ROADWORKS SUMMARY
Salters Lane, WINGATE, TS28 5JB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Salters Lane, TS28 5JB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Salters Lane, WINGATE, TS28 5JB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Salters Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Northumbrian Water logo
LONG TERM
Until
27 Dec 2024
Details
View Map
Share
Follow
Moor Crescent

Northumbrian Water are carrying out Utility repair and maintenance works on Moor Crescent, Ludworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 July 2024 at 13:00 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 4 Jul 2024 at 12:14.

Northumbrian Water logo
LONG TERM
Until
27 Dec 2024
Details
View Map
Share
Follow
Church View

Northumbrian Water are carrying out Utility repair and maintenance works on Church View, Ludworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 July 2024 at 13:00 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 4 Jul 2024 at 12:14.

Durham County Council logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Salters Lane

Durham County Council are carrying out Highway repair and maintenance works on Salters Lane, Wingate.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 October 2024 at 09:00 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Durham County Council on 28 Oct 2024 at 11:03.

Durham County Council logo
LONG TERM
Between
9 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Salters Lane

Durham County Council are proposing to carry out Highway repair and maintenance works on Salters Lane, Shotton Colliery.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 22 Oct 2024 at 13:19.

Durham County Council logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Salters Lane

Durham County Council are carrying out Highway repair and maintenance works on Salters Lane, Shotton Colliery.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 October 2024 at 09:00 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Durham County Council on 9 Oct 2024 at 11:14.

Durham County Council logo
LONG TERM
Between
9 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Salters Lane

Durham County Council are proposing to carry out Highway repair and maintenance works on Salters Lane, Shotton Colliery.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 2 Oct 2024 at 14:40.

Durham County Council logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Salters Lane

Durham County Council are carrying out Highway repair and maintenance works on Salters Lane, Shotton Colliery.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 October 2024 at 09:00 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Durham County Council on 28 Oct 2024 at 11:02.

Durham County Council logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Salters Lane

Durham County Council are carrying out Highway repair and maintenance works on Salters Lane, Wingate.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 October 2024 at 09:00 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Durham County Council on 9 Oct 2024 at 13:29.

Durham County Council logo
LONG TERM
Between
9 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Salters Lane

Durham County Council are proposing to carry out Highway repair and maintenance works on Salters Lane, Wingate.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 3 Oct 2024 at 09:20.

Durham County Council logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Eastbound Link Road Between A181 And Salters Lane

Durham County Council are carrying out Highway repair and maintenance works on Eastbound Link Road Between A181 And Salters Lane, Wingate.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:00 and could run through until 29 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Durham County Council on 28 Oct 2024 at 09:20.

Durham County Council logo
LONG TERM
Between
28 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Eastbound Link Road Between A181 And Salters Lane

Durham County Council are proposing to carry out Highway repair and maintenance works on Eastbound Link Road Between A181 And Salters Lane, Wingate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Durham County Council on 25 Oct 2024 at 11:30.

Durham County Council logo
LONG TERM
Between
28 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Eastbound Link Road Between A181 And Salters Lane

Durham County Council are proposing to carry out Highway repair and maintenance works on Eastbound Link Road Between A181 And Salters Lane, Wingate.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Durham County Council on 3 Oct 2024 at 09:19.

Durham County Council logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Westbound Link Road Between Salters Lane And A181

Durham County Council are carrying out Highway repair and maintenance works on Westbound Link Road Between Salters Lane And A181, Wingate.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:00 and could run through until 29 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Durham County Council on 28 Oct 2024 at 09:20.

Northumbrian Water logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Barnard Avenue

Northumbrian Water are carrying out Utility repair and maintenance works on Barnard Avenue, Ludworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:45 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 28 Oct 2024 at 09:56.

Durham County Council logo
LONG TERM
Between
1 Nov and 20 Dec 2024
Details
View Map
Share
Follow
B1279 (From Hartlepool Street Junc To Front Street Junc)

Durham County Council are proposing to carry out Highway repair and maintenance works on B1279 (From Hartlepool Street Junc To Front Street Junc), Wheatley Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 24 Sep 2024 at 11:06.

Durham County Council logo
LONG TERM
Between
1 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Front Street

Durham County Council are proposing to carry out Highway repair and maintenance works on Front Street, Wheatley Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 24 Sep 2024 at 12:51.

