ROADWORKS SUMMARY
East Lancs Road, ST. HELENS, WA11 9TL

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for East Lancs Road, WA11 9TL and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to East Lancs Road, ST. HELENS, WA11 9TL

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for East Lancs Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Wigan Metropolitan Borough Council logo
LONG TERM
Until
22 Nov 2026
Details
View Map
Share
Follow
Butchers Lane

Wigan Metropolitan Borough Council are carrying out Highway improvement works on Butchers Lane, Ashton-in-makerfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 February 2026 at 09:30 and could run through until 22 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 23 Feb 2026 at 16:17.

Wigan Metropolitan Borough Council logo
LONG TERM
Until
22 Nov 2026
Details
View Map
Share
Follow
Gerard Street

Wigan Metropolitan Borough Council are carrying out Highway improvement works on Gerard Street, Ashton-in-makerfield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 February 2026 at 09:30 and could run through until 22 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 23 Feb 2026 at 16:15.

Wigan Metropolitan Borough Council logo
LONG TERM
Until
22 Nov 2026
Details
View Map
Share
Follow
Garswood Street

Wigan Metropolitan Borough Council are carrying out Highway improvement works on Garswood Street, Ashton-in-makerfield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 February 2026 at 09:30 and could run through until 22 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 23 Feb 2026 at 16:17.

LONG TERM
Until
22 Jan 2027
Details
View Map
Share
Follow
Corporation Street

St. Helens Council are carrying out Section 50 on Corporation Street, St Helens.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 May 2026 at 13:30 and could run through until 22 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 5 May 2026 at 13:53.

LONG TERM
Until
10 Jan 2027
Details
View Map
Share
Follow
Queen Street

St. Helens Council are carrying out Highway improvement works on Queen Street, Newton Le Willows, St Helens.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 June 2026 at 09:30 and could run through until 10 January 2027. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by St. Helens Council on 2 Jun 2026 at 16:53.

LONG TERM
Until
10 Feb 2027
Details
View Map
Share
Follow
Oxford Street

St. Helens Council are carrying out Highway improvement works on Oxford Street, Newton Le Willows, St Helens.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 June 2026 at 09:30 and could run through until 10 February 2027. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by St. Helens Council on 2 Jun 2026 at 17:02.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Jun and 30 Sep 2026
Details
View Map
Share
Follow
Newton Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Newton Road, Lowton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 3 Mar 2026 at 09:15.

Transport For Greater Manchester logo
LONG TERM
Until
28 Feb 2027
Details
View Map
Share
Follow
Wigan Road

Transport For Greater Manchester are carrying out Works for Rail Purposes on Wigan Road, Ashton-in-makerfield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2026 at 08:00 and could run through until 28 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport For Greater Manchester on 8 Jul 2026 at 16:31.

Wigan Metropolitan Borough Council logo
LONG TERM
Until
20 Oct 2026
Details
View Map
Share
Follow
East Lancashire Road

Wigan Metropolitan Borough Council are carrying out Highway improvement works on East Lancashire Road, Lowton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 22 June 2026 at 08:00 and could run through until 20 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 17 Aug 2026 at 09:33.

Wigan Metropolitan Borough Council logo
LONG TERM
Until
20 Oct 2026
Details
View Map
Share
Follow
Stone Cross Lane North

Wigan Metropolitan Borough Council are carrying out Highway repair and maintenance works on Stone Cross Lane North, Lowton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 22 June 2026 at 09:00 and could run through until 20 October 2026. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 17 Aug 2026 at 09:33.

Wigan Metropolitan Borough Council logo
LONG TERM
Until
20 Oct 2026
Details
View Map
Share
Follow
Stone Cross Lane South

Wigan Metropolitan Borough Council are carrying out Highway repair and maintenance works on Stone Cross Lane South, Lowton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 22 June 2026 at 09:00 and could run through until 20 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 17 Aug 2026 at 09:33.

United Utilities Water (formerly North West Water) logo
LONG TERM
Until
16 Oct 2026
Details
View Map
Share
Follow
East Lancashire Road

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on East Lancashire Road, St Helens.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 20 July 2026 at 16:45 and could run through until 16 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Sep 2026 at 11:37.

