ROADWORKS SUMMARY
Meadowsweet Road, REDCAR, TS10 5BB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Meadowsweet Road, TS10 5BB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Meadowsweet Road, REDCAR, TS10 5BB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Meadowsweet Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Redcar And Cleveland Borough Council logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
North Loop Road

Redcar And Cleveland Borough Council are carrying out Section 50 on North Loop Road, Grangetown.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:15 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Redcar And Cleveland Borough Council on 17 Sep 2025 at 09:24.

Northern Powergrid (Northeast) logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Ainstable Road

Northern Powergrid (Northeast) are carrying out Utility asset works on Ainstable Road, Ormesby.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 June 2025 at 14:30 and could run through until 19 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 2 Sep 2025 at 12:49.

Northern Powergrid (Northeast) logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Covent Close

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Covent Close, Normanby.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 19 June 2025 and could run through until 24 September 2025. The works will impact the verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Powergrid (Northeast) on 14 May 2025 at 13:30.

Redcar And Cleveland Borough Council logo
LONG TERM
Until
6 Oct 2025
Details
View Map
Share
Follow
Old Middlesbrough Road

Redcar And Cleveland Borough Council are carrying out Section 50 on Old Middlesbrough Road, South Bank.

These works are categorised as Major.

The works started on 14 July 2025 at 08:00 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Redcar And Cleveland Borough Council on 9 Sep 2025 at 16:57.

Northern Gas Networks logo
LONG TERM
Between
23 Jul and 19 Nov 2025
Details
View Map
Share
Follow
Church Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Lane, Eston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 19 November 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 15 May 2025 at 10:26.

Redcar And Cleveland Borough Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Fabian Road

Redcar And Cleveland Borough Council are proposing to carry out Highway repair and maintenance works on Fabian Road, Eston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Redcar And Cleveland Borough Council on 29 Apr 2025 at 15:37.

Redcar And Cleveland Borough Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Normanby Road

Redcar And Cleveland Borough Council are proposing to carry out Highway repair and maintenance works on Normanby Road, Normanby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Redcar And Cleveland Borough Council on 29 Apr 2025 at 15:37.

Northern Powergrid (Northeast) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Covent Close

Northern Powergrid (Northeast) are carrying out Utility asset works on Covent Close, Normanby.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 29 August 2025 at 12:30 and could run through until 24 September 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Powergrid (Northeast) on 29 Aug 2025 at 13:54.

Electricity Network Company logo
Between
8 and 26 Sep 2025
Details
View Map
Share
Follow
Bolckow Road

Electricity Network Company are proposing to carry out Utility asset works on Bolckow Road, Grangetown.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Electricity Network Company on 5 Aug 2025 at 11:17.

Electricity Network Company logo
Between
8 and 26 Sep 2025
Details
View Map
Share
Follow
Church Lane

Electricity Network Company are proposing to carry out Utility asset works on Church Lane, Grangetown.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Electricity Network Company on 5 Aug 2025 at 11:16.

Northern Gas Networks logo
LONG TERM
Until
7 Jan 2026
Details
View Map
Share
Follow
Church Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Church Lane, Eston.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 12:00 and could run through until 7 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 8 Sep 2025 at 12:00.

Northern Gas Networks logo
Until
30 Sep 2025
Details
View Map
Share
Follow
High Street

Northern Gas Networks are carrying out Utility repair and maintenance works on High Street, Eston.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 16:00 and could run through until 30 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 15 Sep 2025 at 16:01.

Northern Gas Networks logo
Between
10 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Albert Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Albert Road, Eston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 May 2025 at 10:27.

Northumbrian Water logo
Finishing
Today
Details
View Map
Share
Follow
Dale Street

Northumbrian Water are carrying out Utility repair and maintenance works on Dale Street, New Marske.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2025 at 10:24 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 12 Sep 2025 at 10:31.

