ROADWORKS SUMMARY
Cherry Way, SHEPPERTON, TW17 8QG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Cherry Way, TW17 8QG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Cherry Way, SHEPPERTON, TW17 8QG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Cherry Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Surrey County Council logo
LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Staines Road West

Surrey County Council are carrying out Highway improvement works on Staines Road West, Sunbury On Thames.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 16 March 2026 at 09:00 and could run through until 30 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 25 Aug 2026 at 14:09.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2026
Details
View Map
Share
River Mount

Surrey County Council were proposing to carry out Highway repair and maintenance works on River Mount, Walton-on-thames.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2026 and run through until 1 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Aug 2026 at 12:00.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2026
Details
View Map
Share
Follow
Green Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on Green Street, Sunbury On Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 27 Aug 2025 at 13:40.

Affinity Water logo
LONG TERM
Until
4 Dec 2026
Details
View Map
Share
Follow
Stanwell Moor Road

Affinity Water are carrying out Utility asset works on Stanwell Moor Road, Stanwell.

These works are categorised as Major.

The works started on 1 April 2026 at 10:46 and could run through until 4 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 24 Jul 2026 at 15:38.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2026
Details
View Map
Share
Follow
Stanwell Moor Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Stanwell Moor Road, Stanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 31 Mar 2026 at 09:15.

Surrey County Council logo
LONG TERM
Until
1 Mar 2027
Details
View Map
Share
Follow
Holloway Hill

Surrey County Council are carrying out Highway improvement works on Holloway Hill, Lyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2026 at 04:00 and could run through until 1 March 2027. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 10 Sep 2026 at 10:46.

Surrey County Council logo
LONG TERM
Until
24 Sep 2026
Details
View Map
Share
Follow
Hardwick Lane

Surrey County Council are carrying out Highway improvement works on Hardwick Lane, Lyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2026 at 04:00 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Apr 2026 at 10:22.

Surrey County Council logo
LONG TERM
Between
22 Jul and 25 Nov 2026
Details
View Map
Share
Follow
Charlton Road

Surrey County Council are proposing to carry out Works for road purposes on Charlton Road, Shepperton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2026 and could run through until 25 November 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 4 Aug 2026 at 12:57.

Cadent Gas logo
LONG TERM
Until
23 Oct 2026
Details
View Map
Share
Follow
Laleham Road

Cadent Gas are carrying out Utility asset works on Laleham Road, Staines-upon-thames.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 07:56 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Jul 2026 at 08:22.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Martindale Road

Cadent Gas are carrying out Utility asset works on Martindale Road, Hounslow.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 12:16 and could run through until 20 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Jul 2026 at 13:18.

Surrey County Council logo
LONG TERM
Between
1 Aug 2026 and 1 Feb 2027
Details
View Map
Share
Follow
Hampton Court Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Hampton Court Way, Thames Ditton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2026 and could run through until 1 February 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 May 2026 at 08:06.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Holloway Hill

Cadent Gas are carrying out Utility asset works on Holloway Hill, Lyne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 August 2026 at 12:16 and could run through until 20 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Sep 2026 at 10:59.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Feltham Road

Scottish Hydro Electric Power Dis are carrying out New service connection on Feltham Road, Ashford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 August 2026 at 09:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Aug 2026 at 09:24.

Cadent Gas logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Hatton Road

Cadent Gas are carrying out Utility asset works on Hatton Road, Feltham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 August 2026 at 08:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Aug 2026 at 10:22.

Southern Gas Networks logo
LONG TERM
Between
14 Aug and 15 Oct 2026
Details
View Map
Share
Follow
Elgin Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Elgin Road, Weybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2026 and could run through until 15 October 2026. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 13 Aug 2026 at 09:23.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Coombelands Lane

Cadent Gas are carrying out Utility asset works on Coombelands Lane, Addlestone.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 08:02 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 24 Aug 2026 at 08:12.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Springfield Road

Thames Water are carrying out Disconnection or alteration of supply on Springfield Road, Teddington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2026 at 08:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2026 at 08:21.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Oatlands Avenue

Surrey County Council are carrying out Highway repair and maintenance works on Oatlands Avenue, Weybridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 08:00 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 24 Aug 2026 at 08:13.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Staines Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Staines Road, Chertsey.

These works are categorised as Major.

The works will start on or after 24 August 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 19 Aug 2026 at 10:46.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Staines Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Staines Road, Staines-upon-thames.

These works are categorised as Major.

The works will start on or after 24 August 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 19 Aug 2026 at 10:47.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Chertsey Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Chertsey Lane, Staines-upon-thames.

These works are categorised as Major.

The works will start on or after 24 August 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 19 Aug 2026 at 10:48.

London Borough Of Hounslow logo
Between
24 Aug and 15 Sep 2026
Details
View Map
Share
Exeter Road

London Borough Of Hounslow carried out Section 50 on Exeter Road, Feltham.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 24 Aug 2026 and 15 Sep 2026 and were actually completed between 24 Aug 2026 (08:30) and 15 Sep 2026 (11:00). The works impacted the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 15 Sep 2026 at 11:02.

Thames Water logo
Until
23 Sep 2026
Details
View Map
Share
Follow
Grange Avenue

Thames Water are carrying out Disconnection or alteration of supply on Grange Avenue, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2026 at 08:00 and could run through until 23 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2026 at 08:47.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
New Haw Road

Cadent Gas were proposing to carry out Utility asset works on New Haw Road, Addlestone.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 August 2026 and run through until 18 September 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 13:30.

Southern Gas Networks logo
LONG TERM
Until
12 Feb 2027
Details
View Map
Share
Follow
Portsmouth Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Portsmouth Road, Cobham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 12:43 and could run through until 12 February 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Sep 2026 at 07:54.

Surrey County Council logo
Between
1 and 30 Sep 2026
Details
View Map
Share
Follow
Priory Green

Surrey County Council are proposing to carry out Highway repair and maintenance works on Priory Green, Staines-upon-thames.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 27 Aug 2026 at 11:07.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Grange Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Grange Avenue, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2026 at 11:19.

Thames Water logo
Until
2 Oct 2026
Details
View Map
Share
Follow
Wolsey Road

Thames Water are carrying out Disconnection or alteration of supply on Wolsey Road, Hampton Hill.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 September 2026 at 10:00 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 10:25.

Cadent Gas logo
Between
7 and 28 Sep 2026
Details
View Map
Share
Follow
Stonehill Road

Cadent Gas are proposing to carry out Utility asset works on Stonehill Road, Ottershaw.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 11:30.

Cadent Gas logo
Between
7 and 28 Sep 2026
Details
View Map
Share
Follow
Stonehill Road

Cadent Gas are proposing to carry out Utility asset works on Stonehill Road, Ottershaw.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2026 at 11:35.

