ROADWORKS SUMMARY
Fairmead, REDCAR, TS10 4QE

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Fairmead, TS10 4QE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to Fairmead, REDCAR, TS10 4QE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Fairmead are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Redcar And Cleveland Borough Council logo
LONG TERM
Until
30 May 2024
Details
View Map
Share
Follow
Bridgend Close

Redcar And Cleveland Borough Council are carrying out Section 50 on Bridgend Close, Grangetown.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 January 2024 at 08:44 and could run through until 30 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Redcar And Cleveland Borough Council on 25 Apr 2024 at 07:45.

Redcar And Cleveland Borough Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Avondale Close

Redcar And Cleveland Borough Council are carrying out Section 50 on Avondale Close, Grangetown.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 March 2024 at 09:00 and could run through until 3 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Redcar And Cleveland Borough Council on 18 Apr 2024 at 09:27.

Northern Gas Networks logo
LONG TERM
Until
16 May 2024
Details
View Map
Share
Follow
Corporation Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Corporation Road, Redcar.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 08:00 and could run through until 16 May 2024. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Northern Gas Networks on 4 Apr 2024 at 09:32.

Redcar And Cleveland Borough Council logo
LONG TERM
Between
31 Mar and 27 Jun 2024
Details
View Map
Share
Follow
High Street

Redcar And Cleveland Borough Council are proposing to carry out Highway repair and maintenance works on High Street, Normanby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 27 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Redcar And Cleveland Borough Council on 2 Oct 2023 at 13:50.

Redcar And Cleveland Borough Council logo
LONG TERM
Until
28 Jun 2024
Details
View Map
Share
Follow
Normanby Road

Redcar And Cleveland Borough Council are carrying out Highway repair and maintenance works on Normanby Road, Normanby.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 09:00 and could run through until 28 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Redcar And Cleveland Borough Council on 2 Apr 2024 at 09:30.

Redcar And Cleveland Borough Council logo
LONG TERM
Until
28 Jun 2024
Details
View Map
Share
Follow
Cleveland Street

Redcar And Cleveland Borough Council are carrying out Highway repair and maintenance works on Cleveland Street, Normanby.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 09:00 and could run through until 28 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Redcar And Cleveland Borough Council on 2 Apr 2024 at 09:25.

Redcar And Cleveland Borough Council logo
LONG TERM
Until
28 Jun 2024
Details
View Map
Share
Follow
High Street

Redcar And Cleveland Borough Council are carrying out Highway repair and maintenance works on High Street, Normanby.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 09:00 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Redcar And Cleveland Borough Council on 2 Apr 2024 at 09:27.

Northern Gas Networks logo
Until
21 May 2024
Details
View Map
Share
Follow
Normanby Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Normanby Road, South Bank.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 April 2024 at 07:00 and could run through until 21 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 23 Apr 2024 at 07:51.

Northern Gas Networks logo
Until
22 May 2024
Details
View Map
Share
Follow
Briggs Avenue

Northern Gas Networks are carrying out Utility repair and maintenance works on Briggs Avenue, South Bank.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 April 2024 at 07:30 and could run through until 22 May 2024. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 24 Apr 2024 at 09:26.

Northern Gas Networks logo
Between
28 Apr and 14 May 2024
Details
View Map
Share
Follow
Trunk Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Trunk Road, Redcar.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 14 May 2024. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Northern Gas Networks on 11 Apr 2024 at 10:55.

Northern Gas Networks logo
Between
28 Apr and 14 May 2024
Details
View Map
Share
Follow
Corporation Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Corporation Road, Redcar.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 14 May 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 10 Apr 2024 at 11:32.

Northern Gas Networks logo
Between
28 Apr and 14 May 2024
Details
View Map
Share
Follow
Kirkleatham Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kirkleatham Lane, Redcar.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 14 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 11 Apr 2024 at 10:57.

Northern Gas Networks logo
Between
28 Apr and 14 May 2024
Details
View Map
Share
Follow
Kirkleatham Lane Trunk Road To Coatham Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kirkleatham Lane Trunk Road To Coatham Road, Redcar.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 14 May 2024. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 11 Apr 2024 at 10:55.

Northern Gas Networks logo
Between
29 Apr and 28 May 2024
Details
View Map
Share
Follow
Hampden Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hampden Street, South Bank.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 28 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 8 Apr 2024 at 15:51.

Northern Gas Networks logo
Between
1 and 22 May 2024
Details
View Map
Share
Follow
Redcar Road West

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Redcar Road West, South Bank.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 22 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 8 Apr 2024 at 15:53.

Northern Gas Networks logo
Between
1 and 22 May 2024
Details
View Map
Share
Follow
Normanby Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Normanby Road, South Bank.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 22 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 8 Apr 2024 at 15:52.

Northern Gas Networks logo
Between
12 May and 11 Jun 2024
Details
View Map
Share
Follow
Springhill

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Springhill, Ormesby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 11 June 2024. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 17 Apr 2024 at 10:48.

Northern Gas Networks logo
Between
12 May and 4 Jun 2024
Details
View Map
Share
Follow
Garsbeck Way

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Garsbeck Way, Ormesby.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 4 June 2024. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 17 Apr 2024 at 10:34.

