ROADWORKS SUMMARY
Egham Hill, EGHAM, TW20 0ET
Introduction
View current and future planned roadworks and road closures for Egham Hill, TW20 0ET and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Egham Hill, EGHAM, TW20 0ET
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Egham Hill are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
6 Dec 2024
Surrey County Council are carrying out Highway improvement works on Elmsleigh Road, Staines-upon-thames.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 4 March 2024 at 08:00 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 25 Mar 2024 at 10:13.
31 May and 1 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Ashford Road, Laleham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 May 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 29 Nov 2023 at 08:51.
31 May and 1 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Ashford Road, Laleham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 May 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 29 Nov 2023 at 08:51.
1 Jun and 1 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Ashford Crescent, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 26 Feb 2024 at 08:52.
17 Jun 2025
Surrey County Council are carrying out Highway improvement works on Squires Bridge Road, Shepperton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 June 2024 at 08:00 and could run through until 17 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 17 Jun 2024 at 07:34.
30 Jun 2024 and 1 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Dudley Road, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2024 and could run through until 1 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 11 Apr 2024 at 06:36.
1 Jul 2024 and 1 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Staines Road, Laleham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 26 Feb 2024 at 09:17.
1 Jul 2024 and 1 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Ashford Road, Laleham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 20 Mar 2024 at 13:26.
1 Jul 2024 and 1 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Laleham Road, Staines-upon-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 7 Feb 2024 at 13:45.
1 Jul 2024 and 1 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on South Street, Staines-upon-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 5 Feb 2024 at 12:09.
22 Jul 2024 and 22 Aug 2025
Surrey County Council are proposing to carry out Highway improvement works on Guildford Road, Chertsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 22 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 May 2024 at 08:24.
4 Sep and 29 Nov 2024
Surrey County Council are proposing to carry out Highway improvement works on Cornwall Way, Staines-upon-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 September 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 25 Jun 2024 at 13:08.
4 Sep and 29 Nov 2024
Surrey County Council are proposing to carry out Highway improvement works on Wapshott Road, Staines-upon-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 September 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 25 Jun 2024 at 13:09.
4 Sep and 29 Nov 2024
Surrey County Council are proposing to carry out Highway improvement works on Bowes Road, Staines-upon-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 September 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 25 Jun 2024 at 13:08.
4 Sep and 29 Nov 2024
Surrey County Council are proposing to carry out Highway improvement works on St Pauls Road, Staines-upon-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 September 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 25 Jun 2024 at 13:09.
3 Oct and 31 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Stroude Road, Virginia Water.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 12:45.
3 Oct and 31 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Stroude Road, Virginia Water.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 15:20.
7 Jan 2025
Cadent Gas are carrying out Utility asset works on Stroude Road, Virginia Water.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 October 2024 at 13:04 and could run through until 7 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 13:15.
16 Jan 2025
Cadent Gas are carrying out Utility asset works on Green Road, Thorpe.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 10:40 and could run through until 16 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 13:47.
7 Oct and 6 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Green Road, Thorpe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 12:36.
Wednesday
Cadent Gas are proposing to carry out Utility asset works on High Street, Sunningdale, Ascot.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 12:58.
Thursday
Cadent Gas are carrying out Utility asset works on High Street, Sunningdale, Ascot.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 October 2024 at 09:41 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 09:52.
Tuesday
UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Fordwater Road, Chertsey.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 17 Oct 2024 at 09:33.
19 Dec 2024
London Borough Of Hounslow are carrying out Highway improvement works on Ascot Road, Feltham.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 November 2024 at 08:00 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hounslow on 8 Nov 2024 at 09:15.
1 Nov 2024 and 1 May 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Chobham Lane, Chertsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 1 Aug 2024 at 12:08.
1 Nov 2024 and 1 May 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Chobham Lane, Longcross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 1 Aug 2024 at 13:29.
1 Nov 2024 and 1 May 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Spelthorne Lane, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 17 Jul 2024 at 07:01.
1 Nov 2024 and 31 Mar 2025
Surrey County Council are proposing to carry out Highway improvement works on Kingston Road, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 5 Aug 2024 at 08:07.
1 Nov 2024 and 1 May 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Clare Road, Stanwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 5 Aug 2024 at 08:57.
1 Nov 2024 and 1 May 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Clare Road, Stanwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 5 Aug 2024 at 08:59.
13 Dec 2024
Cadent Gas are carrying out Utility asset works on Shepperton Road, Shepperton.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 15:24 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 13:13.
4 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Shepperton Road, Shepperton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 08:17.