Cadent Gas logo
Between
7 and 28 Sep 2026
Details
View Map
Share
Follow
Longcross Road

Cadent Gas are proposing to carry out Utility asset works on Longcross Road, Chertsey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 10:30.

Cadent Gas logo
Between
7 and 28 Sep 2026
Details
View Map
Share
Follow
Longcross Road

Cadent Gas are proposing to carry out Utility asset works on Longcross Road, Chertsey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2026 at 10:58.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Terrace Road

Thames Water are carrying out Utility repair and maintenance works on Terrace Road, Walton-on-thames.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 11:30 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 14:30.

Cadent Gas logo
LONG TERM
Until
23 Oct 2026
Details
View Map
Share
Follow
Coldharbour Lane

Cadent Gas are carrying out Utility asset works on Coldharbour Lane, Thorpe.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 12:23 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 12:29.

Cadent Gas logo
Between
7 and 26 Sep 2026
Details
View Map
Share
Follow
Cecil Road

Cadent Gas are proposing to carry out Utility asset works on Cecil Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 26 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 24 Aug 2026 at 10:10.

Surrey County Council logo
LONG TERM
Between
7 Sep and 9 Oct 2026
Details
View Map
Share
Follow
South Street

Surrey County Council are proposing to carry out Highway improvement works on South Street, Staines-upon-thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 9 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 18 Jun 2026 at 15:29.

Cadent Gas logo
LONG TERM
Until
15 Oct 2026
Details
View Map
Share
Follow
Strawberry Vale

Cadent Gas are carrying out Utility asset works on Strawberry Vale, Twickenham.

These works are categorised as Major.

The works started on 7 September 2026 at 09:22 and could run through until 15 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 09:33.

Cadent Gas logo
Until
2 Oct 2026
Details
View Map
Share
Follow
Hatton Road

Cadent Gas are carrying out Utility asset works on Hatton Road, Feltham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2026 at 08:00 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 08:24.

Thames Water logo
Between
9 and 29 Sep 2026
Details
View Map
Share
Follow
St James's Road

Thames Water are proposing to carry out Disconnection or alteration of supply on St James's Road, Hampton Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2026 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jul 2026 at 10:29.

Surrey County Council logo
Until
24 Sep 2026
Details
View Map
Share
Follow
New Road

Surrey County Council are carrying out Highway repair and maintenance works on New Road, Shepperton.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 September 2026 at 09:20 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 10 Sep 2026 at 11:51.

National Highways logo
Between
10 and 15 Sep 2026
Details
View Map
Share
Windmill Road

National Highways were proposing to carry out Works for road purposes on Windmill Road, Sunbury On Thames.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 September 2026 and run through until 15 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 24 Aug 2026 at 11:48.

Thames Water logo
Until
2 Oct 2026
Details
View Map
Share
Follow
Gomer Place

Thames Water are carrying out Disconnection or alteration of supply on Gomer Place, Teddington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 10:00 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 10:30.

Thames Water logo
Between
11 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Belmont Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Belmont Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Sep 2026 at 16:02.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Hurst Road

Surrey County Council are carrying out Highway repair and maintenance works on Hurst Road, West Molesey.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 10:00 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 14 Sep 2026 at 10:18.

Cadent Gas logo
LONG TERM
Between
14 Sep and 9 Nov 2026
Details
View Map
Share
Follow
Lower Hampton Road

Cadent Gas are proposing to carry out Utility asset works on Lower Hampton Road, Sunbury On Thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 9 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Aug 2026 at 12:37.

Thames Water logo
Between
16 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Heath Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Heath Gardens, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 14:37.

Surrey County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Guildford Road

Surrey County Council are proposing to carry out Highway improvement works on Guildford Road, Chertsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 10 Sep 2026 at 10:29.

Thames Water logo
Between
18 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Bridgeman Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Bridgeman Road, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jul 2026 at 13:39.

Network Rail logo
LONG TERM
Between
19 Sep and 27 Nov 2026
Details
View Map
Share
Follow
Station Avenue

Network Rail are proposing to carry out Works for Rail Purposes on Station Avenue, Walton-on-thames.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 25 Jun 2026 at 12:38.

Network Rail logo
LONG TERM
Between
19 Sep and 27 Nov 2026
Details
View Map
Share
Follow
Station Avenue

Network Rail are proposing to carry out Works for Rail Purposes on Station Avenue, Walton-on-thames.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 21 Aug 2026 at 15:47.

UK Power Networks South Eastern logo
LONG TERM
Between
21 Sep and 30 Oct 2026
Details
View Map
Share
Follow
Addlestone Road

UK Power Networks South Eastern are proposing to carry out New service connection on Addlestone Road, Addlestone.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Jul 2026 at 10:40.

Cadent Gas logo
LONG TERM
Between
21 Sep and 9 Nov 2026
Details
View Map
Share
Follow
New Road

Cadent Gas are proposing to carry out Utility asset works on New Road, Shepperton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 9 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Sep 2026 at 15:26.

Cadent Gas logo
Between
21 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Lower Hampton Road

Cadent Gas are proposing to carry out Utility asset works on Lower Hampton Road, Sunbury On Thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Sep 2026 at 13:20.

Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Wensleydale Road

London Borough Of Richmond Upon Thames are proposing to carry out Section 50 on Wensleydale Road, Hampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 11 Sep 2026 at 10:09.

Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Wensleydale Road

London Borough Of Richmond Upon Thames are proposing to carry out Section 50 on Wensleydale Road, Hampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 11 Sep 2026 at 12:09.

Thames Water logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Queens Road

Thames Water are proposing to carry out Utility repair and maintenance works on Queens Road, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Aug 2026 at 10:51.

Thames Water logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Elfin Grove

Thames Water are proposing to carry out Utility asset works on Elfin Grove, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2026 at 11:34.

Thames Water logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Elfin Grove

Thames Water are proposing to carry out Utility asset works on Elfin Grove, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Sep 2026 at 09:26.

Surrey County Council logo
LONG TERM
Between
21 Sep and 13 Nov 2026
Details
View Map
Share
Follow
Priory Green

Surrey County Council are proposing to carry out Highway repair and maintenance works on Priory Green, Staines-upon-thames.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Sep 2026 at 08:52.

Thames Water logo
Between
21 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Belmont Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Belmont Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2026 at 11:21.

Cadent Gas logo
LONG TERM
Between
21 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Cranbrook Road

Cadent Gas are proposing to carry out Utility asset works on Cranbrook Road, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2026 at 15:51.

Surrey County Council logo
Between
22 and 25 Sep 2026
Details
View Map
Share
Follow
Hampton Court Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Hampton Court Way, Thames Ditton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 25 Aug 2026 at 11:19.

Surrey County Council logo
Between
22 and 25 Sep 2026
Details
View Map
Share
Follow
Thorpe By-pass

Surrey County Council are proposing to carry out Highway improvement works on Thorpe By-pass, Egham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 17 Jul 2026 at 09:20.

