ROADWORKS SUMMARY
Cherry Tree Close, ST. HELENS, WA11 0JR
Introduction
View current and future planned roadworks and road closures for Cherry Tree Close, WA11 0JR and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Cherry Tree Close, ST. HELENS, WA11 0JR
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Cherry Tree Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
Today
St. Helens Council are proposing to carry out Highway repair and maintenance works on Fleet Lane, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2023 and could run through until 24 November 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by St. Helens Council on 12 Nov 2024 at 14:27.
Today
St. Helens Council are proposing to carry out Highway repair and maintenance works on Fleet Lane, St Helens.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2023 and could run through until 24 November 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by St. Helens Council on 12 Nov 2024 at 14:27.
13 Jan 2025
St. Helens Council are carrying out Highway improvement works on Winwick Link Road, Winwick, Warrington.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 09:30 and could run through until 13 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by St. Helens Council on 30 Sep 2024 at 10:55.
1 Jul and 20 Dec 2024
St. Helens Council are proposing to carry out Highway repair and maintenance works on Lowfield Lane, St Helens.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by St. Helens Council on 3 Apr 2024 at 08:41.
1 Jul and 20 Dec 2024
St. Helens Council are proposing to carry out Highway repair and maintenance works on Sherdley Road, St Helens.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by St. Helens Council on 3 Apr 2024 at 08:43.
1 Jul and 20 Dec 2024
St. Helens Council are proposing to carry out Highway repair and maintenance works on Sutton Heath Road, St Helens.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by St. Helens Council on 3 Apr 2024 at 08:44.
22 Jul and 2 Dec 2024
St. Helens Council are proposing to carry out Highway repair and maintenance works on Foundry Street, St Helens.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 2 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by St. Helens Council on 3 Jul 2024 at 12:51.
28 Feb 2025
St. Helens Council are carrying out Highway repair and maintenance works on Foundry Street, St Helens.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 July 2024 at 10:30 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by St. Helens Council on 24 Sep 2024 at 09:25.
28 Feb 2025
St. Helens Council are carrying out Highway repair and maintenance works on Chalon Way West, St Helens.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 July 2024 at 10:30 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by St. Helens Council on 24 Sep 2024 at 09:24.
22 Jul and 2 Dec 2024
St. Helens Council are proposing to carry out Highway repair and maintenance works on Chalon Way West, St Helens.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by St. Helens Council on 3 Jul 2024 at 12:46.
31 Mar 2025
St. Helens Council are carrying out Highway repair and maintenance works on Elton Head Road, Thatto Heath, St Helens.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 09:30 and could run through until 31 March 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by St. Helens Council on 21 Nov 2024 at 14:21.
18 Dec 2024
St. Helens Council are carrying out Highway repair and maintenance works on Claughton Street, St Helens.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 October 2024 at 09:30 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by St. Helens Council on 15 Nov 2024 at 11:12.
23 Oct and 31 Dec 2024
ManWeb are proposing to carry out Utility repair and maintenance works on Penkford Lane, Burtonwood And Westbrook, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 20 Aug 2024 at 16:01.
31 Dec 2024
ManWeb are carrying out Utility repair and maintenance works on Penkford Lane, Burtonwood And Westbrook, Warrington.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 October 2024 at 11:15 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 23 Oct 2024 at 13:23.
30 Oct 2024 and 4 Nov 2025
St. Helens Council are proposing to carry out Highway repair and maintenance works on Leyland Green Road, Ashton In Makerfield, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2024 and could run through until 4 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by St. Helens Council on 18 Oct 2024 at 14:53.
Tomorrow
Electricity North West (NorWeb) are carrying out New service connection on Nicol Road, Ashton-in-makerfield.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 November 2024 at 16:45 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 7 Nov 2024 at 09:22.
9 Dec 2024
Electricity North West (NorWeb) are carrying out Diversionary works on Newton Lane, Newton-le-willows.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 16:45 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 12 Nov 2024 at 09:29.
11 Nov and 11 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on St Georges Road, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 08:55.
11 Nov and 11 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Manor Avenue, Golborne.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 13:05.
Wednesday
Cadent Gas were proposing to carry out Utility asset works on Lancaster Avenue, Golborne.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 27 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 13:05.
11 Nov and 11 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on St Georges Road, St Helens.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 15:13.
Tomorrow
ManWeb are carrying out Utility repair and maintenance works on Dentons Green Lane, Dentons Green, St Helens.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 November 2024 at 11:30 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 22 Nov 2024 at 15:52.
