View current and future planned roadworks and road closures for TS21 1HQ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Bishopton, STOCKTON-ON-TEES, TS21 1HQ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Durham County Council logo
LONG TERM
Between
8 Jan and 29 Nov 2024
Details
View Map
Share
Follow
A167 (From Rushyford Roundabout To C34 Ricknall Lane Junc)

Durham County Council are proposing to carry out Highway repair and maintenance works on A167 (From Rushyford Roundabout To C34 Ricknall Lane Junc), Newton Aycliffe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 6 Nov 2023 at 08:14.

Stockton-on-tees Borough Council logo
LONG TERM
Between
1 Jul and 24 Dec 2024
Details
View Map
Share
Follow
Durham Lane

Stockton-on-tees Borough Council are proposing to carry out Highway improvement works on Durham Lane, Elton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Stockton-on-tees Borough Council on 8 Jan 2024 at 11:06.

Northern Gas Networks logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Cleveland Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Cleveland Street, Darlington.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 08:00 and could run through until 16 December 2024. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 23 Sep 2024 at 08:32.

Northern Gas Networks logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Albert Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Albert Road, Darlington.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 08:00 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 23 Sep 2024 at 08:32.

Northern Gas Networks logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
John Street Cycleway

Northern Gas Networks are carrying out Utility repair and maintenance works on John Street Cycleway, Darlington.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 23 September 2024 at 08:00 and could run through until 16 December 2024. The works will impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 23 Oct 2024 at 11:18.

Nexfibre Networks Limited logo
Finishing
Wednesday
Details
View Map
Share
Biscop Crescent

Nexfibre Networks Limited were proposing to carry out Utility asset works on Biscop Crescent, Newton Aycliffe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 October 2024 and run through until 13 November 2024. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Nexfibre Networks Limited on 8 Oct 2024 at 10:59.

Virgin Media logo
Until
17 Nov 2024
Details
View Map
Share
Follow
Darlington Back Lane

Virgin Media are carrying out Utility asset works on Darlington Back Lane, Stockton-on-tees.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 October 2024 at 08:00 and could run through until 17 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Virgin Media on 7 Nov 2024 at 15:21.

Nexfibre Networks Limited logo
Until
27 Nov 2024
Details
View Map
Share
Follow
Greathead Crescent

Nexfibre Networks Limited are carrying out Utility asset works on Greathead Crescent, Newton Aycliffe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 November 2024 at 09:40 and could run through until 27 November 2024. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Nexfibre Networks Limited on 5 Nov 2024 at 10:09.

Nexfibre Networks Limited logo
Between
4 and 26 Nov 2024
Details
View Map
Share
Follow
Greathead Crescent

Nexfibre Networks Limited are proposing to carry out Utility asset works on Greathead Crescent, Newton Aycliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 17 Sep 2024 at 09:44.

Nexfibre Networks Limited logo
Finishing
Tomorrow
Details
View Map
Share
Biscop Crescent

Nexfibre Networks Limited were proposing to carry out Utility asset works on Biscop Crescent, Newton Aycliffe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 November 2024 and run through until 11 November 2024. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Nexfibre Networks Limited on 15 Oct 2024 at 10:20.

Nexfibre Networks Limited logo
Between
7 and 26 Nov 2024
Details
View Map
Share
Follow
Biscop Crescent

Nexfibre Networks Limited are proposing to carry out Utility asset works on Biscop Crescent, Newton Aycliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 26 November 2024. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Nexfibre Networks Limited on 17 Oct 2024 at 14:04.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Mount Pleasant

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Mount Pleasant, Stillington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 18 Sep 2024 at 07:51.

Fulcrum Pipelines logo
LONG TERM
Between
13 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Heighington Lane

Fulcrum Pipelines are proposing to carry out Utility asset works on Heighington Lane, Newton Aycliffe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Fulcrum Pipelines on 29 Oct 2024 at 12:58.

Northern Powergrid (Northeast) logo
Between
15 Jan and 14 Feb 2025
Details
View Map
Share
Albert Road

Northern Powergrid (Northeast) were proposing to carry out New service connection on Albert Road, Darlington.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 January 2025 and run through until 14 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 31 Oct 2024 at 09:21.

Northern Powergrid (Northeast) logo
Between
15 Jan and 14 Feb 2025
Details
View Map
Share
Albert Road

Northern Powergrid (Northeast) were proposing to carry out New service connection on Albert Road, Darlington.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 January 2025 and run through until 14 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 18 Oct 2024 at 12:06.


Roadworks Map near to Bishopton, STOCKTON-ON-TEES, TS21 1HQ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 10 Nov 2024 03:39
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Bishopton, STOCKTON-ON-TEES, TS21 1HQ (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)