ROADWORKS SUMMARY
Longbeck Estate, REDCAR, TS11 6HH

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Longbeck Estate, TS11 6HH and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Longbeck Estate, REDCAR, TS11 6HH

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Longbeck Estate are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Northumbrian Water logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
High Street

Northumbrian Water are carrying out Utility repair and maintenance works on High Street, Boosbeck.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 17:00 and could run through until 28 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 21 Nov 2024 at 13:42.

Northern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Derwent Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Derwent Road, Skelton-in-cleveland.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 08:00 and could run through until 2 December 2024. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 08:26.

Northern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Birchington Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Birchington Avenue, Eston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 9 Aug 2024 at 13:55.

Northern Gas Networks logo
LONG TERM
Between
14 Oct and 16 Dec 2024
Details
View Map
Share
Follow
Derwent Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Derwent Road, Skelton-in-cleveland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 16 December 2024. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 25 Jul 2024 at 09:46.

Northern Gas Networks logo
LONG TERM
Between
21 Oct and 16 Dec 2024
Details
View Map
Share
Follow
Ullswater Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ullswater Drive, Skelton-in-cleveland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 26 Jul 2024 at 08:35.

Northern Gas Networks logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Fabian Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Fabian Road, Eston.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 October 2024 at 08:00 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 25 Oct 2024 at 09:07.

Northern Gas Networks logo
LONG TERM
Between
28 Oct and 9 Dec 2024
Details
View Map
Share
Follow
Fabian Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Fabian Road, Eston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 4 Sep 2024 at 11:01.

Northern Gas Networks logo
LONG TERM
Until
9 Dec 2024
Details
View Map
Share
Follow
Coniston Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Coniston Road, Skelton-in-cleveland.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 9 December 2024. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 25 Nov 2024 at 10:26.

Northumbrian Water logo
LONG TERM
Between
1 Nov 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Balmoral Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Balmoral Road, Lingdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 1 Oct 2024 at 09:33.

Northern Gas Networks logo
LONG TERM
Between
11 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Coniston Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Coniston Road, Skelton-in-cleveland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 26 Jul 2024 at 08:46.

Northumbrian Water logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Front Street Back Street Rear Of Back Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Front Street Back Street Rear Of Back Street, Charltons.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 4 Oct 2024 at 13:23.

Northumbrian Water logo
LONG TERM
Until
30 Dec 2024
Details
View Map
Share
Follow
Front Street Back Street Rear Of Back Street

Northumbrian Water are carrying out Utility repair and maintenance works on Front Street Back Street Rear Of Back Street, Charltons.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 08:00 and could run through until 30 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 15 Nov 2024 at 08:59.

Northumbrian Water logo
Until
10 Dec 2024
Details
View Map
Share
Follow
Front Street

Northumbrian Water are carrying out Utility repair and maintenance works on Front Street, Charltons.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 08:00 and could run through until 10 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 25 Nov 2024 at 10:43.

Northern Gas Networks logo
LONG TERM
Between
18 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Farndale Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Farndale Drive, Guisborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 7 Nov 2024 at 13:51.

Northern Gas Networks logo
Between
18 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Marske Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Marske Lane, Skelton-in-cleveland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 26 Jul 2024 at 08:42.

Northern Gas Networks logo
Until
11 Dec 2024
Details
View Map
Share
Follow
Marske Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Marske Lane, Skelton-in-cleveland.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 08:00 and could run through until 11 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 25 Nov 2024 at 09:49.

Northern Gas Networks logo
Between
25 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Farndale Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Farndale Drive, Guisborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 8 Nov 2024 at 12:47.

Northern Gas Networks logo
LONG TERM
Between
25 Nov 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Brotton Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Brotton Road, Carlin How.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 16 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 24 Sep 2024 at 09:36.

Northern Gas Networks logo
LONG TERM
Until
16 Jan 2025
Details
View Map
Share
Follow
Brotton Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Brotton Road, Carlin How.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 08:00 and could run through until 16 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 25 Nov 2024 at 09:00.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
High Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on High Street, Marske By The Sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 27 Sep 2024 at 14:37.

