ROADWORKS SUMMARY
Moss Lane, LYMM, WA13 9TX

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Moss Lane, WA13 9TX and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Moss Lane, LYMM, WA13 9TX

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Moss Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Chapel Lane

Trafford Metropolitan Borough Council are carrying out Highway repair and maintenance works on Chapel Lane, Partington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 March 2024 at 08:30 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Trafford Metropolitan Borough Council on 17 Feb 2025 at 07:40.

Network Rail logo
LONG TERM
Until
11 Apr 2025
Details
View Map
Share
Follow
Ashley Road

Network Rail are carrying out Works for Rail Purposes on Ashley Road, Hale Barns.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 September 2024 at 09:00 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 14 Mar 2025 at 09:21.

Cadent Gas logo
LONG TERM
Between
6 Feb and 7 Apr 2025
Details
View Map
Share
Gig Lane

Cadent Gas carried out Utility asset works on Gig Lane, Woolston, Warrington.

These works were categorised as Major.

Multi-way signals were in place for some or all of the period.

The works were originally planned between 6 Feb 2025 and 7 Apr 2025 and were actually completed between 6 Feb 2025 (11:30) and 20 Mar 2025 (11:00). The works impacted the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Mar 2025 at 12:06.

LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Firs Way

Trafford Metropolitan Borough Council are carrying out Highway improvement works on Firs Way, Sale.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:00 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Trafford Metropolitan Borough Council on 13 Mar 2025 at 14:04.

LONG TERM
Between
17 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Firs Way

Trafford Metropolitan Borough Council are proposing to carry out Highway improvement works on Firs Way, Sale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Trafford Metropolitan Borough Council on 22 Jan 2025 at 14:23.

Cadent Gas logo
LONG TERM
Between
17 Feb and 16 Apr 2025
Details
View Map
Share
Follow
Gig Lane

Cadent Gas are proposing to carry out Utility asset works on Gig Lane, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 16 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 08:37.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Shaw Street

Cadent Gas are carrying out Utility asset works on Shaw Street, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 08:00 and could run through until 26 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 08:18.

Electricity North West (NorWeb) logo
LONG TERM
Between
10 Mar and 20 Apr 2025
Details
View Map
Share
Follow
Norris Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Norris Road, Sale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 20 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 6 Feb 2025 at 10:40.

Cadent Gas logo
Between
17 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Shaw Street

Cadent Gas are proposing to carry out Utility asset works on Shaw Street, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 15:52.

Cadent Gas logo
Until
31 Mar 2025
Details
View Map
Share
Follow
Join Road

Cadent Gas are carrying out Utility asset works on Join Road, Sale.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 08:00 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 08:23.

Finishing
Today
Details
View Map
Share
Follow
Grove Lane

Trafford Metropolitan Borough Council are proposing to carry out Highway improvement works on Grove Lane, Hale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Trafford Metropolitan Borough Council on 18 Feb 2025 at 10:27.

Finishing
Today
Details
View Map
Share
Follow
Grove Lane

Trafford Metropolitan Borough Council are carrying out Highway improvement works on Grove Lane, Hale.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 08:00 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Trafford Metropolitan Borough Council on 17 Mar 2025 at 09:11.

Warrington Borough Council logo
LONG TERM
Between
24 Mar and 16 May 2025
Details
View Map
Share
Follow
Higher Lane

Warrington Borough Council are proposing to carry out Highway improvement works on Higher Lane, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 19 Feb 2025 at 11:34.

Network Rail logo
LONG TERM
Between
24 Mar and 2 May 2025
Details
View Map
Share
Follow
Chassen Road

Network Rail are proposing to carry out Works for Rail Purposes on Chassen Road, Flixton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 17 Dec 2024 at 14:27.

Cadent Gas logo
Between
24 Mar and 9 Apr 2025
Details
View Map
Share
Follow
Ivy Road

Cadent Gas are proposing to carry out Utility asset works on Ivy Road, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 12:21.

Warrington Borough Council logo
LONG TERM
Between
24 Mar and 16 May 2025
Details
View Map
Share
Follow
Higher Lane

Warrington Borough Council are proposing to carry out Highway improvement works on Higher Lane, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 12 Mar 2025 at 13:35.