Redcar And Cleveland Borough Council logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Stokesley Road

Redcar And Cleveland Borough Council were proposing to carry out Highway repair and maintenance works on Stokesley Road, Guisborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Redcar And Cleveland Borough Council on 12 Sep 2025 at 12:08.

Redcar And Cleveland Borough Council logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Stokesley Road

Redcar And Cleveland Borough Council are proposing to carry out Highway repair and maintenance works on Stokesley Road, Guisborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Redcar And Cleveland Borough Council on 18 Jun 2025 at 11:14.

Northern Gas Networks logo
Between
17 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Lastingham Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lastingham Avenue, Eston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 8 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 15 Sep 2025 at 15:15.

Northern Gas Networks logo
Between
17 Sep and 15 Oct 2025
Details
View Map
Share
Follow
Churchill Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Churchill Road, Eston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Sep 2025 at 15:10.

Northern Gas Networks logo
LONG TERM
Between
22 Sep and 24 Nov 2025
Details
View Map
Share
Follow
Park Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Avenue, Redcar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 10 Sep 2025 at 16:53.

Northern Gas Networks logo
LONG TERM
Between
22 Sep and 24 Nov 2025
Details
View Map
Share
Follow
Park Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Avenue, Redcar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 27 Aug 2025 at 14:10.

Redcar And Cleveland Borough Council logo
LONG TERM
Between
22 Sep and 19 Dec 2025
Details
View Map
Share
Follow
Trunk Road

Redcar And Cleveland Borough Council are proposing to carry out Section 50 on Trunk Road, Redcar.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Redcar And Cleveland Borough Council on 10 Sep 2025 at 10:46.

Redcar And Cleveland Borough Council logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Marquand Road

Redcar And Cleveland Borough Council are proposing to carry out Section 50 on Marquand Road, South Bank.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Redcar And Cleveland Borough Council on 21 Aug 2025 at 11:11.

Redcar And Cleveland Borough Council logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Bevanlee Road

Redcar And Cleveland Borough Council are proposing to carry out Section 50 on Bevanlee Road, South Bank.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Redcar And Cleveland Borough Council on 21 Aug 2025 at 11:18.

Redcar And Cleveland Borough Council logo
Between
2 and 31 Oct 2025
Details
View Map
Share
Follow
Marquand Road

Redcar And Cleveland Borough Council are proposing to carry out Section 50 on Marquand Road, South Bank.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Redcar And Cleveland Borough Council on 9 Sep 2025 at 16:39.

Redcar And Cleveland Borough Council logo
Between
2 and 31 Oct 2025
Details
View Map
Share
Follow
Bevanlee Road

Redcar And Cleveland Borough Council are proposing to carry out Section 50 on Bevanlee Road, South Bank.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Redcar And Cleveland Borough Council on 9 Sep 2025 at 16:41.

Northern Gas Networks logo
Between
6 and 27 Oct 2025
Details
View Map
Share
Follow
Bylands Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bylands Road, Eston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 Aug 2025 at 12:51.

Redcar And Cleveland Borough Council logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
High Street

Redcar And Cleveland Borough Council are proposing to carry out Highway repair and maintenance works on High Street, Eston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Redcar And Cleveland Borough Council on 29 Apr 2025 at 15:29.

Redcar And Cleveland Borough Council logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Normanby Road

Redcar And Cleveland Borough Council are proposing to carry out Highway repair and maintenance works on Normanby Road, Normanby.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Redcar And Cleveland Borough Council on 3 Sep 2025 at 16:18.

Redcar And Cleveland Borough Council logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Normanby Road

Redcar And Cleveland Borough Council are proposing to carry out Highway repair and maintenance works on Normanby Road, Normanby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Redcar And Cleveland Borough Council on 27 Mar 2025 at 08:51.

Redcar And Cleveland Borough Council logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
High Street

Redcar And Cleveland Borough Council are proposing to carry out Highway repair and maintenance works on High Street, Eston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Redcar And Cleveland Borough Council on 1 May 2025 at 15:50.