18 Nov and 20 Dec 2024
Warrington Borough Council are proposing to carry out Highway improvement works on Winwick Link Road, Winwick, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 15 Oct 2024 at 11:15.
18 Nov and 20 Dec 2024
Warrington Borough Council are proposing to carry out Highway improvement works on Winwick Link Road, Winwick, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 23 May 2024 at 13:16.
Wednesday
St. Helens Council are carrying out Highway repair and maintenance works on Penny Lane, Haydock, St Helens.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 19:00 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by St. Helens Council on 20 Nov 2024 at 09:52.
19 Nov and 9 Dec 2024
Electricity North West (NorWeb) are proposing to carry out New service connection on Nicol Road, Ashton-in-makerfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 27 Aug 2024 at 14:53.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Piele Road, Haydock, St Helens.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 20 November 2024 at 10:11 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 16:13.
Wednesday
Cadent Gas are carrying out Utility repair and maintenance works on East Lancashire Road, Haydock, St Helens.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 11:45 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 13:27.
Tomorrow
St. Helens Council are proposing to carry out Highway repair and maintenance works on Queens Drive, Windle, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by St. Helens Council on 1 Nov 2024 at 08:37.
Tomorrow
St. Helens Council are proposing to carry out Highway repair and maintenance works on Queens Drive, Windle, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by St. Helens Council on 20 Nov 2024 at 09:57.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Lowton Road, Golborne.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 23 November 2024 at 14:38 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 23 Nov 2024 at 14:40.
25 Nov and 18 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Lawrence Road, Windle, St Helens.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 09:05.
25 Nov and 18 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Lawrence Road, Windle, St Helens.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 09:06.
25 Nov and 11 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Dunriding Lane, St Helens.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Aug 2024 at 08:08.
25 Nov and 18 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Woodford Road, Windle, St Helens.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 09:05.
25 Nov and 18 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Woodford Road, Windle, St Helens.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 09:06.
Wednesday
St. Helens Council are proposing to carry out Highway repair and maintenance works on Stuart Road, Windle, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by St. Helens Council on 1 Nov 2024 at 08:38.
27 Nov and 23 Dec 2024
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Rob Lane, Newton Le Willows, St Helens.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 7 Nov 2024 at 15:03.
27 Nov and 20 Dec 2024
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Rob Lane, Newton Le Willows, St Helens.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 8 Nov 2024 at 10:03.
27 Nov and 20 Dec 2024
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Rob Lane, Newton Le Willows, St Helens.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 11 Nov 2024 at 12:41.
29 Nov and 5 Dec 2024
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Mercer Street Passageway Rear Of 1 To 93, Burtonwood And Westbrook, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Sep 2024 at 09:10.
29 Nov and 3 Dec 2024
St. Helens Council are proposing to carry out Highway repair and maintenance works on Stuart Road, Windle, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by St. Helens Council on 20 Nov 2024 at 09:57.
1 and 17 Dec 2024
ManWeb are proposing to carry out Utility repair and maintenance works on Collins Green Lane, Burtonwood And Westbrook, Warrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 25 Sep 2024 at 09:13.
2 and 20 Dec 2024
ManWeb are proposing to carry out Utility repair and maintenance works on Pennington Lane, Burtonwood And Westbrook, Warrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 26 Sep 2024 at 09:10.
2 and 24 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Woodford Road, Windle, St Helens.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 09:46.
2 and 24 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Lawrence Road, Windle, St Helens.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 09:45.
2 and 13 Dec 2024
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Burrows Lane, Eccleston, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 7 Nov 2024 at 10:50.
2 and 13 Dec 2024
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Burrows Lane, Eccleston, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 30 Oct 2024 at 09:05.
2 and 13 Dec 2024
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Burrows Lane, Eccleston, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 24 Oct 2024 at 10:23.
2 Dec 2024 and 1 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Garswood Road, Ashton In Makerfield, St Helens.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 1 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 15:28.
2 and 20 Dec 2024
ManWeb are proposing to carry out Utility repair and maintenance works on Helena Road, Bold, St Helens.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 14 Oct 2024 at 12:48.
2 and 4 Dec 2024
St. Helens Council are proposing to carry out Highway repair and maintenance works on Garswood Road, Ashton In Makerfield, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by St. Helens Council on 20 Nov 2024 at 10:45.
