ROADWORKS SUMMARY
Glebe Road, STOCKTON-ON-TEES, TS21 1NB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Glebe Road, TS21 1NB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Glebe Road, STOCKTON-ON-TEES, TS21 1NB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Glebe Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Northern Gas Networks logo
LONG TERM
Until
10 Mar 2025
Details
View Map
Share
Follow
Cleveland Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Cleveland Street, Darlington.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 08:00 and could run through until 10 March 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 19 Feb 2025 at 11:26.

Northern Gas Networks logo
LONG TERM
Until
10 Mar 2025
Details
View Map
Share
Follow
Albert Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Albert Road, Darlington.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 08:00 and could run through until 10 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 19 Feb 2025 at 11:38.

Northern Gas Networks logo
LONG TERM
Until
10 Mar 2025
Details
View Map
Share
Follow
John Street Cycleway

Northern Gas Networks are carrying out Utility repair and maintenance works on John Street Cycleway, Darlington.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 23 September 2024 at 08:00 and could run through until 10 March 2025. The works will impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 19 Feb 2025 at 11:38.

Durham County Council logo
LONG TERM
Until
31 May 2025
Details
View Map
Share
Follow
Ricknall Lane

Durham County Council are carrying out Highway improvement works on Ricknall Lane, Newton Aycliffe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 07:30 and could run through until 31 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Durham County Council on 14 Feb 2025 at 11:09.

Durham County Council logo
LONG TERM
Until
31 May 2025
Details
View Map
Share
Follow
A167 (From Rushyford Roundabout To C34 Ricknall Lane Junc)

Durham County Council are carrying out Highway improvement works on A167 (From Rushyford Roundabout To C34 Ricknall Lane Junc), Newton Aycliffe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 07:30 and could run through until 31 May 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Durham County Council on 14 Feb 2025 at 11:09.

Durham County Council logo
LONG TERM
Between
20 Nov 2024 and 31 Mar 2025
Details
View Map
Share
Follow
A167 (From Rushyford Roundabout To C34 Ricknall Lane Junc)

Durham County Council are proposing to carry out Highway improvement works on A167 (From Rushyford Roundabout To C34 Ricknall Lane Junc), Newton Aycliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 31 March 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 16 Dec 2024 at 16:22.

Durham County Council logo
LONG TERM
Until
31 May 2025
Details
View Map
Share
Follow
A167 (From C34 Ricknall Lane Junc To B6443 St Cuthberts Way Junc)

Durham County Council are carrying out Highway improvement works on A167 (From C34 Ricknall Lane Junc To B6443 St Cuthberts Way Junc), Newton Aycliffe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 07:30 and could run through until 31 May 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Durham County Council on 14 Feb 2025 at 11:10.

Durham County Council logo
LONG TERM
Between
20 Nov 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Ricknall Lane

Durham County Council are proposing to carry out Highway improvement works on Ricknall Lane, Newton Aycliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 16 Dec 2024 at 16:07.

Durham County Council logo
LONG TERM
Between
20 Nov 2024 and 31 Mar 2025
Details
View Map
Share
Follow
A167 (From C34 Ricknall Lane Junc To B6443 St Cuthberts Way Junc)

Durham County Council are proposing to carry out Highway improvement works on A167 (From C34 Ricknall Lane Junc To B6443 St Cuthberts Way Junc), Newton Aycliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 31 March 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 16 Dec 2024 at 16:23.

Darlington Borough Council logo
LONG TERM
Until
14 Mar 2025
Details
View Map
Share
Follow
Lingfield Way

Darlington Borough Council are carrying out Highway improvement works on Lingfield Way, Darlington.

These works are categorised as Major.

The works started on 2 December 2024 at 10:00 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Darlington Borough Council on 14 Feb 2025 at 10:18.

Durham County Council logo
LONG TERM
Between
16 Dec 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Central Avenue

Durham County Council are proposing to carry out Highway improvement works on Central Avenue, Newton Aycliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 30 April 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 19 Dec 2024 at 08:13.