Thames Water logo
Between
23 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Lindsay Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Lindsay Road, Hampton Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jul 2026 at 10:30.

Surrey County Council logo
Between
25 and 28 Sep 2026
Details
View Map
Share
Follow
St Peters Way

Surrey County Council are proposing to carry out Highway improvement works on St Peters Way, Chertsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2026 and could run through until 28 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 10 Sep 2026 at 10:32.

Surrey County Council logo
Between
25 and 28 Sep 2026
Details
View Map
Share
Follow
St Peters Way

Surrey County Council are proposing to carry out Highway improvement works on St Peters Way, Chertsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2026 and could run through until 28 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Sep 2026 at 12:33.

Thames Water logo
Between
25 Sep and 23 Oct 2026
Details
View Map
Share
Follow
St James's Road

Thames Water are proposing to carry out Disconnection or alteration of supply on St James's Road, Hampton Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Sep 2026 at 10:29.

Surrey County Council logo
Between
25 Sep and 10 Oct 2026
Details
View Map
Share
Follow
Church Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Church Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2026 and could run through until 10 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 19 Aug 2026 at 09:48.

Network Rail logo
Between
26 and 28 Sep 2026
Details
View Map
Share
Follow
Thorpe Road

Network Rail are proposing to carry out Works for Rail Purposes on Thorpe Road, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 29 Jul 2026 at 23:23.

Network Rail logo
Between
26 and 28 Sep 2026
Details
View Map
Share
Thorpe Road

Network Rail were proposing to carry out Works for Rail Purposes on Thorpe Road, Staines-upon-thames.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 September 2026 and run through until 28 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Sep 2026 at 09:10.

National Highways logo
Between
28 Sep and 17 Oct 2026
Details
View Map
Share
Follow
Almners Road

National Highways are proposing to carry out Works for road purposes on Almners Road, Chertsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 17 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 20 Aug 2026 at 09:48.

Surrey County Council logo
Between
28 Sep and 3 Oct 2026
Details
View Map
Share
Follow
The Broadway

Surrey County Council are proposing to carry out Highway repair and maintenance works on The Broadway, Laleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 9 Sep 2026 at 10:15.

Surrey County Council logo
Between
28 Sep and 3 Oct 2026
Details
View Map
Share
Follow
Ashford Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ashford Road, Laleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 9 Sep 2026 at 10:19.

Scottish Hydro Electric Power Dis logo
Between
28 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Sandells Avenue

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Sandells Avenue, Ashford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Jul 2026 at 09:44.

Thames Water logo
Between
28 and 30 Sep 2026
Details
View Map
Share
Follow
Court Close

Thames Water are proposing to carry out Remedial works on Court Close, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Jul 2026 at 10:21.

Affinity Water logo
Between
29 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Stonehill Road

Affinity Water are proposing to carry out Utility asset works on Stonehill Road, Ottershaw.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 27 Aug 2026 at 08:51.

Surrey County Council logo
Between
29 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Esher Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Esher Road, East Molesey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Sep 2026 at 08:59.

Thames Water logo
Between
29 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Gomer Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Gomer Gardens, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jul 2026 at 13:40.

Thames Water logo
Between
30 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Giggs Hill Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Giggs Hill Gardens, Thames Ditton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Jul 2026 at 11:41.

Thames Water logo
Between
30 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Giggs Hill Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Giggs Hill Gardens, Thames Ditton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 10:31.

Surrey County Council logo
LONG TERM
Between
1 Oct 2026 and 1 Mar 2027
Details
View Map
Share
Follow
Ashford Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ashford Road, Laleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 1 March 2027. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Jul 2026 at 15:43.

Surrey County Council logo
LONG TERM
Between
2 Oct and 13 Nov 2026
Details
View Map
Share
Brooklands Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Brooklands Road, Weybridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2026 and run through until 13 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 10 Sep 2026 at 10:06.

Surrey County Council logo
Between
2 and 6 Oct 2026
Details
View Map
Share
Follow
River Bank

Surrey County Council are proposing to carry out Highway repair and maintenance works on River Bank, East Molesey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 6 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 28 Aug 2026 at 08:42.

Surrey County Council logo
Between
2 and 6 Oct 2026
Details
View Map
Share
Follow
River Bank

Surrey County Council are proposing to carry out Highway repair and maintenance works on River Bank, East Molesey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 6 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 3 Sep 2026 at 10:14.

Surrey County Council logo
Between
2 and 6 Oct 2026
Details
View Map
Share
Follow
River Bank

Surrey County Council are proposing to carry out Highway repair and maintenance works on River Bank, East Molesey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 6 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Sep 2026 at 07:26.

Surrey County Council logo
Between
2 and 6 Oct 2026
Details
View Map
Share
Follow
Hurst Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Hurst Road, East Molesey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 6 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 28 Aug 2026 at 08:42.

Surrey County Council logo
Between
2 and 6 Oct 2026
Details
View Map
Share
Follow
Hurst Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Hurst Road, East Molesey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 6 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 3 Sep 2026 at 10:13.

Surrey County Council logo
Between
2 and 6 Oct 2026
Details
View Map
Share
Follow
Hurst Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Hurst Road, East Molesey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 6 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Sep 2026 at 07:25.

Network Rail logo
Between
2 and 5 Oct 2026
Details
View Map
Share
Follow
Thorpe Road

Network Rail are proposing to carry out Works for Rail Purposes on Thorpe Road, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 29 Jul 2026 at 23:26.

Network Rail logo
Between
2 and 5 Oct 2026
Details
View Map
Share
Thorpe Road

Network Rail were proposing to carry out Works for Rail Purposes on Thorpe Road, Staines-upon-thames.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2026 and run through until 5 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Sep 2026 at 09:07.

UK Power Networks South Eastern logo
Between
5 and 30 Oct 2026
Details
View Map
Share
Follow
Addlestone Road

UK Power Networks South Eastern are proposing to carry out New service connection on Addlestone Road, Addlestone.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 30 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 4 Sep 2026 at 12:15.

Surrey County Council logo
Between
5 and 19 Oct 2026
Details
View Map
Share
Follow
Cromwell Close

Surrey County Council are proposing to carry out Highway repair and maintenance works on Cromwell Close, Walton-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 Aug 2026 at 13:24.

Surrey County Council logo
Between
5 and 19 Oct 2026
Details
View Map
Share
Follow
Monks Crescent

Surrey County Council are proposing to carry out Highway repair and maintenance works on Monks Crescent, Walton-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 Aug 2026 at 13:26.

Surrey County Council logo
Between
5 and 19 Oct 2026
Details
View Map
Share
Follow
Fairfax Close

Surrey County Council are proposing to carry out Highway repair and maintenance works on Fairfax Close, Walton-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 Aug 2026 at 13:26.

