Introduction

View current and future planned roadworks and road closures for Haswell Road, TS28 5LE and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Haswell Road, WINGATE, TS28 5LE
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Haswell Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
1 Jul and 30 Sep 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Gore Lane, Thornley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Durham County Council on 5 Mar 2025 at 14:26.
1 Jul and 30 Sep 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on High Street, Thornley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Durham County Council on 7 Mar 2025 at 08:19.
1 Jul and 30 Sep 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Dunelm Road, Thornley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Durham County Council on 7 Mar 2025 at 08:25.
21 Jul and 15 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hall Walk, Easington Village.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 15 September 2025. The works will impact the footway, carriageway, verge and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Gas Networks on 25 Jun 2025 at 13:02.
Friday
Northern Gas Networks are carrying out Utility repair and maintenance works on Hall Walk, Easington Village.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 August 2025 at 08:30 and could run through until 5 September 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Northern Gas Networks on 27 Aug 2025 at 10:16.
Friday
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stockton Road, Easington Village.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 29 Jul 2025 at 11:39.
25 Aug and 22 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stockton Road, Easington Village.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 Jul 2025 at 15:35.
25 Aug and 22 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stockton Road, Easington Village.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 5 Aug 2025 at 14:03.
25 Sep 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Stockton Road, Easington Village.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 August 2025 at 09:15 and could run through until 25 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 29 Aug 2025 at 11:11.
25 Aug and 22 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hall Walk, Easington Village.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Northern Gas Networks on 29 Jul 2025 at 11:37.
Tomorrow
Durham County Council were proposing to carry out Highway repair and maintenance works on High Street, Thornley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 August 2025 and run through until 4 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Durham County Council on 29 Jul 2025 at 12:48.
Tomorrow
Durham County Council were proposing to carry out Highway repair and maintenance works on Gore Lane, Thornley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 August 2025 and run through until 4 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Durham County Council on 29 Jul 2025 at 12:48.
1 Sep and 31 Oct 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Trotter Terrace, Shotton Colliery.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 22 Apr 2025 at 11:03.
1 and 11 Sep 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Lane To Littlethorpe, Little Thorpe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 11 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 7 Aug 2025 at 13:50.
11 Sep 2025
Durham County Council are carrying out Highway repair and maintenance works on Lane To Littlethorpe, Little Thorpe.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 08:00 and could run through until 11 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 1 Sep 2025 at 08:09.
11 Sep 2025
Durham County Council are carrying out Highway repair and maintenance works on Thorpe Road, Easington Village.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 08:00 and could run through until 11 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 1 Sep 2025 at 08:11.
1 Sep and 31 Oct 2025
Durham County Council were proposing to carry out Highway repair and maintenance works on Faraday Terrace, Haswell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Durham County Council on 9 Apr 2025 at 08:42.
11 Sep 2025
Durham County Council are carrying out Highway repair and maintenance works on Thorpe Road, Little Thorpe.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 08:00 and could run through until 11 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 1 Sep 2025 at 08:10.
1 Sep and 31 Oct 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Faraday Terrace, Haswell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 22 Apr 2025 at 10:13.
1 Sep and 31 Oct 2025
Durham County Council were proposing to carry out Highway repair and maintenance works on Richmond Terrace, Haswell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Durham County Council on 9 Apr 2025 at 08:38.
1 Sep and 31 Oct 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Richmond Terrace, Haswell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 24 Apr 2025 at 11:49.
1 Sep and 31 Oct 2025
Durham County Council were proposing to carry out Highway repair and maintenance works on Pesspool Avenue, Haswell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Durham County Council on 9 Apr 2025 at 08:37.
1 Sep and 31 Oct 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Pesspool Avenue, Haswell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 24 Apr 2025 at 11:25.
1 Sep and 31 Oct 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Severn Close, Peterlee.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 24 Apr 2025 at 13:14.
1 Sep and 30 Nov 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Woodlands Avenue, Wheatley Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 30 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 21 Feb 2025 at 08:20.
1 Sep and 30 Nov 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Quilstyle Road, Wheatley Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 30 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 18 Feb 2025 at 15:53.
1 Sep and 30 Nov 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Front Street, Wheatley Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 30 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 24 Feb 2025 at 08:16.
1 Sep and 30 Nov 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on B1279 (From Hartlepool Street Junc To Front Street Junc), Wheatley Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 30 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 24 Feb 2025 at 11:37.
1 Sep and 31 Oct 2025
Durham County Council were proposing to carry out Highway repair and maintenance works on Severn Close, Peterlee.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Durham County Council on 9 Apr 2025 at 08:40.
1 Sep and 31 Oct 2025
Durham County Council were proposing to carry out Highway repair and maintenance works on Sunny Blunts, Peterlee.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Durham County Council on 9 Apr 2025 at 08:41.
1 Sep and 31 Oct 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Sunny Blunts, Peterlee.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 24 Apr 2025 at 10:30.
1 Sep and 31 Oct 2025
Durham County Council were proposing to carry out Highway repair and maintenance works on Helford Road, Peterlee.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Durham County Council on 9 Apr 2025 at 08:40.
1 Sep and 31 Oct 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Helford Road, Peterlee.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 22 Apr 2025 at 13:04.
1 Sep and 31 Oct 2025
Durham County Council were proposing to carry out Highway repair and maintenance works on Trotter Terrace, Shotton Colliery.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Durham County Council on 9 Apr 2025 at 08:41.
1 Sep and 31 Oct 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Old Quarrington, Old Quarrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 8 Apr 2025 at 09:40.
1 Sep and 31 Oct 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Lilac Terrace, Shotton Colliery.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 7 Apr 2025 at 13:22.
6 and 14 Oct 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Fifth Street, Horden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 14 Aug 2025 at 08:15.
9 and 17 Oct 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Fifth Street, Horden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 14 Aug 2025 at 11:48.
25 Oct and 2 Nov 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on B1279 (From Hartlepool Street Junc To Front Street Junc), Wheatley Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 12 May 2025 at 09:47.
25 Oct and 2 Nov 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Front Street, Wheatley Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 12 May 2025 at 09:47.
25 Oct and 2 Nov 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Quilstyle Road, Wheatley Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 12 May 2025 at 09:48.
25 Oct and 2 Nov 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Woodlands Avenue, Wheatley Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 12 May 2025 at 09:47.
Roadworks Map near to Haswell Road, WINGATE, TS28 5LE (Loading...)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Haswell Road, WINGATE, TS28 5LE (4 Events)
(Scheduled Dates)
(miles)
(Scheduled: 1 Sep 2025 - 24 Oct 2025)