Durham County Council logo
LONG TERM
Until
30 May 2025
Details
View Map
Share
Follow
Central Avenue

Durham County Council are carrying out Highway improvement works on Central Avenue, Newton Aycliffe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 08:00 and could run through until 30 May 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Durham County Council on 14 Feb 2025 at 11:08.

Fulcrum Pipelines logo
LONG TERM
Between
13 Jan and 7 Mar 2025
Details
View Map
Share
Heighington Lane

Fulcrum Pipelines were proposing to carry out Utility asset works on Heighington Lane, Newton Aycliffe.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 7 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Fulcrum Pipelines on 13 Nov 2024 at 13:44.

Northern Gas Networks logo
LONG TERM
Until
1 Apr 2025
Details
View Map
Share
Follow
Cumby Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Cumby Road, Newton Aycliffe.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 January 2025 at 16:00 and could run through until 1 April 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 13 Feb 2025 at 09:14.

Northern Gas Networks logo
LONG TERM
Until
11 Mar 2025
Details
View Map
Share
Follow
Watson Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Watson Road, Newton Aycliffe.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 January 2025 at 08:00 and could run through until 11 March 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 14 Feb 2025 at 09:21.

Darlington Borough Council logo
Finishing
Today
Details
View Map
Share
Follow
Jesmond Road

Darlington Borough Council are proposing to carry out Highway repair and maintenance works on Jesmond Road, Darlington.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 24 January 2025 and could run through until 20 February 2025. The works will impact the verge only.

This roadwork event was last updated by Darlington Borough Council on 21 Jan 2025 at 13:56.

Durham County Council logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Heighington Lane

Durham County Council were proposing to carry out Highway repair and maintenance works on Heighington Lane, Newton Aycliffe.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Durham County Council on 13 Dec 2024 at 07:48.

Durham County Council logo
LONG TERM
Between
14 Feb and 30 Apr 2025
Details
View Map
Share
Follow
St Oswalds Court

Durham County Council are proposing to carry out New service connection on St Oswalds Court, Newton Aycliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 30 April 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Durham County Council on 12 Feb 2025 at 13:58.

Nexfibre Networks Limited logo
Between
20 and 27 Feb 2025
Details
View Map
Share
Follow
Aldfrid Place

Nexfibre Networks Limited are proposing to carry out Utility asset works on Aldfrid Place, Newton Aycliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Nexfibre Networks Limited on 27 Nov 2024 at 09:48.

Nexfibre Networks Limited logo
Between
21 and 27 Feb 2025
Details
View Map
Share
Follow
Hickstead Rise

Nexfibre Networks Limited are proposing to carry out Remedial works on Hickstead Rise, Newton Aycliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 18 Feb 2025 at 08:05.

Durham County Council logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
St Oswalds Court

Durham County Council are proposing to carry out New service connection on St Oswalds Court, Newton Aycliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Durham County Council on 12 Feb 2025 at 16:04.

Nexfibre Networks Limited logo
Between
25 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Aldfrid Place

Nexfibre Networks Limited are proposing to carry out Utility asset works on Aldfrid Place, Newton Aycliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Nexfibre Networks Limited on 6 Feb 2025 at 10:19.

Nexfibre Networks Limited logo
Between
26 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Well House Drive

Nexfibre Networks Limited are proposing to carry out Utility asset works on Well House Drive, Newton Aycliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 6 March 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Nexfibre Networks Limited on 3 Dec 2024 at 08:15.

Nexfibre Networks Limited logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Heatherburn Court

Nexfibre Networks Limited are proposing to carry out Utility asset works on Heatherburn Court, Newton Aycliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 11 Feb 2025 at 07:36.

Nexfibre Networks Limited logo
Between
3 and 11 Mar 2025
Details
View Map
Share
Follow
Arncliffe Place

Nexfibre Networks Limited are proposing to carry out Utility asset works on Arncliffe Place, Newton Aycliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 11 March 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Nexfibre Networks Limited on 14 Feb 2025 at 09:28.

National Highways logo
Between
3 and 22 Mar 2025
Details
View Map
Share
Follow
West Road

National Highways are proposing to carry out Works for road purposes on West Road, Bradbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 24 Jan 2025 at 15:42.