Surrey County Council logo
Between
5 and 18 Oct 2026
Details
View Map
Share
Follow
Cottimore Avenue

Surrey County Council are proposing to carry out Highway repair and maintenance works on Cottimore Avenue, Walton-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 18 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 25 Aug 2026 at 10:40.

Surrey County Council logo
Between
5 and 19 Oct 2026
Details
View Map
Share
Follow
Cottimore Avenue

Surrey County Council are proposing to carry out Highway repair and maintenance works on Cottimore Avenue, Walton-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 28 Aug 2026 at 07:59.

Cadent Gas logo
Between
5 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Ten Acre Lane

Cadent Gas are proposing to carry out Utility asset works on Ten Acre Lane, Egham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 09:48.

Southern Gas Networks logo
Between
5 and 19 Oct 2026
Details
View Map
Share
Follow
The Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, Hampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 May 2026 at 14:06.

Southern Gas Networks logo
Between
5 and 19 Oct 2026
Details
View Map
Share
Follow
The Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, Hampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2026 at 10:13.

Affinity Water logo
Between
5 and 9 Oct 2026
Details
View Map
Share
Follow
Dane Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Dane Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 6 Mar 2026 at 14:23.

Affinity Water logo
Between
5 and 7 Oct 2026
Details
View Map
Share
Follow
Service Road Fronting 5 To 47 School Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Service Road Fronting 5 To 47 School Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 16 Jul 2026 at 16:01.

Hutchinson 3G logo
Between
5 and 7 Oct 2026
Details
View Map
Share
Follow
Nallhead Road

Hutchinson 3G are proposing to carry out Utility asset works on Nallhead Road, Feltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the verge only.

This roadwork event was last updated by Hutchinson 3G on 15 Sep 2026 at 09:00.

Cadent Gas logo
LONG TERM
Between
5 Oct 2026 and 22 Jan 2027
Details
View Map
Share
Follow
Hounslow Road

Cadent Gas are proposing to carry out Utility asset works on Hounslow Road, Hanworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 22 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Aug 2026 at 08:25.

Thames Water logo
LONG TERM
Between
5 Oct and 4 Nov 2026
Details
View Map
Share
Follow
Heath Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Heath Gardens, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 4 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2026 at 11:22.

Scottish Hydro Electric Power Dis logo
Between
5 and 20 Oct 2026
Details
View Map
Share
Follow
Bedfont Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Bedfont Lane, Feltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 20 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 26 Aug 2026 at 09:30.

Surrey County Council logo
Between
8 and 10 Oct 2026
Details
View Map
Share
Follow
The Causeway

Surrey County Council are proposing to carry out Highway repair and maintenance works on The Causeway, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2026 and could run through until 10 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 20 Aug 2026 at 13:36.

Surrey County Council logo
Between
8 and 10 Oct 2026
Details
View Map
Share
Follow
The Glanty

Surrey County Council are proposing to carry out Highway repair and maintenance works on The Glanty, Egham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2026 and could run through until 10 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 20 Aug 2026 at 13:36.

Surrey County Council logo
Between
8 and 10 Oct 2026
Details
View Map
Share
Egham By-pass

Surrey County Council were proposing to carry out Highway repair and maintenance works on Egham By-pass, Egham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 October 2026 and run through until 10 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 20 Aug 2026 at 14:13.

Surrey County Council logo
Between
9 and 12 Oct 2026
Details
View Map
Share
Follow
Lime Grove

Surrey County Council are proposing to carry out Highway repair and maintenance works on Lime Grove, Addlestone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2026 and could run through until 12 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Aug 2026 at 11:31.

Network Rail logo
Between
9 and 12 Oct 2026
Details
View Map
Share
Follow
Thorpe Road

Network Rail are proposing to carry out Works for Rail Purposes on Thorpe Road, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 12 Jun 2026 at 13:30.

Network Rail logo
Between
9 and 12 Oct 2026
Details
View Map
Share
Follow
Thorpe Road

Network Rail are proposing to carry out Works for Rail Purposes on Thorpe Road, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Sep 2026 at 16:46.

Network Rail logo
Between
9 and 12 Oct 2026
Details
View Map
Share
Follow
Thorpe Road

Network Rail are proposing to carry out Works for Rail Purposes on Thorpe Road, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 29 Jul 2026 at 23:31.

Network Rail logo
Between
9 and 12 Oct 2026
Details
View Map
Share
Follow
Thorpe Road

Network Rail are proposing to carry out Works for Rail Purposes on Thorpe Road, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 2 Sep 2026 at 11:22.

Surrey County Council logo
LONG TERM
Between
12 Oct and 20 Nov 2026
Details
View Map
Share
Follow
Brooklands Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Brooklands Road, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 10 Sep 2026 at 11:31.

Affinity Water logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Follow
Stonehill Road

Affinity Water are proposing to carry out Utility asset works on Stonehill Road, Ottershaw.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 15 Jul 2026 at 14:37.

Southern Gas Networks logo
Between
12 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Hurst Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hurst Lane, East Molesey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Aug 2026 at 07:52.

Cadent Gas logo
LONG TERM
Between
12 Oct 2026 and 15 Feb 2027
Details
View Map
Share
Follow
Thorpe Lea Road

Cadent Gas are proposing to carry out Utility asset works on Thorpe Lea Road, Egham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 15 February 2027. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Aug 2026 at 07:50.

Southern Gas Networks logo
Between
12 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Oak Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oak Avenue, Hampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 2 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 May 2026 at 14:05.

Southern Gas Networks logo
Between
12 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Oak Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oak Avenue, Hampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 2 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2026 at 10:26.

UK Power Networks South Eastern logo
Between
14 and 16 Oct 2026
Details
View Map
Share
Follow
Matham Road

UK Power Networks South Eastern are proposing to carry out New service connection on Matham Road, East Molesey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 9 Sep 2026 at 15:31.

Surrey County Council logo
Between
15 and 17 Oct 2026
Details
View Map
Share
Follow
Portsmouth Road

Surrey County Council are proposing to carry out Highway improvement works on Portsmouth Road, Cobham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2026 and could run through until 17 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 18 Aug 2026 at 08:02.

Surrey County Council logo
Between
15 and 17 Oct 2026
Details
View Map
Share
Follow
Portsmouth Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Portsmouth Road, Esher.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2026 and could run through until 17 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 18 Aug 2026 at 08:02.

Affinity Water logo
Between
15 and 19 Oct 2026
Details
View Map
Share
Follow
Ruskin Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Ruskin Avenue, Feltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 26 Jul 2026 at 21:43.

Surrey County Council logo
Between
19 and 31 Oct 2026
Details
View Map
Share
Follow
Copsem Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Copsem Lane, Esher.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 3 Jun 2026 at 13:16.