Between
31 Mar and 25 Apr 2025
Details
View Map
Share
Flixton Road

Trafford Metropolitan Borough Council were proposing to carry out Highway improvement works on Flixton Road, Carrington.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 25 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Trafford Metropolitan Borough Council on 7 Mar 2025 at 11:54.

Cadent Gas logo
Between
31 Mar and 16 Apr 2025
Details
View Map
Share
Follow
Maple Road

Cadent Gas are proposing to carry out Utility asset works on Maple Road, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 16 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 12:30.

United Utilities Water (formerly North West Water) logo
Between
31 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Booths Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Booths Lane, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 19 Feb 2025 at 09:00.

Electricity North West (NorWeb) logo
Between
3 and 9 Apr 2025
Details
View Map
Share
Follow
Beech Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Beech Road, Sale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 4 Feb 2025 at 11:04.

Electricity North West (NorWeb) logo
Between
3 and 9 Apr 2025
Details
View Map
Share
Follow
Beech Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Beech Road, Sale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 4 Feb 2025 at 10:51.

Electricity North West (NorWeb) logo
Between
3 and 9 Apr 2025
Details
View Map
Share
Follow
Beech Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Beech Road, Sale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 28 Jan 2025 at 09:23.

Cadent Gas logo
Between
4 and 22 Apr 2025
Details
View Map
Share
Follow
Nursery Close

Cadent Gas are proposing to carry out Utility asset works on Nursery Close, Sale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Mar 2025 at 00:10.

Cadent Gas logo
Between
4 and 22 Apr 2025
Details
View Map
Share
Follow
Nursery Close

Cadent Gas are proposing to carry out Utility asset works on Nursery Close, Sale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Mar 2025 at 09:35.

Between
7 and 25 Apr 2025
Details
View Map
Share
Follow
Manchester Road

Trafford Metropolitan Borough Council are proposing to carry out Section 50 on Manchester Road, Carrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Trafford Metropolitan Borough Council on 4 Mar 2025 at 07:30.

Network Rail logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Chassen Road

Network Rail are proposing to carry out Works for Rail Purposes on Chassen Road, Flixton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 13 Jan 2025 at 14:40.

Network Rail logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Chassen Road

Network Rail are proposing to carry out Works for Rail Purposes on Chassen Road, Flixton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 Jan 2025 at 14:33.

Cadent Gas logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Brooklands Crescent

Cadent Gas are proposing to carry out New service connection on Brooklands Crescent, Sale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 07:38.

Cadent Gas logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Brooklands Crescent

Cadent Gas are proposing to carry out New service connection on Brooklands Crescent, Sale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 12:09.

Cadent Gas logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Brooklands Crescent

Cadent Gas are proposing to carry out New service connection on Brooklands Crescent, Sale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 07:22.

Network Rail logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Chassen Road

Network Rail are proposing to carry out Works for Rail Purposes on Chassen Road, Flixton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 19 Mar 2025 at 16:35.

Network Rail logo
LONG TERM
Between
11 Apr and 26 May 2025
Details
View Map
Share
Follow
Chassen Road

Network Rail are proposing to carry out Works for Rail Purposes on Chassen Road, Flixton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 26 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 14 Jan 2025 at 09:09.

Cadent Gas logo
LONG TERM
Between
14 Apr and 18 Jul 2025
Details
View Map
Share
Follow
Ambleside Road

Cadent Gas are proposing to carry out Utility asset works on Ambleside Road, Flixton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 09:24.

Cadent Gas logo
LONG TERM
Between
14 Apr and 18 Jul 2025
Details
View Map
Share
Follow
Ambleside Road

Cadent Gas are proposing to carry out Utility asset works on Ambleside Road, Flixton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 13:14.

Cadent Gas logo
LONG TERM
Between
14 Apr and 18 Jul 2025
Details
View Map
Share
Ambleside Road

Cadent Gas were proposing to carry out Utility asset works on Ambleside Road, Flixton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 18 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Feb 2025 at 12:19.