Monday
Cadent Gas are proposing to carry out Utility asset works on Windsor Road, Ascot.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 16:29.
Monday
Cadent Gas are proposing to carry out Utility asset works on Windsor Road, Ascot.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 14:50.
Today
Cadent Gas are proposing to carry out Utility asset works on Woodside Road, Winkfield, Windsor.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Sep 2024 at 10:42.
Today
Cadent Gas are proposing to carry out Utility asset works on Woodside Road, Winkfield, Windsor.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 15:57.
Today
Cadent Gas were proposing to carry out Utility asset works on Woodside Road, Winkfield, Windsor.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 22 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 09:19.
6 Nov 2024 and 23 Mar 2026
Surrey County Council are proposing to carry out Highway improvement works on Staines Road, Chertsey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2024 and could run through until 23 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 26 Jun 2024 at 09:37.
8 Nov and 9 Dec 2024
Affinity Water are proposing to carry out Utility asset works on Guildford Road, Chertsey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 4 Sep 2024 at 09:32.
8 Nov and 9 Dec 2024
Affinity Water were proposing to carry out Utility asset works on Guildford Road, Chertsey.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 November 2024 and run through until 9 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 11 Sep 2024 at 07:05.
8 Nov and 9 Dec 2024
Affinity Water are proposing to carry out Utility asset works on Little Green Lane, Chertsey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 6 Aug 2024 at 10:21.
8 Nov and 9 Dec 2024
Affinity Water were proposing to carry out Utility asset works on Little Green Lane, Chertsey.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 November 2024 and run through until 9 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 11 Sep 2024 at 07:04.
8 Nov and 6 Dec 2024
Surrey County Council are proposing to carry out Highway improvement works on Fairfield Avenue, Staines-upon-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 9 Aug 2024 at 08:10.
6 Dec 2024
Surrey County Council are carrying out Highway improvement works on Fairfield Avenue, Staines-upon-thames.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 November 2024 at 07:00 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 18 Nov 2024 at 09:21.
Monday
Cadent Gas are proposing to carry out Utility asset works on Wellington Avenue, Virginia Water.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 12:45.
Wednesday
Cadent Gas are proposing to carry out Utility asset works on Trinity Crescent, Sunningdale, Ascot.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 12:58.
Wednesday
Cadent Gas are carrying out Utility asset works on Trinity Crescent, Sunningdale, Ascot.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 09:06 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 10:05.
Tomorrow
National Highways are proposing to carry out Works for road purposes on Lyne Lane, Chertsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 15 Aug 2024 at 11:24.
11 Nov and 13 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Village Road, Thorpe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 08:53.
11 Nov and 13 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Village Road, Thorpe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 12:52.
11 Nov and 13 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Village Road, Thorpe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 14:25.
18 Dec 2024
Cadent Gas are carrying out Utility asset works on Church Road, Sunningdale, Ascot.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 11:26 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 11:36.
18 Nov and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Church Road, Sunningdale, Ascot.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 12:58.
18 Nov and 6 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Giles Travers Close, Thorpe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 15:37.
18 Nov and 6 Dec 2024
Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Runnemede Road, Egham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Aug 2024 at 12:33.
6 Dec 2024
Scottish Hydro Electric Power Dis are carrying out New service connection on Runnemede Road, Egham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 09:00 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 Nov 2024 at 15:56.
1 Feb 2025
National Highways are carrying out Works for road purposes on Moor Lane, Staines-upon-thames.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 22:00 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 19 Nov 2024 at 09:21.
Tuesday
London Borough Of Hounslow are proposing to carry out Section 50 on Spinney Drive, Feltham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hounslow on 18 Nov 2024 at 12:52.
Today
BT are proposing to carry out Utility asset works on Montagu Road, Datchet, Slough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 7 Aug 2024 at 11:14.
29 Nov 2024
Cadent Gas are carrying out Utility repair and maintenance works on Horton Road, Stanwell Moor.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 23:46 and could run through until 29 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 10:05.
Monday
Thames Water are carrying out Utility repair and maintenance works on St Leonards Hill, Windsor.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 09:02 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 10:24.
22 Nov and 19 Dec 2024
Royal Borough Of Windsor And Maidenhead are proposing to carry out Highway improvement works on Sunning Avenue, Sunningdale, Ascot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 21 Aug 2024 at 11:31.
22 Nov and 17 Dec 2024
Royal Borough Of Windsor And Maidenhead are proposing to carry out Highway improvement works on Sunning Avenue, Sunningdale, Ascot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2024 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 21 Aug 2024 at 12:25.