Surrey County Council logo
Between
19 and 21 Oct 2026
Details
View Map
Share
Follow
Kingston Bypass

Surrey County Council are proposing to carry out Highway repair and maintenance works on Kingston Bypass, Esher.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 24 Aug 2026 at 08:41.

Network Rail logo
Between
19 and 21 Oct 2026
Details
View Map
Share
Follow
Summer Road

Network Rail are proposing to carry out Works for Rail Purposes on Summer Road, Thames Ditton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 27 May 2026 at 10:00.

Thames Water logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Thames Street

Thames Water are proposing to carry out New service connection on Thames Street, Sunbury On Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Aug 2026 at 15:49.

Surrey County Council logo
Between
19 and 30 Oct 2026
Details
View Map
Share
Follow
Berryscroft Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Berryscroft Road, Laleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 7 Aug 2026 at 09:12.

Surrey County Council logo
Between
19 and 30 Oct 2026
Details
View Map
Share
Follow
Greene Fielde End

Surrey County Council are proposing to carry out Highway repair and maintenance works on Greene Fielde End, Laleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 7 Aug 2026 at 09:31.

Surrey County Council logo
Between
19 and 30 Oct 2026
Details
View Map
Share
Follow
Thickthorne Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Thickthorne Lane, Laleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 28 Aug 2026 at 13:39.

Surrey County Council logo
Between
19 and 30 Oct 2026
Details
View Map
Share
Follow
Arnold Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Arnold Road, Laleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 7 Aug 2026 at 09:07.

Thames Water logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Udney Park Road

Thames Water are proposing to carry out New service connection on Udney Park Road, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2026 at 08:55.

Thames Water logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Udney Park Road

Thames Water are proposing to carry out New service connection on Udney Park Road, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 10:23.

Surrey County Council logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Feltham Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Feltham Road, Ashford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 8 Sep 2026 at 13:08.

Cadent Gas logo
Between
19 Oct and 3 Nov 2026
Details
View Map
Share
Follow
Strawberry Vale

Cadent Gas are proposing to carry out Utility asset works on Strawberry Vale, Twickenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 3 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2026 at 14:38.

BT logo
Between
19 and 22 Oct 2026
Details
View Map
Share
Follow
Green Park

BT are proposing to carry out Utility asset works on Green Park, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 22 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 27 Aug 2026 at 11:49.

BT logo
Between
19 and 22 Oct 2026
Details
View Map
Share
Follow
Green Park

BT are proposing to carry out Utility asset works on Green Park, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 22 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 19 Aug 2026 at 09:05.

BT logo
Between
19 and 22 Oct 2026
Details
View Map
Share
Follow
Vicarage Road

BT are proposing to carry out Utility asset works on Vicarage Road, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 22 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 27 Aug 2026 at 11:48.

BT logo
Between
19 and 22 Oct 2026
Details
View Map
Share
Follow
Vicarage Road

BT are proposing to carry out Utility asset works on Vicarage Road, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 22 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 22 Jul 2026 at 14:14.

Surrey County Council logo
Between
20 and 22 Oct 2026
Details
View Map
Share
Follow
Kingston Bypass

Surrey County Council are proposing to carry out Highway repair and maintenance works on Kingston Bypass, Esher.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2026 and could run through until 22 October 2026. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 24 Aug 2026 at 08:42.

Thames Water logo
Between
20 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Ringwood Way

Thames Water are proposing to carry out Disconnection or alteration of supply on Ringwood Way, Hampton Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Jun 2026 at 12:25.

Network Rail logo
Between
20 and 23 Oct 2026
Details
View Map
Share
Follow
Vicarage Road

Network Rail are proposing to carry out Works for Rail Purposes on Vicarage Road, Egham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 18 Jun 2026 at 10:57.

Thames Water logo
Between
21 Oct and 5 Nov 2026
Details
View Map
Share
Follow
Gomer Place

Thames Water are proposing to carry out Disconnection or alteration of supply on Gomer Place, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2026 and could run through until 5 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jul 2026 at 13:40.

Surrey County Council logo
Between
22 and 24 Oct 2026
Details
View Map
Share
Follow
Kingston Bypass

Surrey County Council are proposing to carry out Highway repair and maintenance works on Kingston Bypass, Esher.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2026 and could run through until 24 October 2026. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 24 Aug 2026 at 08:42.

Surrey County Council logo
Between
22 and 24 Oct 2026
Details
View Map
Share
Follow
The Causeway

Surrey County Council are proposing to carry out Highway repair and maintenance works on The Causeway, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2026 and could run through until 24 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Aug 2026 at 08:10.

Surrey County Council logo
Between
22 and 24 Oct 2026
Details
View Map
Share
Follow
The Causeway

Surrey County Council are proposing to carry out Highway repair and maintenance works on The Causeway, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2026 and could run through until 24 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 27 Aug 2026 at 11:06.

Surrey County Council logo
Between
22 and 24 Oct 2026
Details
View Map
Share
The Glanty

Surrey County Council were proposing to carry out Highway repair and maintenance works on The Glanty, Egham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 October 2026 and run through until 24 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 20 Aug 2026 at 14:10.

Surrey County Council logo
Between
22 and 24 Oct 2026
Details
View Map
Share
Follow
The Glanty

Surrey County Council are proposing to carry out Highway repair and maintenance works on The Glanty, Egham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2026 and could run through until 24 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Aug 2026 at 08:10.

Surrey County Council logo
Between
22 and 24 Oct 2026
Details
View Map
Share
Follow
The Glanty

Surrey County Council are proposing to carry out Highway repair and maintenance works on The Glanty, Egham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2026 and could run through until 24 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 27 Aug 2026 at 11:06.

Surrey County Council logo
Between
22 and 24 Oct 2026
Details
View Map
Share
Follow
Egham By-pass

Surrey County Council are proposing to carry out Highway repair and maintenance works on Egham By-pass, Egham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2026 and could run through until 24 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 2 Sep 2026 at 11:31.

Surrey County Council logo
Between
23 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Green Lane

Surrey County Council are proposing to carry out Highway improvement works on Green Lane, Chertsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 26 Aug 2026 at 16:51.

Surrey County Council logo
Between
23 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Green Lane

Surrey County Council are proposing to carry out Highway improvement works on Green Lane, Chertsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 3 Sep 2026 at 13:31.

Surrey County Council logo
Between
23 and 27 Oct 2026
Details
View Map
Share
Follow
The Causeway

Surrey County Council are proposing to carry out Highway repair and maintenance works on The Causeway, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 27 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 28 Aug 2026 at 11:21.

Surrey County Council logo
Between
23 and 27 Oct 2026
Details
View Map
Share
Follow
The Glanty

Surrey County Council are proposing to carry out Highway repair and maintenance works on The Glanty, Egham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 27 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 28 Aug 2026 at 11:22.

