ROADWORKS SUMMARY
Islay Grove, HARTLEPOOL, TS25 3HN

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Islay Grove, TS25 3HN and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Islay Grove, HARTLEPOOL, TS25 3HN

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Islay Grove are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Northern Gas Networks logo
LONG TERM
Until
13 Feb 2025
Details
View Map
Share
Follow
Clavering Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Clavering Road, Hartlepool.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2024 at 08:00 and could run through until 13 February 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 4 Oct 2024 at 14:09.

Northern Gas Networks logo
LONG TERM
Until
3 Mar 2025
Details
View Map
Share
Follow
Caledonian Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Caledonian Road, Hartlepool.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 October 2024 at 08:00 and could run through until 3 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 27 Nov 2024 at 08:13.

Hartlepool Borough Council logo
LONG TERM
Until
2 Jan 2025
Details
View Map
Share
Follow
Dent Street

Hartlepool Borough Council are carrying out roadworks on Dent Street, Hartlepool.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 10:00 and could run through until 2 January 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Hartlepool Borough Council on 7 Oct 2024 at 10:25.

Northern Gas Networks logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Bute Avenue

Northern Gas Networks are carrying out Utility repair and maintenance works on Bute Avenue, Hartlepool.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 08:00 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 Oct 2024 at 15:45.

Hartlepool Borough Council logo
LONG TERM
Until
2 Jan 2025
Details
View Map
Share
Follow
Young Street

Hartlepool Borough Council are carrying out roadworks on Young Street, Hartlepool.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 10:00 and could run through until 2 January 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Hartlepool Borough Council on 7 Oct 2024 at 10:29.

Northern Gas Networks logo
LONG TERM
Until
3 Feb 2025
Details
View Map
Share
Follow
Heathfield Drive

Northern Gas Networks are carrying out Utility repair and maintenance works on Heathfield Drive, Hartlepool.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 October 2024 at 16:00 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 27 Nov 2024 at 08:10.

Northern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Heathfield Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathfield Drive, Hartlepool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 28 Aug 2024 at 15:14.

Northern Gas Networks logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Rafton Drive

Northern Gas Networks are carrying out Utility repair and maintenance works on Rafton Drive, Hartlepool.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 October 2024 at 16:00 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 18 Oct 2024 at 16:04.

Northern Gas Networks logo
LONG TERM
Until
10 Dec 2024
Details
View Map
Share
Follow
Brierton Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Brierton Lane, Hartlepool.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 10 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 21 Oct 2024 at 08:22.

Northern Gas Networks logo
LONG TERM
Between
28 Oct and 16 Dec 2024
Details
View Map
Share
Follow
Ventnor Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ventnor Avenue, Hartlepool.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 28 Aug 2024 at 15:12.

Hartlepool Borough Council logo
LONG TERM
Between
28 Oct 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Stockton Road

Hartlepool Borough Council are proposing to carry out Highway improvement works on Stockton Road, Hartlepool.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 3 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hartlepool Borough Council on 3 Oct 2024 at 16:11.

Hartlepool Borough Council logo
LONG TERM
Until
30 May 2025
Details
View Map
Share
Follow
Stockton Road

Hartlepool Borough Council are carrying out Highway improvement works on Stockton Road, Hartlepool.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 08:00 and could run through until 30 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hartlepool Borough Council on 8 Nov 2024 at 08:30.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Eskdale Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Eskdale Road, Hartlepool.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Sep 2024 at 15:01.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Wynyard Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wynyard Road, Hartlepool.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 28 Aug 2024 at 11:04.

Northern Gas Networks logo
Until
9 Dec 2024
Details
View Map
Share
Follow
Brierton Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Brierton Lane, Hartlepool.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 November 2024 at 08:00 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 27 Nov 2024 at 09:33.

Northern Gas Networks logo
Until
9 Dec 2024
Details
View Map
Share
Follow
Catcote Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Catcote Road, Hartlepool.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 November 2024 at 08:00 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 27 Nov 2024 at 09:32.

Northern Gas Networks logo
LONG TERM
Between
18 Nov 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Brierton Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Brierton Lane, Hartlepool.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 28 Aug 2024 at 12:52.

Anglian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Burn Road

Anglian Water are carrying out Utility repair and maintenance works on Burn Road, Hartlepool.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 13:55 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 25 Nov 2024 at 10:50.

Northern Gas Networks logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Fernwood Avenue

Northern Gas Networks are carrying out Utility repair and maintenance works on Fernwood Avenue, Hartlepool.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:15 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 11:09.

Northern Gas Networks logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Catcote Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Catcote Road, Hartlepool.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 24 Sep 2024 at 13:03.

Northern Gas Networks logo
Until
18 Dec 2024
Details
View Map
Share
Follow
Catcote Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Catcote Road, Hartlepool.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 November 2024 at 08:00 and could run through until 18 December 2024. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Northern Gas Networks on 27 Nov 2024 at 09:20.

Northern Gas Networks logo
Until
17 Dec 2024
Details
View Map
Share
Follow
Dalkeith Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Dalkeith Road, Hartlepool.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 November 2024 at 08:00 and could run through until 17 December 2024. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Northern Gas Networks on 27 Nov 2024 at 09:21.