Durham County Council logo
LONG TERM
Between
1 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Woodlands Avenue

Durham County Council are proposing to carry out Highway repair and maintenance works on Woodlands Avenue, Wheatley Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 24 Sep 2024 at 11:09.

Durham County Council logo
LONG TERM
Between
4 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Cemetery Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Cemetery Road, Wheatley Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 5 Apr 2024 at 07:05.

Durham County Council logo
LONG TERM
Between
4 Nov and 20 Dec 2024
Details
View Map
Share
Follow
St Cuthberts Road

Durham County Council are proposing to carry out Highway repair and maintenance works on St Cuthberts Road, Peterlee.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 24 Sep 2024 at 11:07.

Durham County Council logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Follow
A181 (From C135 Junc To B1280 Salters Lane Overbridge)

Durham County Council are proposing to carry out Highway repair and maintenance works on A181 (From C135 Junc To B1280 Salters Lane Overbridge), Wingate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Durham County Council on 17 Oct 2024 at 08:53.

Durham County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
A181 (From C135 Junc To B1280 Salters Lane Overbridge)

Durham County Council are carrying out Highway repair and maintenance works on A181 (From C135 Junc To B1280 Salters Lane Overbridge), Wingate.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 07:30 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Durham County Council on 11 Nov 2024 at 07:33.

Durham County Council logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
A181 (From C65 Junc To C135 Durham Road Junc)

Durham County Council are proposing to carry out Highway repair and maintenance works on A181 (From C65 Junc To C135 Durham Road Junc), Wheatley Hill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Durham County Council on 16 Oct 2024 at 10:35.

Durham County Council logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
A181 (From C65 Junc To C135 Durham Road Junc)

Durham County Council are proposing to carry out Highway repair and maintenance works on A181 (From C65 Junc To C135 Durham Road Junc), Wheatley Hill.

These works are categorised as Major.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Durham County Council on 9 Oct 2024 at 11:18.

Durham County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
St Cuthberts Road

Durham County Council are proposing to carry out Highway repair and maintenance works on St Cuthberts Road, Peterlee.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 15 Nov 2024 at 14:19.

Northern Powergrid (Northeast) logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Seymour Street (Back)

Northern Powergrid (Northeast) are proposing to carry out New service connection on Seymour Street (Back), Horden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 13 Nov 2024 at 14:28.

Northern Powergrid (Northeast) logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Seymour Street (Back)

Northern Powergrid (Northeast) are proposing to carry out New service connection on Seymour Street (Back), Horden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 30 Oct 2024 at 12:46.

Northern Powergrid (Northeast) logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Seymour Street (Back)

Northern Powergrid (Northeast) were proposing to carry out New service connection on Seymour Street (Back), Horden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Oct 2024 at 12:08.

Northern Powergrid (Northeast) logo
Between
2 and 17 Dec 2024
Details
View Map
Share
Stockton Road

Northern Powergrid (Northeast) were proposing to carry out New service connection on Stockton Road, Cold Hesledon.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 17 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 14 Oct 2024 at 09:05.

Northern Powergrid (Northeast) logo
Between
2 and 17 Dec 2024
Details
View Map
Share
Stockton Road

Northern Powergrid (Northeast) were proposing to carry out New service connection on Stockton Road, Cold Hesledon.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 17 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 7 Nov 2024 at 11:33.

Durham County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Thorntree Gill

Durham County Council are proposing to carry out Highway repair and maintenance works on Thorntree Gill, Peterlee.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 18 Nov 2024 at 09:48.

Durham County Council logo
Between
2 and 8 Dec 2024
Details
View Map
Share
Follow
Thorntree Gill

Durham County Council are proposing to carry out Highway repair and maintenance works on Thorntree Gill, Peterlee.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 9 Oct 2024 at 15:16.

Northern Powergrid (Northeast) logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Malcolm Avenue

Northern Powergrid (Northeast) were proposing to carry out Utility asset works on Malcolm Avenue, Quarrington Hill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Oct 2024 at 12:09.

Northern Powergrid (Northeast) logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Malcolm Avenue

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Malcolm Avenue, Quarrington Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 30 Oct 2024 at 10:40.