22 Nov and 17 Dec 2024
Royal Borough Of Windsor And Maidenhead were proposing to carry out Highway improvement works on Sunning Avenue, Sunningdale, Ascot.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 November 2024 and run through until 17 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 21 Aug 2024 at 12:34.
28 and 30 Nov 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Station Road, Addlestone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 15 Nov 2024 at 16:47.
29 Nov and 10 Dec 2024
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Park Lane, Horton, Slough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2024 and could run through until 10 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 2 Sep 2024 at 08:55.
2 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Bedford Lane, Sunningdale, Ascot.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 09:24.
2 and 12 Dec 2024
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Park Lane, Horton, Slough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 2 Sep 2024 at 12:20.
3 and 9 Dec 2024
Surrey County Council are proposing to carry out Highway improvement works on Weir Road, Chertsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 9 Jan 2024 at 09:23.
3 and 9 Dec 2024
Surrey County Council are proposing to carry out Highway improvement works on Bridge Road, Chertsey.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 9 Jan 2024 at 09:34.
3 and 5 Dec 2024
Affinity Water were proposing to carry out Remedial works on Service Road Fronting 155 To 171 Horton Road, Stanwell Moor.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 December 2024 and run through until 5 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 10:55.
5 and 18 Dec 2024
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Park Lane, Horton, Slough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 5 Sep 2024 at 17:00.
6 and 20 Dec 2024
UK Power Networks South Eastern are proposing to carry out New service connection on Almners Road, Chertsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 30 Sep 2024 at 16:15.
6 and 20 Dec 2024
UK Power Networks South Eastern are proposing to carry out New service connection on Almners Road, Chertsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 16 Oct 2024 at 14:02.
9 and 12 Dec 2024
Affinity Water were proposing to carry out Utility asset works on Long Lane, Stanwell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 12 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 09:49.
9 and 20 Dec 2024
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Park Lane, Horton, Slough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 6 Sep 2024 at 14:22.
10 and 13 Dec 2024
BT are proposing to carry out Utility asset works on Montagu Road, Datchet, Slough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 15 Oct 2024 at 09:38.
10 and 13 Dec 2024
BT are proposing to carry out Utility asset works on Montagu Road, Datchet, Slough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 11 Nov 2024 at 15:37.
10 and 13 Dec 2024
BT are proposing to carry out Utility asset works on Montagu Road, Datchet, Slough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 5 Sep 2024 at 16:48.
16 and 18 Dec 2024
Affinity Water are proposing to carry out Utility asset works on Ruxbury Road, Chertsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 7 Oct 2024 at 16:07.
16 and 18 Dec 2024
Affinity Water are proposing to carry out Utility asset works on Ruxbury Road, Chertsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 13:42.
16 and 20 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Commercial Road, Staines-upon-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 14 Nov 2024 at 07:17.
16 and 20 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Commercial Road, Staines-upon-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 21 Oct 2024 at 08:06.
17 and 20 Dec 2024
Affinity Water are proposing to carry out Utility asset works on High Street, Sunninghill, Ascot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 17 Sep 2024 at 15:17.
21 and 23 Dec 2024
Network Rail were proposing to carry out Works for Rail Purposes on Guildford Road, Chertsey.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 December 2024 and run through until 23 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 6 Sep 2024 at 11:03.
2 and 4 Jan 2025
Affinity Water are proposing to carry out Utility asset works on High Street, Sunninghill, Ascot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 4 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 25 Oct 2024 at 09:10.
2 and 4 Jan 2025
Affinity Water are proposing to carry out Utility asset works on High Street, Sunninghill, Ascot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 4 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 28 Oct 2024 at 08:39.
2 and 4 Jan 2025
Affinity Water are proposing to carry out Utility asset works on High Street, Sunninghill, Ascot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 4 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 15:38.
6 and 8 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Guildford Road, Chertsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 8 Oct 2024 at 17:04.
6 and 9 Jan 2025
Affinity Water are proposing to carry out Utility asset works on Ruxbury Road, Chertsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 2 Oct 2024 at 12:38.
6 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Bedford Lane, Sunningdale, Ascot.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 12:58.
6 Jan and 14 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Lyne Lane, Chertsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 30 Oct 2024 at 15:22.
6 Jan and 14 Feb 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Lyne Lane, Egham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 30 Oct 2024 at 14:43.
6 Jan and 14 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Lyne Lane, Egham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 30 Oct 2024 at 15:23.
6 and 8 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Church Road, Egham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 2 Oct 2024 at 10:26.
6 and 8 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Church Road, Egham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 2 Oct 2024 at 12:06.