Wigan Metropolitan Borough Council logo
LONG TERM
Until
26 Nov 2026
Details
View Map
Share
Follow
Liverpool Road

Wigan Metropolitan Borough Council are carrying out Highway improvement works on Liverpool Road, Ashton-in-makerfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 July 2026 at 09:30 and could run through until 26 November 2026. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 24 Jul 2026 at 13:55.

LONG TERM
Until
24 Sep 2026
Details
View Map
Share
Follow
Rivington Road

St. Helens Council are carrying out roadworks on Rivington Road, St Helens.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 July 2026 at 08:30 and could run through until 24 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by St. Helens Council on 2 Sep 2026 at 12:09.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
3 Aug and 31 Dec 2026
Details
View Map
Share
Follow
Edge Green Lane

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Edge Green Lane, Golborne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 31 December 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 15 Jun 2026 at 16:19.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
3 Aug and 31 Dec 2026
Details
View Map
Share
Follow
Robin Park Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Robin Park Road, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 31 December 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 15 Jun 2026 at 16:12.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
3 Aug and 31 Dec 2026
Details
View Map
Share
Follow
East Lancashire Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on East Lancashire Road, Golborne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 31 December 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 15 Jun 2026 at 15:31.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
3 Aug and 31 Dec 2026
Details
View Map
Share
Follow
Lily Lane

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Lily Lane, Bamfurlong.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 31 December 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 15 Jun 2026 at 15:31.

LONG TERM
Until
12 Apr 2027
Details
View Map
Share
Follow
Market Street

St. Helens Council are carrying out Highway improvement works on Market Street, Newton Le Willows, St Helens.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2026 at 09:30 and could run through until 12 April 2027. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by St. Helens Council on 11 Sep 2026 at 08:39.

LONG TERM
Until
23 Mar 2027
Details
View Map
Share
Follow
Corporation Street

St. Helens Council are carrying out Highway improvement works on Corporation Street, St Helens.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 August 2026 at 08:00 and could run through until 23 March 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by St. Helens Council on 25 Aug 2026 at 12:29.

LONG TERM
Until
23 Mar 2027
Details
View Map
Share
Follow
Linkway East

St. Helens Council are carrying out Highway improvement works on Linkway East, St Helens.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 August 2026 at 08:00 and could run through until 23 March 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by St. Helens Council on 25 Aug 2026 at 12:29.

LONG TERM
Until
22 Mar 2027
Details
View Map
Share
Follow
Peasley Cross Lane

St. Helens Council are carrying out Highway improvement works on Peasley Cross Lane, St Helens.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 August 2026 at 08:00 and could run through until 22 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by St. Helens Council on 25 Aug 2026 at 12:26.

LONG TERM
Until
23 Mar 2027
Details
View Map
Share
Follow
Parr Street

St. Helens Council are carrying out Highway improvement works on Parr Street, St Helens.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 August 2026 at 08:00 and could run through until 23 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by St. Helens Council on 25 Aug 2026 at 12:29.

LONG TERM
Until
23 Mar 2027
Details
View Map
Share
Follow
Phoenix Brow

St. Helens Council are carrying out Highway improvement works on Phoenix Brow, St Helens.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 August 2026 at 08:00 and could run through until 23 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by St. Helens Council on 25 Aug 2026 at 12:29.

Cadent Gas logo
LONG TERM
Until
29 Sep 2026
Details
View Map
Share
Follow
Lincoln Drive

Cadent Gas are carrying out Utility asset works on Lincoln Drive, Ashton-in-makerfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 August 2026 at 09:05 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Aug 2026 at 09:21.

LONG TERM
Until
23 Oct 2026
Details
View Map
Share
Follow
Hall Street

St. Helens Council are carrying out Section 50 on Hall Street, St Helens.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2026 at 09:00 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by St. Helens Council on 10 Sep 2026 at 09:12.

LONG TERM
Until
30 Nov 2026
Details
View Map
Share
Follow
Bickerstaffe Street

St. Helens Council are carrying out Section 50 on Bickerstaffe Street, St Helens.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2026 at 09:00 and could run through until 30 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 10 Sep 2026 at 09:11.

Cadent Gas logo
Until
28 Sep 2026
Details
View Map
Share
Follow
Maple Avenue

Cadent Gas are carrying out Utility asset works on Maple Avenue, Newton Le Willows, St Helens.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 09:00 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2026 at 09:27.