Surrey County Council logo
Between
23 and 27 Oct 2026
Details
View Map
Share
Follow
Egham By-pass

Surrey County Council are proposing to carry out Highway repair and maintenance works on Egham By-pass, Egham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 27 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 3 Sep 2026 at 13:13.

Surrey County Council logo
Between
26 and 29 Oct 2026
Details
View Map
Share
Follow
Copsem Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Copsem Lane, Esher.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 3 Sep 2026 at 09:31.

Surrey County Council logo
Between
26 and 29 Oct 2026
Details
View Map
Share
Follow
Copsem Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Copsem Lane, Esher.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 11 Sep 2026 at 09:45.

Cadent Gas logo
Between
26 Oct and 9 Nov 2026
Details
View Map
Share
Follow
Almners Road

Cadent Gas are proposing to carry out Utility asset works on Almners Road, Chertsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 9 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 29 Jul 2026 at 23:37.

Southern Gas Networks logo
LONG TERM
Between
26 Oct and 20 Dec 2026
Details
View Map
Share
Follow
Palace Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Palace Road, East Molesey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 20 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2026 at 10:24.

Cadent Gas logo
LONG TERM
Between
26 Oct and 4 Dec 2026
Details
View Map
Share
Follow
New Road

Cadent Gas are proposing to carry out Utility asset works on New Road, Shepperton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 4 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 14:28.

Cadent Gas logo
Between
26 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Ten Acre Lane

Cadent Gas are proposing to carry out Utility asset works on Ten Acre Lane, Egham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Sep 2026 at 09:01.

Cadent Gas logo
Between
26 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Commercial Road

Cadent Gas are proposing to carry out Utility asset works on Commercial Road, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Sep 2026 at 16:00.

Affinity Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Feltham Hill Road

Affinity Water are proposing to carry out Utility asset works on Feltham Hill Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 19 Aug 2026 at 09:52.

Thames Water logo
Between
26 Oct and 9 Nov 2026
Details
View Map
Share
Follow
Hampton Road West

Thames Water are proposing to carry out Utility repair and maintenance works on Hampton Road West, Feltham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 9 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Jul 2026 at 13:28.

Thames Water logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Colonial Avenue

Thames Water are proposing to carry out Remedial works on Colonial Avenue, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Jul 2026 at 15:13.

Thames Water logo
Between
27 Oct and 3 Nov 2026
Details
View Map
Share
Follow
Curzon Road

Thames Water are proposing to carry out Utility asset works on Curzon Road, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 3 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Aug 2026 at 10:20.

Surrey County Council logo
Between
28 and 30 Oct 2026
Details
View Map
Share
Follow
Kingston Bypass

Surrey County Council are proposing to carry out Highway repair and maintenance works on Kingston Bypass, Esher.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 3 Sep 2026 at 07:59.

Surrey County Council logo
LONG TERM
Between
1 Nov 2026 and 1 May 2027
Details
View Map
Share
Follow
South Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on South Street, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2026 and could run through until 1 May 2027. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 3 Aug 2026 at 15:45.

Thames Water logo
Between
2 and 6 Nov 2026
Details
View Map
Share
Follow
Aston Road

Thames Water are proposing to carry out Utility repair and maintenance works on Aston Road, Claygate, Esher.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2026 at 07:48.

Cadent Gas logo
LONG TERM
Between
2 Nov and 14 Dec 2026
Details
View Map
Share
Follow
Pyrcroft Road

Cadent Gas are proposing to carry out Utility asset works on Pyrcroft Road, Chertsey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 14 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 Jul 2026 at 10:26.

Southern Gas Networks logo
LONG TERM
Between
2 Nov and 13 Dec 2026
Details
View Map
Share
Follow
Oldfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oldfield Road, Hampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 13 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Aug 2026 at 15:14.

Southern Gas Networks logo
Between
2 and 16 Nov 2026
Details
View Map
Share
Follow
Station Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Hampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 16 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 Aug 2026 at 15:14.

Thames Water logo
Between
2 and 24 Nov 2026
Details
View Map
Share
Follow
Radnor Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Radnor Gardens, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 24 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2026 at 11:34.

Cadent Gas logo
Between
2 and 11 Nov 2026
Details
View Map
Share
Follow
West Road

Cadent Gas are proposing to carry out Utility asset works on West Road, Feltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jul 2026 at 08:25.

Cadent Gas logo
Between
2 and 8 Nov 2026
Details
View Map
Share
Follow
North Road

Cadent Gas are proposing to carry out Utility asset works on North Road, Feltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 8 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jul 2026 at 08:25.

UK Power Networks South Eastern logo
Between
9 and 13 Nov 2026
Details
View Map
Share
Follow
Locke King Road

UK Power Networks South Eastern are proposing to carry out New service connection on Locke King Road, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Aug 2026 at 13:53.

UK Power Networks South Eastern logo
Between
9 and 13 Nov 2026
Details
View Map
Share
Follow
Locke King Road

UK Power Networks South Eastern are proposing to carry out New service connection on Locke King Road, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Sep 2026 at 13:21.

Cornerstone Telecommunications Infrastructure logo
Between
9 and 30 Nov 2026
Details
View Map
Share
Follow
Grotto Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Grotto Road, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 7 Sep 2026 at 11:39.

Cornerstone Telecommunications Infrastructure logo
Between
9 and 30 Nov 2026
Details
View Map
Share
Grenside Road

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Grenside Road, Weybridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 November 2026 and run through until 30 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 7 Sep 2026 at 11:19.

Surrey County Council logo
Between
9 and 11 Nov 2026
Details
View Map
Share
Follow
Kingston Bypass

Surrey County Council are proposing to carry out Highway repair and maintenance works on Kingston Bypass, Esher.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 11 November 2026. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 2 Sep 2026 at 08:10.

UK Power Networks South Eastern logo
Between
9 and 13 Nov 2026
Details
View Map
Share
Follow
Pretoria Road

UK Power Networks South Eastern are proposing to carry out New service connection on Pretoria Road, Chertsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 17 Aug 2026 at 11:37.

Surrey County Council logo
Between
9 and 20 Nov 2026
Details
View Map
Share
Follow
Kingston Road

Surrey County Council are proposing to carry out Highway improvement works on Kingston Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 20 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 19 Aug 2026 at 11:13.

Surrey County Council logo
Between
10 and 12 Nov 2026
Details
View Map
Share
Follow
Kingston Bypass

Surrey County Council are proposing to carry out Highway repair and maintenance works on Kingston Bypass, Esher.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2026 and could run through until 12 November 2026. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 2 Sep 2026 at 08:11.

UK Power Networks South Eastern logo
Between
10 and 15 Nov 2026
Details
View Map
Share
Follow
Matham Road

UK Power Networks South Eastern are proposing to carry out New service connection on Matham Road, East Molesey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2026 and could run through until 15 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 17 Aug 2026 at 08:22.