Cadent Gas logo
LONG TERM
Between
14 Apr and 18 Jul 2025
Details
View Map
Share
Follow
Parsonage Road

Cadent Gas are proposing to carry out Utility asset works on Parsonage Road, Flixton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 09:03.

Cadent Gas logo
LONG TERM
Between
14 Apr and 18 Jul 2025
Details
View Map
Share
Follow
Parsonage Road

Cadent Gas are proposing to carry out Utility asset works on Parsonage Road, Flixton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 12:19.

Cadent Gas logo
Between
14 Apr and 1 May 2025
Details
View Map
Share
Follow
Urban Road

Cadent Gas are proposing to carry out Utility asset works on Urban Road, Altrincham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 1 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Feb 2025 at 08:19.

Cadent Gas logo
LONG TERM
Between
14 Apr and 18 Jul 2025
Details
View Map
Share
Follow
Parsonage Road

Cadent Gas are proposing to carry out Utility asset works on Parsonage Road, Flixton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 11:03.

Cadent Gas logo
LONG TERM
Between
14 Apr and 18 Jul 2025
Details
View Map
Share
Follow
Parsonage Road

Cadent Gas are proposing to carry out Utility asset works on Parsonage Road, Flixton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jan 2025 at 08:53.

Warrington Borough Council logo
LONG TERM
Between
14 Apr and 6 Jun 2025
Details
View Map
Share
Follow
Higher Lane

Warrington Borough Council are proposing to carry out Highway improvement works on Higher Lane, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 29 Jan 2025 at 15:40.

Cadent Gas logo
Between
14 Apr and 1 May 2025
Details
View Map
Share
Follow
Urban Road

Cadent Gas are proposing to carry out Utility asset works on Urban Road, Altrincham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 1 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Feb 2025 at 11:38.

Cadent Gas logo
LONG TERM
Between
15 Apr and 21 Jul 2025
Details
View Map
Share
Follow
Western Road

Cadent Gas are proposing to carry out Utility asset works on Western Road, Flixton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jan 2025 at 08:53.

Cadent Gas logo
LONG TERM
Between
15 Apr and 21 Jul 2025
Details
View Map
Share
Follow
Western Road

Cadent Gas are proposing to carry out Utility asset works on Western Road, Flixton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 11:05.

Cadent Gas logo
LONG TERM
Between
15 Apr and 21 Jul 2025
Details
View Map
Share
Follow
Western Road

Cadent Gas are proposing to carry out Utility asset works on Western Road, Flixton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 09:01.

Cadent Gas logo
LONG TERM
Between
28 Apr and 30 Jul 2025
Details
View Map
Share
Follow
Parsonage Road

Cadent Gas are proposing to carry out Utility asset works on Parsonage Road, Flixton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 08:20.

Cadent Gas logo
LONG TERM
Between
29 Apr and 31 Jul 2025
Details
View Map
Share
Follow
Western Road

Cadent Gas are proposing to carry out Utility asset works on Western Road, Flixton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 08:20.

Cadent Gas logo
LONG TERM
Between
5 May and 6 Aug 2025
Details
View Map
Share
Follow
Ambleside Road

Cadent Gas are proposing to carry out Utility asset works on Ambleside Road, Flixton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 6 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Feb 2025 at 12:31.

Cadent Gas logo
Between
5 and 22 May 2025
Details
View Map
Share
Follow
Shaw Street

Cadent Gas are proposing to carry out Utility asset works on Shaw Street, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 22 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Feb 2025 at 13:13.

United Utilities Water (formerly North West Water) logo
Between
6 and 8 May 2025
Details
View Map
Share
Follow
Booths Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Booths Lane, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Feb 2025 at 14:06.

Electricity North West (NorWeb) logo
Between
8 and 14 May 2025
Details
View Map
Share
Follow
Beech Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Beech Road, Sale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2025 and could run through until 14 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 20 Feb 2025 at 11:11.

Electricity North West (NorWeb) logo
Between
12 and 23 May 2025
Details
View Map
Share
Cross Lane South

Electricity North West (NorWeb) were proposing to carry out New service connection on Cross Lane South, Birchwood, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 23 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Mar 2025 at 12:27.

