ROADWORKS SUMMARY
Thirsk Road, YARM, TS15 9HD
Introduction
View current and future planned roadworks and road closures for Thirsk Road, TS15 9HD and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Thirsk Road, YARM, TS15 9HD
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Thirsk Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
1 Jul and 24 Dec 2024
Stockton-on-tees Borough Council are proposing to carry out Highway improvement works on Durham Lane, Elton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stockton-on-tees Borough Council on 8 Jan 2024 at 11:06.
Today
Network Rail are carrying out Works for Rail Purposes on High Church Wynd, Yarm.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 July 2024 at 07:00 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 1 Oct 2024 at 15:19.
2 Sep and 24 Dec 2024
Stockton-on-tees Borough Council are proposing to carry out Highway improvement works on Hartburn Lane, Stockton-on-tees.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stockton-on-tees Borough Council on 11 Jun 2024 at 13:09.
Monday
Northumbrian Water are carrying out Utility repair and maintenance works on Glaisdale Road, Yarm.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 October 2024 at 10:00 and could run through until 25 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northumbrian Water on 14 Nov 2024 at 10:36.
16 Dec 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Sunningdale Drive, Eaglescliffe.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 08:00 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 20 Nov 2024 at 12:25.
11 Nov and 6 Dec 2024
Energy Assets Networks (formerly Utility Distribution Networks) were proposing to carry out Utility asset works on Green Lane, Yarm.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 6 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 10 Oct 2024 at 08:46.
11 Nov and 6 Dec 2024
Energy Assets Pipelines were proposing to carry out Utility asset works on Green Lane, Yarm.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 6 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Energy Assets Pipelines on 10 Oct 2024 at 08:47.
Thursday
Northern Gas Networks are carrying out Utility repair and maintenance works on Yarm Road, Eaglescliffe.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 17:40 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 19 Nov 2024 at 08:38.
2 and 10 Dec 2024
National Highways are proposing to carry out Works for road purposes on Back Lane, Long Newton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 12 Nov 2024 at 13:20.
2 and 10 Dec 2024
National Highways are proposing to carry out Works for road purposes on Back Lane, Long Newton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 21 Nov 2024 at 14:46.
2 and 13 Dec 2024
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Hatfield Avenue, Middlesbrough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 18 Nov 2024 at 08:42.
2 and 13 Dec 2024
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Hatfield Avenue, Middlesbrough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 30 Sep 2024 at 14:38.
3 and 11 Dec 2024
National Highways are proposing to carry out Works for road purposes on Darlington Road, Long Newton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 12 Nov 2024 at 13:38.
3 and 11 Dec 2024
National Highways are proposing to carry out Works for road purposes on Darlington Road, Long Newton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 21 Nov 2024 at 14:51.
4 and 12 Dec 2024
National Highways are proposing to carry out Works for road purposes on Sandy Leas Lane, Elton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 12 Nov 2024 at 13:48.
4 and 12 Dec 2024
National Highways are proposing to carry out Works for road purposes on Sandy Leas Lane, Elton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 21 Nov 2024 at 14:49.
16 and 20 Dec 2024
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Back Street Between 2 And 4 Raby Road To Oxbridge Avenue, Stockton-on-tees.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 18 Oct 2024 at 15:38.
18 Dec 2024 and 30 Mar 2025
Middlesbrough Borough Council are proposing to carry out Highway repair and maintenance works on Stainton Way, Middlesbrough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 30 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Middlesbrough Borough Council on 26 Apr 2024 at 09:32.
6 Jan and 3 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Thorntree Road, Thornaby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 30 Sep 2024 at 07:34.
6 Jan and 15 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oxbridge Lane, Stockton-on-tees.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 15 May 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Northern Gas Networks on 4 Oct 2024 at 08:22.
6 and 27 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hampton Road, Stockton-on-tees.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 4 Oct 2024 at 08:23.
6 Jan and 24 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Richmond Road, Stockton-on-tees.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Northern Gas Networks on 4 Oct 2024 at 08:19.
6 Jan and 3 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Redcar Road, Thornaby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 27 Sep 2024 at 08:35.
13 Jan and 3 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornaby Road, Thornaby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 27 Sep 2024 at 09:29.
13 Jan and 7 Feb 2025
Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on 1825 Way, Stockton-on-tees.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 20 Sep 2024 at 13:37.
13 Jan and 3 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornaby Road, Thornaby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 27 Sep 2024 at 08:38.
13 Jan and 3 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Northumberland Road, Thornaby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 27 Sep 2024 at 08:39.
20 Jan and 24 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Eton Road, Stockton-on-tees.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Oct 2024 at 11:07.
20 Jan and 17 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Windsor Road, Stockton-on-tees.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Oct 2024 at 08:17.
20 Jan and 17 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Malvern Road, Stockton-on-tees.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 4 Oct 2024 at 08:25.
27 Jan and 24 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Humber Road, Thornaby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 Sep 2024 at 07:41.
30 Jan and 28 Feb 2025
Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Bowesfield Lane, Stockton-on-tees.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 20 Sep 2024 at 13:38.
3 Feb and 14 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Lane, Middlesbrough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 11 Nov 2024 at 09:28.
3 Feb and 14 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Lane, Middlesbrough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 29 Oct 2024 at 14:31.
3 Feb and 3 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Osborne Road, Stockton-on-tees.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Oct 2024 at 11:13.
3 Feb and 3 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Norfolk Street, Stockton-on-tees.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Oct 2024 at 12:58.
10 Feb and 7 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Redcar Road, Thornaby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 30 Sep 2024 at 10:42.
10 Feb and 3 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Access To Oxbridge Social Club From Sheraton Street And Oxbridge Lane, Stockton-on-tees.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 10 Oct 2024 at 10:39.
17 Feb and 29 Jun 2025
Middlesbrough Borough Council are proposing to carry out Highway repair and maintenance works on Low Lane, Middlesbrough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Middlesbrough Borough Council on 26 Apr 2024 at 08:13.
17 Feb and 26 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Acklam Road, Middlesbrough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 26 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 29 Oct 2024 at 14:29.
17 Feb and 26 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Acklam Road, Middlesbrough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 26 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 11 Nov 2024 at 09:44.
Roadworks Map near to Thirsk Road, YARM, TS15 9HD
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Thirsk Road, YARM, TS15 9HD (17 Events)
(Scheduled Dates)
(miles)
(Scheduled: 18 Nov 2024 - 26 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.