4 Dec 2024
St. Helens Council are proposing to carry out Highway improvement works on Lancots Lane, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 4 December 2024 and are due to last for only one day. The works will impact the footway and carriageway.
This roadwork event was last updated by St. Helens Council on 19 Nov 2024 at 14:21.
4 Dec 2024 and 3 Mar 2025
Electricity North West (NorWeb) were proposing to carry out Diversionary works on Ashton Road, Newton Le Willows, St Helens.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 December 2024 and run through until 3 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 16 Oct 2024 at 13:43.
4 Dec 2024 and 3 Mar 2025
Electricity North West (NorWeb) were proposing to carry out Diversionary works on Ashton Road, Newton Le Willows, St Helens.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 December 2024 and run through until 3 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 12 Nov 2024 at 15:50.
4 Dec 2024
St. Helens Council are proposing to carry out Highway improvement works on Woodlands Road, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 4 December 2024 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by St. Helens Council on 19 Nov 2024 at 14:20.
9 and 23 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Briar Walk, Golborne.
These works were categorised as Major.
The works were not intending to impact the carriageway. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 23 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 13:06.
9 and 31 Dec 2024
ManWeb are proposing to carry out Utility repair and maintenance works on Pennington Lane, Burtonwood And Westbrook, Warrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 25 Sep 2024 at 12:14.
9 and 31 Dec 2024
ManWeb are proposing to carry out Utility repair and maintenance works on Pennington Lane, Burtonwood And Westbrook, Warrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 21 Aug 2024 at 14:06.
10 and 12 Dec 2024
United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Moss Road, Billinge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 21 Nov 2024 at 09:28.
10 and 12 Dec 2024
United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Moss Road, Billinge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 17 Sep 2024 at 11:55.
13 and 31 Dec 2024
ManWeb are proposing to carry out Utility repair and maintenance works on Helena Road, Bold, St Helens.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 31 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 8 Oct 2024 at 09:00.
16 Dec 2024 and 10 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Rectory Avenue, Lowton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 10:56.
2 Jan and 1 Dec 2025
ManWeb were proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 1 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 19 Sep 2024 at 14:17.
6 and 22 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Braithwaite Road, Lowton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 22 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 11:00.
6 Jan and 12 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Slag Lane, Lowton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 12 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 11:01.
8 Jan and 25 Apr 2025
The Environment Agency are proposing to carry out Statutory Infrastructure Works on Alexandra Road, Ashton-in-makerfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by The Environment Agency on 20 Jun 2024 at 08:50.
13 and 29 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on The Grove, Lowton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 29 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 11:02.
13 and 24 Jan 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on School Lane, Sutton Manor, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Oct 2024 at 09:18.
13 Jan and 26 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Crank Road, Crank, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 09:07.
13 and 24 Jan 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on School Lane, Sutton Manor, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 16 Oct 2024 at 09:19.
20 and 22 Jan 2025
St. Helens Council are proposing to carry out Highway repair and maintenance works on Rainhill Stoops Roundabout, Rainhill, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by St. Helens Council on 17 Oct 2024 at 12:48.
23 Jan and 7 Feb 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Keith Avenue, Great Sankey, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 28 Oct 2024 at 15:03.
29 Jan and 16 May 2025
The Environment Agency are proposing to carry out Statutory Infrastructure Works on Queens Road, Ashton-in-makerfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by The Environment Agency on 20 Jun 2024 at 08:45.
30 Jan and 27 Feb 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Newton Lane, Newton-le-willows.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 7 Nov 2024 at 14:52.
1 and 7 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on M6 From J25 To J24 S, Wigan.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 24 Sep 2024 at 07:09.
1 and 7 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on M6 From J25 To J24 S, Wigan.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 22 Oct 2024 at 16:30.
3 and 19 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Baxters Lane, St Helens.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 08:55.
6 Feb and 13 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Wigan Road, Golborne.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 15:34.
6 Feb and 13 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Wigan Road, Golborne.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:48.
10 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Sutton Road, St Helens.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 11:33.
10 Feb and 16 Mar 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on High Street, Newton Le Willows, St Helens.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 31 Oct 2024 at 13:15.
17 Feb and 5 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Baxters Lane, St Helens.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:40.
Roadworks Map near to Cherry Tree Close, ST. HELENS, WA11 0JR
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Cherry Tree Close, ST. HELENS, WA11 0JR (29 Events)
(Scheduled Dates)
(miles)
(Scheduled: 21 Nov 2024 - 27 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.