6 Jan and 30 Mar 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on London Road, Staines-upon-thames.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 11:14.
6 Jan and 30 Mar 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on London Road, Staines-upon-thames.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 30 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Nov 2024 at 11:49.
6 and 29 Jan 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Stanwell New Road, Staines-upon-thames.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 29 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Nov 2024 at 11:50.
6 Jan and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Hatchet Lane, Winkfield, Windsor.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 11:18.
6 Jan and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Hatchet Lane, Winkfield, Windsor.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 09:56.
6 Jan and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Hatchet Lane, Winkfield, Windsor.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 11:22.
7 and 16 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Accommodation Road, Chertsey.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 3 Sep 2024 at 14:24.
8 Jan and 2 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Stroude Road, Virginia Water.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 11:14.
10 and 24 Jan 2025
London Borough Of Hounslow are proposing to carry out Highway improvement works on Ascot Road, Feltham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hounslow on 29 Oct 2024 at 10:24.
11 and 13 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Queens Road, Datchet, Slough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 23 Oct 2024 at 14:54.
13 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Coworth Close, Sunningdale, Ascot.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 12:58.
13 and 16 Jan 2025
Affinity Water are proposing to carry out Utility asset works on Long Lane, Stanwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 6 Nov 2024 at 08:10.
13 Jan and 2 Feb 2025
Affinity Water are proposing to carry out Utility asset works on Stanwell Moor Road, Stanwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 15 Oct 2024 at 07:22.
15 and 17 Jan 2025
Surrey County Council are proposing to carry out Works for road purposes on Staines By-pass, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 18 Oct 2024 at 08:42.
15 and 17 Jan 2025
Surrey County Council are proposing to carry out Works for road purposes on Staines By-pass, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 21 Oct 2024 at 13:26.
17 and 23 Jan 2025
Energy Assets Pipelines are proposing to carry out Utility asset works on Rosemary Lane, Thorpe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 23 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Energy Assets Pipelines on 15 Oct 2024 at 16:28.
17 and 23 Jan 2025
Energy Assets Pipelines are proposing to carry out Utility asset works on Rosemary Lane, Thorpe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 23 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Energy Assets Pipelines on 16 Oct 2024 at 13:42.
20 Jan and 7 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Hare Hill, Addlestone.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 13 Aug 2024 at 07:04.
20 Jan and 7 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Hare Hill, Addlestone.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 19 Aug 2024 at 13:54.
20 Jan and 28 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Lyne Lane, Chertsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 13 Nov 2024 at 15:11.
20 Jan and 28 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Lyne Lane, Egham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 13 Nov 2024 at 15:08.
20 Jan and 10 Feb 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Northcroft Road, Englefield Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 10 Oct 2024 at 10:48.
20 Jan and 10 Feb 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Northcroft Road, Englefield Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 Nov 2024 at 13:35.
27 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Giles Travers Close, Thorpe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 13:33.
27 Jan and 17 Mar 2025
Surrey County Council are proposing to carry out Highway improvement works on Fairfield Avenue, Staines-upon-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 5 Nov 2024 at 07:58.
3 and 21 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Woburn Hill, Addlestone.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 23 Sep 2024 at 17:10.
3 and 21 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Woburn Hill, Addlestone.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 4 Oct 2024 at 09:13.
3 and 15 Feb 2025
Esso Petroleum Co are proposing to carry out Utility asset works on Canford Drive, Addlestone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Esso Petroleum Co on 20 Nov 2024 at 13:53.
3 and 24 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Green Road, Thorpe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 11:30.
3 and 24 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Green Road, Thorpe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 10:38.
10 Feb and 3 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on The Hythe, Staines-upon-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 10:16.
10 Feb and 3 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on The Hythe, Staines-upon-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 10:30.
15 and 17 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on London Road, Sunningdale, Ascot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 21 Oct 2024 at 08:31.
17 and 21 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Park Road, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 16 Oct 2024 at 09:57.
17 and 21 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Park Road, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 25 Oct 2024 at 08:26.
18 and 20 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Muncaster Close, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 5 Nov 2024 at 07:57.
18 Feb and 17 May 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on High Street, Staines-upon-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 17 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Nov 2024 at 13:53.
Roadworks Map near to Egham Hill, EGHAM, TW20 0ET
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Egham Hill, EGHAM, TW20 0ET (8 Events)
(Scheduled Dates)
(miles)
(Scheduled: 18 Nov 2024 - 6 Dec 2024)
(Scheduled: 19 Nov 2024 - 25 Nov 2024)
(Scheduled: 21 Nov 2024 - 27 Nov 2024)