Electricity North West (NorWeb) logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
Cross Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Cross Lane, Croft, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Mar 2025 at 12:13.

Electricity North West (NorWeb) logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
Cross Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Cross Lane, Croft, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 19 Mar 2025 at 15:23.

Electricity North West (NorWeb) logo
Between
14 May and 2 Jun 2025
Details
View Map
Share
Follow
Glazebrook Lane

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Glazebrook Lane, Rixton-with-glazebrook, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 2 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 12 Mar 2025 at 14:07.

Electricity North West (NorWeb) logo
Between
14 May and 2 Jun 2025
Details
View Map
Share
Glazebrook Lane

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Glazebrook Lane, Rixton-with-glazebrook, Warrington.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 May 2025 and run through until 2 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 13 Mar 2025 at 08:12.

Network Rail logo
Between
21 and 23 May 2025
Details
View Map
Share
Follow
Chassen Road

Network Rail are proposing to carry out Works for Rail Purposes on Chassen Road, Flixton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 13 Jan 2025 at 14:42.

Network Rail logo
Between
21 and 23 May 2025
Details
View Map
Share
Follow
Chassen Road

Network Rail are proposing to carry out Works for Rail Purposes on Chassen Road, Flixton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 Jan 2025 at 14:35.

United Utilities Water (formerly North West Water) logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Star Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Star Lane, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 4 Mar 2025 at 15:55.

United Utilities Water (formerly North West Water) logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Star Lane

United Utilities Water (formerly North West Water) are proposing to carry out Remedial works on Star Lane, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Mar 2025 at 12:57.

United Utilities Water (formerly North West Water) logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Star Lane

United Utilities Water (formerly North West Water) are proposing to carry out Remedial works on Star Lane, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Mar 2025 at 15:43.

Cadent Gas logo
Between
2 and 18 Jun 2025
Details
View Map
Share
Follow
Warrington Road

Cadent Gas are proposing to carry out Utility asset works on Warrington Road, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Mar 2025 at 11:30.

United Utilities Water (formerly North West Water) logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Star Lane

United Utilities Water (formerly North West Water) are proposing to carry out Remedial works on Star Lane, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 14 Mar 2025 at 13:35.

Electricity North West (NorWeb) logo
Between
6 and 24 Jun 2025
Details
View Map
Share
Follow
Glazebrook Lane

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Glazebrook Lane, Rixton-with-glazebrook, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 24 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 14 Mar 2025 at 08:14.

Electricity North West (NorWeb) logo
Between
10 and 23 Jun 2025
Details
View Map
Share
Follow
Cross Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Cross Lane, Croft, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Mar 2025 at 12:53.

Cadent Gas logo
Between
16 and 27 Jun 2025
Details
View Map
Share
Follow
Thelwall New Road

Cadent Gas are proposing to carry out Utility asset works on Thelwall New Road, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Mar 2025 at 12:00.


Roadworks Map near to Moss Lane, LYMM, WA13 9TX

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 20 Mar 2025 23:15
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Moss Lane, LYMM, WA13 9TX (4 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
MAJOR
  
CHAPEL LANE 
(0.3 miles)
Trafford Metropolitan Borough Council
Highway repair and maintenance works - Footway, Carriageway - Road closure
In Progress
Since: 1 Mar 2024 08:30
(Scheduled: 1 Mar 2024 - 31 Mar 2025)
0.3
Details
Share
Follow
2
United Utilities Water (formerly North West Water) logo
LOCK LANE 
(0.8 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 18 Mar 2025 10:00
(Scheduled: 18 Mar 2025 - 20 Mar 2025)
0.8
Details
Share
Follow
3
Virgin Media logo
BROADWAY 
(0.9 miles)
Virgin Media
Utility asset works - Carriageway - Some carriageway incursion
Complete
19 Mar 2025 10:05 - 11:05
0.9
Details
Share
4
Nexfibre Networks Limited logo
LOCK LANE 
(1.0 miles)
Nexfibre Networks Limited
Utility asset works - Footway - No carriageway incursion
Cancelled
(Scheduled: 18 Mar 2025 - 20 Mar 2025)
1.0
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.