Northern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Brierton Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Brierton Lane, Hartlepool.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 28 Aug 2024 at 15:16.

Northern Powergrid (Northeast) logo
Between
3 and 20 Dec 2024
Details
View Map
Share
Follow
Hartlepool Road

Northern Powergrid (Northeast) are proposing to carry out New service connection on Hartlepool Road, Wynyard.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 22 Nov 2024 at 08:13.

Northern Powergrid (Northeast) logo
LONG TERM
Between
4 Dec 2024 and 1 Mar 2025
Details
View Map
Share
Follow
Hartlepool Road

Northern Powergrid (Northeast) are proposing to carry out New service connection on Hartlepool Road, Hartlepool.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 1 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 22 Nov 2024 at 10:24.

Northern Gas Networks logo
LONG TERM
Between
2 Jan and 20 Feb 2025
Details
View Map
Share
Follow
Ventnor Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ventnor Avenue, Hartlepool.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 26 Nov 2024 at 15:55.

Northern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Woodstock Way

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodstock Way, Hartlepool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 30 May 2024 at 09:46.

Northern Gas Networks logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
York Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on York Road, Hartlepool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Oct 2024 at 15:30.

Northern Gas Networks logo
Between
3 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Westbrooke Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Westbrooke Avenue, Hartlepool.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Aug 2024 at 15:11.

Northern Gas Networks logo
LONG TERM
Between
10 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Westbrooke Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Westbrooke Avenue, Hartlepool.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Aug 2024 at 14:45.

Northern Gas Networks logo
Between
10 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Southbrooke Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Southbrooke Avenue, Hartlepool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Aug 2024 at 14:45.

Northern Gas Networks logo
Between
24 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Westbrooke Grove

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Westbrooke Grove, Hartlepool.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Aug 2024 at 14:46.

Stockton-on-tees Borough Council logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Wolviston Road

Stockton-on-tees Borough Council are proposing to carry out Highway improvement works on Wolviston Road, Billingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Stockton-on-tees Borough Council on 27 Jun 2024 at 12:38.

Stockton-on-tees Borough Council logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Rievaulx Avenue

Stockton-on-tees Borough Council are proposing to carry out Highway improvement works on Rievaulx Avenue, Billingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Stockton-on-tees Borough Council on 25 Jul 2024 at 12:01.


Roadworks Map near to Islay Grove, HARTLEPOOL, TS25 3HN

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Nov 2024 20:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Islay Grove, HARTLEPOOL, TS25 3HN (46 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Hartlepool Borough Council logo
CATCOTE ROAD 
(0.2 miles)
Hartlepool Borough Council
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 14 Nov 2024 - 27 Nov 2024
0.2
Details
Share
Follow
2
Hartlepool Borough Council logo
FENS SHOPS ACCESS ROAD 
(0.2 miles)
Hartlepool Borough Council
Utility asset works - Carriageway - Some carriageway incursion
Planned
Scheduled: 27 Nov 2024 - 10 Dec 2024
0.2
Details
Share
Follow
3
Anglian Water logo
OWTON MANOR LANE 
(0.2 miles)
Anglian Water
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 27 Nov 2024 09:19
(Scheduled: 26 Nov 2024 - 29 Nov 2024)
0.2
Details
Share
Follow
4
Hartlepool Borough Council logo
KILMARNOCK ROAD 
(0.3 miles)
Hartlepool Borough Council
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 26 Nov 2024 - 9 Dec 2024
0.3
Details
Share
Follow
5
Hartlepool Borough Council logo
WYNYARD ROAD 
(0.4 miles)
Hartlepool Borough Council
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 26 Nov 2024 - 9 Dec 2024
0.4
Details
Share
Follow
6
Northern Gas Networks logo
MAJOR
  
DALKEITH ROAD 
(0.4 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge, Cycleway - Multi-way signals
In Progress
Since: 27 Nov 2024 08:00
(Scheduled: 27 Nov 2024 - 17 Dec 2024)
0.4
Details
Share
Follow
7
Northern Powergrid (Northeast) logo
DALKEITH ROAD 
(0.4 miles)
Northern Powergrid (Northeast)
Utility asset works - Footway, Carriageway - Priority working
Planned
Scheduled: 28 Nov 2024 - 11 Dec 2024
0.4
Details
Share
Follow
8
Northern Gas Networks logo
MAJOR
  
CATCOTE ROAD 
(0.4 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge, Cycleway - Multi-way signals
In Progress
Since: 27 Nov 2024 08:00
(Scheduled: 27 Nov 2024 - 18 Dec 2024)
0.4
Details
Share
Follow
9
Northern Gas Networks logo
MAJOR
  
ESKDALE ROAD 
(0.4 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 11 Nov 2024 - 29 Nov 2024
0.4
Details
Share
Follow
10
Hartlepool Borough Council logo
MOWBRAY ROAD 
(0.4 miles)
Hartlepool Borough Council
Utility asset works - Footway - Some carriageway incursion
In Progress
Since: 26 Nov 2024 08:00
(Scheduled: 26 Nov 2024 - 28 Nov 2024)
0.4
Details
Share
Follow
  • ...