Northumbrian Water logo
Until
6 Dec 2024
Details
View Map
Share
Follow
High Street

Northumbrian Water are carrying out Utility repair and maintenance works on High Street, Marske By The Sea.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:45 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 27 Nov 2024 at 15:18.

Northern Gas Networks logo
LONG TERM
Until
10 Jan 2025
Details
View Map
Share
Follow
Grasmere Crescent

Northern Gas Networks are carrying out Utility repair and maintenance works on Grasmere Crescent, Skelton-in-cleveland.

These works are categorised as Major.

The works started on 26 November 2024 at 12:00 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 26 Nov 2024 at 13:12.

Northumbrian Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
High Street

Northumbrian Water are proposing to carry out Permanent reinstatement on High Street, Redcar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 14 Nov 2024 at 16:00.

Northern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
The Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, Guisborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 7 Nov 2024 at 13:50.

Northern Gas Networks logo
LONG TERM
Between
2 Dec 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Grasmere Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Grasmere Crescent, Skelton-in-cleveland.

These works are categorised as Major.

The works will start on or after 2 December 2024 and could run through until 16 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 26 Jul 2024 at 08:40.

Northern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
The Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, Guisborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 8 Nov 2024 at 12:49.

Northern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Coniston Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Coniston Road, Skelton-in-cleveland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 26 Jul 2024 at 08:48.

Northumbrian Water logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
South Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on South Terrace, Skelton-in-cleveland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 25 Nov 2024 at 15:00.

Northumbrian Water logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
South Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on South Terrace, Skelton-in-cleveland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 30 Oct 2024 at 16:21.

Northumbrian Water logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Errington Street Back Street Rear Of Jackson Street North

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Errington Street Back Street Rear Of Jackson Street North, Brotton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 27 Nov 2024 at 11:04.

Northumbrian Water logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Errington Street Back Street Rear Of Jackson Street North

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Errington Street Back Street Rear Of Jackson Street North, Brotton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 1 Nov 2024 at 10:21.

Northumbrian Water logo
LONG TERM
Between
20 Dec 2024 and 17 Apr 2025
Details
View Map
Share
Follow
Stanghow Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Stanghow Road, Lingdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 December 2024 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 27 Nov 2024 at 11:05.

Northumbrian Water logo
LONG TERM
Between
20 Dec 2024 and 17 Apr 2025
Details
View Map
Share
Follow
Stanghow Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Stanghow Road, Lingdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 December 2024 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 1 Oct 2024 at 09:35.

Northern Gas Networks logo
LONG TERM
Between
6 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Coniston Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Coniston Road, Skelton-in-cleveland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 9 Aug 2024 at 13:32.

Northern Powergrid (Northeast) logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Durham Road

Northern Powergrid (Northeast) were proposing to carry out New service connection on Durham Road, Eston.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 31 Oct 2024 at 09:20.

Northumbrian Water logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Balmoral Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Balmoral Road, Lingdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 13 Nov 2024 at 12:59.

Northern Powergrid (Northeast) logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Winston Drive

Northern Powergrid (Northeast) are proposing to carry out New service connection on Winston Drive, Eston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 6 Nov 2024 at 13:02.

Northern Gas Networks logo
LONG TERM
Between
6 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Windermere Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Windermere Drive, Skelton-in-cleveland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 21 Aug 2024 at 12:06.

Northumbrian Water logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Rosedale Crescent

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Rosedale Crescent, Guisborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 1 Nov 2024 at 08:59.

Northern Gas Networks logo
LONG TERM
Between
13 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Redcar Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Redcar Lane, Redcar.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 23 Oct 2024 at 14:32.

Northern Gas Networks logo
LONG TERM
Between
13 Jan and 17 Feb 2025
Details
View Map
Share
Follow
St Thomas Grove

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Thomas Grove, Redcar.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 Oct 2024 at 09:19.