Cadent Gas logo
Between
1 and 28 Sep 2026
Details
View Map
Share
Follow
Bolton Road

Cadent Gas are proposing to carry out Utility asset works on Bolton Road, Ashton-in-makerfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Aug 2026 at 12:19.

Wigan Metropolitan Borough Council logo
LONG TERM
Until
26 Nov 2026
Details
View Map
Share
Follow
Bolton Road

Wigan Metropolitan Borough Council are carrying out Highway improvement works on Bolton Road, Ashton-in-makerfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 09:30 and could run through until 26 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 24 Aug 2026 at 13:06.

Warrington Borough Council logo
LONG TERM
Between
7 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Cromwell Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Cromwell Avenue, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 10 Jun 2026 at 13:56.

Warrington Borough Council logo
LONG TERM
Between
7 Sep and 6 Nov 2026
Details
View Map
Share
Follow
Waterworks Lane

Warrington Borough Council are proposing to carry out Highway improvement works on Waterworks Lane, Winwick, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 21 Jul 2026 at 11:45.

Warrington Borough Council logo
LONG TERM
Between
7 Sep and 6 Nov 2026
Details
View Map
Share
Follow
Myddleton Lane

Warrington Borough Council are proposing to carry out Highway improvement works on Myddleton Lane, Winwick, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 21 Jul 2026 at 11:45.

Cadent Gas logo
Between
7 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Warrington Road

Cadent Gas are proposing to carry out Utility asset works on Warrington Road, Wigan.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2026 at 10:38.

Cadent Gas logo
Between
9 and 29 Sep 2026
Details
View Map
Share
Ashton Heath

Cadent Gas were proposing to carry out Utility asset works on Ashton Heath, Ashton-in-makerfield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2026 and run through until 29 September 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 5 Sep 2026 at 16:04.

Cadent Gas logo
LONG TERM
Between
9 Sep and 19 Oct 2026
Details
View Map
Share
Heath Road

Cadent Gas were proposing to carry out Utility asset works on Heath Road, Ashton-in-makerfield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2026 and run through until 19 October 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 5 Sep 2026 at 15:59.

Cadent Gas logo
Between
14 Sep and 4 Oct 2026
Details
View Map
Share
Follow
Garswood Road

Cadent Gas are proposing to carry out Utility asset works on Garswood Road, Ashton In Makerfield, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 4 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2026 at 11:35.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Kent Road

Cadent Gas are carrying out Utility repair and maintenance works on Kent Road, St Helens.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 12:41 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 14:14.

United Utilities Water (formerly North West Water) logo
Finishing
Monday
Details
View Map
Share
Carr Mill Road

United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Carr Mill Road, St Helens.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2026 and run through until 21 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Sep 2026 at 12:00.

ManWeb logo
Finishing
Today
Details
View Map
Share
Follow
Wolseley Road

ManWeb are proposing to carry out Utility repair and maintenance works on Wolseley Road, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 1 Sep 2026 at 14:31.

United Utilities Water (formerly North West Water) logo
Until
25 Sep 2026
Details
View Map
Share
Follow
Drummers Lane

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Drummers Lane, Ashton-in-makerfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 12:40 and could run through until 25 September 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 14 Sep 2026 at 12:43.

Cadent Gas logo
Until
11 Oct 2026
Details
View Map
Share
Follow
Warrington Road

Cadent Gas are carrying out Utility asset works on Warrington Road, Wigan.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 09:40 and could run through until 11 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 09:44.

LONG TERM
Between
14 Sep and 18 Oct 2026
Details
View Map
Share
Follow
Chester Lane

St. Helens Council are proposing to carry out Highway improvement works on Chester Lane, Clock Face, St Helens.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by St. Helens Council on 11 Sep 2026 at 14:49.

ManWeb logo
Finishing
Tuesday
Details
View Map
Share
Follow
Dunsop Avenue

ManWeb are carrying out New service connection on Dunsop Avenue, Clock Face, St Helens.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 09:00 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 15 Sep 2026 at 09:05.

Transport For Greater Manchester logo
Finishing
Friday
Details
View Map
Share
Follow
Wigan Road

Transport For Greater Manchester are proposing to carry out Works for Rail Purposes on Wigan Road, Ashton-in-makerfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport For Greater Manchester on 2 Sep 2026 at 13:05.

