ROADWORKS SUMMARY
Front Street, STOCKTON-ON-TEES, TS21 2AJ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Front Street, TS21 2AJ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Front Street, STOCKTON-ON-TEES, TS21 2AJ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Front Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Durham County Council logo
LONG TERM
Between
1 Sep and 30 Nov 2026
Details
View Map
Share
Follow
Salters Lane

Durham County Council are proposing to carry out Highway improvement works on Salters Lane, Trimdon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Durham County Council on 24 Mar 2026 at 09:08.

Northumbrian Water logo
LONG TERM
Until
26 Jul 2027
Details
View Map
Share
Follow
The Leas

Northumbrian Water are carrying out Highway repair and maintenance works on The Leas, Sedgefield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 09:21 and could run through until 26 July 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 14 Sep 2026 at 09:35.

Northern Powergrid (Northeast) logo
LONG TERM
Between
21 Sep and 30 Oct 2026
Details
View Map
Share
Follow
Woodham Way

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Woodham Way, Newton Aycliffe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 16 Sep 2026 at 09:47.

Northumbrian Water logo
Between
21 Sep and 11 Oct 2026
Details
View Map
Share
Follow
C26 From Holdforth Farm To Sedgefield Terrace

Northumbrian Water are proposing to carry out Utility asset works on C26 From Holdforth Farm To Sedgefield Terrace, Fishburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 11 October 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 2 Sep 2026 at 09:01.

Northumbrian Water logo
LONG TERM
Between
21 Sep and 18 Dec 2026
Details
View Map
Share
Follow
A177 From Stonybeck Lane To A689 Junction

Northumbrian Water are proposing to carry out Utility asset works on A177 From Stonybeck Lane To A689 Junction, Sedgefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 18 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 2 Sep 2026 at 09:00.

Northumbrian Water logo
Between
29 Sep and 19 Oct 2026
Details
View Map
Share
Follow
C26 From Holdforth Farm To Sedgefield Terrace

Northumbrian Water are proposing to carry out Utility asset works on C26 From Holdforth Farm To Sedgefield Terrace, Fishburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 19 October 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 9 Sep 2026 at 11:47.

Northumbrian Water logo
LONG TERM
Between
29 Sep 2026 and 22 Jan 2027
Details
View Map
Share
Follow
A177 From Stonybeck Lane To A689 Junction

Northumbrian Water are proposing to carry out Utility asset works on A177 From Stonybeck Lane To A689 Junction, Sedgefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 22 January 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 16 Sep 2026 at 09:15.

Northumbrian Water logo
Between
5 and 7 Oct 2026
Details
View Map
Share
Follow
Kirk Street

Northumbrian Water are proposing to carry out Utility asset works on Kirk Street, Stillington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 14 Jul 2026 at 13:28.

Northern Powergrid (Northeast) logo
LONG TERM
Between
5 Oct and 20 Nov 2026
Details
View Map
Share
Follow
B6291 (From Bowburn Interchange To The Avenue Junc)

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on B6291 (From Bowburn Interchange To The Avenue Junc), Coxhoe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 9 Sep 2026 at 13:18.

Northern Powergrid (Northeast) logo
LONG TERM
Between
5 Oct and 20 Nov 2026
Details
View Map
Share
Follow
B6291 (From Bowburn Interchange To The Avenue Junc)

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on B6291 (From Bowburn Interchange To The Avenue Junc), Coxhoe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 9 Sep 2026 at 14:09.

Northern Powergrid (Northeast) logo
LONG TERM
Between
5 Oct and 20 Nov 2026
Details
View Map
Share
Follow
B6291 (From Bowburn Interchange To The Avenue Junc)

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on B6291 (From Bowburn Interchange To The Avenue Junc), Coxhoe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 9 Sep 2026 at 15:57.

Northern Powergrid (Northeast) logo
LONG TERM
Between
19 Oct and 27 Nov 2026
Details
View Map
Share
Follow
The Avenue

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on The Avenue, Coxhoe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 9 Sep 2026 at 13:56.

Northern Powergrid (Northeast) logo
LONG TERM
Between
19 Oct and 20 Nov 2026
Details
View Map
Share
Follow
The Avenue

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on The Avenue, Coxhoe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 9 Sep 2026 at 14:09.

Northern Powergrid (Northeast) logo
LONG TERM
Between
19 Oct and 20 Nov 2026
Details
View Map
Share
Follow
The Avenue

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on The Avenue, Coxhoe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 9 Sep 2026 at 15:56.

Durham County Council logo
LONG TERM
Between
1 Nov and 20 Dec 2026
Details
View Map
Share
Follow
Bridge Road

Durham County Council are proposing to carry out roadworks on Bridge Road, West Cornforth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2026 and could run through until 20 December 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Durham County Council on 24 Aug 2026 at 12:15.

Northern Powergrid (Northeast) logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
West Park Lane

Northern Powergrid (Northeast) are proposing to carry out New service connection on West Park Lane, Sedgefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Sep 2026 at 13:02.


Roadworks Map near to Front Street, STOCKTON-ON-TEES, TS21 2AJ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 16 Sep 2026 11:18
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Front Street, STOCKTON-ON-TEES, TS21 2AJ (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Durham County Council logo
STOCKTON ROAD 
(0.3 miles)
Durham County Council
Optional permit (no fee) e.g. for traffic management etc - Carriageway - Multi-way signals
Planned
Scheduled: 16 Sep 2026 - 17 Sep 2026
0.3
Details
Share
Follow
2
Northumbrian Water logo
MAJOR
  
THE LEAS 
(0.4 miles)
Northumbrian Water
Highway repair and maintenance works - Footway, Carriageway - Road closure
In Progress
Since: 14 Sep 2026 09:21
(Scheduled: 14 Sep 2026 - 26 Jul 2027)
0.4
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.