Northern Gas Networks logo
Between
12 May and 3 Jun 2024
Details
View Map
Share
Follow
Sotherby Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Sotherby Road, South Bank.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 3 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 12 Apr 2024 at 13:14.

Northern Gas Networks logo
Between
12 and 28 May 2024
Details
View Map
Share
Follow
Thrush Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Thrush Road, Redcar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 28 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Apr 2024 at 10:54.

Northern Gas Networks logo
Between
12 May and 3 Jun 2024
Details
View Map
Share
Follow
Brunel Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Brunel Road, South Bank.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 3 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 12 Apr 2024 at 13:14.

Northumbrian Water logo
Between
19 and 23 May 2024
Details
View Map
Share
Follow
Blenheim Terrace Back Street Rear Of Victory Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Blenheim Terrace Back Street Rear Of Victory Terrace, Redcar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 23 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 26 Apr 2024 at 11:24.

Northern Powergrid (Northeast) logo
Between
19 May and 4 Jun 2024
Details
View Map
Share
Follow
Milbank Terrace

Northern Powergrid (Northeast) are proposing to carry out New service connection on Milbank Terrace, Redcar.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 4 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 17 Apr 2024 at 07:03.

Northern Gas Networks logo
LONG TERM
Between
27 May and 16 Jul 2024
Details
View Map
Share
Follow
Birch Tree Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Birch Tree Close, Ormesby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 16 July 2024. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 17 Apr 2024 at 13:04.

Northern Gas Networks logo
Between
2 Jun and 1 Jul 2024
Details
View Map
Share
Follow
Cherry Tree Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cherry Tree Close, Ormesby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 1 July 2024. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 17 Apr 2024 at 13:48.

Northern Gas Networks logo
Between
3 and 21 Jun 2024
Details
View Map
Share
Follow
Park Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Lane, Guisborough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 21 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Mar 2024 at 11:08.

Northern Gas Networks logo
Between
9 Jun and 1 Jul 2024
Details
View Map
Share
Follow
Lobelia Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lobelia Close, Ormesby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 1 July 2024. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 17 Apr 2024 at 13:32.

Northern Gas Networks logo
Between
16 Jun and 8 Jul 2024
Details
View Map
Share
Follow
Ashwood Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashwood Close, Ormesby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 8 July 2024. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 17 Apr 2024 at 14:20.

Northern Gas Networks logo
LONG TERM
Between
16 Jun and 29 Jul 2024
Details
View Map
Share
Follow
Hornbeam Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hornbeam Close, Ormesby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 29 July 2024. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 17 Apr 2024 at 14:43.

Northern Gas Networks logo
LONG TERM
Between
23 Jun and 29 Jul 2024
Details
View Map
Share
Follow
Conifer Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Conifer Close, Ormesby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 29 July 2024. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 17 Apr 2024 at 14:57.

Between
1 and 15 Jul 2024
Details
View Map
Share
Follow
College Road

Middlesbrough Borough Council are proposing to carry out Highway repair and maintenance works on College Road, Middlesbrough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 15 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Middlesbrough Borough Council on 9 Apr 2024 at 10:58.

Between
4 and 18 Jul 2024
Details
View Map
Share
Follow
Marshall Avenue

Middlesbrough Borough Council are proposing to carry out Highway repair and maintenance works on Marshall Avenue, Middlesbrough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2024 and could run through until 18 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Middlesbrough Borough Council on 12 Apr 2024 at 08:07.

Between
7 and 21 Jul 2024
Details
View Map
Share
Follow
Pallister Avenue

Middlesbrough Borough Council are proposing to carry out Highway repair and maintenance works on Pallister Avenue, Middlesbrough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 21 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Middlesbrough Borough Council on 15 Apr 2024 at 12:43.

LONG TERM
Between
18 Jul and 20 Aug 2024
Details
View Map
Share
Follow
Cargo Fleet Lane

Middlesbrough Borough Council are proposing to carry out Highway repair and maintenance works on Cargo Fleet Lane, Middlesbrough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2024 and could run through until 20 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Middlesbrough Borough Council on 26 Apr 2024 at 09:21.


Roadworks Map near to Fairmead, REDCAR, TS10 4QE

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Apr 2024 13:31
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Fairmead, REDCAR, TS10 4QE (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northumbrian Water logo
URGENT
  
RUSHPOOL CLOSE 
(0.4 miles)
Northumbrian Water
Utility repair and maintenance works - Verge, Footpath - No carriageway incursion
In Progress
Since: 25 Apr 2024 15:39
(Scheduled: 25 Apr 2024 - 30 Apr 2024)
0.4
Details
Share
Follow
2
Northern Powergrid (Northeast) logo
URGENT
  
WHEATEAR DRIVE 
(0.8 miles)
Northern Powergrid (Northeast)
Utility repair and maintenance works - Footway, Carriageway - Give and take
In Progress
Since: 25 Apr 2024 08:00
(Scheduled: 25 Apr 2024 - 30 Apr 2024)
0.8
Details
Share
Follow
3
BT logo
ARMITAGE ROAD 
(1.0 miles)
BT
Utility asset works - Footway, Verge - Give and take
Planned
Scheduled: 25 Apr 2024 - 29 Apr 2024
1.0
Details
Share
Follow