Northern Gas Networks logo
LONG TERM
Between
13 Oct and 24 Nov 2025
Details
View Map
Share
Follow
Maple Square

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Maple Square, Redcar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 24 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 1 Sep 2025 at 16:05.

Northern Gas Networks logo
Between
13 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Albert Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Albert Road, Eston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 26 Aug 2025 at 10:25.

Northern Gas Networks logo
LONG TERM
Between
20 Oct and 1 Dec 2025
Details
View Map
Share
Follow
Beech Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Beech Avenue, Redcar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Sep 2025 at 16:04.

Electricity Network Company logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Bolckow Road

Electricity Network Company are proposing to carry out Utility asset works on Bolckow Road, Grangetown.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Electricity Network Company on 16 Sep 2025 at 08:39.

Electricity Network Company logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Bolckow Road

Electricity Network Company are proposing to carry out Utility asset works on Bolckow Road, Grangetown.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Electricity Network Company on 10 Sep 2025 at 17:03.

Redcar And Cleveland Borough Council logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Church Lane

Redcar And Cleveland Borough Council are proposing to carry out Highway repair and maintenance works on Church Lane, Guisborough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Redcar And Cleveland Borough Council on 1 May 2025 at 15:50.

Redcar And Cleveland Borough Council logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Church Lane

Redcar And Cleveland Borough Council are proposing to carry out Highway repair and maintenance works on Church Lane, Guisborough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Redcar And Cleveland Borough Council on 29 Apr 2025 at 15:28.

Northern Gas Networks logo
Between
29 Oct and 26 Nov 2025
Details
View Map
Share
Follow
Fabian Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Fabian Road, Eston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 26 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 15 May 2025 at 10:27.

Northern Gas Networks logo
Between
29 Oct and 26 Nov 2025
Details
View Map
Share
Follow
Fabian Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Fabian Road, Teesville.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 26 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 13 May 2025 at 10:26.

Northern Gas Networks logo
LONG TERM
Between
5 Nov 2025 and 5 Jan 2026
Details
View Map
Share
Follow
Church Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Lane, Grangetown.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 5 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 14 May 2025 at 13:56.

Northern Gas Networks logo
LONG TERM
Between
10 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Lorton Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lorton Road, Redcar.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Sep 2025 at 14:31.

Northern Gas Networks logo
LONG TERM
Between
10 Nov and 15 Dec 2025
Details
View Map
Share
Follow
West Dyke Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on West Dyke Road, Redcar.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Sep 2025 at 13:09.

Northern Gas Networks logo
LONG TERM
Between
1 and 31 Dec 2025
Details
View Map
Share
Follow
West Dyke Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on West Dyke Road, Redcar.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 31 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Sep 2025 at 13:56.

Northern Gas Networks logo
LONG TERM
Between
3 Dec 2025 and 12 Jan 2026
Details
View Map
Share
Follow
Gofton Place

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gofton Place, Grangetown.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2025 and could run through until 12 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 14 May 2025 at 14:45.


Roadworks Map near to Meadowsweet Road, REDCAR, TS10 5BB (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 18 Sep 2025 22:33
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Meadowsweet Road, REDCAR, TS10 5BB (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
WHITSTABLE GARDENS 
(0.1 miles)
BT
New service connection - Footway - Give and take
Complete
16 Sep 2025 12:24 - 15:58
0.1
Details
Share
2
Virgin Media logo
KIRKLEATHAM LANE 
(0.6 miles)
Virgin Media
Utility asset works - Footway - Two-way signals
Cancelled
(Scheduled: 18 Sep 2025 - 22 Sep 2025)
0.6
Details
Share
3
Northern Powergrid (Northeast) logo
URGENT
  
KESWICK ROAD 
(0.7 miles)
Northern Powergrid (Northeast)
Utility repair and maintenance works - Footway, Carriageway - Give and take
Complete
15 Sep 2025 09:15 - 16 Sep 2025 14:01
0.7
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.