National Highways logo
Between
3 and 22 Mar 2025
Details
View Map
Share
Follow
West Road

National Highways are proposing to carry out Works for road purposes on West Road, Bradbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 10 Feb 2025 at 13:06.

National Highways logo
Between
3 and 22 Mar 2025
Details
View Map
Share
Follow
West Road

National Highways are proposing to carry out Works for road purposes on West Road, Bradbury.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 10 Feb 2025 at 11:54.

National Highways logo
Between
3 and 22 Mar 2025
Details
View Map
Share
Follow
West Road

National Highways are proposing to carry out Works for road purposes on West Road, Bradbury.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 10 Feb 2025 at 13:07.

National Highways logo
Between
3 and 22 Mar 2025
Details
View Map
Share
Follow
A689 (From Rushyford Roundabout To A1m Junc 60)

National Highways are proposing to carry out Works for road purposes on A689 (From Rushyford Roundabout To A1m Junc 60), Bradbury.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 10 Feb 2025 at 11:39.

National Highways logo
Between
3 and 22 Mar 2025
Details
View Map
Share
Follow
A689 (From Rushyford Roundabout To A1m Junc 60)

National Highways are proposing to carry out Works for road purposes on A689 (From Rushyford Roundabout To A1m Junc 60), Bradbury.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 10 Feb 2025 at 13:07.

Nexfibre Networks Limited logo
Between
6 and 10 Mar 2025
Details
View Map
Share
Follow
Heatherburn Court

Nexfibre Networks Limited are proposing to carry out Utility asset works on Heatherburn Court, Newton Aycliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 6 Nov 2024 at 08:46.

National Highways logo
Between
7 and 22 Mar 2025
Details
View Map
Share
Follow
West Road

National Highways are proposing to carry out Works for road purposes on West Road, Bradbury.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 10 Feb 2025 at 11:47.

National Highways logo
Between
7 and 22 Mar 2025
Details
View Map
Share
Follow
West Road

National Highways are proposing to carry out Works for road purposes on West Road, Bradbury.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 10 Feb 2025 at 13:08.

Durham County Council logo
Between
10 and 17 Mar 2025
Details
View Map
Share
Follow
Burnhill Way

Durham County Council are proposing to carry out Highway repair and maintenance works on Burnhill Way, Newton Aycliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 22 Jan 2025 at 10:47.

Nexfibre Networks Limited logo
Between
20 Mar and 3 Apr 2025
Details
View Map
Share
Follow
Well House Drive

Nexfibre Networks Limited are proposing to carry out Utility asset works on Well House Drive, Newton Aycliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 3 April 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Nexfibre Networks Limited on 11 Feb 2025 at 11:58.

Nexfibre Networks Limited logo
Between
20 and 28 Mar 2025
Details
View Map
Share
Follow
Arncliffe Place

Nexfibre Networks Limited are proposing to carry out Utility asset works on Arncliffe Place, Newton Aycliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Nexfibre Networks Limited on 10 Dec 2024 at 08:18.

Nexfibre Networks Limited logo
Between
26 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Kimblesworth Walk

Nexfibre Networks Limited are proposing to carry out Utility asset works on Kimblesworth Walk, Newton Aycliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 2 April 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Nexfibre Networks Limited on 3 Dec 2024 at 08:36.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
East End

Durham County Council are proposing to carry out Highway repair and maintenance works on East End, Sedgefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 10 Jan 2025 at 08:38.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Butterwick Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Butterwick Road, Sedgefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 10 Jan 2025 at 08:18.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
The Lane

Durham County Council are proposing to carry out Highway repair and maintenance works on The Lane, Sedgefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 10 Jan 2025 at 10:13.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
High Street

Durham County Council are proposing to carry out Highway repair and maintenance works on High Street, Aycliffe Village.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 9 Jan 2025 at 13:14.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
West Terrace

Durham County Council are proposing to carry out Highway repair and maintenance works on West Terrace, Aycliffe Village.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 9 Jan 2025 at 13:22.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
A167 (From B6443 Junc To C187 Junc)

Durham County Council are proposing to carry out Highway repair and maintenance works on A167 (From B6443 Junc To C187 Junc), Newton Aycliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 9 Jan 2025 at 15:16.

