ROADWORKS SUMMARY
West Terrace, REDCAR, TS10 1DS
Introduction
View current and future planned roadworks and road closures for West Terrace, TS10 1DS and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to West Terrace, REDCAR, TS10 1DS
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for West Terrace are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
6 and 24 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Winston Drive, Eston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Northeast) on 3 Dec 2024 at 15:57.
6 and 24 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Durham Road, Eston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 4 Dec 2024 at 11:23.
6 and 24 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Durham Road, Eston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 11 Dec 2024 at 12:40.
6 and 24 Jan 2025
Northern Powergrid (Northeast) were proposing to carry out New service connection on Durham Road, Eston.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 31 Oct 2024 at 09:20.
13 Jan and 17 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Redcar Lane, Redcar.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 23 Oct 2024 at 14:32.
13 Jan and 17 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Thomas Grove, Redcar.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 22 Oct 2024 at 09:19.
14 Jan and 3 May 2025
Redcar And Cleveland Borough Council are proposing to carry out Section 50 on Longbeck Road, Marske By The Sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 3 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Redcar And Cleveland Borough Council on 28 Oct 2024 at 14:56.
20 Jan and 10 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Borough Road, Redcar.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 23 Oct 2024 at 14:19.
27 Jan and 17 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Redcar.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 22 Oct 2024 at 12:53.
27 Jan and 24 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Queensland Avenue, Redcar.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 23 Oct 2024 at 13:49.
3 Feb and 29 Aug 2025
Redcar And Cleveland Borough Council are proposing to carry out Section 50 on Trunk Road, Redcar.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 29 August 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Redcar And Cleveland Borough Council on 6 Nov 2024 at 16:22.
3 and 24 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Johns Grove, Redcar.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 23 Oct 2024 at 14:34.
10 Feb and 3 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Peters Grove, Redcar.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 22 Oct 2024 at 10:43.
17 Feb and 10 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Aske Road, Redcar.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 10 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 22 Oct 2024 at 10:58.
17 Feb and 10 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ings Road, Redcar.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 10 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 23 Oct 2024 at 14:35.
Roadworks Map near to West Terrace, REDCAR, TS10 1DS
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to West Terrace, REDCAR, TS10 1DS (5 Events)
(Scheduled Dates)
(miles)
(Scheduled: 13 Dec 2024 - 24 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.