Cadent Gas logo
Between
17 Sep and 14 Oct 2026
Details
View Map
Share
Mill Street

Cadent Gas were proposing to carry out Utility asset works on Mill Street, Ashton-in-makerfield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 September 2026 and run through until 14 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2026 at 16:10.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
21 Sep and 14 Dec 2026
Details
View Map
Share
Follow
Waterworks Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Waterworks Lane, Winwick, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 12 Aug 2026 at 09:44.

United Utilities Water (formerly North West Water) logo
Between
22 Sep and 16 Oct 2026
Details
View Map
Share
Laffak Road

United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Laffak Road, St Helens.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2026 and run through until 16 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Sep 2026 at 12:01.

United Utilities Water (formerly North West Water) logo
Between
22 Sep and 6 Oct 2026
Details
View Map
Share
Follow
Laffak Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Laffak Road, St Helens.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 6 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 2 Apr 2026 at 12:23.

Cadent Gas logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Islands Brow

Cadent Gas are proposing to carry out Utility asset works on Islands Brow, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 11:04.

ManWeb logo
Between
28 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Pimbo Road

ManWeb are proposing to carry out New service connection on Pimbo Road, Kings Moss, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 9 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 27 Jul 2026 at 11:53.

Cadent Gas logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Islands Brow

Cadent Gas are proposing to carry out Utility asset works on Islands Brow, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 1 Sep 2026 at 14:35.

Cadent Gas logo
Between
28 Sep and 24 Oct 2026
Details
View Map
Share
Follow
Mill Street

Cadent Gas are proposing to carry out Utility asset works on Mill Street, Ashton-in-makerfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 24 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 16:10.

Cadent Gas logo
LONG TERM
Between
28 Sep and 8 Nov 2026
Details
View Map
Share
Follow
Park Avenue North

Cadent Gas are proposing to carry out Utility asset works on Park Avenue North, Newton Le Willows, St Helens.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 8 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jun 2026 at 07:39.

Cadent Gas logo
LONG TERM
Between
28 Sep and 30 Oct 2026
Details
View Map
Share
Follow
Ashton Heath

Cadent Gas are proposing to carry out Utility asset works on Ashton Heath, Ashton-in-makerfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 15:40.

Cadent Gas logo
Between
3 and 24 Oct 2026
Details
View Map
Share
Follow
Sutton Road

Cadent Gas are proposing to carry out Utility asset works on Sutton Road, St Helens.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2026 and could run through until 24 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Jul 2026 at 12:23.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
4 Oct and 6 Dec 2026
Details
View Map
Share
Follow
Warrington Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Warrington Road, Abram.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2026 and could run through until 6 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 6 May 2026 at 09:52.

Between
5 and 7 Oct 2026
Details
View Map
Share
Follow
Islands Brow

St. Helens Council are proposing to carry out Highway repair and maintenance works on Islands Brow, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 27 Aug 2026 at 07:57.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
5 Oct and 23 Dec 2026
Details
View Map
Share
Follow
Crank Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Crank Road, Crank, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 24 Aug 2026 at 11:31.

Between
5 and 8 Oct 2026
Details
View Map
Share
Follow
East Lancashire Road

St. Helens Council are proposing to carry out Highway repair and maintenance works on East Lancashire Road, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 8 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 3 Sep 2026 at 11:51.

Between
5 and 8 Oct 2026
Details
View Map
Share
Follow
Abbey Road

St. Helens Council are proposing to carry out Highway repair and maintenance works on Abbey Road, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 8 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by St. Helens Council on 27 Aug 2026 at 07:47.

ManWeb logo
Between
5 and 15 Oct 2026
Details
View Map
Share
Follow
Pimbo Road

ManWeb are proposing to carry out New service connection on Pimbo Road, Kings Moss, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 15 October 2026. The works will impact the verge only.

This roadwork event was last updated by ManWeb on 6 Aug 2026 at 11:07.

Cadent Gas logo
Between
5 and 30 Oct 2026
Details
View Map
Share
Follow
Mill Street

Cadent Gas are proposing to carry out Utility asset works on Mill Street, Ashton-in-makerfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 10:15.