Surrey County Council logo
Between
10 Nov and 3 Dec 2026
Details
View Map
Share
Follow
Staines Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Staines Road, Laleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2026 and could run through until 3 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 25 Aug 2026 at 10:14.

Surrey County Council logo
Between
10 Nov and 3 Dec 2026
Details
View Map
Share
Follow
Laleham Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Laleham Road, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2026 and could run through until 3 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 25 Aug 2026 at 09:21.

Surrey County Council logo
Between
12 and 14 Nov 2026
Details
View Map
Share
Follow
Kingston Bypass

Surrey County Council are proposing to carry out Highway repair and maintenance works on Kingston Bypass, Esher.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2026 and could run through until 14 November 2026. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 2 Sep 2026 at 08:12.

Surrey County Council logo
Between
16 and 20 Nov 2026
Details
View Map
Share
Follow
New Haw Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on New Haw Road, Addlestone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 11 Aug 2026 at 11:39.

Cadent Gas logo
LONG TERM
Between
16 Nov 2026 and 25 Jan 2027
Details
View Map
Share
Follow
Crockford Park Road

Cadent Gas are proposing to carry out Utility asset works on Crockford Park Road, Addlestone.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 25 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 29 Jul 2026 at 23:15.

Cadent Gas logo
LONG TERM
Between
16 Nov 2026 and 25 Jan 2027
Details
View Map
Share
Follow
Crockford Park Road

Cadent Gas are proposing to carry out Utility asset works on Crockford Park Road, Addlestone.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 25 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 08:19.

Affinity Water logo
Between
16 and 18 Nov 2026
Details
View Map
Share
Follow
Montrose Walk

Affinity Water are proposing to carry out Utility repair and maintenance works on Montrose Walk, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 18 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 3 Aug 2026 at 08:10.

Surrey County Council logo
Between
16 and 23 Nov 2026
Details
View Map
Share
Follow
Cromwell Close

Surrey County Council are proposing to carry out Highway repair and maintenance works on Cromwell Close, Walton-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 23 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 17 Jul 2026 at 07:36.

Surrey County Council logo
Between
16 and 23 Nov 2026
Details
View Map
Share
Follow
Monks Crescent

Surrey County Council are proposing to carry out Highway repair and maintenance works on Monks Crescent, Walton-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 23 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 17 Jul 2026 at 07:37.

Surrey County Council logo
Between
16 and 23 Nov 2026
Details
View Map
Share
Follow
Fairfax Close

Surrey County Council are proposing to carry out Highway repair and maintenance works on Fairfax Close, Walton-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 23 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 17 Jul 2026 at 07:36.

Surrey County Council logo
Between
16 and 23 Nov 2026
Details
View Map
Share
Follow
Cottimore Avenue

Surrey County Council are proposing to carry out Highway repair and maintenance works on Cottimore Avenue, Walton-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 23 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 16 Jul 2026 at 09:37.

Southern Gas Networks logo
LONG TERM
Between
16 Nov and 18 Dec 2026
Details
View Map
Share
Follow
Garden Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Garden Road, Walton-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2026 at 11:11.

Cadent Gas logo
LONG TERM
Between
16 Nov 2026 and 26 Feb 2027
Details
View Map
Share
Follow
Coldharbour Lane

Cadent Gas are proposing to carry out Utility asset works on Coldharbour Lane, Thorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 26 February 2027. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 08:06.

Cadent Gas logo
LONG TERM
Between
16 Nov 2026 and 26 Feb 2027
Details
View Map
Share
Follow
Coldharbour Lane

Cadent Gas are proposing to carry out Utility asset works on Coldharbour Lane, Thorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 26 February 2027. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Sep 2026 at 14:07.

Cadent Gas logo
LONG TERM
Between
16 Nov 2026 and 22 Feb 2027
Details
View Map
Share
Follow
Cadbury Road

Cadent Gas are proposing to carry out Utility asset works on Cadbury Road, Sunbury On Thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 22 February 2027. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Aug 2026 at 09:10.

Southern Gas Networks logo
Between
16 and 30 Nov 2026
Details
View Map
Share
Follow
Gomer Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gomer Gardens, Teddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 30 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 24 Aug 2026 at 11:16.

Cadent Gas logo
LONG TERM
Between
16 Nov 2026 and 15 Jan 2027
Details
View Map
Share
Follow
Bear Road

Cadent Gas are proposing to carry out Utility asset works on Bear Road, Feltham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 15 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2026 at 11:06.

Thames Water logo
LONG TERM
Between
17 Nov and 18 Dec 2026
Details
View Map
Share
Follow
Udney Park Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Udney Park Road, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Jul 2026 at 08:15.

Thames Water logo
Between
18 Nov and 10 Dec 2026
Details
View Map
Share
Follow
Radnor Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Radnor Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2026 and could run through until 10 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2026 at 11:34.

Thames Water logo
Between
20 Nov and 4 Dec 2026
Details
View Map
Share
Follow
North Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on North Lane, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Jul 2026 at 08:14.

Cadent Gas logo
LONG TERM
Between
23 Nov 2026 and 1 Feb 2027
Details
View Map
Share
Follow
Crockford Park Road

Cadent Gas are proposing to carry out Utility asset works on Crockford Park Road, Addlestone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 1 February 2027. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Sep 2026 at 09:12.

Affinity Water logo
Between
23 and 25 Nov 2026
Details
View Map
Share
Follow
Rydens Grove

Affinity Water are proposing to carry out Utility repair and maintenance works on Rydens Grove, Hersham, Walton-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 25 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 9 Sep 2026 at 09:55.

Surrey County Council logo
LONG TERM
Between
23 Nov 2026 and 23 May 2027
Details
View Map
Share
Follow
River Mount

Surrey County Council are proposing to carry out Highway repair and maintenance works on River Mount, Walton-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 23 May 2027. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 10 Sep 2026 at 11:13.

Southern Gas Networks logo
Between
23 Nov and 7 Dec 2026
Details
View Map
Share
Follow
Cromwell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cromwell Road, Teddington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 7 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 23 Apr 2026 at 14:49.

Cadent Gas logo
LONG TERM
Between
23 Nov 2026 and 8 Mar 2027
Details
View Map
Share
Follow
Thorpe Lea Road

Cadent Gas are proposing to carry out Utility asset works on Thorpe Lea Road, Egham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 8 March 2027. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Aug 2026 at 15:00.

Cadent Gas logo
Between
23 Nov and 20 Dec 2026
Details
View Map
Share
Follow
Hatton Road

Cadent Gas are proposing to carry out Utility asset works on Hatton Road, Feltham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 20 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2026 at 11:23.