Durham County Council logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Hudson Avenue

Durham County Council are proposing to carry out Highway repair and maintenance works on Hudson Avenue, Horden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 13 Nov 2024 at 10:26.

Northern Gas Networks logo
LONG TERM
Between
17 Feb and 7 Apr 2025
Details
View Map
Share
Follow
Staveley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Staveley Road, Peterlee.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 April 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 20 Nov 2024 at 09:44.

Northern Gas Networks logo
LONG TERM
Between
17 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Cumbrian Way

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cumbrian Way, Peterlee.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 30 April 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 20 Nov 2024 at 09:43.


Roadworks Map near to Salters Lane, WINGATE, TS28 5JB

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 22 Nov 2024 05:57
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Salters Lane, WINGATE, TS28 5JB (22 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Durham County Council logo
MAJOR
  
SALTERS LANE 
(0.2 miles)
Durham County Council
Highway repair and maintenance works - Footway, Carriageway, Verge - Multi-way signals
In Progress
Since: 9 Oct 2024 09:00
(Scheduled: 9 Oct 2024 - 29 Nov 2024)
0.2
Details
Share
Follow
2
Durham County Council logo
MAJOR
  
SALTERS LANE 
(0.2 miles)
Durham County Council
Highway repair and maintenance works - Footway, Verge - Give and take
Planned
Scheduled: 9 Oct 2024 - 29 Nov 2024
0.2
Details
Share
Follow
3
Durham County Council logo
MAJOR
  
SALTERS LANE 
(0.2 miles)
Durham County Council
Highway repair and maintenance works - Footway, Carriageway, Verge - Multi-way signals
In Progress
Since: 9 Oct 2024 09:00
(Scheduled: 9 Oct 2024 - 29 Nov 2024)
0.2
Details
Share
Follow
4
Durham County Council logo
MAJOR
  
SALTERS LANE 
(0.2 miles)
Durham County Council
Highway repair and maintenance works - Footway, Carriageway, Verge - Lane closure
Planned
Scheduled: 9 Oct 2024 - 29 Nov 2024
0.2
Details
Share
Follow
5
Durham County Council logo
MAJOR
  
SALTERS LANE 
(0.2 miles)
Durham County Council
Highway repair and maintenance works - Footway, Carriageway, Verge - Multi-way signals
In Progress
Since: 9 Oct 2024 09:00
(Scheduled: 9 Oct 2024 - 29 Nov 2024)
0.2
Details
Share
Follow
6
Durham County Council logo
MAJOR
  
SALTERS LANE 
(0.2 miles)
Durham County Council
Highway repair and maintenance works - Footway, Carriageway, Verge - Give and take
Planned
Scheduled: 9 Oct 2024 - 29 Nov 2024
0.2
Details
Share
Follow
7
Durham County Council logo
MAJOR
  
WESTBOUND LINK ROAD BETWEEN SALTERS LANE AND A181 
(0.2 miles)
Durham County Council
Highway repair and maintenance works - Carriageway, Verge - Multi-way signals
In Progress
Since: 28 Oct 2024 09:00
(Scheduled: 28 Oct 2024 - 29 Nov 2024)
0.2
Details
Share
Follow
8
Durham County Council logo
MAJOR
  
EASTBOUND LINK ROAD BETWEEN A181 AND SALTERS LANE 
(0.3 miles)
Durham County Council
Highway repair and maintenance works - Carriageway, Verge - Lane closure
Planned
Scheduled: 28 Oct 2024 - 29 Nov 2024
0.3
Details
Share
Follow
9
Durham County Council logo
MAJOR
  
EASTBOUND LINK ROAD BETWEEN A181 AND SALTERS LANE 
(0.3 miles)
Durham County Council
Highway repair and maintenance works - Carriageway, Verge - Multi-way signals
Planned
Scheduled: 28 Oct 2024 - 29 Nov 2024
0.3
Details
Share
Follow
10
Durham County Council logo
MAJOR
  
EASTBOUND LINK ROAD BETWEEN A181 AND SALTERS LANE 
(0.3 miles)
Durham County Council
Highway repair and maintenance works - Carriageway, Verge - Lane closure
In Progress
Since: 28 Oct 2024 09:00
(Scheduled: 28 Oct 2024 - 29 Nov 2024)
0.3
Details
Share
Follow
  • ...