Redcar And Cleveland Borough Council logo
LONG TERM
Between
14 Jan and 3 May 2025
Details
View Map
Share
Follow
Longbeck Road

Redcar And Cleveland Borough Council are proposing to carry out Section 50 on Longbeck Road, Marske By The Sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 3 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Redcar And Cleveland Borough Council on 28 Oct 2024 at 14:56.

Northern Gas Networks logo
Between
20 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Borough Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Borough Road, Redcar.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 23 Oct 2024 at 14:19.

Northumbrian Water logo
LONG TERM
Between
21 Jan and 22 Feb 2025
Details
View Map
Share
Follow
Sandringham Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Sandringham Road, Lingdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 1 Oct 2024 at 09:36.

Northern Gas Networks logo
Between
27 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Victoria Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Redcar.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 22 Oct 2024 at 12:53.

Northern Gas Networks logo
Between
27 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Queensland Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Queensland Avenue, Redcar.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 23 Oct 2024 at 13:49.

Northern Gas Networks logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Marske Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Marske Lane, Skelton-in-cleveland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Northern Gas Networks on 12 Sep 2024 at 11:46.

Northern Gas Networks logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Marske Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Marske Lane, Skelton-in-cleveland.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Northern Gas Networks on 22 Aug 2024 at 15:15.

Northern Gas Networks logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Town Green

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Town Green, Skelton-in-cleveland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 6 Aug 2024 at 10:30.

Redcar And Cleveland Borough Council logo
LONG TERM
Between
3 Feb and 29 Aug 2025
Details
View Map
Share
Follow
Trunk Road

Redcar And Cleveland Borough Council are proposing to carry out Section 50 on Trunk Road, Redcar.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 29 August 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Redcar And Cleveland Borough Council on 6 Nov 2024 at 16:22.

Northern Gas Networks logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
St Johns Grove

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Johns Grove, Redcar.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 23 Oct 2024 at 14:34.

Northern Gas Networks logo
Between
10 Feb and 3 Mar 2025
Details
View Map
Share
Follow
St Peters Grove

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Peters Grove, Redcar.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 22 Oct 2024 at 10:43.

Northern Gas Networks logo
Between
17 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Aske Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Aske Road, Redcar.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 10 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 22 Oct 2024 at 10:58.

Northern Gas Networks logo
Between
17 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Ings Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ings Road, Redcar.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 10 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 23 Oct 2024 at 14:35.


Roadworks Map near to Longbeck Estate, REDCAR, TS11 6HH

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Nov 2024 21:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Longbeck Estate, REDCAR, TS11 6HH (5 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northern Powergrid (Northeast) logo
MAJOR
  
FIR RIGG DRIVE 
(0.3 miles)
Northern Powergrid (Northeast)
Utility asset works - Footway, Carriageway - Give and take
Cancelled
(Scheduled: 11 Nov 2024 - 29 Nov 2024)
0.3
Details
Share
2
Northern Powergrid (Northeast) logo
MAJOR
  
FIR RIGG DRIVE 
(0.3 miles)
Northern Powergrid (Northeast)
Utility asset works - Footway, Carriageway - Give and take
Cancelled
(Scheduled: 11 Nov 2024 - 29 Nov 2024)
0.3
Details
Share
3
Northumbrian Water logo
MAJOR
  
HIGH STREET 
(0.4 miles)
Northumbrian Water
Utility repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 25 Nov 2024 - 29 Nov 2024
0.4
Details
Share
Follow
4
Northumbrian Water logo
MAJOR
  
HIGH STREET 
(0.4 miles)
Northumbrian Water
Utility repair and maintenance works - Carriageway - Two-way signals
In Progress
Since: 25 Nov 2024 09:45
(Scheduled: 25 Nov 2024 - 6 Dec 2024)
0.4
Details
Share
Follow
5
BT logo
HUMMERSHILL LANE 
(0.8 miles)
BT
New service connection - Footway, Verge - Give and take
Planned
Scheduled: 28 Nov 2024 - 2 Dec 2024
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.