Cadent Gas logo
LONG TERM
Between
5 Oct and 27 Nov 2026
Details
View Map
Share
Follow
Heath Road

Cadent Gas are proposing to carry out Utility asset works on Heath Road, Ashton-in-makerfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 10:17.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
5 Oct and 23 Dec 2026
Details
View Map
Share
Follow
Crank Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Crank Road, Crank, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Sep 2026 at 08:02.

Cadent Gas logo
LONG TERM
Between
5 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Ashton Heath

Cadent Gas are proposing to carry out Utility asset works on Ashton Heath, Ashton-in-makerfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 10:14.

ManWeb logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
Heath Lane

ManWeb are proposing to carry out New service connection on Heath Lane, Croft, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 28 Jul 2026 at 15:34.

Cadent Gas logo
Between
12 and 26 Oct 2026
Details
View Map
Share
Follow
Noon Court Access Road

Cadent Gas are proposing to carry out Utility asset works on Noon Court Access Road, Newton Le Willows, St Helens.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 12 October 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Jul 2026 at 12:15.

Cadent Gas logo
Between
12 Oct and 8 Nov 2026
Details
View Map
Share
Pine Avenue

Cadent Gas were proposing to carry out Utility asset works on Pine Avenue, Newton Le Willows, St Helens.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2026 and run through until 8 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 13:48.

Wigan Metropolitan Borough Council logo
Between
18 and 25 Oct 2026
Details
View Map
Share
Follow
Warrington Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Warrington Road, Ince.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 October 2026 and could run through until 25 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 25 Jun 2026 at 09:51.

Wigan Metropolitan Borough Council logo
Between
19 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Plank Lane

Wigan Metropolitan Borough Council are proposing to carry out roadworks on Plank Lane, Leigh.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 4 Sep 2026 at 09:51.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
19 Oct and 4 Dec 2026
Details
View Map
Share
Follow
Pimbo Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Pimbo Road, Kings Moss, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 4 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 17 Aug 2026 at 10:37.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
19 Oct and 29 Nov 2026
Details
View Map
Share
Follow
Laffak Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Laffak Road, St Helens.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 29 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Sep 2026 at 12:58.

Cadent Gas logo
Between
19 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Poolstock

Cadent Gas are proposing to carry out Utility asset works on Poolstock, Wigan.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jul 2026 at 15:14.

United Utilities Water (formerly North West Water) logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Acacia Grove

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Acacia Grove, Eccleston, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 3 Aug 2026 at 11:26.

United Utilities Water (formerly North West Water) logo
Between
23 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Myddleton Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Myddleton Lane, Winwick, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 1 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 12 Aug 2026 at 08:57.

Cadent Gas logo
Between
26 Oct and 15 Nov 2026
Details
View Map
Share
Follow
Pool Street

Cadent Gas are proposing to carry out Utility asset works on Pool Street, Wigan.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 15 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Aug 2026 at 12:21.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
26 Oct and 7 Dec 2026
Details
View Map
Share
Follow
Hornby Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Hornby Lane, Winwick, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 19 Aug 2026 at 16:27.

Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
College Street

St. Helens Council are proposing to carry out Highway repair and maintenance works on College Street, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 28 Aug 2026 at 11:05.

Electricity North West (NorWeb) logo
Between
27 and 30 Oct 2026
Details
View Map
Share
Follow
Eskdale Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Eskdale Road, Ashton-in-makerfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 17 Aug 2026 at 12:35.

Electricity North West (NorWeb) logo
Between
27 and 30 Oct 2026
Details
View Map
Share
Follow
Shaw Street

Electricity North West (NorWeb) are proposing to carry out New service connection on Shaw Street, Ashton-in-makerfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 17 Aug 2026 at 12:35.

Electricity North West (NorWeb) logo
Between
2 and 9 Nov 2026
Details
View Map
Share
Follow
Strathmore Avenue

Electricity North West (NorWeb) are proposing to carry out New service connection on Strathmore Avenue, Ashton-in-makerfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 9 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 11 Aug 2026 at 14:29.

Cadent Gas logo
Between
2 and 22 Nov 2026
Details
View Map
Share
Follow
Maple Avenue

Cadent Gas are proposing to carry out Utility asset works on Maple Avenue, Newton Le Willows, St Helens.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 22 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jun 2026 at 07:44.

