ROADWORKS SUMMARY
South Side, YARM, TS15 0DF

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for South Side, TS15 0DF and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to South Side, YARM, TS15 0DF

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for South Side are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Energy Assets Pipelines logo
Finishing
Friday
Details
View Map
Share
Thirsk Road

Energy Assets Pipelines were proposing to carry out Utility asset works on Thirsk Road, Kirklevington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 15 November 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Energy Assets Pipelines on 10 Oct 2024 at 08:47.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Finishing
Friday
Details
View Map
Share
Thirsk Road

Energy Assets Networks (formerly Utility Distribution Networks) were proposing to carry out Utility asset works on Thirsk Road, Kirklevington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 15 November 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 10 Oct 2024 at 08:45.

Northumbrian Water logo
Finishing
Monday
Details
View Map
Share
Follow
Glaisdale Road

Northumbrian Water are carrying out Utility repair and maintenance works on Glaisdale Road, Yarm.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 10:00 and could run through until 18 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 4 Nov 2024 at 10:10.

Energy Assets Pipelines logo
Between
11 Nov and 6 Dec 2024
Details
View Map
Share
Green Lane

Energy Assets Pipelines were proposing to carry out Utility asset works on Green Lane, Yarm.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 6 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Energy Assets Pipelines on 10 Oct 2024 at 08:47.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
11 Nov and 6 Dec 2024
Details
View Map
Share
Green Lane

Energy Assets Networks (formerly Utility Distribution Networks) were proposing to carry out Utility asset works on Green Lane, Yarm.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 6 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 10 Oct 2024 at 08:46.


Roadworks Map near to South Side, YARM, TS15 0DF

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 13 Nov 2024 00:24
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to South Side, YARM, TS15 0DF (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northumbrian Water logo
STOKESLEY ROAD 
(0.6 miles)
Northumbrian Water
Permanent reinstatement - Carriageway, Verge - Two-way signals
Planned
Scheduled: 13 Nov 2024 - 15 Nov 2024
0.6
Details
Share
Follow
2
Northumbrian Water logo
STOKESLEY ROAD 
(0.6 miles)
Northumbrian Water
Permanent reinstatement - Carriageway, Verge - Two-way signals
Planned
Scheduled: 13 Nov 2024 - 15 Nov 2024
0.6
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.