ROADWORKS SUMMARY
Brecon Drive, REDCAR, TS10 4EY
Introduction
View current and future planned roadworks and road closures for Brecon Drive, TS10 4EY and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Brecon Drive, REDCAR, TS10 4EY
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Brecon Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
30 Jun 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Cromwell Road, South Bank.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 March 2021 at 10:10 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 2 May 2024 at 08:08.
30 Jun 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Pym Street, South Bank.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 March 2021 at 08:00 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 2 May 2024 at 08:09.
30 Jun 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Scarborough Street, South Bank.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 June 2021 at 07:00 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 2 May 2024 at 08:09.
Monday
Northern Gas Networks are carrying out Utility repair and maintenance works on Coniston Road, Skelton-in-cleveland.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 08:00 and could run through until 23 December 2024. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 14:25.
Monday
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Coniston Road, Skelton-in-cleveland.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway, verge and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Gas Networks on 26 Jul 2024 at 08:46.
10 Jan 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Grasmere Crescent, Skelton-in-cleveland.
These works are categorised as Major.
The works started on 26 November 2024 at 12:00 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 26 Nov 2024 at 13:12.
Monday
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Coniston Road, Skelton-in-cleveland.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 26 Jul 2024 at 08:48.
2 Dec 2024 and 16 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Grasmere Crescent, Skelton-in-cleveland.
These works are categorised as Major.
The works will start on or after 2 December 2024 and could run through until 16 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 26 Jul 2024 at 08:40.
Tuesday
Northern Gas Networks are carrying out Utility repair and maintenance works on Coniston Road, Skelton-in-cleveland.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 16:00 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 10 Dec 2024 at 16:01.
Friday
Northumbrian Water are proposing to carry out Utility repair and maintenance works on South Terrace, Skelton-in-cleveland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 30 Oct 2024 at 16:21.
2 Jan and 20 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Coniston Road, Skelton-in-cleveland.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 20 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 13 Dec 2024 at 14:43.
2 and 23 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Town Green, Skelton-in-cleveland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 23 January 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 08:59.
6 Jan and 28 Feb 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Whitby Lane, Guisborough.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 16:12.
6 Jan and 24 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Windermere Drive, Skelton-in-cleveland.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Northern Gas Networks on 21 Aug 2024 at 12:06.
6 Jan and 24 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Coniston Road, Skelton-in-cleveland.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 9 Aug 2024 at 13:32.
6 and 24 Jan 2025
Northern Powergrid (Northeast) were proposing to carry out New service connection on Durham Road, Eston.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 31 Oct 2024 at 09:20.
6 and 24 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Durham Road, Eston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 11 Dec 2024 at 12:40.
6 and 24 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Durham Road, Eston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 4 Dec 2024 at 11:23.
6 and 24 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Winston Drive, Eston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Northeast) on 3 Dec 2024 at 15:57.
6 and 24 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on High Street, Eston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 11 Dec 2024 at 12:39.
6 and 24 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on High Street, Eston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 4 Dec 2024 at 11:22.
6 and 24 Jan 2025
Northern Powergrid (Northeast) were proposing to carry out New service connection on High Street, Eston.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 31 Oct 2024 at 09:20.
6 and 24 Jan 2025
Northern Powergrid (Northeast) were proposing to carry out New service connection on High Street, Eston.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 6 Nov 2024 at 12:47.
6 Jan and 28 Feb 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Whitby Lane, Guisborough.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 11 Dec 2024 at 10:30.
13 Jan and 17 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Thomas Grove, Redcar.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 22 Oct 2024 at 09:19.
13 Jan and 17 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Redcar Lane, Redcar.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 23 Oct 2024 at 14:32.
14 Jan and 3 May 2025
Redcar And Cleveland Borough Council are proposing to carry out Section 50 on Longbeck Road, Marske By The Sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 3 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Redcar And Cleveland Borough Council on 28 Oct 2024 at 14:56.
20 Jan and 10 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Borough Road, Redcar.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 23 Oct 2024 at 14:19.
27 Jan and 17 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Redcar.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 22 Oct 2024 at 12:53.
27 Jan and 24 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Queensland Avenue, Redcar.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 23 Oct 2024 at 13:49.
3 and 24 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Johns Grove, Redcar.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 23 Oct 2024 at 14:34.
3 and 24 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Marske Lane, Skelton-in-cleveland.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Northern Gas Networks on 22 Aug 2024 at 15:15.
3 Feb and 29 Aug 2025
Redcar And Cleveland Borough Council are proposing to carry out Section 50 on Trunk Road, Redcar.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 29 August 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Redcar And Cleveland Borough Council on 6 Nov 2024 at 16:22.
3 and 24 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Town Green, Skelton-in-cleveland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Northern Gas Networks on 6 Aug 2024 at 10:30.
3 and 24 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Marske Lane, Skelton-in-cleveland.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Northern Gas Networks on 12 Sep 2024 at 11:46.
10 Feb and 3 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Peters Grove, Redcar.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 22 Oct 2024 at 10:43.
17 Feb and 10 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Aske Road, Redcar.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 10 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 22 Oct 2024 at 10:58.
17 Feb and 10 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ings Road, Redcar.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 10 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 23 Oct 2024 at 14:35.
Roadworks Map near to Brecon Drive, REDCAR, TS10 4EY
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Brecon Drive, REDCAR, TS10 4EY (2 Events)
(Scheduled Dates)
(miles)
(Scheduled: 14 Dec 2024 - 20 Dec 2024)