ROADWORKS SUMMARY
GUISBOROUGH, TS14 6TU
Introduction

View current and future planned roadworks and road closures for TS14 6TU and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to GUISBOROUGH, TS14 6TU
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
20 Dec 2024 and 17 Apr 2025
Northumbrian Water were proposing to carry out Utility repair and maintenance works on Stanghow Road, Lingdale.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 December 2024 and run through until 17 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 16 Dec 2024 at 16:01.
20 Dec 2024 and 17 Apr 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Stanghow Road, Lingdale.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 December 2024 and could run through until 17 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northumbrian Water on 1 Oct 2024 at 09:35.
31 Mar 2025
Northumbrian Water are carrying out Utility repair and maintenance works on Whitby Lane, Guisborough.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 10:15 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 5 Mar 2025 at 08:33.
3 May 2025
Redcar And Cleveland Borough Council are carrying out Section 50 on Longbeck Road, Marske By The Sea.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 January 2025 at 09:30 and could run through until 3 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Redcar And Cleveland Borough Council on 20 Jan 2025 at 11:03.
15 Apr 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Redcar Lane, Redcar.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 February 2025 at 08:00 and could run through until 15 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 12 Feb 2025 at 08:04.
31 Mar 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Birch Tree Close, Ormesby.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 February 2025 at 08:00 and could run through until 31 March 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Northern Gas Networks on 17 Feb 2025 at 08:18.
24 Feb and 16 May 2025
Northumbrian Water were proposing to carry out Utility repair and maintenance works on Stanghow Road, Lingdale.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 16 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 24 Feb 2025 at 12:14.
7 Apr 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Queensland Avenue, Redcar.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 March 2025 at 08:00 and could run through until 7 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 10 Mar 2025 at 09:25.
31 Mar 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on St Johns Grove, Redcar.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 March 2025 at 08:00 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 10 Mar 2025 at 09:25.
Thursday
Northumbrian Water were proposing to carry out Utility repair and maintenance works on Kilton Lane, Lingdale.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 March 2025 and run through until 27 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 17 Dec 2024 at 11:07.
Wednesday
Northern Gas Networks are carrying out Utility repair and maintenance works on Staindale, Guisborough.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 March 2025 at 14:04 and could run through until 26 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 18 Mar 2025 at 09:35.
19 Jun 2025
Northumbrian Water are carrying out Utility repair and maintenance works on Sandringham Road, Lingdale.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 March 2025 at 10:25 and could run through until 19 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 17 Mar 2025 at 11:02.
7 Apr 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on St Peters Grove, Redcar.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 March 2025 at 08:00 and could run through until 7 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 17 Mar 2025 at 09:03.
24 Mar and 4 Apr 2025
Redcar And Cleveland Borough Council are proposing to carry out Section 50 on Bevanlee Road, South Bank.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Redcar And Cleveland Borough Council on 24 Feb 2025 at 11:58.
31 Mar and 4 Apr 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Williams Street Back Street Rear Of Wharton Street, North Skelton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 18 Mar 2025 at 09:41.
31 Mar and 4 Apr 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Williams Street Back Street Rear Of Wharton Street, North Skelton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 23 Dec 2024 at 11:31.
31 Mar and 4 Apr 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Bolckow Street Back Street Joining Railway Terrace Back Street, North Skelton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 17 Mar 2025 at 15:21.
31 Mar and 4 Apr 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Bolckow Street Back Street Joining Railway Terrace Back Street, North Skelton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 23 Dec 2024 at 11:30.
1 Apr and 31 Oct 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on High Street, Great Ayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 24 Dec 2024 at 12:20.
1 Apr and 31 Oct 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Station Road, Great Ayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 31 Dec 2024 at 10:26.
1 Apr and 31 Oct 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Romany Road, Great Ayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 30 Dec 2024 at 12:21.
1 Apr and 31 Oct 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Edward Kitching Terrace, Great Ayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 24 Dec 2024 at 12:22.
1 Apr and 31 Oct 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Roseberry Crescent, Great Ayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 30 Dec 2024 at 12:20.
1 Apr and 31 Oct 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Newton Road, Great Ayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 24 Dec 2024 at 12:16.
7 Apr and 1 May 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Stanghow Road, Lingdale.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 1 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northumbrian Water on 5 Mar 2025 at 11:50.
7 Apr and 13 Jun 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Stanghow Road, Lingdale.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 13 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northumbrian Water on 21 Mar 2025 at 09:10.
17 Apr and 19 Jun 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Sandringham Road, Lingdale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 April 2025 and could run through until 19 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 6 Mar 2025 at 16:19.
17 Apr and 19 Jun 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Sandringham Road, Lingdale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 April 2025 and could run through until 19 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 9 Jan 2025 at 08:10.
5 May and 11 Jun 2025
Redcar And Cleveland Borough Council are proposing to carry out Section 50 on Marske By Pass New Marske To Redcar, Redcar.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 11 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Redcar And Cleveland Borough Council on 10 Mar 2025 at 13:23.
5 May and 11 Jun 2025
Redcar And Cleveland Borough Council are proposing to carry out Section 50 on Marske By Pass New Marske To Redcar, Redcar.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 11 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Redcar And Cleveland Borough Council on 10 Mar 2025 at 13:24.
6 and 28 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Windy Hill Lane, Marske By The Sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 28 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 26 Feb 2025 at 11:15.
6 and 28 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Windy Hill Lane, Marske By The Sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 28 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 4 Mar 2025 at 12:34.
6 and 28 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Zetland Road, Marske By The Sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 28 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 26 Feb 2025 at 11:18.
6 and 28 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Zetland Road, Marske By The Sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 28 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 4 Mar 2025 at 12:33.
6 May and 6 Jun 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Kilton Lane, Lingdale.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 6 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northumbrian Water on 7 Mar 2025 at 15:07.
19 May and 15 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Yew Tree Avenue, Redcar.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 15 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 6 Feb 2025 at 09:21.
9 and 20 Jun 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Stanghow Road, Lingdale.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 11 Mar 2025 at 11:18.
16 Jun and 18 Jul 2025
Northumbrian Water were proposing to carry out Utility repair and maintenance works on Balmoral Road, Lingdale.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 June 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 14 Mar 2025 at 13:38.
16 Jun and 18 Jul 2025
Northumbrian Water were proposing to carry out Utility repair and maintenance works on Balmoral Road, Lingdale.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 June 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 12 Mar 2025 at 10:49.
16 Jun and 18 Jul 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Balmoral Road, Lingdale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 14 Mar 2025 at 14:22.
16 Jun and 21 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on West Dyke Road, Redcar.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 5 Feb 2025 at 16:07.
Roadworks Map near to GUISBOROUGH, TS14 6TU
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to GUISBOROUGH, TS14 6TU (2 Events)
(Scheduled Dates)
(miles)
(Scheduled: 6 Jan 2025 - 31 Mar 2025)
(Scheduled: 20 Mar 2025 - 28 Mar 2025)