Thames Water logo
Between
25 Nov and 10 Dec 2026
Details
View Map
Share
Follow
Park Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Park Lane, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2026 and could run through until 10 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Jul 2026 at 08:14.

Thames Water logo
Between
30 Nov and 2 Dec 2026
Details
View Map
Share
Follow
Molesey Road

Thames Water are proposing to carry out Utility asset works on Molesey Road, Hersham, Walton-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 2 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 07:28.

Surrey County Council logo
Between
30 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Cycle Track From Upper Halliford Road To Nursery Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Cycle Track From Upper Halliford Road To Nursery Road, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 11 December 2026. The works will impact the footway and cycleway.

This roadwork event was last updated by Surrey County Council on 18 Aug 2026 at 08:52.

Southern Gas Networks logo
Between
30 Nov and 14 Dec 2026
Details
View Map
Share
Follow
Cromwell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cromwell Road, Teddington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 14 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2026 at 10:19.

Southern Gas Networks logo
Between
30 Nov and 14 Dec 2026
Details
View Map
Share
Follow
Gomer Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gomer Gardens, Teddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 14 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2026 at 08:28.

Thames Water logo
Between
1 and 17 Dec 2026
Details
View Map
Share
Follow
Bridgeman Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Bridgeman Road, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2026 and could run through until 17 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Aug 2026 at 10:43.

Network Rail logo
Between
1 and 4 Dec 2026
Details
View Map
Share
Follow
Wellesley Road

Network Rail are proposing to carry out Works for Rail Purposes on Wellesley Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 13 Jul 2026 at 16:04.

Network Rail logo
Between
1 and 4 Dec 2026
Details
View Map
Share
Follow
Tower Road

Network Rail are proposing to carry out roadworks on Tower Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 13 Jul 2026 at 17:06.

Transport for London (TfL) logo
Between
1 and 4 Dec 2026
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2026 and could run through until 4 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 14:47.

Thames Water logo
LONG TERM
Between
4 Dec 2026 and 12 Jan 2027
Details
View Map
Share
Follow
Riverview Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Riverview Gardens, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2026 and could run through until 12 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2026 at 11:36.

Southern Gas Networks logo
Between
7 and 23 Dec 2026
Details
View Map
Share
Follow
Cromwell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cromwell Road, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 23 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2026 at 15:04.

Southern Gas Networks logo
Between
7 and 23 Dec 2026
Details
View Map
Share
Follow
Kingston Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingston Lane, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 23 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2026 at 15:03.

Southern Gas Networks logo
Between
7 and 23 Dec 2026
Details
View Map
Share
Follow
Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Road, Teddington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 23 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2026 at 14:30.

Cadent Gas logo
LONG TERM
Between
7 Dec 2026 and 11 Jan 2027
Details
View Map
Share
Follow
Swan Road

Cadent Gas are proposing to carry out Utility asset works on Swan Road, Feltham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 11 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Aug 2026 at 08:19.

Cadent Gas logo
Between
7 and 13 Dec 2026
Details
View Map
Share
Follow
Horsham Road

Cadent Gas are proposing to carry out Utility asset works on Horsham Road, Feltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 13 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Jul 2026 at 15:08.

Cadent Gas logo
Between
7 and 15 Dec 2026
Details
View Map
Share
Follow
The Gardens

Cadent Gas are proposing to carry out Utility asset works on The Gardens, Feltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 15 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 12:30.

Cadent Gas logo
LONG TERM
Between
7 Dec 2026 and 11 Jan 2027
Details
View Map
Share
Follow
Hatton Road

Cadent Gas are proposing to carry out Utility asset works on Hatton Road, Feltham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 11 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 12:30.

Surrey County Council logo
LONG TERM
Between
9 Dec 2026 and 5 May 2027
Details
View Map
Share
Follow
Laleham Road

Surrey County Council are proposing to carry out Highway improvement works on Laleham Road, Shepperton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2026 and could run through until 5 May 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 10 Dec 2025 at 11:20.

Affinity Water logo
Between
9 and 11 Dec 2026
Details
View Map
Share
Follow
Metcalf Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Metcalf Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2026 and could run through until 11 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 27 Aug 2026 at 16:02.


Roadworks Map near to Cherry Way, SHEPPERTON, TW17 8QG

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 16 Sep 2026 00:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Cherry Way, SHEPPERTON, TW17 8QG (9 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
VINCENT DRIVE 
(0.3 miles)
BT
New service connection - Footway - Some carriageway incursion
Complete
14 Sep 2026 10:41 - 13:31
0.3
Details
Share
2
Surrey County Council logo
MAJOR
  
CHARLTON ROAD 
(0.6 miles)
Surrey County Council
Works for road purposes - Footway, Carriageway, Verge - Multi-way signals
Planned
Scheduled: 22 Jul 2026 - 25 Nov 2026
0.6
Details
Share
Follow
3
MAJOR
  
PEREGRINE ROAD 
(0.6 miles)
Open Fibre Networks Ltd
New service connection - Footway, Carriageway, Verge - Some carriageway incursion
In Progress
Since: 4 Sep 2026 10:00
(Scheduled: 3 Sep 2026 - 17 Sep 2026)
0.6
Details
Share
Follow
4
Surrey County Council logo
DOLPHIN ROAD SOUTH 
(0.7 miles)
Surrey County Council
Highway repair and maintenance works - Carriageway - Give and take
In Progress
Since: 9 Sep 2026 09:00
(Scheduled: 8 Sep 2026 - 16 Sep 2026)
0.7
Details
Share
Follow
5
Surrey County Council logo
EMERGENCY
  
NEW ROAD 
(0.8 miles)
Surrey County Council
Highway repair and maintenance works - Carriageway - Two-way signals
In Progress
Since: 10 Sep 2026 09:20
(Scheduled: 10 Sep 2026 - 24 Sep 2026)
0.8
Details
Share
Follow
6
BT logo
GREEN STREET, SURREY 
(0.9 miles)
BT
Utility asset works - Footway - Stop/go boards
Planned
Scheduled: 15 Sep 2026 - 17 Sep 2026
0.9
Details
Share
Follow
7
BT logo
GREEN STREET, SURREY 
(0.9 miles)
BT
Utility asset works - Footway - Stop/go boards
Planned
Scheduled: 15 Sep 2026 - 17 Sep 2026
0.9
Details
Share
Follow
8
Surrey County Council logo
MAJOR
  
LALEHAM ROAD 
(0.9 miles)
Surrey County Council
Highway repair and maintenance works - Carriageway - Stop/go boards
Planned
Scheduled: 1 Sep 2026 - 18 Sep 2026
0.9
Details
Share
Follow
9
BT logo
MULBERRY TREES FOOTPATHS 
(1.0 miles)
BT
New service connection - Footpath - No carriageway incursion
Planned
Scheduled: 14 Sep 2026 - 16 Sep 2026
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.