Nexfibre Networks Limited logo
Between
2 and 10 Apr 2025
Details
View Map
Share
Follow
Garburn Place

Nexfibre Networks Limited are proposing to carry out Utility asset works on Garburn Place, Newton Aycliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 10 April 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Nexfibre Networks Limited on 14 Jan 2025 at 12:44.

Northern Gas Networks logo
LONG TERM
Between
7 Apr and 19 May 2025
Details
View Map
Share
Follow
Horndale Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Horndale Avenue, Newton Aycliffe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 19 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 08:16.

Northern Gas Networks logo
LONG TERM
Between
7 Apr and 19 May 2025
Details
View Map
Share
Follow
Horndale Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Horndale Avenue, Newton Aycliffe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 19 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 19 Nov 2024 at 11:45.

Nexfibre Networks Limited logo
Between
11 and 17 Apr 2025
Details
View Map
Share
Follow
Reeth Place

Nexfibre Networks Limited are proposing to carry out Utility asset works on Reeth Place, Newton Aycliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 17 April 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Nexfibre Networks Limited on 10 Dec 2024 at 08:38.

Northern Gas Networks logo
LONG TERM
Between
14 Apr and 27 May 2025
Details
View Map
Share
Follow
St Cuthberts Way

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Cuthberts Way, Newton Aycliffe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 27 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 19 Nov 2024 at 11:45.

Northern Gas Networks logo
LONG TERM
Between
14 Apr and 6 Jun 2025
Details
View Map
Share
Follow
Heighington Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Heighington Lane, Newton Aycliffe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 12 Feb 2025 at 10:31.

Northern Gas Networks logo
LONG TERM
Between
14 Apr and 6 Jun 2025
Details
View Map
Share
Follow
Heighington Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Heighington Lane, School Aycliffe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 12 Feb 2025 at 10:21.

Northern Gas Networks logo
LONG TERM
Between
14 Apr and 27 May 2025
Details
View Map
Share
Follow
St Cuthberts Way

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Cuthberts Way, Newton Aycliffe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 27 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 08:16.

Northumbrian Water logo
LONG TERM
Between
21 Apr and 22 Sep 2025
Details
View Map
Share
Follow
The Leas

Northumbrian Water are proposing to carry out Utility repair and maintenance works on The Leas, Sedgefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 18 Feb 2025 at 13:45.

Northumbrian Water logo
LONG TERM
Between
21 Apr and 22 Sep 2025
Details
View Map
Share
The Leas

Northumbrian Water were proposing to carry out Permanent reinstatement on The Leas, Sedgefield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 22 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 14 Feb 2025 at 12:52.

Darlington Borough Council logo
Between
22 and 27 Apr 2025
Details
View Map
Share
Follow
Sadberge Road

Darlington Borough Council are proposing to carry out Highway repair and maintenance works on Sadberge Road, Middleton St George.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Darlington Borough Council on 9 Jan 2025 at 13:51.

Darlington Borough Council logo
Between
22 and 27 Apr 2025
Details
View Map
Share
Follow
Sadberge Road

Darlington Borough Council are proposing to carry out Highway repair and maintenance works on Sadberge Road, Middleton St George.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Darlington Borough Council on 9 Jan 2025 at 13:58.

Northumbrian Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
West Park Lane

Northumbrian Water were proposing to carry out Utility repair and maintenance works on West Park Lane, Sedgefield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 24 Jan 2025 at 16:20.

Nexfibre Networks Limited logo
Between
30 Apr and 7 May 2025
Details
View Map
Share
Follow
Whinlatter Place

Nexfibre Networks Limited are proposing to carry out Utility asset works on Whinlatter Place, Newton Aycliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 7 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 14 Jan 2025 at 12:45.


Roadworks Map near to Glebe Road, STOCKTON-ON-TEES, TS21 1NB (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 20 Feb 2025 06:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Glebe Road, STOCKTON-ON-TEES, TS21 1NB (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Darlington Borough Council logo
ELSTOB LANE 
(0.5 miles)
Darlington Borough Council
Highway repair and maintenance works - Carriageway - Two-way signals
Planned
Scheduled: 21 Feb 2025
0.5
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.