Lancashire County Council logo
Between
4 and 6 Nov 2026
Details
View Map
Share
Follow
Sandbrook Road

Lancashire County Council are proposing to carry out Highway improvement works on Sandbrook Road, Up Holland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 25 Aug 2026 at 08:59.

LONG TERM
Between
6 Nov 2026 and 10 Jan 2027
Details
View Map
Share
Follow
Earle Street

St. Helens Council are proposing to carry out Highway improvement works on Earle Street, Newton Le Willows, St Helens.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2026 and could run through until 10 January 2027. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by St. Helens Council on 6 Mar 2026 at 11:40.

Cadent Gas logo
Between
9 and 23 Nov 2026
Details
View Map
Share
Follow
Swan Meadow Road

Cadent Gas are proposing to carry out Utility asset works on Swan Meadow Road, Wigan.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jul 2026 at 12:39.

ManWeb logo
Between
9 and 18 Nov 2026
Details
View Map
Share
Follow
Chesterton Drive

ManWeb are proposing to carry out Utility repair and maintenance works on Chesterton Drive, Winwick, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 18 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 29 Jul 2026 at 13:35.

Cadent Gas logo
Between
23 Nov and 18 Dec 2026
Details
View Map
Share
Follow
Sutton Road

Cadent Gas are proposing to carry out Utility asset works on Sutton Road, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 11:35.

Electricity North West (NorWeb) logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Merton Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Merton Road, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 2 Sep 2026 at 13:45.

Electricity North West (NorWeb) logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Merton Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Merton Road, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2026 at 11:13.

Electricity North West (NorWeb) logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Merton Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Merton Road, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 4 Sep 2026 at 13:24.

ManWeb logo
Between
26 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Newton Road

ManWeb are proposing to carry out Utility repair and maintenance works on Newton Road, Winwick, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2026 and could run through until 11 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 29 Jul 2026 at 13:30.

United Utilities Water (formerly North West Water) logo
Between
30 Nov and 2 Dec 2026
Details
View Map
Share
Follow
Kintbury Street

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Kintbury Street, Bamfurlong.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 2 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 7 Sep 2026 at 09:59.

ManWeb logo
Between
30 Nov and 18 Dec 2026
Details
View Map
Share
Follow
Delph Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Delph Lane, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 18 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 28 Jul 2026 at 11:33.

Cadent Gas logo
Between
1 and 20 Dec 2026
Details
View Map
Share
Follow
Bradlegh Road

Cadent Gas are proposing to carry out Utility asset works on Bradlegh Road, Newton Le Willows, St Helens.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2026 and could run through until 20 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Sep 2026 at 14:29.

Electricity North West (NorWeb) logo
Between
1 and 14 Dec 2026
Details
View Map
Share
Follow
Kenyon Lane

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Kenyon Lane, Croft, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2026 and could run through until 14 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 8 Sep 2026 at 10:35.

United Utilities Water (formerly North West Water) logo
Between
2 and 24 Dec 2026
Details
View Map
Share
Follow
Golborne Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Golborne Road, Winwick, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 24 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 9 Sep 2026 at 10:38.

BT logo
Between
7 and 9 Dec 2026
Details
View Map
Share
Follow
Westbury Avenue

BT are proposing to carry out Utility asset works on Westbury Avenue, Winstanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 9 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Sep 2026 at 13:43.

Warrington Borough Council logo
Between
8 Dec 2026 and 7 Jan 2027
Details
View Map
Share
Follow
Clay Lane

Warrington Borough Council are proposing to carry out Highway improvement works on Clay Lane, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2026 and could run through until 7 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 15 Sep 2026 at 13:52.


Roadworks Map near to East Lancs Road, ST. HELENS, WA11 9TL

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 16 Sep 2026 01:08
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to East Lancs Road, ST. HELENS, WA11 9TL (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
United Utilities Water (formerly North West Water) logo
URGENT
  
HOMESTEAD AVENUE, HAYDOCK 
(0.4 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 14 Sep 2026 12:32
(Scheduled: 14 Sep 2026 - 16 Sep 2026)
0.4
Details
Share
Follow
2
United Utilities Water (formerly North West Water) logo
URGENT
  
GRAY AVENUE, HAYDOCK 
(0.6 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 13 Sep 2026 13:37
(Scheduled: 13 Sep 2026 - 16 Sep 2026)
0.6
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.