAD 
(0.6 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
19 Nov 2024 13:00 - 14:15
0.6
Details
Share
6
DUNHAM ROAD 
(0.8 miles)
Trafford Metropolitan Borough Council
Highway improvement works - Footway - No carriageway incursion
Planned
Scheduled: 20 Nov 2024 - 22 Nov 2024
0.8
Details
Share
Follow
7
United Utilities Water (formerly North West Water) logo
URGENT
  
HEATH ROAD 
(0.8 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Carriageway - Give and take
Complete
21 Nov 2024 00:51 - 09:00
0.8
Details
Share
8
Electricity North West (NorWeb) logo
CECIL ROAD 
(0.9 miles)
Electricity North West (NorWeb)
New service connection - Footway - Give and take
In Progress
Since: 19 Nov 2024 16:45
(Scheduled: 19 Nov 2024 - 25 Nov 2024)
0.9
Details
Share
Follow
9
ARMITAGE ROAD 
(1.0 miles)
Trafford Metropolitan Borough Council
Highway improvement works - Footway - No carriageway incursion
Planned
Scheduled: 20 Nov 2024 - 22 Nov 2024
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.